ME470 Project Proposal Report and Presentation Schedule - Fall 2007
By 5pm Monday Feb. 4th - Students upload Project Proposals (reports) to Website 8am-10 am Tuesday Feb. 5th - Presentations: students bring 5 copies of presentation slide handout (6 slides per page format) for 1 TA & 4 Faculty
Room # TA Project Number & Title #17: Design of a Nozzle Load Cell Adapter Sponsor Vactor Manufacturing Inc. U of I Civil and Env. Eng. Caveat Emptor Inc. Faculty Advisor Brian Thomas Jimmy Hsia Amy Wagoner Johnson Team# 18 16 4 19 11 3 21 12 5 7 22 9 Team Last Names Cholst, Prochnow, Sirota, Wotring Deluca, Fox, Richmond, Schebler Geyer, Knox, Park, Wan Jong, Maduzia, Walters, Zehr Depolo, Harrell, Siap, Wang Hernquist, Hinz, Hughley, Keres Spreenberg, Tong, Wu Jauch, Kendrick, Peake, Ziegler Feder, Khanna, Sehrawat, Weber Gerber, Lieber, Salchenberger, Zimmerman Aussem, Carusona, Rho Buntinas, Jordan, Manley, Mason
135MEB
Kevin Davis (kdavis3 @uiuc.edu)
#15: Design of an Acoustic Signal Generator Assembly for Bridge Testing #5: Design of an Improved Bicycle Helmet #1: Design of a Downhole Hammer #14: Design of a Temperature Controlled Chamber for Sensor Calibration
IL State Geological Survey Gustavo Gioia Psyotech, LLC William King
153MEB
Matthew Kasper #9: U of I Oak Street Chiller Plant Optimization (mkasper3 @uiuc.edu) #3: Design of an Improved Variable Air Volume Box
#23: Design of a Baseball Pitching Practice Device #2: Design of an Electro-pneumatic Control Box for an Alternating Pressure Surgical Pad
UofI Facilities and Services Emad Jassim Greenheck Fan Corp. Dustin Summers Innoventor Bergstrom Inc. Sargent & Lundy LLC Boeing Vasu Salapaka Geir Dullerud Taher Saif Min-Feng Yu Moshe Matalon Petros Sofronis
260MEB (143MEB Final)
Aaron Shinn (afshinn2 @uiuc.edu)
#21: Design of a Magnetically Coupled Impeller for a Water Pump system #10: Determination of Heat Loss Through Stagnant Pipe Branches #13: Design for Optimized Heat Flow Across a Bolted/Gasketed Interface
8am-10 am Thursday Feb. 7th - Presentations: students bring 5 copies of presentation slide handout (6 slides per page format) for 1 TA & 4 Faculty
Room # TA Project Number & Title #6: Design and Implementation of a Sheet Metal Bending Fixture Sponsor John Deere ITW Delpro Ragai Mitry Faculty Advisor Brian Thomas Jimmy Hsia Amy Wagoner Johnson Team# 14 20 1 Team Last Names Abruscato, Chaudry, Choi, Gizynski Conzemius, Lombardi, Shane Alonso, Lee, Wang, Winter
135MEB
Kevin Davis (kdavis3 @uiuc.edu)
#22: Torque Variability Reduction of Plastic Headlamp Adjustment Assembly #12: Design of a Household Soap Dispenser
#18: Thermal Temperature Rise Characterization Using Gap Filler 2000
Continental Automotive NCSA Greenheck Fan Corp.
William King Emad Jassim Vasu Salapaka
13 6 15 10 23 8 2 17
Kaupie, Li, Richards, Valentino Berent, Ratajczak, Thacker, Theis Fuss, Jennings, Johnson, McKenna Balbarin, Black, Howell, Lynk Bhargava, Choo, Dube, Hulva Cafferata, Hewerdine, Kunowski, Stone Amundsen, Savoie, Sutton, Walker El-Beshbeeshy, Lopez, Ramirez
153MEB
Matthew Kasper #11: Design of a Water Side Economizer System for a Petascale Datacenter (mkasper3 @uiuc.edu) #4: Design of a Modulating Air Delivery System Space Conditioning
#16: Design of a Refrigerator for Rural Haiti #20: Design of a Graphite Filter Tube Go/No Go System
Engineers Without Borders Geir Dullerud Honeywell International Milwaukee Electric Tool Eclipse Combustion Inc. Eclipse Combustion Inc. Taher Saif Min-Feng Yu Moshe Matalon Herman Krier
260MEB (143MEB Final)
Aaron Shinn (afshinn2 @uiuc.edu)
#19: Design of a Hydraulic System for Power Tools #7: WRASP-DI Industrial Burner Redesign for Weight Reduction #8: Design of a Scaled Vortometric Burner
By 5pm Thursday Feb 7th - TAs hand deliver TA-graded Project Proposals (reports) to faculty advisors By 5pm Monday Feb 11th - TAs pick up faculty-graded Project Proposals (reports) from faculty advisors, and any outstanding Presentation grade sheets 9am rm1320 DCL Lecture Class - Feb 12th - TAs return graded Project Proposals (reports) to students By 5pm Tuesday Feb 12th - TAs post Project Proposal grades on Website (report and presentation grades/comments) By 5pm Thursday Feb 14th - Students edit reports with Faculty/TA suggestions and upload to website By 5pm Friday Feb 15th - Robin sends Project Proposals to Project Sponsors (by email attachment - unless hard copy specifically requested)