									                   REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Firefighters          Department Priority: 1                     FY: 2005
               (4-FTE)

Status: (Check One) New            Enhancement        Establishing: (Check One) On-Going
                                                                                 One-time
Total Cost: $285,708                         Responsible Lead         Dept: FIRE
                                             Person: Rick Sapp
Description of Improvement: When citizens call 911 with a fire or medical emergency, they
expect a prompt and professional response by enough trained personnel to safely handle the
situation. Both state and federal regulations address minimum fire fighter staffing tools.
WAC 296-305 states that fire fighters must not engage in interior structural fire fighting in the
absence of at least two standby fire fighters (in addition to the two person fire attack team). The
only exception is "where exceptional circumstances indicate that immediate action may be
necessary to prevent or mitigate the loss of life or serious injury to citizenry or fire fighters". In
this case, at least one additional fire fighter must be assigned to stand by. In the City of
Tumwater this means that when an engine arrives staffed with two fire fighters, they cannot
enter a burning structure to perform a rescue (without violating the law) until another unit arrives
on scene with additional trained personnel.
Staffing standards are also addressed by National Fire Protection Association (NFPA) Standard
1710. This standard, adopted by NFPA in 2001, requires that an engine company staffed with
four fire fighters arrive within four minutes and/or the initial full alarm assignment (14-17 fire
fighters) respond within eight minutes, 90% of the time. The standard is based on a 2,000
square foot structure and takes into account all functions that must be performed on the
fireground to maximize fire fighting effectiveness while making safety for the citizenry and fire
fighters the top priority.
The Department continues to strive to meet the objective of the "Fire Service Plan" to staff the
North End Fire Station 100% of the time. The North End station was not staffed 54% of the time
in 2003 up from 49% in 2002. When this station is closed due to insufficient staffing levels,
citizens can expect longer delays in response to critical emergency services in some areas of
the City. Response delays are also created when the one on-duty engine crew has to handle
multiple alarms simultaneously, which is not an uncommon occurrence. The addition of four fire
fighters would allow for the opening of the North End Fire Station on a continuous basis. This
would be an important step in the process of reaching the goal of a minimum staffing of eight
on-duty personnel in the City as outlined in the 1988 "Fire Services Plan".
Alternatives:

1. N/A

Advantages of Approval:                             Resources Required:
                                                                       Salary/Wages:       $ 183,120
    Available resources for large and multiple                  Benefits:                   $ 71,252
alarms                                                            Supplies:                  $
                                                                Other:                      $ 31,336
Implication of Denial:                                           Intergovernmental:          $
                                                                 Capital:                    $
    Must rely on call back and mutual aid                              Total:              $285,708

   Longer responses to citizens'                    Source of Funds:
emergencies                                                      General:                   $285,708
                                                                  Utility:                   $
    Citizens quality of life is diminished                        Other:                     $
                                                           Revenue Enhancements:             $
     Increase risk to litigation                                 Total:                     $285,708
                    REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Prosecutor            Department Priority: 1                   FY: 2005
               (.5-FTE)

Status: (Check One) New           Enhancement            Establishing: (Check One) On-Going
                                                                                   One-time

Total Cost: $ 36,591                         Responsible                 Dept: Legal
                                             Lead Person:
                                             Christy Todd
Description of Improvement: The City of Tumwater has never had attorney representation at
all stages of criminal proceedings. Vigorous prosecution should follow from police arrest or
citation for criminal activity. Societal focus on domestic violence and drunk driving have
highlighted the need for holding offenders accountable to the fullest extent of the law for these
and other crimes committed in our city. Adequate protection of victims and the general public is
a responsibility of a prosecutor after an arrest has been made. Having a staff attorney represent
the City at all stages of prosecution will help protect crime victims because a prosecutor who is
present at preliminary appearances and arraignment can address issues of bail, pretrial release,
and whether no-contact orders are necessary. The citizens of Tumwater, especially crime
victims, will benefit from the increased accountability that will come from bringing this position
in-house as a 1/2 FTE position. The position will also provide a dedicated staff attorney for
purposes of police advice relating to investigations and review of criminal charges.
Alternatives:

1. Continue the prosecutor position as a contract position at $22,000 plus per year




Advantages of Approval:                                Resources Required:
                                                                          Salary/Wages:   $ 27,012
       Increased accountability; brings Tumwater                    Benefits:               $ 7,564
“in line” with other local jurisdiction’s practices;                  Supplies:               $ 100
little increased cost over current contractor                       Other:                  $ 1,915
position ($14,591 increased cost)                                  Intergovernmental:      $
                                                                   Capital:                $
     Dedicated staff position for case review,                     Total:                 $ 36,591
attorney will represent the city at all stages of
criminal proceedings, dedicated police advisor         Source of Funds:
                                                                    General:             $ 14,591
                                                                     Utility:             $
                                                                   Other:               $ 22,000
Implication of Denial:                                        Revenue Enhancements:       $
                                                                    Total:               $ 36,591
     Lack of accountability due to lack of ability
to supervise an independent contractor

     Lack of representation for the city at all
stages of the criminal process results in lost
opportunities to consider adequate protection
for crime victims and the public
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Operating –               Department Priority: 1                      FY: 2005
               Mapping Software

Status: (Check One) New        Enhancement          Establishing: (Check One) On-Going
                                                                              One-time

Total Cost: $ 2,700                         Responsible                 Dept: Planning and
                                            Lead Person:                Facilities
                                            Michael Matlock
Description of Improvement: Purchase two new licenses of ArcView GIS (mapping) software
for use by long-range planning staff in the preparation of maps, studies and plans. The new
version of the software would be an upgrade of the current version that has been an important
planning tool for staff over the past five years. A significant amount of mapping data is provided
from outside agencies. New software will allow staff to continue use of mapping data created by
outside sources. This has become increasingly difficult as other agencies have upgraded their
mapping software. The new sofware also provides new mapping tools that allow maps to be
prepared more efficiently.
Alternatives:

1. Do not fund the software. City staff would continue to complete projects with existing
resources. The ability to prepare maps and reports that rely on data from outside agencies
would continue to diminish over time.


Advantages of Approval:                           Resources Required:
                                                                          Salary/Wages:   $
   Allows staff to prepare maps and reports                       Benefits:               $
more efficently.                                                   Supplies:              $ 2,700
                                                                  Other:                  $
                                                                  Intergovernmental:      $
     Allows staff to utilitize a wide range of                    Capital:                $
mapping data available from federal, state and                     Total:                  $ 2,700
local agencies.
                                                  Source of Funds:
                                                                General:                   $ 2,700
                                                                Utility:                  $
Implication of Denial:                                          Other:                    $
                                                         Revenue Enhancements:            $
    Preparation of maps and reports will take                   Total:                     $ 2,700
longer as the existing software becomes more
obsolete.

     Use of mapping data from outside
agencies will become more difficult to
incororate into maps and long range planning
projects.
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Program Development -          Department Priority: 2              FY: 2005
               Property Maintenance

Status: (Check One) New        Enhancement           Establishing: (Check One) On-Going
                                                                               One-time

Total Cost: $ 30,490                            Responsible         Dept: Development
                                                Lead Person:                Services
                                                Roger Gellenbeck
Description of Improvement: Development Services requests funding of program elements of
Ordinance Nos. O2003-035 and O2004-015 establishing, training, and providing staff support to
a Code Enforcement Board (CEB). Requested funding level will provide for 0.5 FTE (Code
Enforcement Officer), and will be sufficient to conduct 15 CEB cases at 4 meetings per year.


Alternatives:

1. Take no actions; allow nuisance and substandard conditions on properties to persist.


2. Fund implementation of Property Maintenance Ordinance at a lesser amount.


3. Fund implementation of Property Maintenance Ordinance at a greater amount.


Advantages of Approval:                            Resources Required:
                                                                Salary/Wages:        $ 20,433
    Avoids use of criminal actions which may                          Benefits:      $ 8,757
    not result in timely correction of nuisance                      Supplies:       $      0
    conditions.                                                         Other:       $ 1,300
                                                            Intergovernmental:       $      0
    Nuisance conditions on properties can be
                                                                       Capital:      $      0
    abated in situations where timely
                                                                        Total:       $ 30,490
    voluntary compliance cannot otherwise be
    obtained.
                                                   Source of Funds:
Implication of Denial:                                              General:         $ 30,490
                                                                      Utility:       $      0
    Citizen dissatisfaction with city efforts to                      Other:         $      0
    compel clean up substandard property               Revenue Enhancements:         $      0
    nuisance conditions in neighborhoods.                             Total:         $ 30,490
    Liability for failure to compel timely
    corrections to substandard and property
    nuisance violations.
                   REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Probation           Department Priority: 2                    FY: 2005
               Officer (.5 – FTE)

Status: (Check One) New         Enhancement           Establishing: (Check One) On-Going
                                                                                One-time

Total Cost: $ 28,962                      Responsible Lead            Dept: Legal
                                          Person: Christy Todd
Description of Improvement: The citizens, and especially victims of crime in Tumwater, will
benefit from the increased community safety and accountability that will come from having a
probation officer track a defendant's compliance with court-ordered conditions. The municipal
court judge will be able to make better-informed decisions due to the tracking and subsequent
reporting to be presented by a probation officer, regarding offender compliance. Probation
tracking will assure that the offenders complete court-ordered conditions, including: alcohol/drug
treatment, domestic violence treatment, anger management treatment, etc., or face
consequences of jail time for non-compliance. This position will be a 1/2 FTE.
Alternatives:

1. Continue the status quo - no probation officer

Advantages of Approval:                             Resources Required:
                                                                         Salary/Wages:   $ 22,044
     Increased community safety due to                             Benefits:               $ 6,168
increased accountability for criminal offenders                      Supplies:               $ 100
because the judge will have more information                         Other:                  $ 650
for sentencing and non-compliance hearings;                       Intergovernmental:      $
brings Tumwater "in line" with other local                        Capital:                $
jurisdiction's practices.                                         Total:                 $ 28,962

     Probation is statutorily structured to be      Source of Funds:
self-supporting, through the imposition of                        General:                $
probation fees. Revenue enhancements                              Utility:                $
shown are conservative, and are based on                          Other:                  $
2003 convictions for only 6 types of crimes               Revenue Enhancements:          $ 28,962
(where probation fees could have been                            Total:                  $ 28,962
assessed, if a probation officer position
existed).

Implication of Denial:

     Lack of information available to the judge
for sentencing and non-compliance hearings.
Tumwater is the only city among Olympia,
Lacey and Thurston County without a
probation department.

     Increased risk of recidivism due to non
compliance with court-ordered treatment.
Recidivism impacts all tax-payers due to new
offenses which must be prosecuted at
taxpayer expense.
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff -            Department Priority: 2                FY: 2005
               Groundsworkers
               (1-FTE)
Status: (Check One) New    Enhancement     Establishing: (Check One) On-Going
                                                                      One-time
Total Cost: $ 52,721              Responsible Lead         Dept: Planning and
                                  Person: Jeff Vrabel      Facilities
Description of Improvement: The addition of one FTE Groundsworker to meet the increased
number of acreage and grounds responsibilities. In 2005, we will see the completion of Trosper
Lake Park, North East Neighborhood Park, Pioneer Park Phase III, and possibly a "Rotary
Park."


Alternatives:

1.


2.

Advantages of Approval:                         Resources Required:
                                                                      Salary/Wages:   $ 36,396
    Meet the demands of an increasing                          Benefits:              $ 16,325
workload.                                                      Supplies:              $
                                                               Other:                  $
     Maintain existing standards.                              Intergovernmental:      $
                                                               Capital:                $
                                                               Total:                 $ 52,721

Implication of Denial:                          Source of Funds:
                                                             General:                 $ 52,721
     Reduced maintenance standards.                           Utility:                 $
                                                              Other:                   $
                                                       Revenue Enhancements:           $
                                                             Total:                   $ 52,721
                     REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Fire Inspector/         Department Priority: 3                           FY: 2005
               Terrorism Specialist

Status: (Check One) New            Enhancement              Establishing: (Check One) On-Going
                                                                                      One-time
Total Cost: $104,652                           Responsible Lead                Dept: FIRE
                                               Person: Rick Sapp
Description of Improvement:           As the number of large and complex structures containing many
employees increases, the need to continue and expand the fire inspection program increases. The
complexity and size of these buildings will not allow the engine company to conduct even the basic
inspections as they do currently. September 11, 2001 has shown the importance of not only the fire
systems, but that maintaining the exits are aboslutely critical when all else fails. To protect these citizens,
regular visits by the Fire Department are important. The advantage of hiring an Inspector/Terrorism
Specialist would allow the engine companies more time to train and perform pre-fire plans. An additional
person would allow for more personal reinspections, particularly in uncooperative or complex structures.
It is expected that this inspector would be line qualified and able to aid in fire response and fire
investigation during his/her working hours.

The cost of this position could be offset by instituting a fire inspection fee program. While this would not
completely offset the annual cost, it would reduce it substantially and as the city grows, this program
would have the resources to grow with it. The Fire Inspection Fee Program should be based on a basic
fee for all inspections, multiplied by a size factor and multiplied by a degree of difficulty. This would mean
that a small insurance office would pay a minimum, maybe $25 while a large complex structure like the L
& I building would pay substantially more. These fees would be charged to state and county agencies as
well which pay little or nothing at this time. Preliminary estimates using a base rate of $25, 3 degrees of
difficulty and 6 degrees of complexity would generate around $38,000 per year.

As an added benefit the Inspector would assist in coordinating the city's Emergency Management
Program. The field of the Emergency Management has grown tremendously since 9-11 with the
preparations for a weapons of mass destruction incident. The federal government is putting many
resources into this program at this time which requires a lot of staff participation to benefit from them.
This person would also help oversee the setup, maintenance and training of city staff on EOC Operations.
During a disaster the Inspector would be available as a first responder and would be qualified to help with
post disaster inspections of buildings. It is envisioned that this person would spend up to 1/3 of their time
on Terrorism/Emergency Management.
Alternatives: n/a
Advantages of Approval:                                  Resources Required:
                                                                                 Salary/Wages: $ 70,048
     Reduction in fire code violations                                    Benefits:            $ 27,412
                                                                          Supplies:            $
Reduction in fire response                                                  Other:               $7,192
                                                                          Intergovernmental:   $
Safer commerical & multifamily structures                                 Capital:             $
                                                                          Total:              $104,652
Increase response capabilities during working
hours which is when volunteers are the least             Source of Funds:
available                                                             General:                      $104,652
                                                                       Utility:                      $
     More training and grants to the city, to                          Other:                        $
prepare for a weapons of mass destruction                       Revenue Enhancements:                $
incident                                                              Total:                        $104,652
Implication of Denial:

     A continued slow increase in inspection
intervals and ultimate increases in fire
activities
                   REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Professional Services -      Department Priority: 3                   FY: 2005
               Victim Advocate

Status: (Check One) New         Enhancement           Establishing: (Check One) On-Going
                                                                                One-time

Total Cost: $ 6,340                         Responsible Lead          Dept: Legal
                                            Person: Christy Todd
Description of Improvement: The voices of crime victims have gained increased recognition
within the criminal justice system. Crime victims now have a right to address court prior to
sentencing when a defendant has been convicted. The City of Tumwater can provide an
advocate to crime victims by contracting for the provision of services with a trained victim
advocate. The citizens of Tumwater, especially crime victims, will benefit from this advocacy, as
victim advocates are trained to assist crime victims and witnesses through the confusing
criminal justice process, help victims obtain protection orders, and crime victim assistance
funds. Victim advocates can assist crime victims in obtaining court-ordered restitution from
offenders. Victim advocates are increasingly becoming an integral part of a prosecution "team,"
and their services are extremely helpful to prosecutors who utilize their services and training in
working with preparing victims for motion hearings and trials.
Alternatives:

1. Continue the status quo - no victim advocate




Advantages of Approval:                             Resources Required:
                                                                           Salary/Wages: $
     Brings Tumwater "in line" with other local                   Benefits:             $
jurisdiction's practices in Olympia, Lacey and                       Supplies:             $ 100
Thurston County. Domestic Violence Penalty                         Other:                $ 6,240
assessment can eventually help pay for the                        Intergovernmental:    $
cost of a victim advocate.                                        Capital:              $
                                                                   Total:                $ 6,340
     Assists crime victims in obtaining services
and statutory protections; assists the              Source of Funds:
Prosecutor by helping him/her prepare                             General:                 $ 2,340
witnesses for motion hearings and trial                           Utility:                $
                                                                  Other:                  $
                                                            Revenue Enhancements:         $ 4,000
                                                                  Total:                  $ 6,340
Implication of Denial:

    Continue the status quo - crime victims in
Tumwater will not be assisted through the
criminal justice process; the Prosecutor will not
have assistance in preparing witnesses for
motion hearings and trial
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Operating - Security Department Priority: 3                FY: 2005
               Access System –
               Fire Headquarters
Status: (Check One) New      Enhancement     Establishing: (Check One) On-Going
                                                                        One-time
Total Cost: $ 15,000                Responsible Lead         Dept: Planning and
                                    Person: Jeff Vrabel      Facilities
Description of Improvement: This item would replace the currently-malfunctioning electronic
access system at the Headquarters Fire Station building. The new system would allow for
better access control to sensitive areas of the building. This system is the same as the Police
Department's access system currently being used.


Alternatives:

1.


2.


3.


Advantages of Approval:                          Resources Required:
                                                                         Salary/Wages: $
     Improved security.                                          Benefits:             $
                                                                 Supplies:             $
     Improved accountability.                                    Other:               $ 15,000
                                                                 Intergovernmental:    $
                                                                 Capital:              $
                                                                 Total:               $ 15,000
Implication of Denial:
                                                 Source of Funds:
    Less access control in sensitive and                      General:                  $ 15,000
secure areas.                                                  Utility:                  $
                                                               Other:                    $
                                                        Revenue Enhancements:            $
                                                              Total:                    $ 15,000
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Temporary         Department Priority: 4                     FY: 2005
               Help - Museum

Status: (Check One) New        Enhancement              Establishing: (Check One) On-Going
                                                                                       One-time
Total Cost: $ 2,000                         Responsible Lead             Dept: Planning and
                                            Person:                      Facilities
                                            Carla Wulfsberg
Description of Improvement: Since 2001, the Henderson House Museum has increased its
programming to include the growing and popular Fall Harvest Festival, 2 monthly series of
programs on Tumwater TV, and research to produce a furnished period home. The Museum
has had only 1 full-time staff for the past 5 years. It is necessary to increase staff hours to
assist the Museum Coordinator as new programs are developed. This increase of $2,000 will
give the Museum Temporary Help line a total of $6,000 in 2005.
Alternatives:

1. Limit the growth of the Fall Harvest Festival and other public programs of the Museum.


2. Restrict research and development of furnished period house museum.


3.


Advantages of Approval:                           Resources Required:
                                                                           Salary/Wages: $ 1,500
    Harvest Festival programming can                                 Benefits:             $ 500
continue to expand.                                               Supplies:             $
                                                                   Other:                $
     New programs can be developed.                               Intergovernmental:    $
                                                                  Capital:              $
                                                                   Total:                $ 2,000

Implication of Denial:                            Source of Funds:
                                                                General:                 $
    Development of Harvest Festival                             Utility:                 $
programming will decrease.                                      Other:                    $ 2,000
                                                         Revenue Enhancements:           $
    Development of the interpretive/                            Total:                    $ 2,000
development plan for the Museum will be
reduced.
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Operating – Repair & Department Priority: 5                          FY: 2005
                 Replace Curbing /
                 Speed Bumps
Status: (Check One) New         Enhancement          Establishing: (Check One) On-Going
                                                                                   One-time
Total Cost: $ 12,000                     Responsible Lead             Dept: Planning and
                                         Person: Jeff Vrabel          Facilities
Description of Improvement: Replacement of concrete curbing at City parks and facilities. At
several locations, the concrete curbing has been damaged and/or deteriorated. An example of
this condition can be seen at the Northend Fire Station parking lot. This request would also add
asphalt speed bumps to Pioneer Park and Historical Park.


Alternatives:

1.


2.


3.


Advantages of Approval:                          Resources Required:
                                                                        Salary/Wages: $
     Improve safety.                                            Benefits:             $
                                                                Supplies:             $
     Improve appearance.                                        Other:               $ 12,000
                                                                Intergovernmental:    $
                                                                Capital:              $
                                                                Total:               $ 12,000
Implication of Denial:
                                                 Source of Funds:
     Safety concerns.                                         General:                 $ 12,000
                                                               Utility:                 $
     Deteriorated appearance.                                  Other:                   $
                                                        Revenue Enhancements:           $
                                                              Total:                   $ 12,000
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Operating – Supplies        Department Priority: 6                   FY: 2005
               for Harvest Festival

Status: (Check One) New        Enhancement             Establishing: (Check One) On-Going
                                                                                    One-time
Total Cost: $ 3,500                       Responsible                   Dept: Planning and
                                          Lead Person:                  Facilities
                                          Carla Wulfsberg
Description of Improvement: The Tumwater Fall Harvest Festival has grown since 2001 with
more participants presenting events and more community in attendance. There is only one paid
staff person to coordinate the Festival. Currently the Festival has no dedicated funding from the
City; it is dependent on fundraising from private and other sources. The Festival is a free event
sponsored by the City and promotes a stronger sense of community. A commitment of
dedicated funding for the Festival is necessary for it to continue as a City-sponsored event.
Alternatives:

1. Limit the growth of the Fall Harvest Festival.


2.


3.


Advantages of Approval:                             Resources Required:
                                                                         Salary/Wages:   $
     The Harvest Festival can continue to                        Benefits:               $
increase its events.                                              Supplies:              $ 3,500
                                                                  Other:                  $
     The Festival continues as a free event                      Intergovernmental:      $
that promotes a sense of community in                            Capital:                $
Tumwater.                                                         Total:                  $ 3,500

                                                    Source of Funds:
                                                                  General:               $
Implication of Denial:                                            Utility:               $
                                                                  Other:                  $ 3,500
    Increasing difficulty to produce the                   Revenue Enhancements:         $
Harvest Festival in the future.`                                  Total:                  $ 3,500
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Staff – Museum             Department Priority: 7                     FY: 2005
               Assistance (.5-FTE)

Status: (Check One) New        Enhancement           Establishing: (Check One) On-Going
                                                                               One-time

Total Cost: $ 19,990                      Responsible Lead            Dept: Planning and
                                          Person: Mike Matlock        Facilities
Description of Improvement: City Council directed that the Henderson House Museum
transition into a furnished period home interpreting the early 20th century history of Tumwater.
This project will require that the Museum Coordinator devote a significant amount of time
developing and implementing the Council's directive. During the development phase, a half
time assistant is needed to respond to public requests, implement continuing programs, and
fulfill other staffing responsibilities at the Museum.
Alternatives:

1. No development of the Museum as a furnished period home.


2. No public programs or heritage services as a period home are developed.


3.


Advantages of Approval:                           Resources Required:
                                                                         Salary/Wages:    $ 15,690
     Will allow continuation of existing                           Benefits:                $ 4,300
programs and transition to a heritage                             Supplies:               $
interpretive site as recommended by the City                      Other:                   $
Council.                                                          Intergovernmental:       $
                                                                  Capital:                 $
                                                                  Total:                  $ 19,990

                                                  Source of Funds:
                                                                General:                   $
Implication of Denial:                                          Utility:                   $
                                                               Other:                     $ 19,990
     Continue existing public programs and               Revenue Enhancements:             $
services currently offered with no development                 Total:                     $ 19,990
of furnished period home project.
                   REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Capital – Security       Department Priority: 8            FY: 2005
               Automatic Gate to
               City OPS
Status: (Check One) New      Enhancement     Establishing: (Check One) On-Going
                                                                        One-time
Total Cost: $ 15,000                    Responsible Lead     Dept: Planning and
                                        Person: Jeff Vrabel Facilities

Description of Improvement: Installation of an automated security gate at the entrance to the
yard area behind City Hall. This would provide added security and access control to the
equipment yard. This automated gate would use the same access cards that staff uses to
access the City Hall building.


Alternatives:

1.


2.


3.


Advantages of Approval:                         Resources Required:
                                                                        Salary/Wages: $
     Protection of city equipment.                             Benefits:              $
                                                               Supplies:              $
     Access contro to a restricted area; and                   Other:                 $
better accountability.                                         Intergovernmental:     $
                                                               Capital:              $ 15,000
                                                               Total:                $ 15,000

Implication of Denial:                          Source of Funds:
                                                             General:                $ 15,000
    City equipment, Police impound yard and                   Utility:                $
other items reamin vulnerable.                                Other:                  $
                                                       Revenue Enhancements:          $
     No accountability or access control; and                Total:                  $ 15,000
risk of injury, vandalism, and theft.
                  REQUEST FOR PROGRAM ENHANCEMENT
Program Title: Professional Services- Department Priority: 9             FY: 2005
               Museum Program
               Provider
Status: (Check One) New      Enhancement      Establishing: (Check One) On-Going
                                                                        One-time

Total Cost: $ 1,000                         Responsible               Dept: Planning and
                                            Lead Person:              Facilities
                                            Carla Wulfsberg
Description of Improvement: To increase the Henderson House Museum's Professional
Services line by $1,000 for a total of $2,000 in the 2005 budget. This increase will allow the
Museum to cover the increasing costs of professional services retained by the Musem to help
implement Museum and historical programs in Tumwater.


Alternatives:

1.


2.


3.


Advantages of Approval:                          Resources Required:
                                                                         Salary/Wages:   $
    Museum programs continue to benefit                          Benefits:               $
from the expertise of professionals.                             Supplies:               $
                                                                  Other:                  $ 1,000
                                                                 Intergovernmental:      $
                                                                 Capital:                $
                                                                  Total:                  $ 1,000

Implication of Denial:                           Source of Funds:
                                                               General:                  $
    Quality of the Museum programs could                       Utility:                  $
decrease without the benefit of professional                   Other:                     $ 1,000
services.                                               Revenue Enhancements:            $
                                                               Total:                     $ 1,000

								
To top