July 12, 2006 CPUC Energy Division Workshop on Draft Scope of Work for Updating Potential Study/EE Savings Goals Overview/Background
Decision 04-09-060 – sets 10-year savings goals Decision 05-09-043 – directs that savings goal update include recommendations on baseline/methodology Assigned Commissioner Ruling (May 24, 2006) – looks at embedded energy savings associated with water efficiency
Timeline
Workshop on Draft Scope of Work on Updating Potential Study/EE Savings Goals Post-workshop Comment on Draft Scope of Work RFP Release (Update Potential Study/EE Savings Goals) Completion of Update Potential Study/EE Savings Goals Joint Staff Report on EE Savings Goals (Electric & Natural Gas) ALJ Ruling or ACR soliciting parties’ comments on EE Savings Goals Workshop on EE Savings Goals Draft Decision on EE Savings Goals Final Commission Decision on EE Savings Goals IOU Filing of EE Programs for 2009-2011 July 12, 2006 July 19, 2006 July 28, 2006 October 1, 2007 October 12, 2007 October 17, 2007 November 17, 2007 December 15, 2007 January 15, 2008 June 1, 2008
Draft Scope of Work prepared by ED and CEC
Potential Studies undertaken: Kema Xenergy, Inc. CA Statewide Commercial Sector EE Potential Study, July 2002 Kema Xenergy, Inc. CA Statewide Residential Sector EE Potential Study, April 2003 Kema Xenergy, Inc., CA Statewide Commercial Sector Natural Gas EE Potential Study, July 2003 KEMA, Inc., CA Industrial Existing Construction EE Potential Study, May 2006 Itron, KEMA, Inc., RLW Analytics & Architectural Energy Corp., CA EE Potential Study, May 2006 Joint Staff’s Suggested Approach: Review/Assess Potential Studies undertaken and other relevant studies Review/Asses 2004-2005 IOU EE program achievements Determine any gaps or better approach/methodology based on review/assessment Determine any expansion needed to update the goals (any new information/data that should be included in the study) Recommend the best approach to update the 10-year goal adopted in D.04-09-060 based on the results of review and assessment Recommend the updated savings for 2009 and beyond Recommend when the next potential study should be conducted/time interval between potential studies
Comments from Interested Parties
Submit post-workshop written comments no later than July 19, 2006 to ED (Attn: Nora Gatchalian nyg@cpuc.ca.gov ) and CEC (Attn: Sylvia Bender sbender@energy.state.ca.us ) Join Project Study Team on Updating Potential Study/EE Savings Goals