ION 7500 _ ION 7600 by hcj

VIEWS: 288 PAGES: 4

									                                                       Power Measurement Ltd.
                                                       2195 Keating Cross Road
                                                                                                                   ION 7500 / ION 7600
                                                       Saanichton, BC, Canada V8M 2A5                          RMICAN-SEAL Checklist
                                                       Tel: (250) 652-7103                                             For use with ION 7500 / ION 7600
                                                       Fax: (250) 652-7107                                                  RMICAN-SEAL Meters only
                                                       E-mail: order.entry@pwrm.com

This checklist must accompany your Purchase Order for ION 7500 / ION 7600 RMICAN-SEAL (Measurement Canada approved and
sealed) meters. Fill in this checklist, then fax or email it to Order Entry.

   Customer:                                                                        P.O.#:                                   P.O. line#:

Fill out one RMICAN-SEAL Checklist for each different configuration of RMICAN-SEAL meter in your order.
  Use one                                              Form     Current       Voltage     Power    System                                         Special
                       Qty          Model                                                                     Comms        I/O       Security
  row only                                             Factor   inputs         inputs     supply    Freq                                           Order
ION 7500                            P7500                          C            0            B         6                                 4

ION 7600                            P7600                          C            0            B         6                                 4

Factory Sealing Checklist for RMICAN-SEAL Meters
Important: This checklist and the checklist for Data Recorder #1 only apply to customers ordering the RMICAN-SEAL option
(Measurement Canada approved meters that are to be factory sealed). The following information must be provided, as the specified
quantities are fixed and locked at time of sealing.

  Meter Owner:                                                                      Contact Name:
  Street:                                                                           Phone:
  City:                                                                             Fax:
  Province:                                                                         Meter Owner’s Measurement Canada Contractor Registration Number*:

  Zip / Postal Code:
* The meter owner or contractor must be registered with their regional Measurement Canada District Office prior to the sealing of their meters.
  It is the responsibility of the meter owner/contractor to obtain the registration as per Subsection 9 of the Electricity and Gas Inspection Regulations.

Form Factor / Service Type (select one):
ION 7500 / ION 7600
   2-Element 3-Wire Delta (Volts Mode = DELTA)
   2 ½ -Element 4-Wire Wye (Volts Mode = 3W-WYE)
   3-Element 4-Wire Wye (Volts Mode = 4W-WYE)


Voltage Transformer Ratio                          :               Primary/Secondary Rating (ex. 12000:120)
* NOTE: Voltage Transformer Ratio must be given in terms of VL-N for Wye service or VL-L for Delta service.
Current Transformer Ratio                          :     5       Primary/Secondary Rating (ex. 5000:5)


I4 Transformer Ratio                    :    5         (default = CT ratio)

I5 Transformer Ratio                    :    5         (default = CT ratio)


Demand Method:                Sliding Window Demand
                              Thermal Demand

Demand Interval =                     minutes (default = 15 minutes)             Number of sub-intervals =                   (default = 1)


Clock synchronization method (select one):
   Sync to Line Frequency (default setting)
   Sync to Internal Clock

Time sync source (select one):
      COM1 RS232/RS485 (default)                          COM2 RS485                    Front optical port/Modem          Ethernet

Time zone offset =                     hours (default is GMT = 0)                       DST offset =               hours (default = 1)



Rev date: April 28, 2006                                                                                                    9d1765eb-e881-4644-bc85-40a04f49a49c.doc
                                                   Power Measurement Ltd.
                                                   2195 Keating Cross Road
                                                                                                       ION 7500 / ION 7600
                                                   Saanichton, BC, Canada V8M 2A5                  RMICAN-SEAL Checklist
                                                   Tel: (250) 652-7103                                   For use with ION 7500 / ION 7600
                                                   Fax: (250) 652-7107                                        RMICAN-SEAL Meters only
                                                   E-mail: order.entry@pwrm.com


  Energy register rollover =
        (default = 10,000,000)

                  2                                            2
                V h rollover =                                 I h rollover =
    (default = 1,000,000,000)                        (default = 1,000,000,000)


                                                   OWNER INFO 1:
  Side Label Nameplate Information
  PLEASE TYPE OR PRINT CLEARLY                             INFO 2:
  (maximum 15 characters per line)
                                               **METER TAG #:
** The METER TAG number is a mandatory requirement for this checklist; each meter to be sealed must have a unique tag number.

                                                        Pulse          Parameter     Integrator Mode    Pulse Weight (Kt)        Pulse Output
  Energy Pulse Outputs
                                                       Output        (kWh, kVARh,   (specify Del, Rec    (Energy/Pulse)          Mode (select
                                                       Channel           kVAh)         or Del+Rec)                               Pulse or KYZ)
  Pulse Width (ms):              Default = 100ms          D1                                                                          Pulse
                                                          D2                                                                          Pulse
                                                          D3                                                                          Pulse
                                                          D4                                                                          Pulse
                                                          R1
                                                          R2
                                                          R3




Rev date: April 28, 2006                                                                                     9d1765eb-e881-4644-bc85-40a04f49a49c.doc
                                           Power Measurement Ltd.
                                           2195 Keating Cross Road
                                                                                                         ION 7500 / ION 7600
                                           Saanichton, BC, Canada V8M 2A5                            RMICAN-SEAL Checklist
                                           Tel: (250) 652-7103                                              For use with ION 7500 / ION 7600
                                           Fax: (250) 652-7107                                                   RMICAN-SEAL Meters only
                                           E-mail: order.entry@pwrm.com

Data Recorder #1 (Sealed)
Below are the factory-default metrological quantities recorded by Data Recorder module #1. If you want different quantities recorded
instead, please specify them under the Customer-Specified Metrological Quantity column.

Notes:
 1. Data Recorder #1 is locked when it is sealed. Channel assignments must therefore be specified prior to sealing.
 2. TIM_ION Version 1 requires Data Recorder #1 to be configured as a 16-channel recorder.
 3. TIM_ION Version 2 allows Data Recorder #1 to be configured with any number of channels.


             Channel             Factory-Default Metrological Quantity                    Customer-Specified Metrological Quantity
                                                                                                    (in place of Factory-Default Quantity)

                   1                             kWh del int

                   2                            kVARh del int

                   3                             kWh rec int

                   4                           kVARh rec int

                   5                             <not used>

                   6                             <not used>

                   7                             <not used>

                   8                             <not used>

                   9                             <not used>

                  10                             <not used>

                  11                             <not used>

                  12                             <not used>

                  13                             <not used>

                  14                             <not used>

                  15                             <not used>

                  16                             <not used>


Recorder Depth =                 records (default = 3360 records = 35 days @ 15 minute intervals)

Recorder Interval =              minutes (default = 15 minutes)




Rev date: April 28, 2006                                                                                         9d1765eb-e881-4644-bc85-40a04f49a49c.doc
                                                       Power Measurement Ltd.
                                                       2195 Keating Cross Road
                                                                                                                         ION 7500 / ION 7600
                                                       Saanichton, BC, Canada V8M 2A5                                RMICAN-SEAL Checklist
                                                       Tel: (250) 652-7103                                                For use with ION 7500 / ION 7600
                                                       Fax: (250) 652-7107                                                     RMICAN-SEAL Meters only
                                                       E-mail: order.entry@pwrm.com

Transformer/Line Loss Calculation Checklist
This checklist only applies if you ordered the RMICAN-SEAL option (Measurement Canada sealed meters) AND you require loss
calculations. Ignore this section if you do not require loss calculations.
1.    Select one box below that represents the location of the billing point (BP):


                                 BP 4             BP 3               BP 2               BP 1         Customer
                                                                                                 (Power Consumer)

         Utility
     (Power Supplier)
                             Supply Side Line                           Load Side Line

                                                      Power Transformer                                BP = Billing Point
                                                                                                                               * This is the
                             *       + kW                          * + kW                              MP = Metering Point
                                                                                                                               assumed power flow
                                                                                                                               direction and polarity


                           MP4                    MP3                MP2                   MP1


2.    Select one box above that represents the location of the metering point (MP):

3.    Line Loss:
        Supply side line length:                         meters                  kilometers
        Resistance per length:                        ohms per          meter             kilometer
        Reactance per length:                         ohms per          meter             kilometer

        Load side line length:                           meters                  kilometers
        Resistance per length:                        ohms per          meter             kilometer
        Reactance per length:                         ohms per          meter             kilometer
4.    Transformer Loss Compensation (via Transformer Test Sheet Method):

        Power Transformer ratio:                         :                   (Supply : Load)

        How is the transformer connected at the metering point (MP)?                          Wye                 Delta
        What is the rated transformer voltage at the metering point (MP)?
         If Wye,                 Volts line-neutral                  If Delta,                  Volts line-line

        Rated Transformer kVA:                          kVA

        No-Load Watt test losses (LWFe):                          Watts             Full-Load Watt test losses (LWCu):                     Watts

        Impedance:                   %                 Excitation:                    %

        VT Ratio:                :                (Actual VT Ratio as indicated on the Instrument Transformer Nameplate)

        CT Ratio:                :                (Actual CT Ratio as indicated on the Instrument Transformer Nameplate)

5.    Transformer Loss Compensation (via Percent Loss Constant Method):
        Instrument Transformer Ratios                 PT ratio:                                CT ratio:
        (primary / secondary)
        Copper Loss Compensation               %LW Cu:                               %LVCu:
        Iron Loss Compensation                 %LW Fe:                               %LVFe:



Rev date: April 28, 2006                                                                                                     9d1765eb-e881-4644-bc85-40a04f49a49c.doc

								
To top