Acrobat PDF

Project Management in Developing Communicable Disease Public Health Surveillance Systems

Click to download
Reviews
Project Management in Developing A Communicable Disease Surveillance System Hwa-Gan Chang1 Jacquelin Griffin2 Perry Smith1 York State Department of Health 2Keane, Inc 1New Division of Epidemiology Statistical Unit Bureau of Communicable Disease Control Bureau of HIV/AIDS Epidemiology Hospital Aquired Infection Program Bureau of Sexually Transmitted Disease Control Bureau of Tuberculosis Control Timeline of System Evolution 1997 Confcase1 ! Counties report Commiunicable 2001 ECLRS2 ! Laboratories report Communicable, HIV, Cancer, Lead 2004 PreConf3 ! Load ECLRS reports ! Allow ICP to initiate a Case ! SARS Contact Tracking 1 Communicable Disease Confidential Case Reporting System 2 Electronic Clinical Laboratory Reporting System 3 A patient-based system that acts as a ‘bridge’ to link ECLRS with Confcase Background – Previous Environment ECLRS PreConf ConfCase Labs Hospital ICP State/Regional CD, TB, STD Upstate LHDs Paper Reports Reasons to Change • Inconvenient and cumbersome to use multiple systems • Expensive to maintain multiple systems • Not all data gets transferred between systems, causing redundant data entry • The restrictive architectural design of Confcase System Background – Current Environment ECLRS CDESS Labs Hospital ICP State/Region CD, TB, STD Upstate LHDs Paper Reports Challenges • Significant time required to navigate • Users were resistant to change • Difficulties in reaching consensus with multiple stakeholders through an organization for approval • Competing priorities Methodology Project Planning Project Execution Project Control Project Management Methodology Requirements Definition Design Development Testing/ Acceptance Implementation System Development Life Cycle Methodology - Deliverables • Project Charter !Mission !Objectives !Goals !Scope !Metrics !Team members Project Charter - Objectives • Create confidential case reports from laboratory data without data reentry • Integrate multiple applications into a single application (Bridge and Confcase) • Provide tracking and case management functions for hepatitis and other diseases (eg. SARS) • Provide patient centric, flexible architecture • Provide secured data access for users ! Local Health Departments by program areas ! State program areas for central and regional office ! Hospital Infection Control Practitioners Project Charter – Team Members • State: General Communicable, STD, TB, Immunization, Arthopod-borne, EIP • • • • • State: Regional Office State: Public Laboratory State: Information Technology Local Health Department: 3 Counties 1 Hospital Methodology - Deliverables • System Prospectus !Background !Project Definition !Business Requirements !Security Requirements !Screen Mock-ups !Use Cases System Prospectus • Project Definition ! Create a patient-based, integrated system ! Collect laboratory reports from ELCRS to review, update and initiate case reports ! Serve as a hepatitis tracking system to allow monitoring of long term, chronic hepatitis cases • Business Requirements ! Requirements were compiled by existing functionality in the current system(s) and proposed functionality ! Meetings were held to elicit new business requirements. System Prospectus con’t • Security Requirements Category Hospital ICP County Region State Program Area Type Data Access Type Category Value PFI Codes FIPS Codes 1-4 NY ‘CD’, ‘STD’, ‘TB’, ‘ALL’ ‘SEL’, ‘UPD’, ‘PRI’, ‘HEP’, ‘DEL’,‘DWL’, ‘UPL’, ‘MNT’ Methodology - Deliverables •Technical Documentation !Technical Specifications !Mapping documents !Conversion business rules !Database Model Technical Documentation • Technical specifications were developed and included the following information: ! Dependencies ! User Interaction ! Output ! Business Logic ! Process Flow Diagram ! Data Flow ! Exception Handling Methodology - Deliverables •Test Plans !Test Scenarios !Test Cases !Pass/Fail Criteria •Training !User manual !County/Region/State users Testing Plans • System Testing • Alpha Testing ! System testing was performed by the immediate project team ! Alpha testing was performed by the extended project team ! BETA testing was performed by all counties prior to the release of the application into the production environment • BETA Testing Critical Success Factors • Stakeholder involvement and management • Correct SDLC for environment • Scope Management • Project Sponsor CDESS Project Timeline September 2004 2005 Project Charter Approved (9/04) Business requirements- 6 sessions (10/04- 01/05) County approval (02/05) System Requirements (02/05-08/05) Use Cases Screen Mock-ups Security Requirements Coding (04/05-11/05) CDESS Project Timeline 2005 2006 Testing Alpha testing (12/05) Beta testing (1/06) Prepare user guide Training Video Conference training 3 sessions (1/05) - state and 57 county users Implementation (02/06-03/06) Revisions Conclusion • A dedicated project manager to manage each phase • Apply Project Management in the Software Development Life Cycle (SDLC) • The first phase of the CDESS system was implemented within 18 months 800 users • The product has been used daily by about

Related docs
premium docs
Other docs by GovernmentDocs
dv105v
Views: 195  |  Downloads: 0
fss4
Views: 159  |  Downloads: 0
The Steadfast Love of the Lord
Views: 342  |  Downloads: 1
The Psychology of False Confessions
Views: 824  |  Downloads: 49
We Exalt Thee
Views: 176  |  Downloads: 1
Exercise Chart
Views: 1186  |  Downloads: 24
Contracts Outline 1
Views: 414  |  Downloads: 7
Resources for Organizational Behavior
Views: 1120  |  Downloads: 63
National Chemistry Week Experiments: Bubbles
Views: 496  |  Downloads: 12
I Was Made for This
Views: 262  |  Downloads: 0
Getting Started on an Exericse Program
Views: 309  |  Downloads: 9
Holisitc Nursing Practices
Views: 341  |  Downloads: 11
Awesome God (parts)
Views: 439  |  Downloads: 0
cr175
Views: 94  |  Downloads: 0
ch150
Views: 115  |  Downloads: 0