RRB - Ottobre 2006

Reviews
Shared by: Sam Rob
Stats
views:
10
rating:
not rated
reviews:
0
posted:
5/1/2009
language:
ITALIAN
pages:
0
RRB - Ottobre 2006 •Aggiornamento tempistica (dall’ Atlas week) •Situazione finanziaria complessiva di Atlas •Bilancio 2007 •CtC •M&O-A •M&O-B 9/10/2004 L. Mandelli Installation schedule version 8.1 (draft) Sep '06 O ct '06 N ov '06 D ec '06 Jan '07 2 3 4 5 Feb '07 6 7 8 9 M ar '07 A pr '07 M ay '07 Jun '07 Jul '07 A ug '07 Sep '07 O ct '07 N ov '07 D ec '07 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 B T test Full M agnet test B W -A (tooling B W -A (M D T) B W -A (TG C 2) S mall W heel A B W -A JF S id e A B arrel M uon A J N + TG C 1) o p e n in g ID A (TG C 3) JF E O , side A S id e A E ndcap Toroid A E C T on half truck JT C old tests VA VT VJ services LA r A cool dow n A ccess restrictions once toroid in place G lo b a l C o m m issio n in g g lo b a l te sts, p u m p d o w n & b a k e o u t ID barrel connection and testing ID A connection and testing U X 1 5 & L H C c lo sin g B arrel Pixel connection and testing G lobal C om m issioning B eam tuning @ 450 G eV + collisions ID C connection and testing A ccess from sector 13 services installation LA r C cool dow n B arrel Lim ited access C old tests o p e n in g ID C ID C P ix el JT VA VT JF VJ T ru ck S id e C JF B ig W heel (TG C 1) B ig W heel (M D T) B IG W H E E L (TG C 2) o p e n in g B ig W heel (TG C 3) M uon B arrel C E ndcap Toroid C S mall W heel C E O , side C E C T- C cooldow n & test S id e C B ig W heels in park position 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Sep '06 O ct '06 N ov '06 D ec '06 Jan '07 Feb '07 M ar '07 A pr '07 M ay '07 Jun '07 Jul '07 A ug '07 Sep '07 O ct '07 N ov '07 D ec '07 9/10/2004 L.Mandelli -CSN1 2 Overall financial situation Baseline Cost-to-Completion (CtC) for the initial detector 468 MCHF 68 MCHF Main funding issues today Outstanding contributions to the baseline CP (Russia+ JINR(5);Canada(1.5);USA(1);China(0.3).. Pledged CTC contributions 62.7 MCHF. Missing 9 MCHF 5.3 MCHF (NB: Situation looks rather good due to 5 MCHF more given by CERN; 9/10/2004 L.Mandelli -CSN1 3 Unfortunately as already warned at the April 2006 RRB there are new extra cost for a total of 4.4 MCHF. CB chair ha nominated an audit Committee ( Bethke; Mandelli; Oram) who looked into the overcosts (report available) System Item Item Over Run System Over Run System Total Cost System Over Cost MCHF Magnet Technical Coordination Muon Big Wheels TCn installation manpower efforts at Point 1. 1.39 1.00 MCHF 1.76 2.39 MCHF 158.2 49.6 % 1.1% 4.8% LArCC project ATLAS 0.25 4.40 38.7 536 0.6% 0.8% Further delays in installation work beyond August 2007 could require additional resources for manpower to be paid. 9/10/2004 L.Mandelli -CSN1 4 Strategy proposed to the RRB to cover the remaining funding gap, including the new CtC 1) Urge all FA to fulfill their baseline and Common Fund contribution according to the Construction MoU Urge all FA to pledge their full CtC share as determined in October 2002 2) As CERN has committed 5 MCHF above its calculated share, this would cover the new 4.4 MCHF additional CtC costs 3) As a fallback, extend the annual member fee for one or two years more (2007 and 2008) The present budget request for 2007 includes this as an option, to be decided by RRB in its April meeting, should it become necessary 9/10/2004 L.Mandelli -CSN1 5 Projected Budget Balance (CERN-RRB-2006-071 Table 7) P A YM EN T S Ba s e lin e + C C (A ) of w hich deferrals 95-01 231 0 2002 71 1 1 2003 56 3 1 61 2003 55 9 4 68 7 23 2004 52 4 1 57 2004 54 3 2 59 2 25 2005 43 -3 2006 41 -2 2007 13 -4 2008 2 -2 2009 2010 T o tal 509 -11 C & I (A + B) C C (B) TO TA L IN C O M E Ba s e lin e + C C (A ) C & I (A + B) C C (B) TO TA L B U D G ET B A LA N C E C U M U LA T IV E 9 4 54 2005 33 4 1 38 -15 9 3 3 45 2006 28 4 1 33 -13 -3 1 1 11 2007 9 0 0 10 -1 -4 0 0 -4 0 0 -4 0 0 -4 0 2008 0 2009 0 2010 21 12 531 T o tal 495 21 11 526 -4 231 73 95-01 2002 252 65 1 2 252 21 21 68 -5 15 Magic: the assumed deferral income covers part of the missing funds. If 4 MCHF not found cut again on HLT processors 9/10/2004 L.Mandelli -CSN1 6 Updated Baseline Commitments Evolution (%) P ercen t ag e C o m p let ed 100 90 80 70 60 50 ID LA r T ile c al Muons 40 30 20 10 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 CP s T ot T DA Q Note: TDAQ re-baselined in accordance with CERN-RRB-2004-017 (initial detector) 9/10/2004 L.Mandelli -CSN1 7 2007 Construction Budget  Core and CC-A  C&I  CC-B Italy: Table 10 Committments 12.866 MCHF 0.650 MCHF 0.167 MCHF CERN-RRB-2006-071_CtC  CtC: CC (A-B) + C&I : Paid Difference Magnet overcost Total debt pledged C&I and CC-B CC-A m.s. Contribution TOTAL 9/10/2004 6.638 MCHF 4.000 MCHF 2.638 MCHF - 0.350 MCHF 2.288 MCHF 0.000 MCHF 2.288 MCHF 1.476 ME 0.150 MCHF (to be decided in April) 2.438 MCHF L.Mandelli -CSN1 1.573 ME 8 M&O 2007 ( CERN RRB-2006-072) - Base: Memorandum M&O (1/05/2002-31/12/2011) - A : CP : Servizi tecnici al point1, Servizi generali , Magneti, Criogenia, TDAQ. Discusso dallo “ scrutiny group”. Richiesta 2007: 11.722 MCHF (2006: 9.395 MCHF) Power in. La divisione si basa sugli autori con “PHD” : 2007 : 172/1471 = 10.43% (final ?) 2006 : 145/1320 = 11.0% 2005 : 150/1328 = 11.3% 2004 : 144/1301 = 11.0% -B : sottositemi (aree di assemblaggio (SR1;B180;B191); consumi specifici sostituzioni. Discussi negli IB. RRB “ prende visione” Richiesta 2007: 6.98 MCHF (2006: 4.370 MCHF) -C Covered by Cern as host lab Divisione sulla % CORE nei sottosistemi. In corso di revisione nel gruppo OTSMOU L.Mandelli -CSN1 9/10/2004 9 M&O Summary totali A 10727 (*) INFN kCHF 911(**) INFN kEuro 587 Moduli Euro 613 ID LAr Tiles Mu Totali-B Totali 3935 1065 805 1175 6980 17708 296 57 63 252 668 1579 192 36 41 163 432 1019 255 43 31 162 491 1104 (*) Senza costo del power (**) In kind sottratto : 158.4 kCHF = 102.2 kE 9/10/2004 L.Mandelli -CSN1 10 Evolution of M&O Plans (MCHF) 25 20 MCHF 15 10 5 0 2002 2003 2004 2005 2006 Year M&O Plan October '01 M&O Update October '06 2007 2008 2009 2010 MOF-B T otal 10000 8000 ID LAr MU Tiles Total 2002 2004 2006 ye a r 2008 2010 2012 kCHF 6000 4000 2000 0 2000 9/10/2004 L.Mandelli -CSN1 11 ( CERN RRB-2006-070) Power non compreso Cifre in MCHF M&O-A 2007 2006 8.367  M&O Category A Total 10.252  Consumi sul rivelatore e Cryogenia; 5.183 3.738 Magnete: operazione e ricambi; controlli; power supply Gas: mantenimento e consumi generali non detector specifici) Sistemi e liquidi di raffreddamento ( non detector specifici) Criogenia esterna: operazione e ricambi (2.535 MCHF) Sistemi di movimentazione, idraulici e sicurezza generale Operazioni di movimentazione (0.450MCHF) Supporto tecnico generale al pit e TDAQ (0.510MCHF) Vuoto e beam pipe Counting room  Segretariato, Economato, Pubblicazioni  Comunicazioni TDAQ e TC ; Videoconferencing (0.110 MCHF) 9/10/2004 L.Mandelli -CSN1 0.245 0.120 0.240 0.070 12  Core Computing 1.475 1.445 Servizi centrali generali ( processing; produzione; user support 13.4 (FTE) x 88kCHF + 1 FTE x 122kCHF + 2 FTE x 71kCHF = 1.443MCHF Contributo INFN: 1.8 FTE x 88kCHF = 158.4 kCHF = 102.2 kE. Il più alto in kind dopo USA (3FTE)- Dettaglio del contributo 06 disponibile  Online computing  Facilities Bldg. 180, TDAQ pool 1.405 0.810 Management system (0.550MCHF); sostituzione processori (0.625MCHF); licenze; infrastrutture 0.180 0.250  Laboratory operations Workshop TDAQ Lab equipment 0.075 1.569 0.075 1.739  General Services Ventilazione (0.364MCHF);Trasporti, Cranes (0.540 MCHF); Survey (0.2MCHF) Outreach (0.2MCHF) 9/10/2004 L.Mandelli -CSN1 13 MOF-B Inner Detector 2007 595 725 925 1690 3935 2008 935 871 1035 1131 3972 kCHF Pixel SCT TRT IDGen Total 2009 1590 1027 1110 1427 5154 2010 1790 892 1010 1297 4989 Note! Replacement of the Pixel b-layer is included from 2008 % INFN Pixel INFN 32,00% 190 299 509 573 IDGen INFN 6,30% 106 71 90 82 totale kCHF 297 370 599 655 totale kE 192 239 386 422 2006 9/10/2004 134 k€ L.Mandelli -CSN1 14 M&O-B 2007 IDGEN IDGEN (kCHF) 360 SR1 refurbishment (upgrade) 183 consumi SR1 295 cooling 110 Environmental Gas (N2, CO2)  55 stores 636 manpower (3% costo core,10% rinnovo liquido, extra coolant per cavi (250kchf))  50 spares off detec electr. (mainly DCS items) (installazione/commissioning 7.5, evaporative Cooling 2, monophase Cooling 1, SR1 1)  TOTALE 1690KCHF 9/10/2004 L.Mandelli -CSN1 15 M&O-B 2007 Pixel  Dettaglio Pixel (kCHF)  30 consumi SR1  125 Spare off detec. electr.  100 subdetectors spares  40 Stores  300 manpower (5%CORE crate+rod, 1.5%CORE per PS) (extra production type0 cables)  (installazione compressa, lavoro squadre in parallelo)  (+16 FTE pagati dagli Istituti)  Totale 595 KCHF 9/10/2004 L.Mandelli -CSN1 16 ID M&O Final Payments in 2005 P ixe l SCT TRT ID G e n C a te g o ry B M&O 3 144 251 Ite m & C o s t D riv e r (b y R R B S G H e a d in g s ) M e c h a n ic s & G a s & C o o lin g & C ry o g e n ic s G ases S ta n d a rd e le c tro n ic s E le c tro n ic s p o o l re n ta ls fo r te s t-b e a m s D e te c to r c o n tro ls D C S re p la c e m e n ts fo r ID fo r te s t b e a m s A re a s T e s t-b e a m a c tiv itie s C o m m u n ic a tio n s 33 6 42 40 121 0 S to re ite m s S u b -d e te c to r s p a re s (C ritic a l s p a re s d e a lt w ith s e p a ra te ly ) (E x c lu d in g h ire d m a n p o w e r fo r C a te g o ry B ) H ire d m a n p o w e r a t C E R N (in k C H F ) In s titu te m a n p o w e r to b e c re d ite d (in k C H F ) In s titu te m a n p o w e r (in F T E ) T O T A L M & O F O R B (k C H F ) 77 27 4 18 46 5 73  Main cost driver 48 48 12 20 22 100 153 are:  SR1 operation  Services (exp. cooling) Budget was 1065 126 0 6 126 71 33 113 0 0 336 353 5 689 646 387 0 11 1 ,0 3 2 105 113 9/10/2004 L.Mandelli -CSN1 17 LAR M&O Piano di spesa 2006 750 (K CHF) : 2008 1285 2007 1170 2009 1285 2010 1285 L’incremento nel 2007 rispetto al 2006, risente della richiesta di 350 KCHF per “spares FE”. In realtà gia’ anticipato dal CERN. La prima valutazione dei costi M&O per il 2007 ( maggio 06) e’ stata ridotta del ~ 14 %, per tener conto della nuova schedula di LHC. 9/10/2004 L.Mandelli -CSN1 18 LAr- M&O-B Dettaglio Meccanica Impianti Gas Sist. Criogenici 5 1 30 Acquisti/Lavoraz. meccanic. , saldature….. Affitto bombole e racks Manten. sist. Crio., gas x tests, slow control Coolling PS, FE crates, mantenim., upgrades Strumentaz per laboratori, affitto pool, RO, manuten., upgrades Componenti per ELMBs, sensori, sniffers Manutenzione, upgrades Componenti meccanici, elettrici, etc… Trasporti,logistica, pulizia aree sperim. Sist. Cooling Elettronica Contr. DCS,DSS PS(LV,HV) Magazzino Gestione Aree 30 160 30 200 50 30 Comunicazioni Manpower Elettronica FE 4 280 350 Telefoni portatili, videoconferenze Personale tecnico,ingegn. esterno/gruppi Spares, rimborso Totale 9/10/2004 1170 kCHF L.Mandelli -CSN1 Italy : 57 kCHF 19 Carry Over 2005 + 35kCHF M&O Tile Cal Year M&O(KChF) Spent 2004 105 105 2005 95 95 2006 371 375* 2007 805 2008 500 * Projections to the end of the year 2006 budget M&O reduced from 625KChF (2003 estimate) to 371KChF. 2007 budget. From 600 KChF (2005 expectation for 2007), about 800 KChF are needed. (Late commissioning of the fLVPS has produced a spill of expenses in 2007 of about 200KChF ) 9/10/2004 L.Mandelli -CSN1 20 TileCal M&O 2007 Details Maintainance Manpower E-pool rentals Spare parts, store items 41% 33% 15% 10% The italian share is 7.6% Beyond 2007 The fLVPS seems now in good shape, after the problems encountered at the beginning of this year. If this is the case, the foreseen M&O in 2008 and following will come back to the planned value. 9/10/2004 L.Mandelli -CSN1 21 Muons M&O Budget for 2007  Mechanics Repairs and maintenance 150 K 355 K 25 K 100 K 100 K  Gas consumption and gas system maintenance Very accurate estimate from the LHC Gas Group  Cooling system Consumables and maintenance Strong reduction (was 550)- Agreement CERN-Israel  FE Electronic spares  Standard electronics (HV-LV) spares  Standard electronics E-pool 110 K 5K 330 K  Communications  Hired manpower Installation and commissioning work (regie + subsistance)  Total 9/10/2004 L.Mandelli -CSN1 632 K 22 M&O Final Payments in 2005 Category B Item & Cost Driver (by RRB SG Headings) Mechanics & Gas & Cooling & Cryogenics Gases Standard electronics M&O 60 Budget for 2005: 240 k 23 Electronics pool rentals for test-beams Detector controls Income in 2005:  in kind Expenditures: 381 k 220 k 15 k 114 DCS for test beams Areas Test-beam activities Due to open commitments from 2004 paid in 2005) 1 18 0 Communications Store items Sub-detector spares (Critical spares dealt with separately) 216 150 15 (Excluding hired manpower for Category B) Hired manpower at CERN (in kCHF) Institute manpower to be credited (in kCHF) Institute manpower (in FT E) 381 T OTAL M&O FOR B (kCHF) 9/10/2004 L.Mandelli -CSN1 23 Spares transparencies Core computing in-kind in 2007 Czech Rep: IN2P3: BMBF: MPI: Israel: INFN: Poland: Russia: JINR: Taipei: UK: US: TOTAL: 0.4 FTE x 88 kCHF/FTE = 1.0 FTE x 88 kCHF/FTE = 0.9 FTE x 88 kCHF/FTE = 0.3 FTE x 88 kCHF/FTE = 0.2 FTE x 88 kCHF/FTE = 35 kCHF 88 kCHF 79 kCHF 22 kCHF 18 kCHF 1.8 FTE x 88 kCHF/FTE = 158 kCHF 0.10 FTE x 88 kCHF/FTE = 9 kCHF 0.3 FTE x 88 kCHF/FTE = 22 kCHF 0.4 FTE x 88 kCHF/FTE = 35 kCHF 0.1 FTE x 88 kCHF/FTE = 9 kCHF 1.5 FTE x 88 kCHF/FTE = 132 kCHF 3.0 FTE x 88 kCHF/FTE = 264 kCHF 9.9 FTE x 88 kCHF/FTE = 870 kCHF 9/10/2004 L.Mandelli -CSN1 25  Help desk and user support Guido Negri (CNAF) 0.4FTE Computer and SW documentation and training _ Stefano Antonelli (Bo) 0.4FTE Management of the ATLAS VO on the Grid  Alessandro De Salvo (Ro1) Alessandro Barchiesi (Ro1) Filippo Grimaldi (Bo) Software Installation on the Grid Alessandro De Salvo (Ro1) 0.2FTE 0.3FTE 0.3FTE 0.2FTE Total 1.8FTE 9/10/2004 L.Mandelli -CSN1 26 Muon M&O B Old Planning 9/10/2004 L.Mandelli -CSN1 27 Muon M&O B New Planning Budget for Electronics spares reduced by 1 MCHF due to contribution from the CERN-Israeli agreement 9/10/2004 L.Mandelli -CSN1 28 2007 M&O Sharing 9/10/2004 L.Mandelli -CSN1 29

Related docs
  CV 07-0010 RRB
Views: 0  |  Downloads: 0
RRB-YSI-Calibration-QC-spreadsheet-WG
Views: 0  |  Downloads: 0
Recommandation 5 - Elections au RRB
Views: 3  |  Downloads: 0
RRB Form UI-41 Example
Views: 0  |  Downloads: 0
6 RRB Coupons.indd
Views: 0  |  Downloads: 0
Other docs by Sam Rob
Netselect Inc Ammendments and Bylaws
Views: 179  |  Downloads: 0
understanding_and_managing
Views: 348  |  Downloads: 1
Maxygen Inc Ammendments and Bylaws
Views: 248  |  Downloads: 1
Board Resolution Approving S Corp Election
Views: 197  |  Downloads: 3
Independent contractor agreement
Views: 490  |  Downloads: 47
Application to Extend Time
Views: 178  |  Downloads: 0
Board Resolution Advising Approval of Merger
Views: 163  |  Downloads: 0
Harley Davidson Inc Ammendments and Bylaws
Views: 216  |  Downloads: 1
Accenture Partnership Agreement
Views: 276  |  Downloads: 12
aycock-all
Views: 488  |  Downloads: 2