DATESUB JOBNO City COUNTY GARLAND GARLAND GARLAND GARLAND GARLAND

Reviews
Shared by: Take Mehome
Stats
views:
22
rating:
not rated
reviews:
0
posted:
4/16/2009
language:
pages:
0
DATESUB 10/2/2007 10/24/2007 10/24/2007 11/7/2007 11/7/2007 11/7/2007 12/10/2007 1/16/2008 2/27/2008 2/27/2008 3/6/2008 4/8/2008 4/25/2008 5/1/2008 5/5/2008 5/20/2008 5/20/2008 5/20/2008 5/20/2008 6/4/2008 6/24/2008 7/8/2008 7/8/2008 8/7/2008 9/10/2008 9/10/2008 9/18/2008 JOBNO 060776 R60130 R60130 061170 060942 060942 061156 060989 060686 060686 061193 061137 R60130 061193 060942 061113 061113 061113 061113 061059 R60130 060776 R60032 060942 061217 061217 061222 City COUNTY GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND GARLAND FTA Grant Translease Translease Translease AR‐03‐0031 AR‐03‐0031 AR‐16‐0002 AR‐16‐0002 AR‐16‐0002 AR‐16‐X001 AR‐16‐0002 FY 2008 Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Hot Springs Village Hot Springs ABBREVIATIONS AUTH CONST F.V. Authorization Request Construction Final Voucher MISC MPAE P.E. PAE PE CONSULT ROW STP CENG Miscellaneous Modified Project Agreement Estimate Preliminary Engineering Project Agreement Estimate Preliminary Engineering‐Consultant Right‐of‐way Surface Transportation Program Construction Engineering TERMINI HWY. 5‐HOT SPRINGS VILLAGE (PASSING LANES)(HWY. 7) HWY. 70 EAST INTERCHANGE (HOT SPRINGS) (HWY. 270) (EAST‐WEST ARTERIAL) HWY. 70 EAST INTERCHANGE (HOT SPRINGS) (HWY. 270) (EAST‐WEST ARTERIAL) HOT SPRINGS HWY. 7 CROSSWALKS (ATEP‐2000) HWY. 270/HIGDON FERRY RD. & HWY. 7 INTCHNGS. (HOT SPRINGS) (EAST‐WEST ARTERIAL) HWY. 270/HIGDON FERRY RD. & HWY. 7 INTCHNGS. (HOT SPRINGS) (EAST‐WEST ARTERIAL) COOPER CREEK STR. & APPRS. (HWY. 171) WESTINGHOUSE DR. INTCHNG. (HOT SPRINGS) (HWY. 70) HWY. 7 SOUTH‐HWY. 270 (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HWY. 7 SOUTH‐HWY. 270 (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HWY. 227/MID AMERICA BLVD. SIGNAL (GARLAND CO.) (HWY. 227) SHADY GRAVE RD.‐NORTH OF HWY. 270 (HOT SPRINGS) (HWY. 128) HWY. 70 EAST INTERCHANGE (HOT SPRINGS) (HWY. 270) (EAST‐WEST ARTERIAL) HWY. 227/MID‐AMERICA BLVD. SIGNAL (GARLAND CO.) (HWY. 227) HWY. 270/HIGDON FERRY RD. & HWY. 7 INTCHNGS. (HOT SPRINGS) (EAST‐WEST ARTERIAL) HWY. 270‐PRINTERS PLACE (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HWY. 270‐PRINTERS PLACE (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HWY. 270‐PRINTERS PLACE (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HWY. 270‐PRINTERS PLACE (HIGDON FERRY RD.) (HOT SPRINGS) (HWY. 88) HOT SPRINGS‐WEST (PASSING LANES) (HWY. 270) HWY. 70 EAST INTERCHANGE (HOT SPRINGS) (HWY. 270) (EAST‐WEST ARTERIAL) HWY. 5‐HOT SPRINGS VILLAGE (PASSING LANES)(HWY. 7) HEMPWALLACE‐HWY. 192 (HWY. 70) HWY. 270/HIGDON FERRY RD. & HWY. 7 INTCHNGS. (HOT SPRINGS) (EAST‐WEST ARTERIAL) HWY. 70 EAST INTCFHNG. (HOT SPRINGS) (PH. II) (HWY. 70) HWY. 70 EAST INTCFHNG. (HOT SPRINGS) (PH. II) (HWY. 70) VALLEY STREET CREEKWALK Vehicle Make/Model Ford 13‐Pass Ford 13‐Pass Ford 13‐Pass Ford 25‐Pass Ford 25‐ Pass Bus  14‐Pass. Bus w/o lift 13‐Pass. Van (Exec. Top) w/o lift 13‐Pass. Van (Exec. Top) w/o lift Ford 15‐ Pass Bus w/o lift Chevy Uplander Lowered Floor Ramp Van 5307 Funding (operating) PHASE STP-ANY AREA < 200,000 MPAE CONGESTION MITIGATION AND AIR QUALITY F.V. MINIMUM GUARANTEE EXEMPT FROM LIMITATION F.V. STP-ENHN PAE CERTIFIED AUTHORIZED FUNDS SEC. 1102(f) MPAE CERTIFIED AUTHORIZED FUNDS SEC. 1102(f) MPAE HIGHWAY BRIDGE PROGRAM 85% ON/OFF SYSTEM MPAE CONGESTION MITIGATION AND AIR QUALITY MPAE HIGH PRIORITY PROJECTS MPAE HIGH PRIORITY PROJECTS MPAE STP-< 200,000-CITY MPAE STP-ANY AREA < 200,000 PAE MINIMUM GUARANTEE EXEMPT FROM LIMITATION LETTER STP-< 200,000-CITY MPAE CERTIFIED AUTHORIZED FUNDS SEC. 1102(f) MPAE HIGH PRIORITY PROJECTS PAE HIGH PRIORITY PROJECTS PAE HIGH PRIORITY PROJECTS MPAE HIGH PRIORITY PROJECTS MPAE HIGHWAY SAFETY IMPROVEMENT PROGRAM PAE MINIMUM GUARANTEE EXEMPT FROM LIMITATION MPAE STP-ANY AREA < 200,000 MPAE STP-DISCRETIONARY MPAE CERTIFIED AUTHORIZED FUNDS SEC. 1102(f) MPAE HIGH PRIORITY PROJECTS PAE HIGH PRIORITY PROJECTS PAE RECREATIONAL TRAIL PROGRAM PAE Federal $0 $0 $0 $44,208 $46,672 $32,244 $27,379 $27,379 $29,520 $25,474 Not Yet Available Local ###### ###### ###### ###### ###### $8,061 $6,845 $6,845 $7,380 $6,368 TYPE FUNDS AMOUNT  WORKPHASE SUBMITTED UTILITIES $88,126  ALL ($2,479) ALL ($712) CONST $48  CONST ENG $4,795  CONST ENG $43,978  CONST $169,722  CENG ($335,990) ROW $393,475  ROW $466,922  CONST $100,486  UTILITIES $16,000  CENG $2,496  CONST ($16,660) CONST ENG $11,769  ROW $161,232  ROW $191,329  ROW $216,642  PE CONSULT $686,014  UTILITIES $16,000  CENG $297  UTILITIES $95,834  UTILITIES $373,028  CONST ENG $16,977  CONST $1,710,945  CONST $1,731,356  TRAILS $84,270  Vehicle $39,335 $39,335 $39,335 $55,260 $58,340 $40,305 $34,224 $34,224 $36,900 $31,842

Related docs
Other docs by Take Mehome
CorpDocs- Corporate Governance Guidelines
Views: 443  |  Downloads: 36
THE REVERSE MERGER: BACKING INTO WALL
Views: 663  |  Downloads: 36
Employee Discipline Form
Views: 5948  |  Downloads: 211
Board Resolution to Elect Officers
Views: 355  |  Downloads: 6
CorpDocs-Board Resolution Authorizing Litigation
Views: 274  |  Downloads: 2
adopt210
Views: 109  |  Downloads: 0
The Home Depot Inc Ammendments and Bylaws
Views: 227  |  Downloads: 1
r492
Views: 282  |  Downloads: 6
website rough layout
Views: 433  |  Downloads: 9
Sample emergency procedures
Views: 365  |  Downloads: 9
Articles of IncorporationCalifornia Simple
Views: 160  |  Downloads: 1
FinanceCorporateStrategy-RM
Views: 183  |  Downloads: 1