									                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                 Description of Project                                              Grant
                                                                                                                $

NEW SOUTH WALES

GOVERNMENT
Auburn           Auburn West Public     Upgrade of new school - stage 1.                                    400 000
                 School
Avoca Beach      Avoca Beach Public     Upgrade of administration area, library and learning spaces.        800 000
                 School
Banora Point     Banora Point High      Construction of new school - stage 1.                              4 660 000
West             School
Baulkham Hills   Baulkham Hills High    Construction of new gymnasium including stage.                     1 240 000
                 School
Bega             Bega High School       Provision of new accommodation and car parking - stage 1            810 000
                                        of upgrade.
Berala           Berala Public          Construction of administration, library, classrooms and staff       800 000
                 School                 and student amenities. Provision of hall, canteen and
                                        covered outdoor learning area.
Beverly Hills    Beverly Hills Public   Provision of new and converted accommodation such as                150 000
                 School                 classrooms, library, administration area and canteen to
                                        consolidate school onto one site.
Bexley           Carlton Public         Provision of practical activities areas and withdrawal areas in     300 000
                 School                 classrooms. Refurbishment of library and administration.
Bidwill          Chifley College        Upgrade of junior campuses at Dunheved (general learning           2 202 000
                 Bidwill Campus         spaces, new covered outdoor learning area, fitness
                                        laboratory and outdoor workshop) Mount Druitt (enhanced
                                        library facilities) Bidwill (staff facilities, computer learning
                                        space and outdoor workshop)
Blacktown        Marayong South         Consolidation of school to one site - stage 1.                      100 000
                 Public School
Bogangar         Bogangar Public        Construction of new school.                                         595 000
                 School
Cammeray         Cammeray Public        Construction of classrooms, administration area and access          700 000
                 School                 link to library.
Canley Vale      Lansvale Public        Provision of new administration facilities.                         200 000
                 School
Carlingford      James Ruse             Provision of materials technology spaces and facilities for         500 000
                 Agricultural High      total disabled access. Conversion of existing areas to
                 School                 general learning areas.
Carlton          Carlton South          Upgrade of classrooms, core facilities, staff and student           150 000
                 Public School          amenities.
Cecil Hills      Cecil Hills Public     Construction of new school.                                         800 000
                 School
Colo Vale        Colo Vale Public       Provision of six homebases and administration facilities.           850 000
                 School
Dorrigo          Dorrigo High School    Upgrade of staff facilities, materials workshop, music, art and     400 000
                                        general learning spaces. Provision of new administration
                                        facilities and performance workshop.
Dubbo            Dubbo Multi            Refurbishment of buildings at Dubbo South High School to           1 800 000
                 Campus College         senior college standard. Refurbishment of buildings at Delroy
                                        High School. Provision of shade facilities. Consolidation of
                                        Dubbo Public School to one site by providing classrooms
                                        and shade facilities. Upgrade of Dubbo South campus.
                                        Upgrade of library, general learning and specialist areas.
                                        Construction of new buildings.

__________________________________________________________________________________________




                                                      11
                    SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                          GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                    Description of Project                                             Grant
                                                                                                                   $

NEW SOUTH WALES

GOVERNMENT
Fairfield West    Westfields Sports High    Upgrade of existing accommodation including technology            1 500 000
                  School                    and applied science, administration area, classrooms, car
                                            parking, staff and student amenities.
Flinders          Flinders Public School    Construction of new school.                                       1 500 000
Glenmore Park     Surveyors Creek           Construction of new school.                                         110 000
                  Primary School
Glenwood          Caddies Creek Public      Construction of new school.                                       3 400 000
                  School
Gosford           Henry Kendall High        Upgrade of learning facilities - stage 1.                          900 000
                  School
Harbord           Harbord Public School     Provision of new administration, library and four homebases.      1 500 000
                  Northern Beaches          Creation of senior campus at Freshwater High School.              2 382 000
                  Secondary College
Hay               Hay War Memorial          Construction of new multi purpose centre.                          500 000
                  High School
Hill Top          Hill Top Public School    Provision of eight homebases, administration facilities and        800 000
                                            toilets.
Hoxton Park       Hoxton Park Public        Construction of replacement school - stages 1 and 2.               840 000
                  School
Jewells           Jewells Public School     Construction of new library and amenities.                           10 000
Kellyville        Kellyville High School    Construction of new school - stage 1.                             6 000 000
                  Kellyville High School    Construction of new school - stage 2.                             4 500 000
Kiama             Kiama High School         Upgrade of classrooms and specialist learning spaces.               500 000
                                            Provision of additional permanent accommodation.
Lightning Ridge   Lightning Ridge Central   Provision of general learning spaces, visual arts and science      600 000
                  School                    facilities.
Marayong          Marayong Heights          Consolidation of school to one site. Construction of new            40 000
                  Public School             library and canteen. Upgrade of classrooms.
Merimbula         Merimbula Public          Upgrade of student facilities.                                     290 000
                  School
Merrylands        Holroyd School            Upgrade of facilities for students with severe disabilities.      1 700 000
Mount Annan       Mount Annan High          Construction of new school - stages 1 and 2.                      9 100 000
                  School
Mount Colah       Mount Colah Public        Upgrade of practical activities areas and withdrawal areas for     900 000
                  School                    existing classrooms. Provision of permanent library facilities.
Mount Druitt      Chifley College           Refurbishment of buildings at Whalan High school. Upgrade         2 660 000
                                            of facilities at Mount Druitt High School, including ground
                                            works. Upgrade of junior campuses at Dunheved. Mount
                                            Druitt and Shalvey High Schools.
Mudgee            Cudgegong Valley          Construction of facilities including new classrooms.               350 000
                  Public School
Mullumbimby       Mullumbimby High          Upgrade of new classrooms, administration, library, staff and      675 000
                  School                    student amenities and specialist accommodation.
Murwillumbah      Murwillumbah High         Provision of facilities for disabled access.                       250 000
                  School
Muswellbrook      Muswellbrook South        Provision of modern learning and core facilities including        1 575 000
                  Public School             facilities for a support unit for disabled students.
Nowra             Nowra East Public         Provision of new school hall.                                      300 000
                  School

__________________________________________________________________________________________




                                                          12
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                 Description of Project                                            Grant
                                                                                                              $

NEW SOUTH WALES

GOVERNMENT
Nowra           Nowra Public School    Construction of new hall, canteen and covered outdoor              300 000
                                       learning area.
Oberon          Oberon High School     Provision of disabled access including new lifts and ramps.        400 000
Oyster Bay      Oyster Bay Public      Construction of new hall and associated amenities.                 400 000
                School
Paddington      Glenmore Road          Provision of new library.                                          450 000
                Public School
Prestons        Dalmeny Public         Construction of new school.                                      2 200 000
                School
                Prestons Public        Construction of new classrooms and staff facilities.               790 000
                School
Riverstone      Riverstone Public      Consolidation of school onto one site - stage 2.                   700 000
                School
Rouse Hill      Rouse Hill Public      Construction and relocation of replacement school.               1 236 000
                School
Seven Hills     Seven Hills North      Provision of new buildings to upgrade school - stage 1.            300 000
                Public School
                Seven Hills School     Relocation of existing school to Seven Hills.                    1 200 000
                (formerly North
                Rocks School for the
                Blind)
Tuncurry        Great Lakes College    Construction of new school - stage 1.                            7 000 000
Ultimo          Ultimo Public School   Construction and refurbishment of classrooms, administration,    1 171 000
                                       library and other facilities.
West Pennant    West Pennant Hills     Provision of hall, canteen, covered outdoor learning area and      229 000
Hills           Public School          library facilities.
Westmead        Westmead Public        Refurbishment and adaptation of buildings acquired from            255 000
                School                 Sydney University to enable use by the school.
Woodburn        Woodburn Public        Conversion of existing central school to primary school.           500 000
                School
Woolloomooloo   Sydney Secondary       Refurbishment and consolidation of existing facilities at          500 000
                Distance Education     Plunkett Street Primary School - stages 1 and 2.
                Centre
                Sydney Secondary       Refurbishment and consolidation of existing facilities at          600 000
                Distance Education     Plunkett Street Public School - stage 3.
                Centre
                                       TOTAL GOVERNMENT                                                78 570 000




__________________________________________________________________________________________




                                                      13
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                Description of Project                                                 Grant
                                                                                                                  $

NEW SOUTH WALES

CATHOLIC BLOCK GRANT AUTHORITY
Ashfield         St Vincent's School   Construction of library, withdrawal space and administration.         1 159 853
                                       Refurbishment and conversion to provide 8 general teaching
                                       spaces, pupils' facilities, pupils' amenities, physical education
                                       sports store and canteen.
Cranebrook       Xavier College        Construction of administration/staff facilities areas, 13 general     2 587 861
                                       learning areas, library, dark room, performing arts space and
                                       associated areas, 4 art rooms, 5 science laboratories,
                                       technology and applied science areas, 2 music rooms,
                                       physical education area and student amenities.
Dubbo            St Mary's Primary     Construction of administration area, 4 general learning areas,           7 284
                 School                pupils' amenities, library, canteen and travel. Refurbishment of
                                       administration area.
Gateshead        St Paul's Primary     Demolition of existing facilities. Construction of                    1 515 686
                 School                administration/staff facilities and library. Site works and travel.
                                       Construction of 7 general learning areas, 4 withdrawal areas,
                                       pupils' amenities, canteen, physical education store and
                                       walkways.
Greenacre        Holy Saviour          Construction of pupils' toilets, tiered learning space and store.      167 392
                 School                Site works and travel.
Hinchinbrook     Good Samaritan        Construction of 4 art learning facilities, 6 general learning         1 812 245
                 Catholic College      spaces, 4 technical and applied learning spaces and pupils'
                                       amenities. Conversions to provide science laboratory.
Lake             St Brendan's          Construction of administration block, pupils' amenities, store,        144 374
Munmorah         Primary School        library, withdrawal area and physical education area.
                                       Conversion to provide 3 general learning areas.
Liverpool        All Saints Catholic   Construction of 8 technical and applied studies spaces, art           1 553 196
                 Boys' College         teaching space and canteen.
Marayong         St Andrew's           Construction of administration, staff amenities, 4 technical and      1 000 000
                 College               applied studies learning spaces. Refurbishment of library.
                                       Conversion to provide 2 general learning areas. Site works
                                       and travel.
Narellan         Magdalene Catholic    Construction of 2 art spaces, administration extension, staff         1 010 090
                 High School           amenities and staff facilities. Refurbishment of administration.
Pambula          Lumen Christi         Construction of 2 science laboratories, a preparation room with       1 063 378
Beach            Catholic College      chemical storage, 4 general learning areas, temporary
                                       technology facility area, temporary music and drama facilities,
                                       student toilets, staff facilities and technology and applied
                                       studies facilities.
Port Macquarie   St Joseph's High      Construction of extension to administration, staff facilities, art    1 284 495
                 School                facilities, 3 technical applied studies, canteen and 2 general
                 (McKillop Senior      learning areas. Conversion to provide science laboratory.
                 College Campus)
Prestons         St Catherine of       Construction of 8 general learning spaces, pupils' amenities          1 283 336
                 Siena Primary         and physical education store. Conversion to provide staff
                 School (Prestons)     room.
Tamworth         McCarthy Catholic     Construction of performing arts, music facilities, 2 general          2 732 724
                 College               learning areas and an extension to administration/staff
                                       facilities. Conversions to provide library facilities, 7 general
                                       learning areas, science laboratory, design technology and food
                                       technology areas.


__________________________________________________________________________________________



                                                       14
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                  Description of Project                                                  Grant
                                                                                                                   $

NEW SOUTH WALES

CATHOLIC BLOCK GRANT AUTHORITY
Wagga Wagga    Mater Dei Catholic      Construction of administration block, 3 technical and applied         1 864 663
               College                 studies spaces, technical applied studies area, 5 general
                                       learning areas, computer room, library, dark room, staff
                                       facilities, pupil toilets and amenities and sports store.
Waratah        Corpus Christi          Construction of general purpose learning area, administration           553 120
               Primary School          area, library, canteen, physical education store, pupils'
                                       amenities and travel. Refurbishment of 7 general learning
                                       areas.
Warnervale     MacKillop Catholic      Construction of administration, staff facilities building and         1 496 423
               College                 travel.
West Kempsey   St Paul's College       Construction of administration area, 2 science areas,                    77 967
                                       technology and applied studies area and travel. Conversion to
                                       provide general learning area and visual arts area.
                                       Refurbishment of science area and food technology area.
Young          Hennessy Catholic       Conversions to provide library. Travel.                                 177 860
               College
               St Mary's Primary       Construction of 2 general learning areas and an extension of            246 536
               School                  pupils' amenities.
                                       Total Catholic Block Grant Authority                                 21 738 483


INDEPENDENT BLOCK GRANT AUTHORITY
Auburn         Al Faisal College       Construction of 4 general learning areas, 4 specialist learning         350 000
                                       areas, canteen/home science area and reception area.
Ballina        Richmond Christian      Construction of library, administration area. temporary general         200 000
               College                 learning area (to be used as a science classroom and prep
                                       room) and shelter area.
Balmain        Inner City Montessori   Refurbishment of 2 general learning areas, computing space,             100 000
               Primary School          design and technology space, library/resource area, pupil
                                       amenities and travel. Professional fees. Furniture. Library
                                       resources.
Bankstown      Al Amanah College       Purchase of one additional property. Conversion of existing             300 000
                                       building to 7 general learning areas. Development of master
                                       plan. On-costs. Fittings and furnishings.
Bellbrook      Mirriwinni Gardens      Renovation of existing boys' dormitory to meet health and               197 000
               Aboriginal Academy      safety requirements, particularly with regard to fire regulations.
                                       Renovation of administration building. Remedial work on
                                       septic tanks.
Belrose        Covenant Christian      Construction of multi-purpose hall, 4 general learning areas,            90 397
               School                  staff and student amenities and maintenance area. Furniture
                                       and equipment. Demolition. Fire services.
Berowra        Berowra Christian       Construction of 4 general learning areas, amenities area,               150 000
               Community School        library and travel. Refurbishment of administration area.
Bourke         Cornerstone             Construction of general learning area (primary), pupil                  130 000
               Community Schools -     amenities and library/resource centre. Furniture. Equipment.
               Pera Bore, Bourke




__________________________________________________________________________________________




                                                       15
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                 Description of Project                                             Grant
                                                                                                                $

NEW SOUTH WALES

INDEPENDENT BLOCK GRANT AUTHORITY
Canyonleigh     Matthew Hogan          Purchase of loose furniture and equipment to support its              30 000
                School                 design and technology centre. The equipment includes hand
                                       tools, power tools, forming materials, oxy acetylene, materials
                                       for construction, concreting equipment and plant equipment,
                                       library resources.
                Matthew Hogan          Refurbishment of existing large machine shed to provide a            100 000
                School                 design and technology (building) facility. Installation of a
                                       concrete floor, fume extraction system, work bay, work
                                       benches, welding benches, furniture and equipment and
                                       timber store room.
Cherrybrook     Tangara School for     Construction of 6 general learning areas, pupil amenities,           150 000
                Girls                  administration facilities, enclosed travel, unenclosed travel and
                                       art store room. Road widening. Car parking. Landscaping.
Cobbitty        Macarthur Region       Construction of class room block comprising 7 general                200 000
                Anglican Church        learning areas, entrance area, covered walkway and
                School                 storeroom. Furniture and equipment.
Corrimal        Illawarra School for   Construction of shade structures for 4 outdoor learning areas.        37 000
                Autistic Children
Darlinghurst    East Sydney            Refurbishment of school's fixtures, fittings and classrooms           64 000
                Community-Based        generally. Electrical work, additional lighting and some
                High School            structural strengthening.
Dubbo           Dubbo Christian        Construction of 3 general learning areas, student amenities,         100 000
                School                 stores, special education/withdrawal facilities and physical
                                       education store. Furniture and equipment.

Dulwich Hill    St Maroun's College    Construction of administration facilities, students' amenities, 6    100 000
                                       general learning areas, music room, music practice room and
                                       music store. Other costs including fees, council fees, furniture,
                                       air-conditioning, fire services and lift for disabled.
East Armidale   Minimbah Primary       Construction of administration office, staff room, diagnostic        176 000
                School                 testing area and health pad. Fees. Furniture. Fire services.
                Minimbah Primary       Construction of student amenities and links.                          73 000
                School
Erina           Central Coast          Construction of 3 general learning areas, food technology,           150 000
                Adventist School       textile and design areas, storeroom and travel. Conversion to
                                       provide 2 general learning areas for industrial arts, arts, stores
                                       and staff room. Furniture and equipment.
Farmborough     Cedars Christian       Construction of access and car parking. (Waples Road                  50 000
Chase           College                upgrade).
Fletcher        Bishop Tyrrell         Construction of 4 general learning areas, covered area and           250 000
                Anglican College       external travel. Library resources. Furniture and equipment.
Greenacre       Malek Fahd Islamic     Construction of 3 art rooms and workshops with stores, 3             200 000
                School                 music rooms and music resource room, 2 staff rooms,
                                       walkways and courtyard. Furniture and equipment.
Hazelbrook      Blue Mountains         Construction of general learning area, library, kitchen, 1           120 000
                Steiner School         disabled toilet and travel. Fees. Furniture and equipment.
Manly           Stella Maris College   Construction of multi-purpose tiered hall, 3 general learning        300 000
                Manly                  areas, specialist classroom, physical education facility, music
                                       practice building, staff room and facilities. Refurbishment of
                                       existing travel. Furniture and equipment.


__________________________________________________________________________________________



                                                       16
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                            Grant
                                                                                                                $

NEW SOUTH WALES

INDEPENDENT BLOCK GRANT AUTHORITY
Mount Ousley    Elonera Montessori      Refurbishment of electrical, fire services, toilets, flooring,      103 000
                School                  telephone, security, administration/sick bay and entry point.
                                        Demolition/excavation of part of existing building.
Oakhurst        Richard Johnson         Construction of art learning area, music/drama learning area        300 000
                Anglican School         and store, design and technology area and amenities.
                                        Furniture and equipment.
Orchard Hills   Penrith Anglican        Construction of administration block, 4 general learning areas,      74 000
                College                 library resource room, student amenities and travel. Furniture
                                        and equipment.
                Penrith Christian       Construction of 7 general learning areas, computer room,            300 000
                Community School        resource area and administration area. Refurbishment of
                                        design and technology area, internal travel and external travel.
                                        Professional fees.
                Penrith Christian       Construction of technology block including art, music, science,      65 000
                Community School        LOTE, 2 general learning areas, computer lab and staff study.
                                        Student amenities block and store. Oval development. Site
                                        works. Roads, paths and paved areas. Landscaping and
                                        improvements.
Oxford Falls    Oxford Falls            Construction of 5 general learning areas, library and multi-        174,273
                Grammar School          purpose centre. Furniture and equipment. External
                                        infrastructure including parking, bus bay and roundabout.
Prestons        Sule College            Construction of 6 prefabricated general learning areas,             250 000
                                        portable general learning area and travel. Provision of furniture
                                        and equipment.
Salamander      St Philip's Christian   Construction of visual arts area, workshop, resource area and       300 000
Bay             College - Port          store, music room, 3 practice rooms and store, technology and
                Stephens                design complex, student amenities, enclosed and unenclosed
                                        travel.
Scone           Scone Grammar           Construction of art facility, design and technology facility,       250 000
                School                  computer and business studies facilities. Fees. Furniture and
                                        equipment.
Tamworth        William Cowper          Construction of 6 general learning areas, science laboratory,       300 000
                Anglican School         design and technology room, library, administration area,
                                        computing store room, student amenities and travel.
Taree           Taree Christian         Construction of creative arts block comprising art room, senior     400 000
                Community School        arts store room, photography room, kiln, drama and music
                                        room, music practice room and store room, design and
                                        technology rooms, storage and laundry, staff accommodation
                                        and amenities.
Telopea         Kingsdene Special       Construction of student amenities block. Demolition. Paving          70 000
                School                  and contingencies. Site development costs and professional
                                        fees.
                                        Construction of 4 general learning areas (primary), art
Terranora       Lindisfarne Anglican    specialist area, sport science laboratory and computer area,         50 000
                School                  design and technology area, covered work area and pupil
                                        amenities.
Terrey Hills    Kinma School            Installation and upgrading of sewerage, playground, remedial         55 000
                                        equipment and ground works.




__________________________________________________________________________________________




                                                        17
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School              Description of Project                                           Grant
                                                                                                          $

NEW SOUTH WALES

INDEPENDENT BLOCK GRANT AUTHORITY
Walla Walla    St Paul's College   Refurbishment of existing boys boarding house building to          130 000
                                   provide for technology workshop and computing and design
                                   room. Creation of staff accommodation. Extension and
                                   renovation of art learning space to include ceramics/kiln and
                                   print areas, and storage rooms.
Wallsend       Macquarie College   Construction of 7 general learning areas, amenities block,         330 000
                                   enclosed and unenclosed travel. Fees. Furniture.
West Ballina   Emmanuel Anglican   Construction of 4 general learning areas (primary), 5 general      300 000
               College             learning areas (secondary), art room, music/drama room, pupil
                                   amenities, enclosed and unenclosed travel, art store room,
                                   music/drama store and practice room.
West Hoxton    Thomas Hassall      Construction of multi-purpose hall/gym, food technology room,      201 200
               Anglican College    2 music/drama rooms, music/drama practice rooms & store,
                                   administration space, pupil amenities and enclosed and
                                   unenclosed travel.
Wyong          Wyong Christian     Construction of 3 general learning areas, science laboratory       400 000
               Community School    and preparation/store room, temporary library (future science
                                   laboratory) and travel.
                                   Total Independent Block Grant Authority                          7 669 870

                                   TOTAL BLOCK GRANT AUTHORITY                                     29 408 353




_______________________________________________________________________________________



                                                  18
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                   Description of Project                                            Grant
                                                                                                                $

VICTORIA

GOVERNMENT
Ararat          Ararat Primary School   Construction of general purpose classrooms and staff admin         400 000
                                        area. Upgrade of classrooms, library, art/craft, multi-purpose
                                        room, canteen and amenities.
Ballarat        Pleasant Street         Provision of general purpose classrooms, staff administration      600 000
                Primary School          and amenities.
                (Ballarat)
Balwyn North    Balwyn North Primary    Construction of general purpose classrooms, multi-purpose          450 000
                School                  classrooms, canteen, amenities and staff administration area.
Baranduda       Baranduda Primary       Construction of general purpose classrooms, art/craft, library,    450 000
                School                  multi-purpose room, staffs work space, student toilets and
                                        canteen - stage 2.
Berwick         Berwick Primary         Construction of new replacement school.                           3 200 000
                School
                Kambrya College         Provision of new school - stage 2.                                2 700 000
Blackburn       Laburnum Primary        Construction of general purpose classrooms, art/craft, canteen      650 000
                School                  amenities and staff administration area.
Boisdale        Boisdale                Upgrade of general purpose classrooms, library, staff              400 000
                Consolidated School     administration and amenities.
Boronia         Boronia Primary         Provision of general purpose classrooms, library and canteen.      600 000
                School                  Upgrade of art/craft facilities.
Brighton        Brighton Primary        Provision of general purpose classrooms, amenities and staff       530 000
                School                  workspace.
Burwood         Princess Elizabeth      Provision of new school.                                          1 000 000
                Junior School
Canterbury      Camberwell High         Upgrade of general purpose classrooms, library, staff              700 000
                School                  administration area home economics information technology
                                        and staff toilet.
Ceres           Ceres Primary School    Construction of general purpose classrooms, students toilets       300 000
                                        and staff administration area. Upgrade of distance education
                                        facility.
Cheltenham      Cheltenham              Construction of physical education, staffs work space and          700 000
                Secondary College       student toilets. Upgrade of general purpose classroom, arts,
                                        technology studies, lecture room staff work space and
                                        amenities - stage 1.
Cohuna          Cohuna Secondary        Upgrade of fabrics, general science, home economics, library,      429 000
                College                 staff administration and student centre lounge.
Colac           Colac South West        Construction of art/craft facility. Upgrade of general purpose     500 000
                Primary School          classrooms, library and amenities.
Cranbourne      Courtenay Gardens       Provision of general purpose classrooms.                           300 000
                Primary School
Croydon         Yarra Road Primary      Provision of library, multi purpose room, staff administration,    350 000
                School                  canteen and amenities.
Croydon Hills   Croydon Hills Primary   Construction of general purpose classrooms. Upgrade of            1 000 000
                School                  library, staff administration and amenities.
Deer Park       Deer Park West          Construction of multi-purpose room, library and canteen.           350 000
                Primary School          Upgrade of general purpose classrooms and art/craft facility.
Dromana         Peninsula Special       Construction of general purpose classrooms, workshop/art,          600 000
                Developmental           library, multi-purpose room, amenities and staff administration
                School                  area.


_______________________________________________________________________________________



                                                        19
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                  Description of Project                                              Grant
                                                                                                                 $

VICTORIA

GOVERNMENT
Edenhope        Edenhope College        Construction of general purpose classroom, relocatable               600 000
                                        classrooms, art, technology studies, staff work space and staff
                                        amenities. Upgrade of graphics, commerce and technology
                                        studies.
Eltham          Eltham High School      Construction of general purpose classrooms, home                     430 000
                                        economics, technology studies and staff work space.
Eltham North    Glen Katherine          Construction of general purpose classrooms and library.              700 000
                Primary School          Upgrade of staff administration and amenities.
Epping          Lalor North             Construction of music and drama facility and staff work space.       450 000
                Secondary College       Upgrade of general purpose classrooms, graphics, information
                                        technology, library and canteen.
Geelong East    Geelong East Primary    Provision of relocatable general purpose classrooms. Upgrade         500 000
                School                  of classrooms, library, sick bay and staff administration area.
Geelong North   Herne Hill Primary      Provision of general purpose classrooms, library, art/craft          550 000
                School                  facilities, amenities and staff administration.
Greensborough   Greensborough           Upgrade of general purpose classrooms, arts, science. Staff          430 000
                Secondary College       administration, lecture rooms student locker space and student
                                        lounge.
Hampton         Hampton Primary         Provision of library, art/craft and music facilities. Upgrade of     500 000
                School                  general purpose classrooms and staff administration.
Heathcote       Heathcote Primary       Construction of general purpose classrooms, relocatable              450 000
                School                  classrooms and library. Upgrade of staff administration and
                                        amenities.
Heathmont       Heathmont College       Upgrade of general purpose classrooms, graphics, information         450 000
                                        technology, fabrics, home economics, general science,
                                        physics, staff work space and student centre.
Kangaroo Flat   Kangaroo Flat           Construction of replacement school.                                  950 000
                Primary School
Kings Park      Copperfield College -   Construction of physical education activity area, staff work         450 000
                Kings Park Junior       space, canteen, boys change/shower. Upgrade of drama and
                Campus                  science facilities.
Lalor           Lalor North Primary     Upgrade of general purpose classrooms, music, drama,                 450 000
                School                  graphics, information technology, library, canteen, staff work
                                        space and student locker space.
Langawarrin     Langwarrin Park         Provision of general purpose classrooms.                             650 000
                Primary School
Lara            Lara Secondary          Provision of new school - stage 1.                                  1 800 000
                College
Leopold         Leopold Primary         Provision of general purpose classrooms, physical education         1 303 000
                School                  area and amenities.
Lilydale        Birmingham Primary      Provision of general purpose classrooms, art/craft facilities and    700 000
                School                  amenities. Upgrade of library.
Lucknow         Lucknow Primary         Provision of replacement school.                                    1 700 000
                School
McKinnon        McKinnon Secondary      Construction of graphics, technology studies and staff work          550 000
                College                 space - stage 1.
Melton          Wedge Park Primary      Construction of general purpose classrooms and staff                 350 000
                School                  workspace.




_______________________________________________________________________________________



                                                       20
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                Description of Project                                            Grant
                                                                                                             $

VICTORIA

GOVERNMENT
Mentone         Mentone Primary       Construction of general purpose classrooms, relocatable            500 000
                School                classrooms, library, multi-purpose room and canteen. Upgrade
                                      of classrooms, staff administration and amenities.
Mont Albert     Mont Albert Primary   Provision and upgrade of general purpose classrooms.               530 000
                School
Montmorency     Montmorency           Provision of art facility, library, lecture room and amenities.   1 100 000
                Secondary College     Upgrade of personal development and general purpose
                                      classrooms.
Mooroolbark     Mooroolbark East      Construction of music, physical education, canteen and             470 000
                Primary School        amenities. Upgrade of classrooms, library and staff
                                      administration - stage 2.
Mooroopna       Mooroopna             Construction of technology studies and staff work space.           550 000
                Secondary College     Upgrade of arts, personal development, staff work space,
                                      student locker space and student centre/lounge.
Mornington      Brenton Junior        Provision of new school.                                          2 400 000
                College
Mount Eliza     Mount Eliza Primary   Construction of music area, library, staff administration and      500 000
                School                amenities. Upgrade of general purpose classrooms.
                Kunyung Primary       Construction of general purpose classrooms and staff work          450 000
                School                space - stage 3.
Murtoa          Murtoa College        Construction of relocatable general purpose classrooms.            500 000
                                      Upgrade of classrooms, library, lecture room, staff
                                      administration and amenities.
Napoleons       Napoleons Primary     Construction of general purpose classrooms, library, staff         450 000
                School                administration and amenities.
Narre Warren    Hillsmeade Primary    Provision of new school.                                          1 600 000
                School
Narre Warren    Narre Warren South    Provision of new school - stage 2.                                1 800 000
South           P-12 School
Newtown         Chilwell Primary      Provision of relocatable general purpose classroom and multi-      400 000
                School                purpose room. Upgrade of classrooms, art/craft, library and
                                      student toilets.
                Fyans Park Primary    Provision of general purpose classrooms, canteen and               300 000
                School                amenities. Upgrade of art/craft facilities.
Numurkah        Numurkah Secondary    Construction of science facility.                                  200 000
                College
Ringwood        Ringwood Secondary    Upgrade of general purpose classrooms, library, technology         500 000
                College               studies, amenities, staff and administration area - stage 3.
Rosanna         Rosanna Primary       Construction of general purpose classrooms art/craft and staff     450 000
                School                work space.
                Viewbank College      Upgrade of art graphics, fabrics, home economics, technology       450 000
                                      studies and staff work space.
Rowville        Rowville Primary      Provision of general purpose classrooms. Upgrade of staff          650 000
                School                administration.
Roxburgh Park   Roxburgh College –    Provision of new school - stage 1.                                2 000 000
                Roxburgh Campus
Somerville      Somerville Rise       Provision of general purpose classrooms.                           400 000
                Primary School
St Albans       Albanvale Primary     Provision of general purpose classrooms.                           520 000
                School

_______________________________________________________________________________________



                                                      21
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                             Grant
                                                                                                                 $

VICTORIA

GOVERNMENT
Strathmore       Strathmore              Provision of personal development facility. Upgrade of general      450 000
                 Secondary College       purpose classrooms, commerce, fabrics and home economics
                                         facilities and amenities.
Sydenham         Copperfield College -   Construction of new school - stage 2.                               600 000
                 Sydenham Junior
                 Campus
                 Copperfield College -   Provision of new school - stage 3.                                  700 000
                 Sydenham Junior
                 Campus
Taylors Lakes    Taylors Lakes           Provision of general purpose classrooms library and staff           450 000
                 Primary School          workspace.
Thomastown       Thomastown              Provision of general purpose classrooms, music facilities and       270 000
                 Meadows Primary         staff administration.
                 School
Thornbury        Wales Street Primary    Provision of library, multi purpose room, art/craft and music       320 000
                 School                  facility, canteen and student amenities.
Trafalgar        Trafalgar High School   Construction of arts, personal development, science and staff       750 000
                                         administration areas. Upgrade of general science, technology
                                         studies and student amenities.
Upper Ferntree   Upper Ferntree Gully    Construction of relocatable general purpose classrooms,             400 000
Gully            Primary School          art/craft, music, staff work space and amenities.
Warragul         Warragul Regional       Provision of general purpose classrooms, commerce,                  600 000
                 College                 technology, staff administration and amenities.
Warrnambool      Warrnambool East        Upgrade of general purpose classrooms, library and student          650 000
                 Primary School          amenities. Provision of staff administration and amenities.
                 Warrnambool West        Provision and upgrade of general purpose classrooms and             450 000
                 Primary School          art/craft facility.
Wendouree        Forest Street Primary   Provision and upgrade of general purpose classrooms, multi          450 000
                 School                  purpose room, staff administration, canteen and amenities.
Wheelers Hill    Wheelers Hill           Construction of library and student lockers. Upgrade of             550 000
                 Secondary College       technology studies and staff administration area.
Whittlesea       Whittlesea Secondary    Provision of personal development, arts and technology              350 000
                 College                 facilities, staff administration and canteen.
Williamstown     Bayside Secondary       Upgrade of general purpose classrooms, information                  400 000
                 College                 technology, home economics, science, staff work place,
                                         canteen and amenities.
Wyndhamvale      Iramoo Primary          Provision of physical education and music facilities, general       350 000
                 School                  purpose classrooms and canteen. Upgrade of library.
                                         TOTAL GOVERNMENT                                                 54 632 000




_______________________________________________________________________________________




                                                        22
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location        School                  Description of Project                                               Grant
                                                                                                                 $

VICTORIA

CATHOLIC BLOCK GRANT AUTHORITY
Altona West     Mount St Joseph         Construction of arts facilities.                                     700 000
                Girls' College
Benalla         FCJ College             Construction of technology and applied studies extension.            427 186
Bendigo North   St Peter's School       Construction of administration area, 4 general learning areas,       768 131
                                        video conferencing room, reading recovery room and travel.
                                        Demolition of existing facilities.
Bunyip          Columba Catholic        Construction of library, multi-purpose area, student and staff       840 000
                Primary School          amenities, administration facilities and travel.
Cobram          St Joseph's School      Construction of 5 general learning areas and covered                 466 095
                                        walkway. Demolition of existing facilities. Relocation of
                                        portable building.
Colac           Sacred Heart School     Refurbishment of 4 general learning areas and travel.                170 000
                St Mary's School        Refurbishment of 4 general learning areas and multi-purpose          245 000
                                        room.
                Trinity College Colac   Construction of travel. Refurbishment of special education           587 945
                Inc                     area, office, student amenities, information technology facilities
                                        and information resource centre.
Cranbourne      St Agatha's Primary     Construction of front entry. Refurbishment of administration         110 000
                School                  and staff facilities.
                St Peter's College      Construction of 6 general learning areas, associated areas,          799 400
                                        student amenities and travel.
Creswick        St Augustine's School   Construction of administration, staff and library facilities.        397 000
                                        Refurbishment of 4 general learning areas and external works
                                        and services.
Dallas          Holy Child Primary      Construction of administration areas. Reconstruction of              590 000
                School                  student amenities. Refurbishment of library and administration
                                        areas.
East Coburg     Antonine Sisters        Reconstruction of student amenities. Refurbishment of                236 509
                Maronite Catholic       playground pavements.
                School
Epping          St Monica's College     Construction of food technology centre.                              142 937
                (Dalton Road
                Campus)
Euroa           St John's Primary       Refurbishment of administration, staff facilities and external       208 416
                School                  pavements. Conversion to provide sick bay, entry and
                                        administration areas.
Geelong         Catholic Regional       Construction of information learning centre including staff and      661 504
                College                 administration area.
                (St Thomas Campus,
                Drysdale)
Hamlyn          St Anthony's Primary    Conversion and refurbishment to provide administration area          139 000
Heights         School                  and staff facilities.
Kerang          St Joseph's School      Construction of library.                                             181 413
Kilmore         Assumption College      Conversion to provide administration facilities.                     850 000
Laverton        St Martin de Porres'    Construction of 2 general learning areas. Reconstruction of          210 000
                Primary School          administration areas. Refurbishment of external pavements.




_______________________________________________________________________________________



                                                         23
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                  Description of Project                                             Grant
                                                                                                                $

VICTORIA

CATHOLIC BLOCK GRANT AUTHORITY
Leongatha        Mary Mackillop          Construction of information technology centre and staff area       651 000
                 Catholic Regional       extension. Refurbishment of relocatable classroom and staff
                 College                 area. Relocation of information technology room, music room,
                                         art room and relocatable building.

Maryborough      St Augustine's School   Refurbishment of student amenities and external areas.              143 422
Mildura          St Joseph's College     Conversion to provide food technology, hospitality and            1 081 900
                                         materials technology facilities and associated areas.
Narre Warren     Mary Mackillop          Construction of 5 general learning areas, associated areas,        656 000
North            Primary School          stores and covered ways. Extension of student amenities.
                 Mary Mackillop          Construction of multi-purpose building. Refurbishment of staff     500 000
                 Primary School          amenities.
Newcomb          Christ the King         Construction of staff and administration areas, entry and site     370 000
                 School                  works. Conversion to provide 4 specialist rooms.
Preston          Sacred Heart Primary    Reconstruction of staff and administration facilities.              68 795
                 School                  Refurbishment of library. Conversion to provide multi-purpose
                                         area.
Springvale       Killester College       Conversion to provide computer areas, storage and travel in        150 000
                                         technology/arts facility. Asbestos removal and replacement of
                                         ceilings.
                 St Joseph's Parish      Refurbishment of library, work room and staff resource areas.      469 000
                 Primary School          Reconstruction of student amenities.
St Albans West   Resurrection Primary    Construction of 8 general learning areas and administration        323 995
                 School                  area. Refurbishment of administration area as a multi-purpose
                                         area. Demolition of 8 relocatable classrooms.
Sunshine         Our Lady's School       Reconstruction of 4 general learning areas. Refurbishment of       889 925
                                         4 general learning areas. Conversion to provide administration
                                         areas.
Sunshine West    Marian College          Construction of gymnasium facility.                                695 153
Sydenham         Emmaus Catholic         Construction of 6 general learning areas, pupils' amenities and    163 089
                 Primary School          travel.
Tarneit          Thomas Carr College     Construction of music and drama facilities and associated          780 382
                                         areas, 12 general learning areas, multi-purpose area,
                                         associated areas and travel, gymnasium, student amenities
                                         and associated areas. Conversion to provide an extension to
                                         information technology area.
Tatura           Sacred Heart School     Construction of staff and administration facilities.               259 895
Thomastown       St Clare's School       Construction of multi-purpose facility, canteen and student        318 000
West                                     amenities.
Tongala          St Patrick's Primary    Refurbishment of library, 2 general learning areas, technology     148 937
                 School                  room, staff room and administration areas.
Traralgon        Lavalla Catholic        Construction of verandahs and main entry. Refurbishment of         686 320
                 College (Presentation   main classroom block and administration and library areas.
                 Campus)                 Relocation of portable classrooms.
Warrnambool      Emmanuel College        Refurbishment of arts/technology wing.                              64 706
                 (Ardlie Street
                 Campus)
Werribee North   Bethany Primary         Construction of 6 general learning areas and associated            980 000
                 School                  areas.


_______________________________________________________________________________________




                                                        24
                    SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                          GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                                Grant
                                                                                                                    $

VICTORIA

CATHOLIC BLOCK GRANT AUTHORITY
Wonthaggi         St Joseph's School      Refurbishment of administration, staff areas and student              164 137
                                          amenities.
Yarrawonga        Sacred Heart College    Construction of general learning area and applied                     493 967
                                          studies/technology area. Refurbishment of administration and
                                          staff areas.
                                          Total Catholic Block Grant Authority                               18 789 159


INDEPENDENT BLOCK GRANT AUTHORITY
Alphington        Alphington Grammar      Refurbishment of 4 general learning areas and administration.        282 000
                  School                  Construction of science room.
Baxter            Bayside Christian       Extension and refurbishment of library. Construction of art and      300 000
                  College                 general learning area.
Bendigo           Victory Christian       Construction of general learning area and information                336 500
                  College                 technology area, amenities, office and locker bay.
Broadmeadows      Isik College            Construction of art room and amenities.                              270 000
                  Isik College            Construction of shade structure.                                      15 000
Caulfield South   Caulfield Montessori    Construction of 3 general learning areas and                          81 759
                  School                  reception/administration area.
Cobram            Christ the King         Construction of library resource centre, administration and          190 000
                  Anglican College        amenities.

Diamond Creek     Plenty Valley           Construction of general learning area.                               105 000
                  Montessori School
Elsternwick       Adass Israel School     Construction of special education & ESL areas and                    150 000
                                          administration.
Geelong           St John's Lutheran      Construction of 2 general learning areas. Conversion of art to 1     190 000
                  School                  general learning area. Refurbishment of student amenities.
                  St John's Lutheran      Conversion to create art, music and LOTE areas.                      125 000
                  School
Greenvale         Aitken College          Construction of VCE centre (5 general learning areas, offices,       430 000
                                          amenities, common room, storage and study areas).
Heatherton        Heatherton Christian    Construction of 2 general learning areas and administration.         213 500
                  College
Keysborough       Lighthouse Christian    Construction of home economics, information technology, art          225 000
                  College                 and 4 general learning areas.
Leongatha         South Coast Christian   Construction of library, general learning area and information       400 000
                  College                 technology area. Conversion to create administration and
                                          student amenities.
Lilydale          Edinburgh Adventist     Construction of general learning area.                                90 000
                  Primary
Macedon           Macedon Grammar         Construction of student amenities.                                    70 000
                  School Co-Op Ltd
Melton            Mowbray College         Construction of 9 general learning areas, administration and           4 939
                                          student amenities.
Mildura           Holy Trinity Lutheran   Construction of 2 general learning areas, art and music areas.       240 000
                  School
Mount Evelyn      Mount Evelyn            Construction of science and home economics areas.                    100 000
                  Christian School        Refurbishment of art area.


_______________________________________________________________________________________



                                                         25
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                  Description of Project                                               Grant
                                                                                                                  $

VICTORIA

INDEPENDENT BLOCK GRANT AUTHORITY
North Coburg    King Khalid Islamic     Construction of 4 general learning areas, seminar room,               200 000
                College of Victoria     administration area and amenities.
                (Inc)
North Fawkner   Darul Ulum College of   Construction of library. Conversion to create 2 general learning      412 400
                Victoria                areas.
Nunawading      Nunawading Seventh      Construction of 2 general learning areas, amenities and               220 000
                Day Adventist           extension to library.
                Primary School
Oakleigh        Oakleigh Greek          Construction of art area.                                             117 000
                Orthodox College
Shepparton      Shepparton Christian    Construction of student amenities.                                    149 250
                Community School
Springvale      Minaret College         Construction of multi-purpose hall (amenities, weights room,          100 000
                                        stage, offices and foyer).
                Minaret College         Construction of multi-purpose hall and canteen.                       200 000
St Kilda East   Yeshivah and Beth       Refurbishment of 8 general learning areas and administration.         340 000
                Rivkah Colleges         Construction of amenities area and administration area.
                                        Conversion to provide library, computer area, special education
                                        area, associated stores, administration area and travel.
Taylors Hill    Gilson College          Construction of 3 general learning areas, administration,             500 000
                                        amenities and information technology.
Wodonga         Mount Carmel            Construction of materials technology room.                            250 000
                Christian School
                                        Total Independent Block Grant Authority                             6 307 348

                                        TOTAL BLOCK GRANT AUTHORITY                                        25 096 507




____________________________________________________________________________________



                                                       26
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                             Grant
                                                                                                                 $

QUEENSLAND

GOVERNMENT
Albany Creek    Albany Hills State      Extension of administration block.                                  296 000
                School
Annandale       Annandale State         Provision of a three space relocatable building. Construction of    562 000
                School                  4th classroom space.
Beaconsfield    Beaconsfield State      Construction of half general learning area block - stage 1.         495 000
                School
Beerwah         Beerwah State           Upgrade of special education unit.                                  390 000
                School
Cairns          Balaclava State         Upgrade of administration area.                                     126 967
                School
Cawarral        Cawarral State          Upgrade of relocatable administration area and library.             422 000
                School
Cleveland       Cleveland State         Upgrade of administration area.                                     278 000
                School
Crestmead       Crestmead State         Provision of a two space relocatable building.                      205 697
                School
Currimundi      Currimundi Special      Construction of 4 general learning areas and student               1 097 000
                School                  amenities.
                Talara Primary          Provision of a two space relocatable building.                      188 000
                College
Edmonton        Bentley Park College    Provision of a two space relocatable building - special             385 000
                                        education unit.
Flagstone       Flagstone State         Construction of new school - stage 1.                              7 000 000
                Community College
Forest Lake     Forest Lake State       Construction of resource centre.                                   1 800 000
                High School
Geebung         Geebung Special         Provision of a two space relocatable building.                      280 000
                School
Glass House     Glass House             Construction of canteen, amenities and covered play area.           639 000
Mountains       Mountains State
                School
Glennie         Glennie Heights State   Construction of resource centre.                                    258 000
Heights         School
Warwick
Goodna          Goodna Special          Provision of a two space relocatable building.                      265 000
                School
Ipswich         Ipswich Central State   Upgrade of administration area.                                     203 000
                School
Jindalee        Centenary State High    Construction of general learning area block.                       1 450 000
                School
Logan Central   Logan City Special      Provision of a two space relocatable building                       394 000
                School
Mango Hill      North Lakes State       Construction of new school - stage 2.                               900 000
                College
Mansfield       Mansfield State High    Upgrade of administration area.                                     150 000
                School
Maroon Dam      Maroon Outdoor          Upgrade of kitchen.                                                 427 000
via Boonah      Education Centre
Maryborough     Maryborough West        Conversion of staffroom to general learning areas. Creation of      455 850
                State School            administration area by enclosure of undercroft.

_______________________________________________________________________________________



                                                        27
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                   Description of Project                                                Grant
                                                                                                                    $

QUEENSLAND

GOVERNMENT
Middle Ridge    Middle Ridge State      Provision of a two space relocatable building.                         195 892
Toowoomba       School
Mornington      Mornington Island       Construction of staff amenities block.                                 395 000
Island Gununa   State School
Mount Isa       Spinifex State          Construction of Mount Isa education precinct - stage 1 - junior        750 000
                College-Mount Isa-      secondary campus.
                Junior Campus
Mountain        Mountain Creek State    Provision of 2 x two space relocatable buildings and 2 hire            415 000
Creek           High School             buildings.
Mudgeeraba      Mudgeeraba Special      Provision of 2 x two space relocatable buildings.                      634 000
                School
Nambour         Nambour State High      Provision of a two space relocatable building.                         198 000
                School
Narangba        Narangba Valley         Construction of school facilities - stage 4.                           800 000
                State High School
Nelly Bay       Magnetic Island State   Upgrade of administration area.                                        400 000
Magnetic        School
Island
North           Tamborine Mountain      Construction of establishment stage.                                   889 000
Tamborine       State High School
                Tamborine Mountain      Provision of general learning area block.                              852 000
                State High School
Palm Beach      Palm Beach-             Refurbishment of Blocks D and G to provide 4 classroom                 330 000
                Currumbin State High    spaces.
                School
Redland Bay     Redland Bay State       Construction of general learning area block - stage 2.                 244 000
                School
Silkstone       Silkstone State         Provision of a two space relocatable building - special education      256 000
                School                  unit.
Tannum Sands    Tannum Sands State      Provision of a two space relocatable building.                         225 000
                School
Tingalpa        Tingalpa State School   Construction of general learning area block - stage 2.                 319 000
Torbanlea       Torbanlea State         Upgrade of administration area and library.                            250 000
                School
Upper           Upper Coomera State     Construction of new school.                                          10 000 000
Coomera         College

                                        Minor projects                                                        8 697 594
                                        TOTAL GOVERNMENT                                                    44 518 000




_______________________________________________________________________________________



                                                         28
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                 Description of Project                                             Grant
                                                                                                             $

QUEENSLAND

CATHOLIC BLOCK GRANT AUTHORITY
Annandale      Southern Cross         Construction of 2 general learning areas, administration and       173 631
               Catholic School        travel. Conversion to provide library. Furniture and equipment.
Beaudesert     St Mary's School       Construction of 3 general learning areas and travel. Furniture      75 000
                                      and equipment.
Brighton       St Kieran's School     Refurbishment of 3 general learning areas, library and travel.     144 355
                                      Furniture.
Bulimba        Sts Peter and Paul's   Construction of 4 general learning areas, library,                 452 820
               School                 administration and travel. Furniture and equipment.
Cairns         St Andrew's Catholic   Construction of general learning area, library, pupils'            153 815
               College                amenities, administration and travel. Refurbishment of pupils'
                                      amenities and general learning area. Furniture and equipment.
               St Monica's College    Refurbishment of administration and travel.                        360 482

Camp Hill      St Thomas' School      Construction of 2 general learning areas, pupils' amenities and    103 607
                                      travel. Furniture and equipment.
Chinchilla     St Joseph's School     Conversion to provide administration, pupils' amenities,           128 719
                                      general learning area and travel. Refurbishment of
                                      administration. Furniture and equipment.
Clayfield      St Agatha's Primary    Refurbishment of library, administration area, 5 general           132 000
               School                 learning areas and travel.
Clermont       St Joseph's School     Conversion to provide library.                                      30 322
Collinsville   St John Bosco's        Conversion to provide administration, pupils' amenities and        162 173
               School                 physical education store. Furniture.
Cunnamulla     Sacred Heart Parish    Refurbishment of library, 6 general learning areas, pupils'        413 605
               School                 amenities and travel. Equipment.
Dalby          St Columba's School    Construction of library, administration, 2 general learning        216 465
                                      areas and travel. Furniture and equipment.
               St Mary's College      Construction of pupils' amenities and travel. Refurbishment of     228 357
                                      administration and travel. Furniture.
Eli Waters     Xavier Catholic        Construction of library, 6 general learning areas,                 261 721
               College                administration, pupils' amenities, physical education store,
                                      science, preparation room, art, art store, manual arts, home
                                      economics and travel.
Gatton         Our Lady of Good       Construction of pre-school, 3 general learning areas and           390 011
               Counsel School         travel. Refurbishment of administration. Furniture and
                                      equipment.
Gladstone      Star of the Sea        Refurbishment of 3 general learning areas. Furniture and           140 810
               School                 equipment.
Halifax        St Peter's Convent     Conversion to provide library, administration, pupils' amenities   226 364
               School                 and pre-school. Refurbishment of 2 general learning areas and
                                      pupil's amenities. Furniture and equipment.
Highfields     Mary MacKillop         Construction of 6 general learning areas, pre-school, pupils'      200 000
               Catholic School        amenities, administration, library and travel. Furniture and
                                      equipment.
Ingham         Gilroy Santa Maria     Construction of pupils' amenities, physical education store,       292 336
               College                equipment store and travel. Equipment.
Jimboomba      Emmaus Primary         Construction of pre-school, 11 general learning areas,             481 193
               School                 administration, library, pupils' amenities, physical education
                                      area and travel. Furniture and equipment.


_______________________________________________________________________________________



                                                     29
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location        School                  Description of Project                                              Grant
                                                                                                                $

QUEENSLAND

CATHOLIC BLOCK GRANT AUTHORITY
Kedron          St Anthony's School     Construction of extension to library, extension to 8 general        295 691
                                        learning areas and travel. Refurbishment of library and 7
                                        general learning areas. Furniture.
Kenmore         Our Lady of the         Construction of 2 general learning areas, administration and        309 997
                Rosary School           travel. Refurbishment of 3 general learning areas,
                                        administration and travel. Furniture and equipment.
Kingaroy        South Burnett           Construction of manual arts and travel. Demolition. Furniture       242 576
                Catholic College        and equipment.
Kingston        The Centre Education    Construction of administration, computer room, 7 general            270 669
                Programme               learning areas, pupils' amenities and travel. Furniture and
                                        equipment.
Kirwan          Ryan Catholic           Construction of 5 general learning areas, pupils' amenities,        200 000
                College                 administration and travel. Furniture and equipment.
Mackay          Mercy College           Construction of administration extension. Refurbishment of           24 066
                                        administration. Conversion to provide travel. Equipment.
Mackay West     St Francis Xavier's     Refurbishment of general learning area, administration, pupils'      86 711
                School                  amenities and travel.
Manunda         St Francis Xavier's     Conversion to provide pre-school. Construction of pre-school,       142 964
                School                  2 general learning areas, pupils' amenities and travel.
                                        Furniture and equipment.
Mitchell        St Patrick's Parish     Conversion to provide library. Refurbishment of 3 general           154 145
                Primary School          learning areas and travel. Furniture and equipment.
Mossman         St Augustine's School   Construction of general learning area, pupils' amenities and        354 660
                                        travel. Refurbishment of physical education store. Furniture
                                        and equipment.
Mount Gravatt   St Agnes' School        Refurbishment of 3 general learning areas, store,                    91 452
                                        administration and travel.
Quilpie         St Finbarr's School     Conversion to provide administration. Refurbishment of              202 867
                                        administration, general learning area and boarding ablutions.
                                        Furniture and equipment.
Rasmussen       Good Shepherd           Construction of 4 general learning areas and travel.                171 331
                Catholic Community      Conversion to provide library. Furniture and equipment.
                School
Sippy Downs     Siena Catholic          Construction of library, 9 general learning areas,                   45 507
                College                 administration area, pupils' amenities, physical education store
                                        and travel. Conversion to provide administration area.
                                        Furniture and equipment.
                Siena Catholic          Construction of 5 general learning areas, pupils' amenities and     100 000
                Primary School          travel. Furniture and equipment.
                Siena Catholic          Construction of pre-school, 9 general learning areas, pupils'       600 000
                Primary School          amenities, administration area, library and travel. Furniture and
                                        equipment.
Springfield     St Augustine's          Construction of library, pre-school, 14 general learning areas,     636 105
                College                 pupils' amenities, 2 physical education stores, administration,
                                        science, art, home economics, manual arts and travel.
                                        Furniture and equipment.
Springsure      Our Lady of the         Refurbishment of pre-school and store, general learning area,        56 198
                Sacred Heart School     administration and pupils' amenities. Furniture and equipment.




_______________________________________________________________________________________




                                                        30
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                 Description of Project                                              Grant
                                                                                                              $

QUEENSLAND

CATHOLIC BLOCK GRANT AUTHORITY
Stanthorpe     St Joseph's School     Refurbishment of home economics, general learning area and          223 904
                                      travel. Furniture and equipment.
Toowoomba      St Joseph's College    Refurbishment of general learning area and travel. Conversion        48 420
                                      to provide disabled toilet. Furniture.
               St Saviour's College   Refurbishment of lower dormitories including reception,              67 782
                                      laundry, common room, supervisor's rooms and director's
                                      office. Furniture.
Wilston        St Columba's Primary   Construction of library and travel. Conversion to provide            84 259
               School                 general learning area. Furniture and equipment.
Yeppoon        St Brendan's College   Construction of library, 3 general learning areas,                  600 000
                                      administration and travel. Refurbishment of manual arts.
                                      Furniture.
                                      Total Catholic Block Grant Authority                              9 777 090


INDEPENDENT BLOCK GRANT AUTHORITY
Andrews        St Andrews Lutheran    Construction of 3 manual arts rooms, spray booth, wet area, 2        88 963
               College                store rooms, computer/technology room, staff room and travel.
                                      Equipment.
               St Andrews Lutheran    Construction of 4 (secondary) general learning areas (GLA) 2         30 236
               College                music rooms computer laboratory temporary (secondary)
                                      GLA (to be used later as a music/drama room) staff room
                                      (secondary) pupils’ and staff amenities and travel.
Annandale      Annandale Christian    Construction of administration/library building. Conversion of       10 000
               School                 library to home economics. Furniture and equipment.
Ashmore        Trinity Lutheran       Construction of home economics room staff preparation room           85 209
               College                staff room and travel. Upgrading of 2 home economics rooms.
Bald Hills     St Paul's School       Construction of 8 general learning areas administration area          3 574
                                      store room pupils' amenities and travel and extension to
                                      covered way. Conversion of general learning area to
                                      administration area.
               St Paul's School       Construction of pupils' and staff amenities 4 store rooms first      28 898
                                      aid room and travel.
Beaconsfield   Whitsunday Anglican    Construction of 4 general learning areas 2 store rooms 2 staff       10 000
               School                 preparation rooms covered area and covered link. Furniture.
               Whitsunday Anglican    Conversion of 3 general learning areas to 2 pre-school general       12 223
               School                 learning areas kitchen 2 store rooms and (primary) general
                                      learning area. Construction of extension to pre-school general
                                      learning area and to travel.
Bethania       Bethania Lutheran      Construction of 2 general learning areas (GLA) withdrawal            14 051
               Primary School         room temporary drama room (to be used later as a GLA)
                                      temporary music room (to be used later as a GLA) temporary
                                      music practice room (to be used later as a store room) covered
                                      link and travel.
Birtinya       Pacific Lutheran       Construction of staff room staff preparation room 2 interview        45 800
               College                rooms 3 (secondary) general learning areas (GLA)
                                      (secondary) pupils' and staff amenities 2 science laboratories
                                      science preparation room temporary art room (to be used later
                                      as a science room).


_______________________________________________________________________________________




                                                     31
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                    Description of Project                                          Grant
                                                                                                               $

QUEENSLAND

INDEPENDENT BLOCK GRANT AUTHORITY
Bray Park       Genesis Christian         Construction of 2 (primary) general learning areas (secondary)   110 889
                College                   general learning area drama room music room 2 withdrawal
                                          rooms art room 2 art store rooms dark room gallery music
                                          store room office covered link and travel.
Bundaberg       Bundaberg Christian       Construction of (combined) library incorporating 2 seminar        67 801
                College                   rooms work room office and entry area 3 (secondary)
                                          general learning areas (GLA) 2 home economics rooms 3
                                          home economics store rooms art rooms staff room and
                                          covered area.
                Bundaberg Christian       Construction of 5 general learning areas 4 withdrawal rooms.      42 693
                College                   Extension to pupils' amenities and travel. Furniture and
                                          equipment.
                Bundaberg Christian       Construction of covered area.                                      1 546
                College
                St John's Lutheran        Construction of administration building including library.        26 018
                Primary School            Conversion of administration area to general learning area 2
                                          remedial rooms and wet area. Furniture.
Burua           Faith Baptist Christian   Construction of 4 general learning areas withdrawal room          11 073
                School                    multi-purpose general learning area 2 administration areas
                                          store room computer room staff amenities covered area and
                                          travel.
Caboolture      Caboolture Christian      Construction of 2 (primary) general learning areas withdrawal    139 757
                School                    room wet area store room (primary) pupils’ amenities and
                                          travel. Furniture.
Cannonvale      Whitsunday Christian      Construction of 4 (primary) general learning areas 2             195 221
                College                   withdrawal rooms 2 wet areas 3 staff preparation rooms
                                          science laboratory science preparation/store room temporary
                                          (secondary) general learning area (to be used later as science
                                          laboratory).
                Whitsunday Christian      Construction of 4 general learning areas 2 withdrawal rooms 2    536 700
                College                   staff preparation rooms administration area staff common room
                                          pupils' and staff amenities and travel.
Charters        Blackheath and            Extension to boarding house office. Upgrading of boys' and       101 740
Towers          Thornburgh College        girls' dormitories and ablution areas. Furniture.
Coomera         Saint Stephen's           Construction of 2 science laboratories science preparation       354 886
                College                   room drama area 8 general learning areas audio-visual room
                                          computer resource room 2 seminar rooms 2 air-conditioning
                                          plant rooms sports store room library area pupils' and staff
                                          amenities.
Dakabin         Northpine Christian       Construction of 6 (primary) general learning areas 4 learning     20 908
                College                   support rooms computer laboratory computer control room
                                          withdrawal room 2 store rooms covered area covered link
                                          and travel.
Doonan          Noosa Pengari             Construction of (primary) general learning area 4 store rooms     88 877
                Steiner School            wet area (primary) pupils’ amenities covered area and travel.
                                          Upgrading of administration building.
Everton Hills   Prince of Peace           Construction of 2 general learning areas kitchen area            159 321
                Lutheran Primary          teachers' preparation room entry area 4 general learning
                School                    areas 2 withdrawal rooms practical learning area 3 store
                                          rooms pupils' and staff amenities covered area and travel.


_______________________________________________________________________________________



                                                         32
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location         School                 Description of Project                                             Grant
                                                                                                               $

QUEENSLAND

INDEPENDENT BLOCK GRANT AUTHORITY
Everton Park    Northside Christian    Construction of tiered lecture room/music and drama theatrette       31 919
                College                including 2 change rooms and pupils' amenities home
                                       economics/catering facility comprising dining room/textiles
                                       area laundry 2 store rooms staff room home economics area
                                       and 4 withdrawal rooms.
Forest Glen     Sunshine Coast         Construction of 9 general learning areas. Extension of staff         83 017
                Grammar School         room staff amenities and travel. Conversion of 2 temporary
                                       general learning areas to 2 science laboratories..
Forest Lake     Forest Lake College    (Alpine place campus) construction of art learning area 2            71 106
                                       teachers’ preparation rooms 2 store rooms practical art area
                                       covered area (primary) pupils’ amenities under croft and travel.
                Forest Lake College    Construction of 13 general learning areas library 3 offices store    89 561
                                       room teachers' preparation room pupils' amenities entry area
                                       and travel. Conversion of temporary general learning area to
                                       staff room and staff amenities.
                Forest Lake College    Purchase of 6 (primary) general learning areas multi-purpose        121 200
                                       (primary) general learning area quiet learning area withdrawal
                                       room 3 teachers' preparation rooms 2 practical learning areas
                                       3 store rooms sick bay interview room teachers aides'
                                       workroom.
Gladstone       St Stephens Lutheran   Construction of 6 (primary) general learning areas wet area         203 354
                College                withdrawal area sports store room manual arts room (primary)
                                       pupils' and staff amenities covered area under croft and travel.
Gordonvale      Djarragun College      Construction of 2 temporary (secondary) general learning             62 200
                                       areas (GLA) (to be used later as 2 science laboratories)
                                       temporary (secondary) GLA (to be used later as a science
                                       preparation room) and travel. Furniture and equipment.
                Djarragun College      Construction of dormitory accommodation ablution areas              160 995
                                       kitchen dining room (secondary) pupils’ common room
                                       boarding house office sick bay laundry supervisors’
                                       accommodation (secondary) pupils’ amenities and travel.
                                       Furniture and equipment.
                Djarragun College      Installation of sewer pump station and rising main.                  54 215
Gympie          Victory College        Construction of general learning area centre. Site works.            10 000
                                       Furniture and equipment.
Highfields      Toowoomba Christian    Construction of science laboratory science preparation room 2       122 184
                College                temporary (secondary) general learning areas (to be used later
                                       as a science laboratory) staff room and travel.
Indooroopilly   St Peter's Lutheran    Construction of 6 general learning areas 6 withdrawal rooms 9       169 919
                College                general learning areas pupils' amenities under croft and travel.
                                       Upgrading of pupils' amenities.
Kalkie          St Luke's Anglican     Construction of general learning area store room pupils'             10 000
Bundaberg       School                 amenities entry area and travel. Furniture and equipment.
Karrabin        West Moreton           Construction of 6 (primary) general learning areas and travel.       55 827
                Anglican College       Site works. Furniture.
                West Moreton           Construction of 6 (secondary) general learning areas                 14 958
                Anglican College       (combined) administration areas 2 staff rooms 2 music
                                       rehearsal rooms 6 music practice rooms 2 store rooms
                                       covered entry area staff amenities and travel.




__________________________________________________________________________________________



                                                      33
                SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                      GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                  Description of Project                                           Grant
                                                                                                            $

QUEENSLAND

INDEPENDENT BLOCK GRANT AUTHORITY
Mansfield     Christian Outreach      Construction of 12 general learning areas 5 store rooms 2         191 821
              College Brisbane        lecture theatres pupils' amenities and travel. Furniture.
Manunda       Cairns Seventh Day      Construction of general learning area. Furniture.                  10 377
              Adventist School
Morningside   Cannon Hill Anglican    Construction of 3 art studios 9 store rooms (secondary)            38 739
              College                 general learning area 2 staff rooms computer room
                                      photographic laboratory wet area and travel. Conversion of kiln
                                      room to store room; and 2 art rooms to 2 (secondary) general
                                      learning areas.
Murrumba      Living Faith Lutheran   Construction of 2 (pre-school) general learning areas (GLA) 2      61 902
Downs         Primary School          locker areas kitchen 4 (primary) GLAs 2 withdrawal rooms 4
                                      teachers’ preparation areas computer room 5 store rooms
                                      (pre-school and primary) pupils’ and staff amenities.
Noosaville    Good Shepherd           Construction of 4 home economics/catering and hospitality          97 430
              Lutheran College        areas preparation/store room teachers' preparation room
                                      fitting/store room general learning area administration area 2
                                      store rooms 2 locker areas and travel.
North         Heights College         Construction of store room covered entry and travel.              120 816
Rockhampton                           Upgrading of administration area. Conversion of 2 (secondary)
                                      general learning areas to administration area. Furniture.
Plainland     Faith Lutheran          Construction of manual arts room science laboratory science        10 180
              College (Plainland)     preparation room home economics room music room 3 store
                                      rooms drama room pupils' amenities covered area covered
                                      link and travel.
Reedy Creek   Gold Coast Adventist    Construction of (pre-school) general learning area wet area         4 336
              School                  office store room (pre-school) amenities and travel. Site
                                      works. Furniture and equipment.
              King's Christian        Construction of 2 art rooms dance studio 4 store rooms wet        229 475
              College                 area administration area staff preparation room staff
                                      common room (primary and secondary) pupils’ and staff
                                      amenities 2 manual arts rooms graphics room and travel.
Rothwell      Mueller College         (Kingston campus) construction of 4 (primary) general learning    177 505
                                      areas 5 (secondary) general learning areas 2 staff preparation
                                      rooms 5 store rooms staff common room (secondary) pupils’
                                      and staff amenities and travel.
Sheldon       Sheldon College         Construction of 4 general learning areas 4 practical learning      57 994
                                      areas 6 store rooms teachers' preparation room and travel.
                                      Site works. Furniture and equipment.
Springfield   The Springfield         Construction of 11 (primary) general learning areas 2             194 656
              College                 withdrawal rooms 6 teachers’ preparation rooms 6 store
                                      rooms 4 music practice rooms staff room sports store room
                                      (primary) pupils’ and staff amenities covered area and travel.
Springwood    Calvary Christian       (Carbrook campus) construction of 4 (primary) general learning     42 171
              College                 areas 4 store rooms 2 manual arts workshops computer
                                      laboratory graphics room store room 2 covered manual arts
                                      work areas and travel. Furniture and equipment.
              Calvary Christian       Construction of library/resource/information technology centre     26 162
              College (Carbrook       including 7 general learning areas multi-purpose learning area
              Campus)                 3 computer laboratories and travel. Furniture and equipment.




__________________________________________________________________________________________



                                                     34
               SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                     GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location      School                Description of Project                                              Grant
                                                                                                            $

QUEENSLAND

INDEPENDENT BLOCK GRANT AUTHORITY
Sunnybank    Southside Education   Construction of science room science preparation room art            156 450
             Centre                room art store room manual arts room covered area and travel.
                                   Conversion of multi-purpose hall to administration area home
                                   economics room laundry library and 2 (secondary) general
                                   learning areas.
Toowoomba    Christian Outreach    Construction of 6 general learning areas 6 withdrawal rooms           10 000
             College               3 store rooms 4 wet areas 3 creative play rooms teachers'
                                   preparation room pupils' amenities undercroft and travel.
                                   Furniture.
             Christian Outreach    Construction of administration building. Conversion of                57 565
             College               administration areas to 4 (combined) general learning areas.
                                   Furniture.
Wellington   Redlands College      Construction of 2 general learning areas 2 withdrawal rooms 2         22 892
Point                              store rooms 2 foyer areas covered entry area circulation area
                                   and travel.
Woombye      Christian Outreach    Construction of pre-school centre part of library 6 general          247 212
             College - Sunshine    learning areas 3 withdrawal rooms 3 teachers' preparation
             Coast                 rooms pupils’ and staff amenities and travel. Conversion of
                                   graphics room to special education room and 3 general
                                   learning areas.
             Nambour Christian     Construction of computer laboratory computer maintenance             114 861
             College               and server rooms tiered lecture theatre 5 music practice rooms
                                   control room foyer and travel.
Yatala       Rivermount College    Construction of art studio staff room store room entry area          288 544
                                   library area librarian's office computer area careers reference
                                   area 3 teachers' offices 2 withdrawal rooms 2 general
                                   learning areas store/work room entry area art/drama room
                                   and travel.
                                   Total Independent Block Grant Authority                            5 607 927

                                   TOTAL BLOCK GRANT AUTHORITY                                       15 385 017




_______________________________________________________________________________________




                                                  35
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                             Grant
                                                                                                                 $

SOUTH AUSTRALIA

GOVERNMENT
Angaston         Angaston Primary        Upgrade and redevelopment of school facilities. Provision of       800 000
                 School                  teaching facilities.
Booleroo         Booleroo Centre         Redevelopment of facilities to effect amalgamation of high         600 000
Centre           District School         school and primary school into one site.
Ceduna           Ceduna Area School      Redevelopment and upgrade of existing facilities - stage 1.       1 000 000
Coromandel       Coromandel Valley       Redevelopment and upgrade of existing facilities.                 1 200 000
Valley           Primary School
Craigmore        Playford Primary        Provision of essential site works including pedestrian and         600 000
                 School                  vehicle access.
Eden Hills       Blackwood High          Construction of visual arts facility.                              702 000
                 School
Hove             Kilparrin Teaching &    Construction of purpose built accommodation to cater for the      2 000 000
                 Assessment Unit         special needs of students with disabilities.
Loxton           Loxton High School      Redevelopment and upgrade of administration, resource             1 200 000
                                         centre and science and arts facilities. Refurbishment of
                                         existing facilities.
One Tree Hill    One Tree Hill Primary   Provision of new accommodation. Removal of high                    800 000
                 School                  maintenance liability buildings.
Semaphore        Le Fevre High School    Upgrade of home economics building and the upgrade and            1 000 000
South                                    conversion to provide music and drama specialist facilities and
                                         general learning areas.
Stirling         Stirling East Primary   Redevelopment and upgrade of existing facilities.                 1 714 000
                 School
Willunga         Willunga Primary        Amalgamation of primary school and preschool into one site.       1 000 000
                 School                  Refurbishment of existing facilities.
Woodville        Woodville Special       Upgrade of facilities. Provision of outreach facilities in        2 000 000
                 School                  neighbouring schools.
                                         Minor projects.                                                   3 400 000
                                         TOTAL GOVERNMENT                                                  18 016 00

CATHOLIC BLOCK GRANT AUTHORITY
Andrews Farm     St Columba College      Construction of staff kitchen and facilities, administration        590 000
                                         facilities, food and hospitality, drama and student amenities.
                                         Site works including lift. Furniture and equipment including
                                         specialist facilities equipment.
Barmera          St Joseph's School      Construction of unenclosed travel. Refurbishment of general         220 000
                                         learning area. Alterations to provide library, information
                                         technology facility, general learning area, staff common room,
                                         canteen, uniform store room and multipurpose room.
Elizabeth Park   St Thomas More's        Construction of information technology facility, music              173 000
                 Parish School           art/science extension to administration area, student amenities
                                         and travel. Refurbishment of 2 general learning areas.
                                         Alterations to provide extension to administration tutorial
                                         rooms and travel.
Enfield          Our Lady of the         Construction of minor additions to new library/resource             204 000
                 Sacred Heart College    location. Refurbishment of multi-purpose store room.
                                         Alterations to provide new student amenities, new
                                         library/resource area, 3 new classrooms and vocational
                                         education room.


_______________________________________________________________________________________



                                                        36
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                Description of Project                                                 Grant
                                                                                                                   $

SOUTH AUSTRALIA

CATHOLIC BLOCK GRANT AUTHORITY
Enfield          St Gabriel's School    Construction of 3 general learning areas (with wet areas), 2           131 000
                                        literacy support areas and covered ways. Refurbishment of
                                        staff common room, preparation and resource areas and
                                        student computer facility. Alterations to provide staff amenities.
Glengowrie       Our Lady of Grace      Construction of extension to administration and staff facilities,      100 000
                 School                 student and staff amenities. Alterations to provide
                                        administration and staff facilities.
Loxton           St Albert's School     Construction of administration and staff facilities and                300 000
                                        amenities, office, store, canteen and store, students'
                                        amenities, library and information technology facility. Site
                                        works including demolition of 1950's building.
Noarlunga        Cardijn College        Construction of workroom/reception area, public waiting area,          395 663
Downs                                   entrances, interview room, meeting room, tea room,
                                        gymnasium, two change rooms, physical education laboratory
                                        and multipurpose viewing area. Refurbishment of existing
                                        administration area.
Payneham         St Joseph's School     Construction of administration and staff facilities and                550 000
                                        amenities, under croft, canteen, three general learning areas
                                        and information technology facility.
Renmark          St Joseph's School     Construction of library resource and information technology            220 000
                                        facility, store room, canteen, 2 wet areas in existing general
                                        learning areas and multi purpose room. Refurbishment of 2
                                        general learning areas.
Richmond         Tenison Woods          Construction of 2 general learning areas, student amenities,           146 000
                 Catholic Primary       staff common room and resource area. Refurbishment of
                 School                 administration facilities.
Taperoo          Our Lady of the        Construction of canteen, store room, travel and general                179 000
                 Visitation School      learning area, extensions to information technology area,
                                        administration and library. Refurbishment of art/craft and
                                        music room. Alterations to provide administration and staff
                                        facilities.
Whyalla          Saint John's College   Construction of library/resource centre, store room, music             226 000
                                        facility, boys' amenities, 3 offices and travel. Demolition of
                                        existing buildings. Provision of lift with associated circulation.
Windsor          St Pius X School       Construction of extension to administration facilities, staff          300 000
Gardens                                 preparation area, staff amenities, students' entry and two
                                        general learning areas. Alterations to provide art/science
                                        room, two tutorial spaces, administration facilities and
                                        amenities.
                 St Pius X School       Construction of library resource area, information technology          138 000
                                        area, 4 general learning areas, store room and travel.
                                        Alterations to provide 3 general learning areas, deputy
                                        principal's office and cleaners' store room.
Woodville Park   Whitefriars School     Construction of canteen, multi purpose room                            218 000
                                        (art/science/drama/music), 3 general learning areas, student
                                        amenities, tutorial room and travel. Demolition of existing
                                        buildings.
                                        Total Catholic Block Grant Authority                                 4 090 663




_______________________________________________________________________________________



                                                        37
                  SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                        GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                 Description of Project                                            Grant
                                                                                                               $

SOUTH AUSTRALIA

INDEPENDENT BLOCK GRANT AUTHORITY
Angle Vale      Gawler River School     Construction of physical education/multipurpose building, 6        106 661
                                        general learning areas and verandah.
Belair          St John's Grammar       Construction of industrial arts and design facility.                51 280
                School
                St John's Grammar       Construction of lift for the disabled.                               7 650
                School
Glenside        Massada College         Refurbishment of 6 general learning areas, computer                  9 323
                Adelaide                resource and administration areas.
Goolwa          Investigator College    Construction of library/resource centre.                            73 487
Kadina          Harvest Christian       Construction of 2 general learning areas, library, teacher         284 574
                School                  preparation, ablutions, verandahs and lunch shelter.
Mawson Lakes    Endeavour College       Construction of 4 general learning areas, computer room,            84 920
                                        music room, art and design area, staff room, administration,
                                        student amenities and enclosed travel.
Mclaren Vale    Tatachilla Lutheran     Construction of 2 general learning areas, wet area and             110 862
                College                 verandah.
Mile End        Temple Christian        Purchase of building adjacent to existing school property.         100 760
                College                 Refurbishment of building to provide general learning areas
                                        and music area.
                Temple Christian        Construction of general learning area, science room, toilet        156,810
                College (Bethany        and travel link.
                Campus)
Murray Bridge   Murray Bridge           Construction of 2 general learning areas, administration area,       6 240
                Christian College       library and unenclosed travel.
                Unity College Inc       Construction of 5 general learning areas, administration area,     530 159
                                        verandah and toilets. Refurbishment of library resource and 2
                                        general learning areas.
Oakden          Cedar College           Construction of student amenities.                                   6 922
Para Vista      Prescott Primary -      Construction of tutorial room, 5 general learning areas,           343 540
                Northern an Adventist   canteen, staff preparation, music practice, art room, enclosed
                Christian School        travel and walkway.
Paralowie       Bethany Christian       Construction of administration area, 3 general learning areas,     162 585
                School Incorporated     travel links, toilet and staff preparation area.
South           Bethesda Christian      Refurbishment of 2 general learning areas and student                3 946
Plympton        College                 amenities.
Strathalbyn     Murraylands Christian   Construction of art/craft room, 2 general learning areas and       187 607
                College                 verandahs.
Victor Harbor   Encounter Lutheran      Construction of 2 general learning areas, wet area,                267 622
                Primary School          administration and unenclosed travel.
West Croydon    Islamic College of      Refurbishment of 4 general learning areas, toilet and hallway.      50 343
                South Australia
Willunga        Willunga Waldorf        Construction of general learning area and verandah.                 50 699
                School
                                        Total Independent Block Grant Authority                          2 595 990

                                        TOTAL BLOCK GRANT AUTHORITY                                      6 686 653




__________________________________________________________________________________________




                                                        38
                SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                      GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                  Description of Project                                               Grant
                                                                                                                $

WESTERN AUSTRALIA

GOVERNMENT
Balga         Balga Senior High       Upgrade of design and technology classrooms.                         350 000
              School
Bunbury       Bunbury Senior High     Upgrade of design and technology classrooms.                         700 000
              School
Dunsborough   Dunsborough Primary     Construction of pre primary classrooms, new classrooms and           500 000
              School                  art and craft area.
Eaton         Eaton Community         Construction of new school.                                         2 500 000
              College
Exmouth       Exmouth District High   Upgrade of technology and enterprise areas.                          400 000
              School
Geraldton     Geraldton Secondary     Upgrade of administration, arts and canteen areas.                  1 200 000
              College
Gosnells      Gosnells Senior High    Upgrade of technology and enterprise and student studies            1 800 000
              School                  classrooms.
Medina        Kwinana Senior High     Upgrade of technology and enterprise classrooms.                     450 000
              School
Merredin      Merredin Senior High    Construction of new administration area.                             350 000
              School
Midland       Woodbridge Primary      Redevelopment of school - stage 1.                                  2 500 000
              School
Mindarie      Mindarie Senior         Construction of new school.                                         8 852 000
              College
Noranda       Morley Senior High      Refurbishment of visual arts and computer studies                    450 000
              School                  classrooms.
Swan View     Swan View Senior        Upgrade of technology and enterprise classrooms.                     450 000
              High School
                                      Minor projects                                                      2 850 000
                                      TOTAL GOVERNMENT                                                   23 352 000

CATHOLIC BLOCK GRANT AUTHORITY
Attadale      Mel Maria Catholic      Construction of 2 general learning areas (pre-built), hardcourt       148 734
              Primary School          and covered area. Upgrade of original classroom block.
                                      Extension of administration area. (Corpus Christi Campus).
                                      Construction of covered area. (Santa Maria Campus).
Ballajura     Mary Mackillop          Construction of 2 pre-built general learning areas and pre-built      145 293
              Catholic Community      library. Furniture and equipment.
              Primary School
Bedford       Chisholm Catholic       Construction of 16 general learning areas, 6 science                1 194 000
              College                 laboratories, home economics/art room, collaborative learning
                                      room, canteen, toilets, staff studies room, 2 courtyards,
                                      balconies, links, design area, 3 workshops and machine room.
Beeliar       Emmanuel Catholic       Construction of 3 information technology areas, 3 design              541 999
              College                 technology areas, administration (temp admin/library), change
                                      rooms, 2 hard courts, toilets and oval. Conversion of
                                      temporary administration/library to 5 general learning areas.
              Emmanuel Catholic       Construction of library, canteen, covered area and hard court.        400 000
              College                 Conversion of temporary covered area to 2 home economics
                                      areas and general learning area (GLA); temporary GLA to
                                      home economics area; temporary canteen to GLA; temporary
                                      food technical area.

______________________________________________________________________________________



                                                       39
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                 Description of Project                                             Grant
                                                                                                             $

WESTERN AUSTRALIA

CATHOLIC BLOCK GRANT AUTHORITY
Broome         St Mary's College      Construction of 2 manual arts areas and design technology           46 600
                                      area. Demolition of existing manual arts areas.
Butler         Irene McCormack        Construction of 10 general learning areas, science block,          450 000
               Catholic College       toilets covered area, hard court, oval and parking.
                                      Landscaping and landscaping master plan. Furniture and
                                      equipment.
Canning Vale   Canning Vale           Construction of 2 general learning areas, 2 pre-primary areas,     606 066
               Catholic Primary       library, covered area, pupils' amenities, oval/bore/landscaping,
               School                 store area (external) and parking.
Clarkson       St Andrew's Catholic   Construction of 2 general learning areas, library, multi-purpose    76 737
               Primary School         room and parking. Conversion of temporary library to
                                      administration area and temporary staff room to sick bay and
                                      workroom. Furniture and equipment.
Cloverdale     Notre Dame School      Construction of general learning area and covered area.             50 955
                                      Upgrade of canteen and toilet for disabled. Demolition of
                                      existing transportable building.
Currambine     Currambine Catholic    Construction of 4 general learning areas, covered area and          40 389
               Primary School         hard court.
Dianella       Our Lady's             Construction of 10 general learning areas and 1 multipurpose         7 000
               Assumption School      room. Demolition work.
               Our Lady's             Construction of administration area, library and entry area.       300 000
               Assumption School      Furniture and equipment.
               Our Lady's             Construction of covered area, 2 pre-primary areas, verandah,       200 000
               Assumption School      4 general learning areas, toilets, simple entry, canteen and
                                      external store. Demolition of 3 buildings and a hall.
Dunsborough    Our Lady of the Cape   Construction of 3 general learning areas and pupils' amenities.     61 610
               Primary School
Ellenbrook     St Helena's Catholic   Completion of 4 general learning areas. Extension of                70 000
               Primary School         administration. Refurbishment of administration. Construction
                                      of toilets.
               St Helena's Catholic   Construction of 3 general learning areas and hard court.           130 438
               Primary School         Furniture and equipment.
Geraldton      Nagle College          Construction of 4 level lift and stairwell/retaining. Conversion   161 240
                                      of 2 general learning areas and toilet block to locker room.
Kalgoorlie     John Paul College      Construction of covered link across court to science               200 000
                                      preparation area; new block to provide 4 general learning
                                      areas, computer room, staffroom, staff preparation area, staff
                                      toilets and student toilets. Demolition of Mcauley classroom
                                      block.
Katanning      St Patrick's School    Construction of general learning area.                              50 000
Kelmscott      Good Shepherd          Extension of 2 temporary general learning areas. Conversion        100 000
               Primary School         of resource centre to multipurpose area. Construction of 3
                                      general learning areas and covered area. Demolition of 2
                                      portable general learning areas. Installation of computer
                                      cabling.
Lathlain       St Clare's School      Refurbishment of existing building to provide administration       351 091
                                      area, library, general purpose learning areas, home
                                      economics, art & sewing, recreation area, pupils' amenities,
                                      store and courtyard.




______________________________________________________________________________________



                                                      40
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location      School                  Description of Project                                               Grant
                                                                                                               $

WESTERN AUSTRALIA

CATHOLIC BLOCK GRANT AUTHORITY
Mandurah      Mandurah Catholic       Construction of general learning area, music room and toilets.       110 236
              College                 Extension of administration area, storage and canteen servery.
                                      Furniture and equipment.
Manning       St Pius X School        Construction of covered area. Resurfacing of upper                    64 000
                                      playground. Upgrade of canteen and verandahs. Modification
                                      of existing ramps.
Tuart Hill    St Kieran's School      Conversion of administration area to 2 general learning areas;       100 000
                                      store and general learning areas and small multi-purpose
                                      room to administration area. Extension of general learning
                                      area to multi-purpose room. Upgrade of 3 general learning
                                      areas.
Wyndham       St Joseph's School      Construction of toilets and verandah. Upgrade of pre-primary         186 000
                                      area including toilets, general learning area block. Demolition
                                      of current toilets.
                                      Total Catholic Block Grant Authority                               5 792 388


INDEPENDENT BLOCK GRANT AUTHORITY
Albany        Bethel Christian        Refurbishment of playground area and school ovals.                    50 000
              School
Armadale      John Calvin Christian   Re-roofing of existing classrooms. Provision of undercover            10 000
              College                 area.
Bassendean    Casa Mia Montessori     Construction of general learning area (transportable) and             40 000
              Community School        pupils' amenities. Furniture and equipment
Bedfordale    Armadale Christian      Construction of change rooms and pupils' amenities. Special           75 000
              College                 services.
Bunbury       Grace Christian         Construction of pre-primary centre.                                  100 000
              School
Busselton     Cornerstone Christian   Construction of industrial arts centre.                               30 000
              College
Carmel        Carmel Adventist        Refurbishment of existing area to create an integrated art area       45 000
              College                 incorporating ceramics, photography and art rooms.

Coolgardie    Christian Aboriginal    Construction of 2 general learning areas, canteen, store,            240 000
              Parent-Directed         pupils' amenities and travel.
              School
Denmark       Golden Hill Steiner     Construction of general learning area, pupils' amenities and          36 000
              School                  administration area.
Ellenbrook    Ellenbrook Christian    Construction of 8 general learning areas, covered area and           200 000
              College                 pupils' amenities.
Fitzroy       Yiyili Aboriginal       Refurbishment of termite affected pre-primary centre.                 40 000
Crossing      Community School
Forrestdale   Carey Baptist College   Construction of early childhood centre including 4 primary           133 000
                                      general learning areas, kindergarten, staff and pupils’
                                      amenities, store. Construction of senior school building
                                      including 3 specialist teaching areas, 3 general learning areas,
                                      staff and pupils’ amenities.
Fremantle     Lance Holt School       Construction of external play space.                                  40 000




______________________________________________________________________________________




                                                      41
                   SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                         GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location          School                  Description of Project                                             Grant
                                                                                                                 $

WESTERN AUSTRALIA

INDEPENDENT BLOCK GRANT AUTHORITY
Gibson          Wongutha Christian      Construction of kitchen and dining facility. Equipment.               35 168
                Aboriginal Parent-
                Directed School
                Wongutha Christian      Construction of library.                                              60 000
                Aboriginal Parent-
                Directed School
Gnangara        Aboriginal Community    Refurbishment of 2 general learning areas and pupil's                 11 500
                College                 amenities.
Hamilton Hill   Calvary Christian       Replacement of toilets. Extension and refurbishment of pre-           55 000
                School                  primary centre. Upgrade of staff room.
Lower           Great Southern          Construction of 8 general learning areas, central resource area      203 128
Kalgan          Grammar                 and pupils' amenities.
                Great Southern          Construction of library and temporary administration area.           100 000
                Grammar
Margaret        Margaret River          Acquisition of existing school site.                                  60 000
River           Montessori School
Port            Strelley Community      Upgrade of power. Installation of air conditioning for Strelley       35 000
Hedland         School                  and Warralong campuses.
                Strelley Community      Replacement of student amenities including laundry, storage,         100 000
                School (Strelley        staff and pupils' amenities.
                Station Campus)
Rivervale       Divine Mercy College    Construction of 2 general learning areas, 1 specialist teaching       50 000
                                        area and store, staff preparation area, pupils' amenities and
                                        travel.
Strathalbyn     Strathalbyn Christian   Construction of stage 1 of performing arts centre including           44 483
                College                 drama room, music room, practice rooms, store, office, pupils'
                                        amenities and travel.
                Strathalbyn Christian   Construction of 4 general learning areas.                            100 000
                College
Via Fitzroy     Wulungarra              Refurbishment of general learning area including                     150 000
Crossing        Community School        airconditioning and installation of lighting and awning windows.
                                        Construction of homemaker area.
Warnbro         Living Waters           Construction of technology stage 2 canteen, pupils’ amenities        250 000
                Lutheran College        and travel, visual arts building incorporating 3 teaching areas,
                                        careers room, media area. Construction of 3 general learning
                                        areas. Furniture and equipment.
                Living Waters           Construction of 5 general learning areas, pupils' amenities and      100 000
                Lutheran College        travel.
Wellard         El Shaddai College      Construction of specialist teaching area. Connection to               77 000
                                        reticulated water and sewerage.
Yalyalup        Georgiana Molloy        Construction of stage 1 of new school including 10 teaching          200 000
                Anglican School         areas, pupils' and staff amenities, canteen and administration
                                        area. Furniture and equipment. Library resources.
                                        .
                                        Total Independent Block Grant Authority                            2 670 279

                                        TOTAL BLOCK GRANT AUTHORITY                                        8 462 667




______________________________________________________________________________________



                                                        42
                SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                      GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School                  Description of Project                                                Grant
                                                                                                                 $

TASMANIA

GOVERNMENT
Bellerive     Clarence High School    Redevelopment of specialist and general learning areas.              1 350 000
Bridport      Bridport Primary        Redevelopment of 4 new classrooms. Upgrade of 2 existing               645 000
              School                  classrooms and Kindergarten area.
Claremont     Claremont College       Construction of gymnasium.                                             379 000
Hagley        Hagley Farm Primary     Redevelopment of classrooms - stage 2.                               1 400 000
              School
Hobart        Elizabeth College       Redevelopment of specialist and general learning areas.                482 000
Howrah        Howrah Primary          Redevelopment of classrooms.                                           300 000
              School
Riverside     Riverside Primary       Redevelopment of classrooms.                                           700 000
              School
Rosetta       Rosetta High School     Redevelopment of materials, design and technology, art and             880 000
                                      home economics facilities.
South Arm     South Arm Primary       Redevelopment of classrooms.                                           360 000
              School
                                      TOTAL GOVERNMENT                                                     6 496 000


CATHOLIC BLOCK GRANT AUTHORITY
Bellerive     Corpus Christi School   Refurbishment of 4 general learning areas, special education           233 047
                                      and music facilities. Construction of administration facilities,
                                      student amenities, disabled student amenities, uniform shop
                                      and storage.
Devonport     St Brendan-Shaw         Construction of bus lay-by.                                             84 650
              College
Mornington    Mackillop College       Construction of multi-purpose facility.                                 95 969
New Norfolk   St Brigid's School      Construction of 2 general learning areas and covered ways.             170 845
                                      Refurbishment to provide general learning area, library facilities
                                      and multi-purpose area. Demolition of toilet block.
New Town      Sacred Heart College    Refurbishment and construction to provide food technology               85 211
                                      facility, materials design and technology facilities and staff
                                      facilities.
Riverside     St Anthony's School     Construction of primary school incorporating construction of           456 568
                                      general learning areas, pupils' amenities, administration, multi-
                                      purpose facility, library, canteen and walkways.
Sandy Bay     Mount Carmel College    Refurbishment of 2 science laboratories, preparation room and          162 313
                                      2 general learning areas.
Ulverstone    Sacred Heart School     Construction of 2 general learning areas and car park.                  71 898
                                      Landscaping of surrounding areas. Extension and
                                      refurbishment of 2 general learning areas and administration
                                      area. Refurbishment of 6 general learning areas.
                                      Total Catholic Block Grant Authority                                 1 360 501




_____________________________________________________________________________________




                                                     43
               SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                     GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location      School                 Description of Project                                             Grant
                                                                                                            $

TASMANIA

INDEPENDENT BLOCK GRANT AUTHORITY
Kingston     Calvin Christian       Construction of student open area and car park.                      26 582
             School
             Calvin Christian       Refurbishment of technology area, dust extraction, equipment         35,442
             School                 and services.
Latrobe      Geneva Baptist         Construction of new technology area for metalwork,                  118 141
             School                 woodwork, technology, general learning area and covered
                                    walkway..
Launceston   Launceston             Construction of toilet block. Refurbishment of purchased            100 684
             Preparatory School     property at 117 Elphin Road comprising 4 general learning
                                    areas, amenities, services and 2 administrative offices.
Riverside    Launceston Christian   Conversion of 5 general learning areas to senior secondary           37 617
             School                 area. Construction of art, music and administration facilities,
                                    woodwork and design graphics rooms.
Sandy Bay    Fahan School           Construction of boarding facility comprising 12 sleeping areas,     108 140
                                    kitchen, administration, lounge, student amenities, staff
                                    amenities and recreational areas.
             Fahan School           Construction of extension to science and art rooms.                  22 734
                                    Refurbishment of 3 secondary science laboratories and art
                                    room. Upgrading of chemical store to modern safety
                                    standards.
Somerset     Seabrook Christian     Construction of 2 general purpose classrooms, amenities,            150 165
             School (St Helens      administration and site development. Purchase of land.
             Campus)
                                    Total Independent Block Grant Authority                            599 505

                                    TOTAL BLOCK GRANT AUTHORITY                                       1 960 006




_____________________________________________________________________________________



                                                   44
                 SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                       GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location        School                Description of Project                                             Grant
                                                                                                             $

NORTHERN TERRITORY

GOVERNMENT
Gillen        Alice Springs High     Replacement of evaporative air conditioning system with           1 077 000
              School                 refrigerated system.
Nhulunbuy     Nhulunbuy High         Construction of new multi-purpose hall.                             525 000
              School
Via Alice     Papunya School         Construction of community room and facilities.                    1 050 000
Springs
Via           Minyerri School        Construction of library, classrooms, storage and toilets.           340 000
Mataranka
                                     TOTAL GOVERNMENT SCHOOL                                           2 992 000


CATHOLIC AND INDEPENDENT BLOCK GRANT AUTHORITY
Alice         Our Lady of the        Construction of library/resource centre. Refurbishment of three     100 000
Springs       Sacred Heart College   general learning areas.
Gray          Good Shepherd          Construction of administration building and resource centre.        100 000
              Lutheran Primary
              School
Marlow        Palmerston Christian   Refurbishment of modular classroom complex.                          63 000
Lagoon        School
Marrara       Marrara Christian      Refurbishment of technology area and electrical upgrade.             92 122
              School
Nhulunbuy     Nhulunbuy Christian    Construction of 2 general learning areas.                           100 000
              School
Nightcliff    St Paul's Primary      Refurbishment of general learning areas in two storey building.      72 000
              School
              The Essington School   Refurbishment of junior school classroom block including the         90 702
                                     removal of asbestos, replacement of the ceiling, louvered
                                     windows and electrical fittings and overhauling of the air-
                                     conditioning unit.
Stuart Park   St John's College      Refurbishment of physics laboratory.                                 29 057
Wanguri       Holy Spirit Primary    Construction of upstairs verandah.                                   37 000
              School
                                     TOTAL BLOCK GRANT AUTHORITY                                         683 881




__________________________________________________________________________________________



                                                     45
                SUMMARY OF CAPITAL GRANTS AND PROJECT DESCRIPTIONS FOR
                      GOVERNMENT AND NON GOVERNMENT SCHOOLS


Location       School               Description of Project                                             Grant
                                                                                                           $

AUSTRALIAN CAPITAL TERRITORY

GOVERNMENT
Campbell     Campbell Primary      Upgrade of facilities including classrooms, administration area   1 000 000
             School                and student amenities.
Deakin       Woden School (the)    Upgrade of wood and metal construction room, machine and            200 000
                                   fabrication areas.
Dickson      Dickson College       Upgrade of facilities including classrooms and student
                                   amenities.                                                          750 000
Lyneham      Lyneham High School   Upgrade of facilities including classrooms, gymnasium and           772 000
                                   student amenities.
Melba        Copland College       Upgrade of 3 science laboratories.                                  450 000
Yarralumla   Yarralumla Primary    Upgrade of facilities including classrooms and student              800 000
             School                amenities.
                                   TOTAL GOVERNMENT SCHOOL                                           3 972 000


CATHOLIC AND INDEPENDENT BLOCK GRANT AUTHORITY
Amaroo       Good Shepherd         Construction of 6 general learning areas, administration,           376 180
             Primary School        student amenities for stage 1 of new school.
Braddon      Merici College        Conversion and construction to provide a physical health            100 000
                                   development and physical education centre.
Dickson      Emmaus Christian      Purchase of existing school buildings.                              300 000
             School
Florey       St Francis Xavier     Refurbishment of science laboratories and library.                  200 000
             College
Gordon       Covenant College      Construction of 4 general learning areas and travel.                 68 328
Gowrie       Holy Family Primary   Refurbishment of administration building and student                 98 150
             School                amenities.
Griffith     St Clare's College    Construction of lift and disabled toilet. Refurbishment of          129 700
                                   student amenities. Relocation of staff amenities.
Gungahlin    Burgmann Anglican     Construction of 4 general learning areas and car park.              179 503
             School
             Burgmann Anglican     Construction of resource centre/library, 4 general learning         207 309
             School                areas, administration and student amenities.
Isabella     Mackillop College     Construction of 4 general learning areas.                           161 692
Plains
O'Connor     St Joseph's Primary   Refurbishment of administration area. Construction of disabled       93 280
             School                access and disabled toilet.
Weston       Orana School          Construction of 2 general learning areas and sports equipment        61 100
                                   store.
                                   TOTAL BLOCK GRANT AUTHORITY                                       1 975 242