GEF
UNDP/GEF PROJECT ENTITLED “REDUCING ENVIRONMENTAL STRESS IN THE YELLOW SEA LARGE MARINE ECOSYSTEM”
UNDP/GEF/YS/RWG-E.4/8 Date: 29 August 2007 English only
Fourth Meeting of the Regional Working Group for the Ecosystem Component Ningbo, China, 3-5 October 2007
Ecosystem Component’s Workplan for 2008
The attached draft workplan was produced based on Documents UNDP/GEF/YS/RWGE.4/5 to 4/7. The workplan will be revised during the meeting, according to the discussions from Agendas 5 through 7. The full workplan containing activities from the “Project Implementation Plan” is attached, as well as a condensed version (for easier perusal) of activities to implement next year. Members are invited to review and agree on the workplan for 2008, which will be submitted to the Project Steering Committee in November 2007 for approval.
Ecosystem Component Workplan for 2008
UNDP/GEF/YS/RWG-E.4/8
Activity CPR 2 OC Phase 2 Primary productivity estimation Ecosystem monitoring? SAP Finalisation Feasibility Studies Demo site selection SAP drafting SAP review by RSTP and PSC SAP approval Demo site implementation Other SAP-related tasks to be inserted during meeting NYSAP drafting NYSAP govt approval of NYSAP 5th RWG-E Meeting
Action
Timeline / Deadline
4th RSTP & PSC Drafting Group to liaise through e-mail and 3 working meetings Special RSTP/PSC govts
Sept - Dec. 2007 Nov. 2007 Dec. 2007 to May 2008 Apr-08 Jun-08 2008 - 2009
NPC and national members govt PMO will arrange
2008 late 2008 3rd quarter 2008
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
Task Name OBJECTIVE III: ECOSYSTEM IIIA: STATUS OF ECOSYSTEM ACT 1: Prepare state-of-ecosystem reviews and reports (incl. long-term and recent changes) Contract (1) to relevant national institution(s) - collect data & info Processing existing raw data Establish a regional editorial group /or use the WG Prepare a draft report (consultant 1) Discuss the draft (WG meeting 2) Revise the draft report (consultant 1) Finalise the draft report (WG meeting 3) ACT 2: Identify data and information gaps and develop strategies for monitoring changing status of ecosystem and its transboundary impacts Prepare synthesis of the national assessment, and identify the info gaps (consultant 1) Prepare draft strategy, including: parameters, analysis, intercalibration, data exchange etc. (consultant 1) Discuss the draft (WG meeting 3) Revise the draft Finalise the strategy (WG meeting 4) ACT 3: Demonstration of new and innovative technologies for monitoring Contract (2) to relevant national institution(s) Application of remote sensing Ship-of-opportunities monitoring. Molecular probes - low priority IIIB: CARRYING CAPACITY OF ECOSYSTEM ACT 1: Establish the logistical and data requirements of estimating carrying capacity Contract (1) to relevant national institution(s) Discuss and coordinate with fisheries WG (joint workshop) Decide on the assessment methods of carrying capacity Training on carrying capacity (Estimation of carrying capacity) ACT 2: Conduct a basin-scale survey on lower-trophic level ecosystem Conduct a basin-scale survey on lower-trophic level ecosystem (contract 4) ACT 3: Assess the carrying capacities of the ecosystem under changing human-induced and natural variability Prepare a regional synthesis (consultant 2) Finalisation national outputs and synthesis IIIC: STRESSORS TO THE ECOSYSTEM ACT 1: Identify and rank stresses on the ecosystem; identify data and information gaps Contract (1) to relevant national institution(s) Present outcomes of ranking, data and info in WG meeting 2 Prepare a regional synthesis (consultant 3) Finalization of national outputs and synthesis (WG Meeting 3) Publish the outcomes (printing) Inputs to final TDA ACT 2: Identify corrective measures to minimize human-induced stress Identify major human induced stresses (contract) Causal chain analysis (contract 1) Identify measures to address the root causes (WG meeting 3) Inputs to final TDA ACT 3: Develop strategy for intercalibration and data exchange Prepare draft strategy, including: parameters, analysis, intercalibration, data exchange etc. Discussion the draft (WG meeting 4) Revise the draft Finalise the strategy (WG meeting4) ACT 4: Develop strategy to identify long-term sustainable investments to improve the YSLME Prepare a format for nat'l strategy-PMO Prepare national strategy (contract 3) Discussing national stratgey (WG Meeting 5) Revise national strategy (contract 3) Prepare regional draft strategy (consultant 3) Finalise natl strategy (WG mtg 5) Discuss reg. strategy (WG mtg 5) Finalise reg strategy (WG meeting 6) Inputs to natl & reg SAP Implement SAP (PILOT PROJECTS) New Activities CPR Survey 2 OC 2 Primary productivity estimation Ecosystem monitoring?
Duration 1227 days? 781 days? 254 days? 130 days 65 days? 4 days? 151 days? 4 days? 151 days? 4 days? 349 days? 152 days? 152 days? 4 days? 22 days? 2 days 781 days? 261 days? 261 days? 261 days? 1 day? 423 days? 161 days? 3 days? 3 days? 3 days? 157 days? 21 days? 13 days? 261 days? 261 days? 261 days? 1032 days? 586 days? 130 days? 4 days? 152 days? 4 days? 66 days? 110 days? 238 days? 152 days? 110 days? 4 days? 110 days? 175 days? 130 days? 2 days 45 days? 2 days? 684 days? 143 days? 143 days? 143 days 143 days? 143 days? 177 days 177 days 177 days 500 days? 446 days? 1 day? 1 day? 1 day? 1 day? 1 day?
Start Mon 1/3/05 Mon 1/3/05 Mon 10/3/05 Mon 10/3/05 Mon 1/2/06 Tue 11/29/05 Mon 1/2/06 Tue 11/29/05 Mon 1/2/06 Mon 9/18/06 Wed 2/1/06 Wed 2/1/06 Wed 2/1/06 Mon 9/18/06 Mon 10/2/06 Fri 6/1/07 Mon 1/3/05 Mon 1/1/07 Mon 1/1/07 Mon 1/1/07 Mon 1/3/05 Fri 9/1/06 Tue 9/4/07 Tue 9/4/07 Tue 9/4/07 Tue 9/4/07 Mon 9/10/07 Fri 9/1/06 Fri 9/1/06 Mon 1/1/07 Mon 1/1/07 Mon 1/1/07 Mon 10/3/05 Mon 10/3/05 Mon 10/3/05 Tue 11/29/05 Wed 2/1/06 Mon 9/18/06 Mon 10/1/07 Mon 7/31/06 Wed 2/1/06 Wed 2/1/06 Mon 7/31/06 Mon 9/18/06 Mon 7/31/06 Mon 1/1/07 Mon 1/1/07 Fri 6/1/07 Mon 7/2/07 Fri 6/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Thu 2/1/07 Tue 1/1/08 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08
Finish Tue 9/15/09 Mon 12/31/07 Thu 9/21/06 Fri 3/31/06 Fri 3/31/06 Fri 12/2/05 Mon 7/31/06 Fri 12/2/05 Mon 7/31/06 Thu 9/21/06 Mon 6/4/07 Thu 8/31/06 Thu 8/31/06 Thu 9/21/06 Tue 10/31/06 Mon 6/4/07 Mon 12/31/07 Mon 12/31/07 Mon 12/31/07 Mon 12/31/07 Mon 1/3/05 Tue 4/15/08 Tue 4/15/08 Thu 9/6/07 Thu 9/6/07 Thu 9/6/07 Tue 4/15/08 Sat 9/30/06 Sat 9/30/06 Mon 12/31/07 Mon 12/31/07 Mon 12/31/07 Tue 9/15/09 Mon 12/31/07 Fri 3/31/06 Fri 12/2/05 Thu 8/31/06 Thu 9/21/06 Mon 12/31/07 Fri 12/29/06 Fri 12/29/06 Thu 8/31/06 Fri 12/29/06 Thu 9/21/06 Fri 12/29/06 Fri 8/31/07 Sat 6/30/07 Mon 6/4/07 Fri 8/31/07 Mon 6/4/07 Tue 9/15/09 Mon 8/20/07 Mon 8/20/07 Mon 8/20/07 Mon 8/20/07 Mon 8/20/07 Fri 10/5/07 Fri 10/5/07 Fri 10/5/07 Wed 12/31/08 Tue 9/15/09 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08 Thu 1/3/08
2005 Q1
Q2
Q3
Q4
2006 Q1
Q2
Q3
Q4
2007 Q1
Q2
Q3
Q4
2008 Q1
Q2
Q3
Q4
2009 Q1
Q2
Q3
Q4