Acrobat PDF

Handout NPPTL CBRN Step PAPR Powered Air Purifying Respirator Fee Invoice Form date - 008

Click to download
Reviews
Form date 9/06 Manufacturer Task Number: Test Number1 Invoice date NPPTL - CBRN Step 1 PAPR (Powered Air Purifying Respirator) Fee Invoice Trials Required 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A* B A* B 1 1 1 1 1 1 1 1 1 1 1* 1* 2* 2* 0* 1* 0* 1* 1* 0 Trials Performed 0 Fee Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0001 Initial DOP 0003 Exhalation Resistance 0004 Exhalation Valve Leakage 0005-5A-6 IAA Fit Test 0007 Inhalation Resistance (tight fit only) 0012 PAPR Air Flow Test 0014 Leakage of Drink Tubes and Accessories 0025 Silica Dust for Resistance 0030 Sound Level (if device covers ears) 0051 Dioctyl Phthalate(DOP) P100 & 6 P100 w/Test 0301 0060 & 0066 ESLI visibility & 0066 operation (if applicable) 0061 ESLI Damage Resistance (if applicable) 0063 CO2 Machine test- Blower on 0064 CO2 Machine test- Blower Off (tight fit only) 0065 Airflow resistince for Breath Response PAPRS 0311 RDECOM Environmental Conditioning 0311 NPPTL Environmental Conditioning 0311 RDECOM Modified Environ. (W.O Can. or Cart.) 0311 NPPTL Modified Environ. Cond.- (W.O. Can. or Cart. Minus 0501 Cyclohexane (Set of 9 Canisters) 0502 Cyanogen Chloride (Set of 9 Canisters) 0503 Hydrogen Cyanide (Set of 9 Canisters) 0504 Phosgene (Set of 9 Canisters) 0505 Hydrogen Sulfide (Set of 9 Canisters) 0506 Sulfur Dioxide (Set of 9 Canisters) 0507 Ammonia (Set of 9 Canisters) 0508 Nitrogen Dioxide (Set of 9 Canisters) 0509 Phosphine (Set of 9 Canisters) 0510 Formaldehyde (Set of 9 Canisters) 0550 GB (SMARTMAN) Qualifier LAT(QLAT) Only 0551 HD (SMARTMAN) QLAT Only 0550 GB (SMARTMAN) Remainder LAT (RLAT) 0551 HD (SMARTMAN) RLAT Only 2 0550/0551 Aerosol process TDA-99M (SMARTMAN) Only 0552 Laboratory Respirator Protection Level (LRPL) 0552 Partial LRPL ECBC Inventory handling-ALL PROJECTS RDECOM Admin fee- ALL PROJECTS NIOSH/NPPTL Admin Fee- ALL PROJECTS $100.00 0 $175.00 0 $175.00 0 $450.00 0 $175.00 0 $100.00 0 $175.00 0 $175.00 0 $175.00 0 $1,600.00 0 $100.00 0 $100.00 0 $175.00 0 $175.00 0 $175.00 0 $32,044.00 0 $21,900.00 0 $8,825.00 0 $7,520.00 0 $930.00 0 $2,300.00 0 $2,585.00 0 $1,365.00 0 $880.00 0 $815.00 0 $925.00 0 $1,325.00 0 $1,025.00 0 $1,000.00 0 $5,177.00 0 $5,177.00 0 $5,177.00 0 $5,177.00 0 $310.00 0 $18,700.00 0 $12,257.00 0 $721.00 0 $6,180.00 0 $1,300.00 Additional Applicable Costs: TOTAL 1 2 Multiple configruations may require multiple tests Charged only if project will not be LAT * Performed at RDECOM Remarks: Examiner Team Leader Branch Chief Date: Date: Date:

Related docs
premium docs
Other docs by GovernmentDocs
Users marcsigal Desktop term papers TermPap
Views: 183  |  Downloads: 0
Form FinCEN104 (PDF) Currency Transaction Report
Views: 600  |  Downloads: 0
Summary of SBA Loan Programs
Views: 321  |  Downloads: 4
Response to Preliminary Allegations
Views: 173  |  Downloads: 3
Contract Checklist
Views: 544  |  Downloads: 37
edens_1c-all
Views: 104  |  Downloads: 1
craven-all
Views: 166  |  Downloads: 2
Form 4684 Casualties and Thefts
Views: 322  |  Downloads: 5
Little Essays of Love and Virtue
Views: 315  |  Downloads: 8