               NFPA CODE TESTING & INSPECTION Requirements & Recommendations
       for Licensed Florida Health Care Facilities per NFPA Life Safety Code – 101 (2003) Edition
      Biannual or semiannual = 2 time a year or every 6 months       Biennial = every other year or every 2 years
                                                  REVISED 4/10/06


                Required tests and inspections                        Frequency             NFPA Reference

I.   Fire Alarm System:
     A. System operational test & central station notification            Yearly           72 (2002) 10.4.3
     B. All manual pull stations                                          Yearly           72 (2002) 10.4.3
     C. All indicating smoke detectors - operational test                 Yearly           72 (2002) 10.4.3
     D. All smoke detectors - sensitivity test                      Within 1 year of       72 (2002) 10.4.3
                                                                  installation & then Biennial
     E. Restorable heat detectors                                     20% yearly or        72 (2002) 10.4.3.4
                                                                    100% in 5 years
     F. Non restorable heat detectors                              After 15 years, test 72 (2002) 10.4.3.4 &
                                                                  2/100 or replace all    10.4.2.2 (13) 4
                                                                                        72 (2002) 10.4.2.2 &
     G. Remote annunciators                                               Yearly        10.4.3 (14)
     H. Fire panel inspection, cert and tag                               Yearly        72 (2002) 10.4.3 (1)
     I. Alarm supervisory & trouble signals – can include:            Quarterly and    72 (2002) 10.4.3 (15) L
        sprinkler system alarms                                        Semiannual               (m)(n)
                  This can be done as part of quarterly sprinkler system testing.

II. Ventilating System Dampers & Detectors
    A. Fire damper - maintenance – remove thermal links,    Every 4 years or
              operate damper to verify closure & lubricate.   25% yearly       90A(2002) 5.4.7
    B. Fire, Smoke & Ceiling Dampers – maintenance testing Recommd biennial 90A(02) Appd’x. B.2.1
    C. Smoke detectors for automatic control                  Test yearly      90A(2002) 6.4.1




III. Automatic Sprinkler System:
     A. Waterflow switches (fire alarm in 90 seconds per
         NFPA 72, 5.10.2), tamper switches, trouble alarm tests     Quarterly        25 (2002) 6.3.3
     B. Sprinkler system inspection & test                          Quarterly        25 (2002) 4.5
     C. Fire pump flow capacity test run (no flow)                   Weekly           25 (2002) 8.3.1
     D. Fire pump flow capacity test (flow)                          Yearly          25 (2002) 8.3.3
     E. Calibrate pressure gauge, extra high temp. heads         Every 5 years       25 (2002) 5.3.2
     F. System obstruction flushing – only where condit. exists      5 years      25 (2002) Chap. 13
     G. post indicator & control valves test                        Annually          25 (2002) 12.3.3
     H. Water storage tanks, temp & water level switch alarm    Monthly/Weekly 25(2002) 9.2.1& 9.2.4.3
     I. Dry pipe valves trip test                                    Yearly      25 (2002) 12.4.4.2.2
     J. Dry pipe valves full flow test                           Every 3 years 25 (2002) 12.4.4.2.2.2
     K. Fire Hose (occupant use) inspect & re-rack                   Yearly          1962 (1998) 2-3
                                                                At 5 year & then
     L. Fire Hose (occupant use) pressure test                   every 3 years      1962 (1998) 2-3.3
     M. Fire hydrant (private) functional test                       Yearly          25 (2002) 7.3.2
     N. Fire hydrant (private) piping flow test                  Every 5 years       25 (2002) 7.3.1
                                                    2006 update


IV. Other Fire Suppression Systems & Equipment: does not include all types – just most common
    A. Portable fire extinguishers in-house inspection           Monthly              10 (2002) 6.2
    B. Portable fire extinguishers (tagging) maintenance          Yearly              10 (2002) 6.3
    C. Portable fire extinguishers - re-fill & maintenance    Every 6 years           10 (2002) 6.3.3
    D. Portable fire extinguishers - hydrostatic test         Every 12 years 10 (2002) Table 7.2
    E. Gas (Halon) systems – inspection & tested                Biannually          12A (1997) 4-1.1
    F. Kitchen hood extinguishing system – tag & service        Biannually            96 (2001) 11.2
    G. Kitchen hood exting. system, replace fusible links         Yearly              96 (2001) 11.2.4
    H. Kitchen hood exting. system – Quick Check - in-house      Monthly          17, 9-2 & 17A (98) 5-2
    I. Water spray systems, flow test & flush                     Yearly              25 (2002) 10.2



V. Facility Requirements applicable to NFPA 99 – chapters 12-18 specify application of chapters 3 -11.
   A. Hospitals                                                 All requirements NFPA 99 (‘02) Chap.13
   B. Ambulatory Surgical Centers                              Some requirements NFPA 99 (‘02) Chap.14
   C. Nursing Homes                                            Some requirements NFPA 99 (‘02) Chap.17
   D. Birth Centers                              Requirements as applicable        NFPA 99 (‘02) Chap.21
   E. Laboratories – safety officer appointed - 11.8.1.1 &
     periodic inspection of electrical, gas & safety equipment 11.8.1.1.2 & 1.1.3 NFPA 99 (‘02) Chap.11
   F. Hyperbaric Fac. – safety ofcr. appted.; maint. & testing 20.3.1.3.2 & 20.3.4 NFPA 99 (‘02) Chap.20
   G. Appendix & Annex – not Code Requirements (Recommendations)

VI.    Electrical Power Standby System: (EPSS)                                            110 (2002) 8.4.1
      A. Emergency generator system –          inspect weekly &    test monthly          99 (2002) 4.4.4.1.1
      B. Emergency generator - run under load                     30 min./month           110 (2002) 8.4.2
      C. Emerg. Gen – diesel – not meeting 8-4.2                  2 hrs. annually        110 (2002) 8.4.2.3
      D. Main & feeder circuit breakers – exercise per mfgr. &    Inspect yearly        99 (2002) 4.4.4.1.1.1
      E. Storage batteries - inspect & maintenance                    Weekly            99 (2002) 4.4.4.1.3
      F. Emergency Lighting- “             “ 30 sec. Monthly-----90 min. Annually       101 (2003) 7.9.3.1
      G. EPSS shall be test run continuously for 4 hours for      Every 3 years         110(2002) 8.4.8
            Hospitals, SNF’s, and ASC’s per AHJ. See appdx.

VII. Electrical Testing:
     A. Receptacles in critical care areas - test Hospital grade     - at intervals per   99 (2002) 4.3.3.2
     B. Receptacles in general areas – test non-hospital grade         documented         99 (2002) 4.3.3.2
     C. Receptacles in wet locations -            yearly            performance data      99 (2002) 4.3.3.2
     D. Ground fault circuit interrupters - test                           Yearly         99 (2002) 4.3.3.2
     E. Patient care electrical equipment (critical care) test     Biannual or except.    99 (2002) 8.4.1.3
     F. Patient care electrical equipment (general care) test      Yearly or exception   99 (2002) 8.5.2.12
     G. Patient care electrical equipment (wet locations) test     Biannual or except. 99 (2002), exception #1
     H. Conductive floors (maintain & test only w/ flam. anest.)   Monthly 99 (2002)      Annex E, E.6.6.8
      I. Line isolation monitors - test circuits                          Monthly        99 (2002) 4.3.3.3.2
     J. Test instrument – continuity testing                               Yearly        99 (2002) 4.3.3.1.5

VIII. Medical Gas Systems: periodic testing for gas & alarm systems shall be done 99(2002) 5.1.13.6
     A. Reserve supply operation & warm signals              Recommend yearly 99 , Appendix C.5.2
     B. Mainline pressure & change over signals              Recommend daily      99 , Appendix C.5.2
     C. Signal panel audible/visual signals                 Recommnd monthly 99 , Appendix C.5.2
     D. Reserve in use warning signals - test               Recommnd monthly 99 , Appendix C.5.2
     E. Compressed air intake -test                          Recomm quarterly 99 , Appendix C.5.2

						