					PROPOSED BILL OF QUANTITY FOR DUPLEX                                         YEMTECHCONSTRUCTION.COM




    ELEMENT NO 1
    SUBSTRUCTURE
    (ALL PROVISIONAL)
    EXCAVATION AND EARTHWORK

 A Clear entire site of bushes shrubs,trees including grubbing
   out roots and removal from site.                                   m2          40.00         0.00

 B Excavate to remove vegetable soil average150mm deep and
    remove from site.                                                 m2          80.00         0.00

 C Excavate pit for column bases commencing from stripped
    level and notexceeding1500mm deep                                 m3         500.00         0.00

 D Excavate trench for foundation starting from stripped
   level and notexceeding1000mm deep                                  m3         500.00         0.00

 E Selected excavated material for back fill around
   foundation.                                                        m3         185.00         0.00

 F Remove surplus excavated materials from site                       m3         750.00         0.00


 G Level and compact bottom of excavation to receive concrete
    bed                                                               m2          35.00         0.00

   Disposal of Water
   Allow for keeping excavations free from general water other than
 H spring or running water                                            item

 I Apply "Deldrex 20" Anti-termite treatment in foundation            m2          60.00         0.00

 J 300mm (average) sandfilling well compacted and rammed in
   layers to receive hardcore                                         m3       2,000.00         0.00



 K 150mm thick approved hardcore on ditto                             m3         450.00         0.00

   Damp Membrane
 L 1000 gauge polythene single layer damp proof sheet
    membrane spread to lap 150mm all round(measured net ) on
    hardcore.                                                         m2         150.00         0.00

                          Carried to collection                                                 -




                                                   DUPLEX / 1 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                     YEMTECHCONSTRUCTION.COM




    CONCRETE WORK
    PLAIN INSITU CONCRETE (1:10 ) mix in
 A 50mm thick blinding                                              m2       750.00         0.00

    Reinforced in-situ concrete (1:2:4 -19mm
    aggregate) packed around reinforcement in
    formwork (both measured separately ) in
 B Column bases                                                     m3     22,000.00        0.00

 C Foundation                                                       m3     22,000.00        0.00

 D 150mm thick floor slab                                           m3     22,000.00        0.00

 E 150mm thick floor slab in Pent house                             m3     22,000.00        0.00

 F Ditto 100mm steps                                                m2      2,200.00        0.00

   Reinforcement
   High yield tensile steel bar reinforcement
   to BS 4461 including cutting, bending and
   tying wire in -provisional
 G 10 - 16mm diameter rod in column bases
    ( 120kg/m3 of concrete )                                        kg       280.00         0.00

 H BRC to ground floor slab                                         m2       750.00         0.00

    SAWN FORMWORK TO:-
 I Vertical sides of column bases and beams                         m2       950.00         0.00

 J Edge of floor slab, 150mm thick                                  m        200.00         0.00




                         Carried to collection                                              -

                                 COLLECTION
                                   Page1                                                    -

                                    Page 2                                                  -

                               Carried to Summary                                           -




                                                 DUPLEX / 2 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                      YEMTECHCONSTRUCTION.COM




    ELEMENT NO 2
    FRAMES
    Reinforced in-situ concrete (1:2:4-19mmaggregate
    packed around reinforcement in formwork
    both measured separately) in
 A Isolated Column                                                 m3       22,000.00         0.00

 B Columns                                                         m3       22,000.00         0.00

   Reinforcement
   High yield tensile steel bar reinforcement to BS 4461
   including cutting, bending and tying wire in the following:
 C 10 - 16mm diameter rod in column                                kg         280.00          0.00

    FORMWORK TO:
 D Vertical sides of column                                        m2         950.00          0.00

   Protection
 E Protect all works in this section                               item                 100,000.00




                                   FRAMES                                                      -
                              Carried to Summary                                        100,000.00




                                                DUPLEX / 3 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                       YEMTECHCONSTRUCTION.COM




    ELEMENT NO 3
    EXTERNAL AND INTERNAL WALLS
    CONCRETE WALL
    Reinforced in Situ Concrete (1:2:4-19mm aggre-gate packed
    around reinforcement in formwork(both measured separately)
    in

 A Lintel beam sectional area 0.05 - 0.10metre square                 m3     22,000.00        0.00

    Reinforcement
    High yield tensile steel bar reinforcement to BS 4461
    including cutting , bending and tying wire in :

 B 10 - 12mm diameter high yield tensile steel bar in lintel          kg       280.00         0.00

    FORMWORK T0

 C Sides and soffit of lintel                                         m2       950.00         0.00

    BLOCKWORK WALL
    Hollow sandcrete load bearing blockwork
    and laid in cement mortar (1:4)
 D 225mm wall Externally.                                             m2      2,000.00        0.00

 E Ditto Internally.                                                  m2      2,000.00        0.00




    EXTERNAL AND INTERNAL WALLS
                  Carried to summary                                                          -




                                                   DUPLEX / 4 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                         YEMTECHCONSTRUCTION.COM




    ELEMENT NO 4
    FITTINGS AND FIXTURES


 A Allow the provisional sum of N600,000.00                     for
   complete installation of wardrobe and kitchen cabinet as per
   detailed drawing                                                   item    600,000.00   600,000.00


    FITTING AND FIXTURE
                   Carried to summary                                                      600,000.00




                                                 DUPLEX / 5 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                      YEMTECHCONSTRUCTION.COM




    ELEMENT NO 5
    ROOF CONSTRUCTION AND COVERING

 A 0.7mm Aluminium long span roofing sheet nailed on
   hardwood with required laps and to slope as shown on
   the drawings and strictly in accordance with manufacturer's
    instruction .                                                    m2     2,600.00         0.00

 B Ditto but 0.70mm thick ridge capping 600mm girth                  m      1,560.00         0.00

 C Ditto but 0.70mm thick ridge capping 300mm girth                  m        780.00         0.00

   CARCASSING
   Treated sawn hardwood in:
 D 75 x 150mm Wall Plates                                            m        340.00         0.00

 E 50 x 150mm tie beam                                               m        340.00         0.00

 F 50 x 150mm rafters                                                m        340.00         0.00

 G Ditto king post                                                   m        340.00         0.00

 H Ditto struts                                                      m        340.00         0.00

 J 50 x 75mm purlins                                                 m        260.00         0.00

 K 25 x 300mm Fascia board                                           m        340.00         0.00

 L 50 x 50mm noggin                                                  m        340.00         0.00


                      ROOF Carried to Summary                                                -




                                                  DUPLEX / 6 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                     YEMTECHCONSTRUCTION.COM




    ELEMENT NO 6
    WINDOWS
    Powder coated aluminium profile casement windows
    complete with all necessary ironmongery and
    5mm thick light glazing fixed to opening including cutting
    and pinning lugs to concrete or blockwork surrounded
    and bedding frame in cementand sand mortar (1:6) and
    pointing internally and externally

 A Window opening size 1800 x 1200mm high                          No      22,000.00        0.00

 B Window opening size 1500 x 1200mm high                          No      22,000.00        0.00

 C Window opening size 2400 x 1200mm high                          No       5,400.00        0.00

 D Window opening size 900 x 1100mm high                           No      22,000.00        0.00

 E Window opening size 1000 x 1200mm high                          No      22,000.00        0.00

 F Window opening size 600 x 600mm high                            No      22,000.00        0.00

   Sundries
 G Approved design burglar proofing on windows openings            sum    280,000.00        0.00



                            WINDOWS
                        Carried to summary                                                  0.00




                                                DUPLEX / 7 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                     YEMTECHCONSTRUCTION.COM




    ELEMENT NO 7
    DOORS

   STEEL DOOR
 A Supply and fix heavy duty steel door including metal frame
   with fixed metal grill to door opening size 900 x 1200mm high    no     30,000.00        0.00

    Supply and fix alluminium sliding door with frame size 3300 x
    2100mm                                                          no     75,000.00        0.00

    Supply and fix 45mm (finished ) Solid Core Flush door
    with hardwood lipping on all edges including sub frames to:

 B size 900 x 2100mm high (Bed rooms incl. Kitchen)                 no     12,000.00        0.00

 C size 750 x 2050mm high (Rest room/Bath)                          no     10,000.00        0.00

   Ironmongery
   Supply and fix following ironmonery to the frame with
   matching screws
 D Pair 100mm steel butt hinges                                     no       600.00         0.00

   75mm "Union" or other approved Mortice lock and set of lever
 E furniture                                                        no      5,000.00        0.00



                               DOOR
                         Carried to summary                                                 0.00




                                                 DUPLEX / 8 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                       YEMTECHCONSTRUCTION.COM



    ELEMENT NO 8
    PLUMBING INSTALLATION

   Sanitary fittings
   Supply and fix the following sanitary fittings
 A Vitreous China Tywford S-trap Water Closet complete               no      18,000.00        0.00

 B Vitreous China Tywford bath tub complete                          no      25,000.00        0.00

 C Stainless steel Shower Tray and drain tap                         no       8,000.00        0.00

 D Stainless steel sink double bowl and drain tap 1.40 union
   waste and 1.5 bottle trap and all other accessories               no      12,000.00        0.00

 E Wall mounted toilet roll holder with chrome plated frame and
   plastic roller                                                    no       2,300.00        0.00

 F Soap holder                                                       no       1,500.00        0.00

 G Pilkington or other approved mirror size 600 x600mm
   complete with clips and screw for mounting to wall                no       2,500.00        0.00

   Floor drain
 H 50mm diameter galvanised mild steel floor drain complete
   with stainer and running trap                                     no       2,500.00        0.00
   Include the P.C sum of =N=350,000.00 for coldwater.The cold
 I water
   installation comprise a risingmain and cold water storage
   tanks on the concrete roof slab together with cold
   waterfeedsto toilets throughout the building
   includingstatutory fees.                                                 350,000.00        0.00


   BUILDERS WORKS
 J Include a provisional sum of =N=for marking the position
   of holes, mortices, chases and the likes instructure.             sum     75,000.00        0.00

                   PLUMBING INSTALLATIONS
                       Carried to summary                                                     0.00




                                                  DUPLEX / 9 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                      YEMTECHCONSTRUCTION.COM



    ELEMENT NO.9

    ELECTRICAL INSTALLATION

 A Allow a Prime cost sum of =N= for electrical installation
   complete.                                                        sum   1,000,000.00       0.00




                 ELECTRICAL INSTALLATIONS
                      Carried to summary                                                     0.00




                                                DUPLEX / 10 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                        YEMTECHCONSTRUCTION.COM



    ELEMENT NO 10
    FLOOR WALL AND CEILING FINISHINGS
    INTERNAL FINISHINGS

     Wall finishings
     In - situ finishings
    12mm cement and sand (1:4) smooth rendering on the
    following

 A Blockwork /concrete wall                                            m2       450.00         0.00

 B Surfaces not exceeding 300mm wide                                   m        135.00         0.00

   Bed and backings
 C 12mm cement and sand (1:4 ) screeded
    backingon blockwork to receive wall tile                           m2       350.00         0.00

   TILE. SLAB AND BLOCK FINISHINGS
 D 6 x 200mm x 300mm white glazed ceramic tiles but pointed on
   screeded backing and beddedand 'jointed in cement and
    sand mortar ( 1:3) pointed in matching cement wall .               m2      1,950.00        0.00

    CEILING FINISHING
 E 12mm x 600 x 600mm P O P ceiling on aluminium grille                m2      2,100.00        0.00

    FLOOR FINSHINGS

    Bed and backings
    FLOOR FINSHINGS
    concrete slab
 F 30mm bed to receive Mable Floor Tiles                               m2       650.00         0.00

 G 38mm bed to receive Granite Floor tiles                             m2       650.00         0.00

 H 44mm bed to receive Virtified floor tile                            m2       650.00         0.00

 J 44mm bed to receive Ceramic floor tile                              m2       650.00         0.00

 K 12mm backing to receive skirting, 100mm wide                        m        150.00         0.00

   TILE. SLAB AND BLOCK FINISHINGS
 L 20mm Polished Marble slab laid and bedded in
    cement on screeded bed (measured separately)                       m2     10,500.00        0.00

M 400 x 400 x 12mm Granite tiles laid ditto.                           m2      9,000.00        0.00

                          Carried to collection                                                0.00




                                                   DUPLEX / 11 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                       YEMTECHCONSTRUCTION.COM



    TILE. SLAB AND BLOCK FINISHINGS (Cont'd)

 A 300 x 300 x 6mm thick approved vitrified floor tile laid on
    screeded bed                                                      m2     2,800.00         0.00

 B 200 x 200 x 6mm Ceramic floor tiles laid on floated bed ditto.     m2     2,200.00         0.00

 C 300 x 6mm Skirting                                                 m        475.00         0.00


    EXTERNAL FINISHINGS
     Wall finishings
    In - situ finishings12mm cement and sand (1:4) smooth
    renderingon the following

 D Blockwork                                                          m2       450.00         0.00

    Ceiling finishings

 E PVC Tonge & Grove to hardwood noggins                              m2     1,500.00         0.00

                          Carried to collection                                               0.00

                                COLLECTION

                                Page 11                                                       0.00

                                   Page 12                                                    0.00

            FLOOR WALL AND CEILING FINISHINGS
                    Carried to summary                                                        0.00




                                                  DUPLEX / 12 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                       YEMTECHCONSTRUCTION.COM



    ELEMENT NO 11
    PAINTING AND DECORATION

    INTERNAL WORK
    Painting, polishing and similar work

    Prepare and apply one undercoat and two
    finishing coats of emulsion paint on :

 A Rendered wall                                                      m2       285.00         0.00

 B Surfaces not exceeding 300mm wide                                  m         86.00         0.00

 C Prepare knot, prime stop and paint two undercoats and one
    finishing coat of gloss paint on metalwork including frame.       m2     1,500.00         0.00


    EXTERNAL WORK

    Prepare and apply texcote finish of approved quality
    apply in
    accordance with themanufacturer's printed instructions on
    the following rendered surfaces .

 D Rendered blockwork and concrete wall                               m2       600.00         0.00

 E Sides of isolated concrete column                                  m2       600.00         0.00


                   PAINTING AND DECORATION
                        Carried to summary                                                    0.00




                                                  DUPLEX / 13 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                                       YEMTECHCONSTRUCTION.COM



    ELEMENT NO 12
    EXTERNAL WORKS
    EXTERNAL DRAINAGE

   Drainage
   Septic Tank
 A Standard septic tank size 2500 x 1000mm x 1800mm deep in
   225mm blockwork with reinforced concrte cover slab and
   rendered internally                                               sum    150,000.00        0.00

 B Ditto size 1500 x 900 x 1800mm deep ditto 1800mm deep             sum    120,000.00        0.00


   Other auxilliary work continues
   Soak Away pit
 C Soak Away pit size 1500 x 1500mm x 1200mmdeep built in
   225mm blockwork built in honeycombed with reinforced
   concrete cover slab                                               sum     40,000.00        0.00

   Manhole
 D Standard manhole size 600 x 600 x 450mm deepin 225mm
   blockwork with reinforced cover slaband rendered internally.      no       5,500.00        0.00

    Pipe work - provisional

 E Excavate trench for pipe not exceeding 300mm wide including
   return fill andrammed and removesurplus excavatedmaterial
    from site                                                        m         350.00         0.00


 F 100mm diameter UPVC drain pipe in trench including
   concrete surround and its associated fittings
                                                                     m        1,200.00        0.00


    EXTERNAL WORKS TO SUMMARY                                                                 0.00




                                                 DUPLEX / 14 of 15
PROPOSED BILL OF QUANTITY FOR DUPLEX                       YEMTECHCONSTRUCTION.COM



   SUMMARY

 1 SUBSTRUCTURE                                                                 -

 2 FRAME AND SUSPENDED SLAB                                              100,000.00

 3 EXTERNAL AND INTERNAL WALLS                                                  -

 4 FITTINGS AND FIXTURES                                                 600,000.00

 5 ROOF                                                                         -

 6 WINDOWS                                                                      -

 7 DOORS                                                                        -

 8 PLUMBING INSTALLATION                                                        -

 9 ELECTRICAL INSTALLATION                                                      -

10 FLOOR, WALL, AND CEILING FINISHINGS                                          -

11 PAINTING AND DECORATION                                                      -

12 EXTERNAL WORKS                                                               -




       ESTIMATED TOTAL COST                                              700,000.00