Wk Content Unit 1 BCG1000A 1
Introduction -Course structure & sequence -overview of units -method of a) presentation b) assessment c) recording -expectation of students -Work readiness/work placement -accountability & industry expectations Introduction to communication Effective site communication Signage Basic terms used in building industry Industry personnel Workplace meetings
Resources 20Hrs
Elements / Performance Criteria
Regist ration
Practical
Resources
Elements / Performance Criteria.
Regist ration
Communication.
Introduction to workshop. Safety tests Puzzles – to determine entry level skills & knowledge of students, establish workshop routines/procedures & enforce OH&S Drop Saw Drill Press Materials Router Sander Plans.
Video - So You Want to be a Builder Basic Building & Construction – Longman Support Materials – BCG1000A
2 3 4
Support Materials – BCG1000A Support Materials – BCG1000A Support Materials – BCG1000A
1.1 1.2 1.3 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2
2nd Puzzle - as test
Cement Float.
Tools & Materials
Unit 2 BCG1001A 5
Introduction to OH&S Session 1 OH&S Responsibility Session 2 OH&S Communication. Session 3 OH&S Planning & action
35 Hrs
Occupational Health & Safety
1.2 1.3 1.4 2.1 2.2 2.3 2.4 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 5.1 5.2 5.3 5.4 5.5 6.1 6.2 7.1 7.2 7.3
General OH&S induction training for construction. Board of Studies. BCG1001A Support Materials. It is expected that all teachers will follow the OH&S course presented in the Workcover approved Board of Studies developed package.
Tool Box See Activity 5 from Hand & Power Tools – BCG 1005A Support Materials for plan. Page 158
Materials :-
6
CD Ply 12mm Screws Handle material Glue & nails Drop saw Router Screw Gun Hand tools BCG1005A P158
Tools :(Teachers may wish to vary dimensions)
7 8
Session 4 Workplace emergencies & first aid for construction work. Session 5 Injury management & workers compensation Assessment 1
Plan :-
9
Board of studies resource Royal Life saving Society.
10
Emergency Care Certificate
Wk Content Unit 3 BCG1002A 11 12 13 14
Time Management
Resources 20 Hrs
Reg’n Practical Plan & Organise Work
Elements 1.1 2.1 3.2 3.3 4.1 4.2 4.3 5.1 5.2 6.1 7.3 Work Method Statement for Tool Box - Post completion. Work Method Statement for Saw Horse.
Resources
Materials :Radiata pine 70 x 30 x 4.2 cut to 3/1.4m lengths Screws Glue & nails Drop Saw Screw Gun Hand tools
Elements Reg’n
BCG 1002A Support Materials Work Method Statements Basic Building & Construction - Longman
Work Scheduling
Basic Quality Concepts
Tools :Saw Horse
Selected exercises, activities & assessment tasks
Plan :See plan for cutting jig used with drop saw. Note :- 2 legs cut from 1.4m length splay cut using handsaw & finished / trimmed on drop saw. Jig :-
Unit 4 BCG1005A 15 16 17 18
Basic Hand Tools Exercises & Activities
20 Hrs
Hand & Power Tools
1.1 1.3 2.1 2.3 2.5 3.1 3.3 4.1 4.2 5.1 6.2 7.1 7.3 1.2 1.4 2.2 2.4 3.2 4.2 4.4 6.1 6.3 7.2 7.4 Saw Horse - (con’t)
BCG 1005A Support Materials. Basic Building & Construction - Longman
Basic Power Tools
Exercises & Activities.
Unit 5 BCG1004A 19 20
Basic Measuring, Calculations & Quantities Exercises 1 & 2, Activity 1
10 Hrs
Carry Out Measurements & Calculations
1.1 1.2 2.1 3.1 3.2 3.3 3.4 3.5 Saw Horse - (con’t)
BCG1004A Support Materials Basic Building & Construction – Longman. Costing of group project eg Picnic table & slab.
Wk Content Unit 6 BCG1008A 21 22 23 Unit 7 BCG1011A 24 25 26 27
Work Placement Section 1 Storage, Stacking & Protection of Building Materials Section 2 Manual Handling. OH&S Assessment Task 2 Basic Levelling Equipment. Notes, exercises & activities.
Resources 10 Hrs
Elements / Performance Criteria. 1.1 1.4 2.1 2.3 3.1 4.1 4.3 5.1 1.1 2.1 2.4 3.1 4.2 5.1 5.4 1.3 2.2 3.2 4.2
Regist ration
Practical
Resources
Elements / Performance Criteria.
Regist ration
Use Simple Levelling Devices
Completion of Sawhorse & suitable group project. Eg. Pergolas, Storage areas, Covered walkways, Shade areas etc depending upon individual school needs.
Board of Studies Resource Basic Building & Construction – Longman.
As required for selected project.
10 Hrs
Handle Construction Materials & Safe disposal of Waste
1.2 2.2 2.5 3.2 4.3 5.2 1.4 2.3 2.6 3.3 4.4 5.3 Group Project & Saw Horse Completion Group project to include large material components to facilitate assessment outcomes for handling & storage unit.
BCG1011A Support Materials Basic Building & construction – Longman.
28
Revision & consolidation of previous units. Review of work placement.
29 30
Year 11 Final Examinations.
Variations.
Wk Contents Unit 8 BCC1009A 31 32
Manual excavation for footings & slabs Exercises & Activities
Resources 10 Hrs
Elements / Performance Criteria 1.1 1.2 2.1 2.2 3.1 4.1 5.1 1.2 1.4 2.2 2.4
Regist ration
Practical
Resources
Elements / Performance Criteria
Regist ration
Carry Out Manual Excavation.
600mm Square concrete tile. Individual project. Materials - Formwork, Sand, Aggregate, Cement. Tools (Can be used as pavers) 5.2 Barrows, Hand tools, Electric mixer – Optional.
BCC1009A Support Materials. Basic Building & Construction - Longman
Personal Protective Equipment.
Unit 9 BCC1012A - 10 Hrs 33 34
Spread & Compact Materials
Spread & Compact Materials Manually.
1.1 1.2 2.1 2.2 2.5 3.1 1.2 1.4 2.2 2.4 3.2 Group project. – pathway or mowing strips.
BCC1012A Support Materials. Basic Building & Construction – Longman.
Exercises & Activities.
35 36
Work Placement.
Unit 10 BCC1003A - 10 Hrs 37 38
Drain & De-water site. Exercises & Activities BCC1003A Support Materials.
Drain & De-water Site.
1.1 2.1 3.1 3.4 4.1 5.1 6.1 1.2 1.3 2.2 2.3 3.2 3.3 Group Project. (con’t)
5.2
39 40
End of Year Review & tests
Wk Contents
Resources
Elements / Performance Criteria.
Regist ration
Practical
Resources
Elements / Performance Criteria.
Regist ration
Unit 11 BCG1010A - 30 Hrs 1 2 3 4 5 6 7 8 9 10
The Placement & Finishing of Concrete. Exercises & activities from resource package. - Types of concrete & concrete materials. - Types & uses of reinforcement - Erection / dismantle & maintenance of formwork. - Preparation of forms for concreting - Installation of formwork for slabs on ground. - Assist with placement of concrete. - Use & maintenance of concreting tools.
Concreting to Simple Forms
1.2 1.3 1.4 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3 4.1 4.3 4.4 4.5 5.1 5.2 5.3 5.4 Group Project – Picnic Table on Slab Materials – as determined in Measurement & Calculation unit. Wks 19 & 20
BCG1010A Support Materials Basic building & construction – Longman.
Tools -
as required.
P.P.E.
OH&S considerations
Site Visit to concrete pour.
Wk Contents
Resources
Elements / Performance Criteria.
Regist ration
Practical
Resources
Elements / Performance Criteria
Regist ration
Unit 12 BCG1003A - 20 Hrs 11 12 13 14
Interpretation of Plans Plans
Read & Interpret Plans
1.1 1.3 2.1 3.1 3.3 4.1 5.1 6.1 1.2 2.2 3.2 3.4 4.2 6.2 P.P.E. Step Ladder. Materials –
BCG1003A Support Materials. Basic Building & Construction – Longman.
Tools – Plans & Specifications –
Reading scale rule Plan & document reading Exercises & activities from resource package.
15 16 17 18 19
Half Yearly Examinations Unit 13 BCG1006A - 20 Hrs
Identification, selection, use & maintenance of Compaction equipment Pumping equipment Power source equipment Concreting / bricklaying equipment General equipment Exercises & activities from resource package. End of unit test.
Use Small Plant & Equipment.
1.1 1.2 1.4 2.1 2.2 2.3 3.1 Step Ladder - (con’t)
BCG1006A Support Materials. Basic building & Construction – Longman.
20 21 22 23 24 25 26 27 28 29 30
Revision for HSC Examination ensuring all HSC components from Part B of syllabus are addressed.
Part B syllabus document. Notes & exercises.
Completion of all practical projects given throughout the course.
Trial HSC Examinations.
Continued preparation for HSC Examination.
Past examination Papers & exercises.