                                     CHAPTER 1 – INTRODUCTION


1. Purpose

This manual is intended to present an overview of basic requirements, procedures, and
other essential information as a guide for South Atlantic Division personnel concerning
aspects of the administration of construction contracts. This manual is also available
electronically at:

http://www.sam.usace.army.mil/cd/SAD/DM 1110-1-1/dm1110-1-1.htm

This manual does not supersede the requirements of law, governing regulations, or the
specific provisions of contracts. This manual cannot cover all possible conditions and
requirements that may develop in administering construction contracts, but rather is
intended to furnish information of a practical nature. When the manual does not provide
appropriate or complete guidance for a particular or unique situation, personnel shall
exercise their best professional judgment in close coordination with all relevant District
Office elements.


2. Applicability

All personnel of the South Atlantic Division, Corps of Engineers, who are involved in
the administration of construction contracts, should use this manual as a resource guide
and tool.


3. References

      FAR, DFARS, AFARS, EFARS
      ER 5-1-11, U.S. Army Corps of Engineers Business Process (HQUSACE)
      USACE Project Management Business Process Manual
      USACE Quality Management System (QMS)
      USACE Centers of Standardization (COS) Website

                                                                 1-1
        This printed copy is for “Information Only.” The controlled version resides on the SAD Contract Administration Website.
Apr 2010                              Contract Administration Manual                                           SADDM 1110-1-1


4. Related Documents

      SAD QMS Website
      SAD Regional Contracting Center Website
      SAD Construction Portal
      SAD Quality Assurance Manual
      SAD Lessons Learned/Construction Bulletins
      SAD Safety Success Program

5. Definitions

Definitions of terms used are as shown in Appendix A.


6. Responsibilities

(1) The established command channel in the Corps of Engineers is from the Office of the
Chief of Engineers (HQUSACE) to the Division Commander (SAD), to the District
Commander, to the Division Chief, to the Area/Resident Engineer.

(2) The Chief, Construction Division, is the staff supervisor for Area/Resident Offices
and is generally responsible for staff supervision and coordination of all Area/Resident
Office functions, including organization, cost control, staffing, assignments, and
administrative actions.

(3) The Area/Resident Engineer is responsible for the overall administration of all
construction contracts assigned to their office.

(4) Contracting Officer (KO) is the person with the authority to enter into, administer,
and/or terminate contracts and make related determinations and findings.

(5) Administrative Contracting Officer (ACO) may perform any of the contract
administration functions in FAR 42.302, subject to the limitations in their Certificate of
Appointment on assigned contracts and consistent with their Warrant.

(6) Contracting Officer's Representative (COR) is appointed by the Contracting Officer.
CORs perform those functions specifically designated in their letter of appointment,

                                                                  1-2
         This printed copy is for “Information Only.” The controlled version resides on the SAD Contract Administration Website.
Apr 2010                             Contract Administration Manual                                           SADDM 1110-1-1


however in no instance may a COR make any commitments or changes affecting price,
quality, quantity, delivery, or other terms and conditions of a contract.

(7) Project Manager (PM) is the leader of the project delivery team (PDT) who must
seamlessly integrate USACE efforts to deliver the best possible solution for the
customer. The PM manages all project resources, information and commitments,
facilitates the PDT toward effective project development and execution, and is the
customer’s primary interface within the Corps. This approach is consistent with the
definition of “project manager” found in ER 5-1-11: “Assigned to achieve the project
objectives, the person who manages scope, schedule, quality and budget while leading a
project delivery team. Project managers may be assigned to any organizational or
geographic element.”


7. Procedure

See SADDM 1110-1-1 for specific procedures.


8. Records and Measurements

See SADDM 1110-1-1 for specific records/forms.


9. Attachments

See SADDM 1110-1-1 for specific attachments.


10. Flow Charts

See SADDM 1110-1-1 for specific attachments.

11. Revision History

(1) PDT will meet on an annual basis or more frequently as the need arises. PDT will
post added or revised pages to the manual on the website.


                                                                 1-3
        This printed copy is for “Information Only.” The controlled version resides on the SAD Contract Administration Website.
Apr 2010                               Contract Administration Manual                                           SADDM 1110-1-1


http://www.sam.usace.army.mil/cd/SAD/DM 1110-1-1/dm1110-1-1.htm

Revisions will be numbered in sequence, starting with Revision 1, and the date of the
revision indicated. The rewritten material or additions will be by the entire chapter or
section revised and the month and year of the change will be placed in the header/footer
of the chapter or section where applicable.

(2) It will be the responsibility of each individual to check the website for the most
current version and/or changes to the manual.

(3) All individuals using this manual are encouraged to submit recommendations to
improve the manual directly to the PDT:

                Browder, Gary W SAM                                             251-690-2916
                Chevres, Roberto J SAJ                                          904-232-3278
                Lynch, Dennis V SAW                                             910-251-4642
                Moore, Mary M. SAM                                              251-690-2894
                Cagle, Robert L SAS                                             910-303-9948
                Weston, Susan K SAS                                             912-652-5140
                Williams, Patricia G SAS                                        912-652-5419
                Billard, William D., SAS                                        912-652-5096
                Brasfield, David C SAM                                          251-690-2493
                Livasy, Jeff, SAC                                               843-329-8062
                Corbin, Mary M, SAS                                             912-652-5301
                Bentley, Stephen D SAD                                          404-562-5245




  Revision            Revision                                    Description of Revisions
   Level                Date
  Original            Jun 2006            First issue of SADDM 1110-1-1
      1               Mar 2007 Revision 1 to incorporate SAD & POA Comments
                               Revision 2 to incorporate SAD, POD and SWD
      2               Mar 2008
                               comments.

                                                                   1-4
          This printed copy is for “Information Only.” The controlled version resides on the SAD Contract Administration Website.
Apr 2010                              Contract Administration Manual                                           SADDM 1110-1-1


     3              May 2009 Revision 3 to incorporate SAD and POD comments.
                             Revision 4 to incorporate USACE/SAD QMS
     4              Apr 2010 Enterprise Standards and SAD Comments.




                                                                  1-5
         This printed copy is for “Information Only.” The controlled version resides on the SAD Contract Administration Website.