                                        ABSTRACT
When developing software for flight worthiness, the FAA requires that software must go through a
life cycle of requirements, design, implementation and verification. For most Avionic programs,
the verification phase has become one of the most expensive phases. The implementation phase is
where the code is developed. Most software used in Avionic Equipment is written using Boolean
logic and if statements for conditional decisions. To test the code to verify it has been developed
correctly, tests are done in 2 steps. The first is the system test to verify that the software and
hardware perform to the requirements created for the system. The second suite of tests is on the
code to exorcize each Boolean logic equation, as well as all the possible paths the conditional
decisions provide. At times this must be done at the object code and not the source level. This
project will create an Artificial Neural Network (ANN) engine, which will run all the ANNs
created. Since the ANNs created are strictly data structures, no executable code is create except
for the engine. This will only require the ANN engine to be part of the second, low level tests.
Since there is only data structures created, the creation of code for the implementation is reduced
as well. The ANNs created in the project will be trained to replace convention software and must
be 100% accurate.
1.
2.   Table of Contents
3.   ABSTRACT ...................................................................................................... 1
4.   Problem Statement ............................................................................................ 3
5.   Method/Setup .................................................................................................... 4
6.   Results ............................................................................................................. 12
7.   Further Study. ................................................................................................. 15
8.   Proposal........................................................................................................... 18
9.
Problem Statement
The proposal for this project has been attached as appendix A.

In order to have ANNs replace convention software in certifiable equipment, two areas of concern
must be overcome. The first is to have the ANN that is going to be placed in a safety critical box
must be developed to 100% accuracy to its requirements. The ANN must be able to handle many
different types of mappings such as time-delays, analog input boundary decisions, input relations,
and previous states of the ANN. Some of these mappings are used in this project. The ANNs
created must be able to execute in a real-time environment. With the latest embedded processors
now providing multiplications and floating point arithmetic in a few clock cycles along with the
processor’s cache, real-time execution is achievable. The second area of concern is how to trace
the requirements to trained ANN. This process must be provided in an intuitive way to allow
many engineers to develop a system at the same time.

Although the proposal stated the project would create a GUI simulator to run the ANN control
software against the convention software, a second GUI interface to provide an engineer with an
environment to provide requirements to the ANN and train it. The second GUI interface allows
the second area of concern to be addressed. All the requirements are provided to create the ANN.

This project will take the requirements for the proposal and create conventional software to run in
the simulator as well as the ANNs to control the power quality of an aircraft. As stated in the
proposal, a generator is attached to an airplane engine and the generator control unit (GCU) is used
to control the generator to provide good quality power for the aircraft. The normal parameters are
400Hz and 115V.

The first goal is to create an ANN, which will control the power quality according to the
requirements of GCU #1, section 6 of the proposal. This ANN will be trained to handle 100% of
these requirements.

The second goal is to create additional requirement for GCU#1 such that no executable code is
added, deleted, or changed. The new requirements are adding hysteresis to the frequency and
voltage. By adding hysteresis, the ANN now must use its own output as one of its inputs, which
not gives it a mapping of its previous state.

The third goal is to produce a second GCU controller with different requirements without creating
any new executable code.
Method/Setup
The tools used for this project were created using Borland C++ builder environment. Two GUIs
were created to help in developing the ANNs required and run a simulation of the control. The
following files were used for this project:


Project.exe           Program containing the two GUIs.
gcu1mann_err.txt      File created using the Neuron Simulator GUI to contain the
                      requirements for Generator Control Unit 1GCU1. The under
                      speed threshold was set in error to be 0-3000 instead of 0-2999.
                      This file is used to show an error when comparing the
                      conventional software to the ANN logic.
Gcu1mann_err.ann      Trained network of ANNs for GCU1 with the under speed error.
Gcu1mann.txt          File created using the Neuron Simulator GUI to contain the
                      requirements for Generator Control Unit 1GCU1.
Gcu1mann.ann          Trained network of ANNs for GCU1
Gcu2mann.txt          File created using the Neuron Simulator GUI to contain the
                      requirements for GCU2.
Gcu2mann.ann          Trained network of ANNs for GCU2
Gcu1cann.txt          File created using the Neuron Simulator GUI to contain the
                      requirements for GCU1 with hysterisis added to the frequency
                      and voltage levels. This requires the output of the top-level
                      neuron to be fed back into its inputs. Uses a previous state.
Gcu1cann.ann          Trained network of ANNs for GCU1 with hysteresis.




The implementation of the ANN to run the controller was broken down into several expert ANNs
and one top level ANN providing the final output. The architecture is shown below.
                                                  Relay Output


            Top Level Sigmodial Multi-Layered Perceptron




                                                             Threshold
   Under      Over     Under       Over         Under
   Freq       Freq      Volt       Volt         Speed        ANNs




         Frequency           Voltage          Engine Speed               Pilot Relay Switch



                                          Hardware Inputs
FIGURE A.

The top-level ANN was designed as a Multi-Layered Perceptron[1] using one hidden layer and one
output layer. Each neuron used an activation function of a sigmoidal function. The number of
hidden neurons can be adjusted. This was to allow the network to be trained using the back-
propagation algorithm to a supervised set of samples. The inputs to the top level ANN are all
discrete inputs in order to bound the number of input samples required to train the network. To
allow for analog data as part of the control, expert threshold networks were created to provide
input into the top-level neuron.

The back-propagation algorithm for calculation of weights [2]:

Weigh          Learning        Local             Input signal of
Correction      rate           Gradient           neuron j
Connect
Neuron i to j
wij(n)       =        *      j(n)      *     yi(n)

The local gradient would change based on whether the neuron is hidden [3] or the neuron is an
output [4]. The forward pass algorithm to calculate the neuron output [5]:

Output        Activation function (Summation of weights * previous layer inputs)
yj(n)       = ( wij(n) * yi(n))
() Activation function.
       The threshold ANNs were designed as a Multi-Layered Perceptron using one hidden layer
and one output layer. Each neuron used an activation function of a threshold function. There are
two hidden neurons that sample the same input. The weights of a threshold ANN are calculated
from the required thresholds. One hidden neuron is calculated to respond to the low threshold and
one hidden neuron is calculated to respond to the high threshold. The threshold ANN is shown
below.




                               Threshold ANNs


             Bias




      Bias                                                                  Bias




                               Analog Inputs
                               (Voltage, Frequency)
FIGURE B.

        The controller network is based on the top-level ANN that in turn gets its inputs form either
the threshold ANNs or discrete inputs. A visual presentation of the top-level ANN and its inputs
can be seen in Fig A.
        The process to create the required networks uses the Neuron Editor program. Although not
part of the original project, the Neuron Editor was created to help architect the neuron layout.
This program was designed to prototype a process in which a designer can enter all the inputs,
requirements and neuron network parameters. The Neuron Editor is not a commercial quality
product but does allow for simple editing of the controller network.


                Neuron Network Creating Process
                 Using the Neuron Editor GUI

                             Create All Inputs
                               (digital & analog)


                    Create Threshold Level ANNs

                 Create Requirements for Top-Level
                               ANN

                       Generate Training Samples
                       and Train Top-Level ANN
FIGURE C.
Edit Neuron GUI Overview
The following is not intended to show how to create a layout from scratch but to display an
existing one. To view a layout of a complete network, go to the Neuron Editor window and enter
in “gcu1mann”, without quotes, located at the top right corner of the window. Then hit the Load
Network button.
    1. At this point under the Inputs tab, all the inputs for the simulation are presented. A range
        form 0 to 1 indicates that the input is a discrete input.
    2. The Levels tab shows all the thresholds ANNs created for this controller network. With a
        mouse click on a listed Level Neurons will display its required thresholds.
    3. The Top Level tab displays 3 steps in setting up the top neuron. Going to Step 2 shows the
        requirements that the top-level ANN will train with. A cell with a “1” indicates that the
        input is required to be a “1” while a “0” indicates the input shall be a “0”. An “X” is
        showing that this input is a don’t care input. The end column holds the required output for
        the controller network. This layout has 7 requirements with only one of them turning the
        output relay on. Step 3 is used to show the layout of the top-level ANN. Here the number
        of hidden neurons can be selected.
    4. The Train tab is used to create the training samples from the requirements table. These
        training samples can be seen in a file tmp.txt after the Create Training Samples button is
        selected. The file holds a column for each input and one for the output. The last column is
        used as a tag to remove duplicated samples. After the samples are created, the top-level
        neuron is ready for training by selecting the Training button. This will train the top-level
        neuron and create a file gcu1mann.ann, which is then used by the simulator program. The
        file created contains all the weights for all the neurons used in the network. All files have
        been created to be view with an editor.


Loading Simulator with ANNs.
To load a new file into the simulator, follow the steps below:
    1. Select the NO ANN radio button to stop any networks from running
    2. Type in the file to be loaded in the ANN FILE edit box, top right in GUI. (do not add
       extension)
    3. Select the LOAD ANN button
Conventional Software
The conventional software logic was created using the requirements in the proposal, appendix A.
Each Generator Controller has its own code, shown below, and is selectable on the Simulator.

Common code for both GCUs
#include "common.h"
//---------------------------------------------------------------------------
// Return if under threshold
U16 UnderVoltage(U16 voltage, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;

   if(voltage < threshold)
      returnCondition = 1;

   return(returnCondition);
}
//---------------------------------------------------------------------------
// Return if over threshold
U16 OverVoltage(U16 voltage, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;

   if(voltage > threshold)
      returnCondition = 1;

   return(returnCondition);
}
//---------------------------------------------------------------------------
// Return if under threshold
U16 UnderFrequency(U16 frequency, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;

   if(frequency < threshold)
      returnCondition = 1;

   return(returnCondition);
}
//---------------------------------------------------------------------------
// Return if over threshold
U16 OverFrequency(U16 frequency, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;

   if(frequency > threshold)
      returnCondition = 1;

   return(returnCondition);
}
//---------------------------------------------------------------------------
// Return if over threshold
U16 OverCurrent(U16 current, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;
    if(current > threshold)
       returnCondition = 1;

    return(returnCondition);
}

//---------------------------------------------------------------------------
// Return if under threshold
U16 UnderSpeed(U16 speed, U16 threshold)
{ //Check parameter to threshold
   U16 returnCondition = 0;

    if(speed < threshold)
       returnCondition = 1;

    return(returnCondition);
}


GCU1 code

U16 GCU1_SW(U16 frequency, U16 voltage, U16 speed, U16 current, U16 switchValue)
{
  //local variables
  static U16 closeRelay;
  static U16 UV,OV,OC,OF,UF,US;

    //Check Voltage
    UV = UnderVoltage(voltage, 90);
    OV = OverVoltage(voltage, 130);
    UF = UnderFrequency(frequency, 370);
    OF = OverFrequency(frequency, 430);
    OC = OverCurrent(current, 7);
    US = UnderSpeed(speed, 3000);

    //Close relay only when power is in the good quality zone
    if(((UV || OV || UF || OF || OC || US) == 0) && switchValue)
       closeRelay = 1;
    else
       closeRelay = 0;

    return(closeRelay);

}
GCU2 Software
U16 GCU2_SW(U16 frequency, U16 voltage, U16 speed, U16 current, U16 switchValue )
{
  //local variables
  static U16 closeRelay;
  static U16 UV,OV,OC,OF,UF,US, USS, UFF;

    //Check Voltage
    UV = UnderVoltage(voltage, 90);
    OV = OverVoltage(voltage, 130);
    UF = UnderFrequency(frequency, 380);
    OF = OverFrequency(frequency, 420);
    OC = OverCurrent(current, 9);
    US = UnderSpeed(speed, 3000);
    USS = UnderSpeed(speed, 100);
    UFF = UnderFrequency(frequency, 350);

    if(USS && (UFF == 0))
    {// The input speed wire is broken
       US = 0;//No underspeed
    }




    //Close relay only when power is in the good quality zone
    if(((UV || OV || UF || OF || OC || US) == 0) && switchValue)
       closeRelay = 1;
    else
       closeRelay = 0;

    return(closeRelay);

}
Results
To show the goals have been met to the requirements of the controllers, test procedures have been
used.
Goals
      1. To create an ANN that can replace the conventional software for the contactor control
          in a GCU. This requires the ANN software to learn 100% of the contractor functional
          requirements.
      2. To create an ANN algorithm such that the code to calculate the ANN output does not
          change if the contactor requirements change. It is ok for the inputs to have their
          thresholds change or new inputs, this should not change the algorithm required to
          calculate the output.
      3. To create an generic ANN algorithm such that this network will run the contactor
          control requirements from 2 different GCUs by only changing the ANN data. This
          would consist of changing only the ANN weights, again no code change.
      4. To validate the ANN data to the requirements using mathematics/graphs. Use of Matlab
          can provide a visual display.

The results form the 1st three goals have been met with success. The 4th goal to have the create
ANN be verified with graphs can now be done for each threshold ANN. Since each threshold
ANN has only one input the graph would show the same result as the level requirements used to
create it.

Goal 1 success
The first goal of creating an ANN to be trained to meet 100% of the requirements from logic
developed using conventional software. The requirements were taken from GCU 1 of the
proposal. The first test loads file gcu1mann_err, which was trained using the Neuron Editor GUI,
into the simulator GUI. The following test was used to verify goal one was met.
    1. Select RUN ANN radio button.
    2. Select AIRCRAFT 1 LOGIC radio button. Executes GCU 1 conventional software.
    3. Select SWITCH button (enables the relay to close when power quality is good)
    4. Select START ENGINE button. ( the engine will start to increase in RPM. At 3000 RPM
        the ANN logic has an error and the ERROR COUNT should increment to show that the
        ANN logic and conventional software are in disagreement. The engine button may be used
        to increase or decrease the RPMs to keep incrementing. These first 4 steps are used to
        show how an error is detected.
    5. Turn off the execution of the ANN, select NO ANN, SWITCH, STOP ENGINE.
    6. As stated in the Methods section, load in the file gcu1mann. The remaining steps were used
        to verify that the ANN ran to its requirements.
    7. Select RUN ANN radio button.
    8. Select SWITCH button (enables the relay to close when power quality is good)
    9. Select START ENGINE button.
    10. When the output closes and provides power to the aircraft bus then test the Under Voltage
        fault of < 90, select the 89 volt fault. This will open the relay. Verify the ERROR
        COUNT did not change. Now hit the 90 volt fault. This will close the relay. Verify the
        ERROR COUNT did not change.
   11. Test the Over Voltage fault of > 130, select the 131 volt fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 130 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   12. Test the Under Frequency fault of < 370, select the 368 freq fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 379 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   13. Test the Over Frequency fault of > 430, select the 432 freq fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 421 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   14. Test the Broken Wire fault, select the BROKEN WIRE fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the BROKEN WIRE fault. This
       will close the relay. Verify the ERROR COUNT did not change.
   15. Test the switch requirement, select the SWITCH. This will open the relay. Verify the
       ERROR COUNT did not change. Now hit the SWITCH. This will close the relay.
       Verify the ERROR COUNT did not change.
   16. Test the Under Speed fault , select the STOP ENGINE button. This will bring the engine
       speed down and open the relay. Verify the ERROR COUNT did not change.
   17. Reset the faults ( the NONE) button for voltage and frequency.


Goal 2 success
       The second goal, to change the requirements without changing the executable code, created
a new requirement to add hysterisis to the voltage and frequency thresholds. Using hysterisys to
change the threshold allows for using the ANN as a state machine. The new requirement to
implement is :

In order to close the relay the frequency must be between 370 -430 Hz and the voltage must be
between 90 - 130 volts. In order to open a closed relay the frequency must be outside 368 - 432
Hz or the voltage must be outside 89 – 131 volts. The remaining GCU1 requirements apply as
stated in the proposal. File gcu1cann holds the training for the new requirements. Since the
simulator treats the ANNs as data, no executable code is changed to implement the new
requirement. Because the new requirements are implemented in the ANN and not in the
conventional software logic, the error count will increment in this test. The test used to verify that
all requirements have been implemented is as follows:

   1.  Select NO ANN radio button.
   2.  Select SWITCH button ON(enables the relay to close when power quality is good)
   3.  Select START ENGINE button so engine speed = 0.
   4.  As stated in the Methods section, load in the file gcu1cann. The remaining steps were used
       to verify that the ANN ran to its requirements.
   5. Select RUN ANN radio button.
   6. Select START ENGINE button to start engine.
   7. When the output closes and provides power to the aircraft bus then test the Under Voltage
       fault of < 89, select the 89 volt fault. The relay will remain closed.
   8. Test the trip point of < 89 Volts, select the 88 volt fault. This will open the relay.
   9. Test the close point of > =90 Volts, select the 89 volt fault. The relay will remain opened.
   10. Test the close point of > =90 Volts, select the 90 volt fault. This will close the relay. (items
       7 - 10 are the under voltage hysterisys requirements)
   11. Test the Over Voltage fault of > 131 Volts, select the 131 volt fault. The relay will remain
       closed.
   12. Test the trip point of > 131 Volts, select the 132 volt fault. This will open the relay.
   13. Test the close point of < =130 Volts, select the 131 volt fault. The relay will remain
       opened.
   14. Test the close point of < =130 Volts, select the 130 volt fault. This will close the relay.
       (items 11 - 14 are the over voltage hysteresis requirements)
   15. Select the NONE fault for the voltage, set the voltage back to 115V.
   16. Test the Under Freq fault of < 368, select the 368 Freq fault. The relay will remain closed.
   17. Test the trip point of < 368 Freq, select the 367 Freq fault. This will open the relay.
   18. Test the close point of > =370 Freq, select the 368 Freq fault. The relay will remain
       opened.
   19. Test the close point of > =370 Freq, select the 379 Freq fault. This will close the relay.
       (items 14 - 19 are the under Freq hysteresis requirements)
   20. Test the Over Freq fault of > 432 Freq, select the 432 Freq fault. The relay will remain
       closed.
   21. Test the trip point of > 433 Freq, select the 433 Freq fault. This will open the relay.
   22. Test the close point of < =430 Freq, select the 432 Freq fault. The relay will remain
       opened.
   23. Test the close point of < =430 Freq, select the 421 Freq fault. This will close the relay.
       (items 20 - 23 are the over frequency hysteresis requirements)
   24. Select the NONE fault for the Frequency, set the voltage back to 400Hz.
   25. Test the Broken Wire fault, select the BROKEN WIRE fault. This will open the relay.
   26. Now hit the BROKEN WIRE fault. This will close the relay.
   27. Test the switch requirement, select the SWITCH. This will open the relay.
   28. Now hit the SWITCH. This will close the relay.
   29. Test the Under Speed fault , select the STOP ENGINE button. This will bring the engine
       speed down and open the relay.

Goal 3 success
The third goal of creating an ANN to be trained to meet 100% of the requirements from logic
developed using conventional software. The requirements were taken from a second controller,
GCU 2 of the proposal. Since no executable code is actually created when developing the ANN
for GCU2, the only item left is to verify it works to the conventional software. The following test
was used to verify the goal was met.
    1. Select NO ANN radio button.
    2. Select AIRCRAFT 2 LOGIC radio button. Executes GCU 2 conventional software.
    3. Select SWITCH button ON(enables the relay to close when power quality is good)
    4. Select START ENGINE button so engine speed = 0.
    5. As stated in the Methods section, load in the file gcu2mann. The remaining steps were used
       to verify that the ANN ran to its requirements.
    6. Select RUN ANN radio button.
    7. Select START ENGINE button to start engine.
    8. When the output closes and provides power to the aircraft bus then test the Under Voltage
       fault of < 90, select the 89 volt fault. This will open the relay. Verify the ERROR
       COUNT did not change. Now hit the 90 volt fault. This will close the relay. Verify the
       ERROR COUNT did not change.
   9. Test the Over Voltage fault of > 130, select the 131 volt fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 130 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   10. Test the Under Frequency fault of < 380, select the 379 freq fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 380 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   11. Test the Over Frequency fault of > 420, select the 421 freq fault. This will open the relay.
       Verify the ERROR COUNT did not change. Now hit the 420 volt fault. This will close
       the relay. Verify the ERROR COUNT did not change.
   12. Test the Broken Wire fault, select the BROKEN WIRE fault. The relay will remain
       CLOSED. Reset the Broken Wire fault, select the BROKEN WIRE fault.
   13. Test the switch requirement, select the SWITCH. This will open the relay. Verify the
       ERROR COUNT did not change. Now hit the SWITCH. This will close the relay.
       Verify the ERROR COUNT did not change.
   14. Test the Under Speed fault, select the STOP ENGINE button. This will bring the engine
       speed down and open the relay. Verify the ERROR COUNT did not change.
   15. Reset the faults ( NONE) button for voltage and frequency.


   All three of these test procedures pass to show that the ANN software performs to 100% of the
   convention software.


Further Study.
         This project has provided some initial architecture for running Artificial Neural Networks
in a deterministic real-time environment. Further studies can include the increase in CPU
workload to run ANNs over conventional software. With new CPUs geared toward looping
execution code and cache, the CPU workload may not be a big increase. This project only used a
one hidden layer Multi-layered Perceptron and a threshold Multi-layered Perceptron. To handle
the full range of controllers other Neuron Networks must be used such as time delay Networks.
Bibliography

[1] Simon Haykin, 1999, Neural Networks A Comprehensive Foundation, Multi-layer Perceptron ,
Chapter 4,
[2] Simon Haykin, 1999, Neural Networks A Comprehensive Foundation, Back-Propagation
Algorithm, Equation 4.25
[3] Simon Haykin, 1999, Neural Networks A Comprehensive Foundation, Hidden Neuron
Gradient, Equation 4.24
[4] Simon Haykin, 1999, Neural Networks A Comprehensive Foundation, Output Neuron
Gradient, Equation 4.14
[5] Forward Pass Algorithm, Equation 4.26 & 4.27
                                                     Appendix A
                                                      Proposal

     Proposal for Artificial Neural Network Project
                          (Graduate Study University Wisconsin Madison 539)
                                           By Jeff Schmidt
                                            815-226-6410
                                        Hamilton-Sundstrand
                                             Feb 4 2001



5. 1............................................................................................................Overview 18
6. 2............................................................................................................. Proposal 18
7. 3.................................................................................................................. Goals 12
8. 4....................................................................................... Application of Results 19
9. 5....................................................................................... GCU #1 Requirements 20
10. 6....................................................................................... GCU #2 Requirements 22
11. 7..................................................................................................... GUI Interface 25
Overview
Hamilton-Sundstrand provides the avionic equipment to control the power through out most
passenger aircraft. This includes Boeing, Airbus and smaller business jet companies. Hamilton-
Sundstrand provides both the hardware and software required to control the power generation.
Generators are attached to the aircraft’s engines, which provide the torque for the generators to
produce the electrical power. Generator Control Units (GCUs) are used to control the generators
power quality and contactors (relays) for power distribution through out the aircraft. Figure 1
shows an overview of the power generation system.

                           Generator Control Unit

 Software
 ANN


                    Switch Speed        Current    Voltage Frequency          Output

 Hardware
 (ASIC, AtoD)




           Engine          Generator



                                                         AC BUS

                                       Cockpit                              phones
Figure 2


Proposal
The proposal is concentrated on the software effort to produce an Artificial Neural Network
(ANN) that will replace the conventional contactor control software. As seen in figure 1, the GCU
is made up of hardware and software. Hardware provides the inputs in a digital format for
software to act upon. The ANN shall take these inputs and provide the correct output according to
the requirements of GCU #1. This is accomplished by feeding the ANN the requirements for
training. Since the requirements of the contactor output is known, the training shall result in
performing to the same level as the conventional software. This is the first goal. Once the first
goal is met, a few of the requirements stated in the requirements of GCU #1 will be changed. The
second goal is to add these changed requirements without changing the ANN algorithm code, the
ANN only needs to be retrained. The third goal is to use the same ANN algorithm used for the
requirements of GCU #1 and training it to the requirements of GCU #2. This will allow the same
ANN software to run 2 different GCUs requirements. The fourth goal is to provide a mathematical
verification method. This will allow software engineers to verify their software before hardware is
available.

Goals
      12. To create an ANN that can replace the conventional software for the contactor control
          in a GCU. This requires the ANN software to learn 100% of the contractor functional
          requirements.
   1. To create an ANN algorithm such that the code to calculate the ANN output does not
      change if the contactor requirements change. It is ok for the inputs to have their thresholds
      change or new inputs, this should not change the algorithm required to calculate the output.
   2. To create an generic ANN algorithm such that this network will run the contactor control
      requirements from 2 different GCUs by only changing the ANN data. This would consist
      of changing only the ANN weights, again no code change.
   3. To validate the ANN data to the requirements using mathematics/graphs. Use of Matlab
      can provide a visual display.



Application of Results
Having goals 1-3 met would allow Hamilton-Sundstrand to get most if not all its structure
coverage when doing system tests. Structural coverage is required by the FAA to certify avionic
software. The ANN can be use for control logic, protection logic and low level Built In Test
(BIT). This would allow the same ANN code to run all the different logic. Since all of the network
must be run every time to find an output the execution time becomes deterministic. This helps for
hard-realtime software.
GCU #1 Requirements
The relay shall be able to close when the power is within the following parameters:

Voltage is between 90Volts and 130 Volts.
Frequency is between 370 and 430 Hz.
The speed of the generator must be greater than 3000rpm

The pilot, to open and close the contactor when the above requirements have been met, can use the
contactor switch.

LOGIC for requirements


 Voltage                   >=90                                           VoltageGood
 (volts)


                           >130



 Frequency                  >= 370                                         FreqGood
 (hz)

                             > 430




                                                   SpeedGood
 Speed                             >=3000
 (rpm)
Final Output




   SwitchOn




   VoltageGood      CloseOutput

   FreqGood



   SpeedGood




                 PowerQualityGood
GCU #2 Requirements
The relay shall be able to close when the power is within the following parameters:

Voltage is between 90Volts and 130 Volts.
Frequency is between 380 and 420 Hz.
The speed of the generator must be greater than 3000rpm or if the speed wire is broken (speed <
100 rpm) then use greater than 350hz

The pilot, to open and close the contactor when the above requirements have been met, can use the
contactor switch.

LOGIC for requirements

 Voltage                   >=90                                           VoltageGood
 (volts)


                           >130



 Frequency                  >= 380                                         FreqGood
 (hz)

                             > 420




   Speed                  >=3000
   (rpm)

                                                                             SpeedGood
                           < 100
                                                                          OR

 Frequency
                           > =350
 (hz)
Final Output


   SwitchOn




   VoltageGood      CloseOutput

   FreqGood



   SpeedGood




                 PowerQualityGood
GUI Interface
A GUI interface will be used to help in the training of the ANN. Actual results can then be
compared to the conventional software side by side. The GUI interface would have some of the
following information as seen in figure 2. This software would be developed for a Microsoft
Windows environment using Borland C++.



                                                             Engine Up
                                                            Engine Up
     Freq        400                  Training
                                     Training
     Volt        100
                                                           Over Current
                                                           Over Current
     Speed      4000
                                                          Over Frequency
                                                          Over Frequency
     Current       6
                                                           Over Voltage
                                                           Over Voltage
      0       Conventional Output
                                                          Breaker speed
                                                          Breaker speed
              ANN Output                                       input
      0                                                       input

                                    GCU


           Generator                                         AC BUS




Figure 2

								
To top