Installation Integrity H V A C Commissioning Management Tel

Reviews
Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 www.i2ime.com SAMPLE OF HVAC COMMISSIONING TEST SHEETS AIR SYSTEMS Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 AHU PERFORMANCE SHEET WITH RETURN AIR www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Model Serial no. Ordered duty l/s Pa MOTOR Manufacturer Frame size Serial no. Power Kw Electrical supply volts / phase / hertz Motor current amps STATIC DETAILS Belt manf. Belt type / size No. of belts Motor pulley dia. mm Motor shaft dia. mm Motor bush Fan pulley dia. mm Fan shaft dia mm Fan bush Pulley centers mm Motor adjustment mm Ref Date Job ref Sheet OVERLOAD Type Range Setting Fuse Amps Amps Amps MEASURED CURRENT Amps R-Y-B PERFORMANCE Design Actual Total system duty l/s Return air l/s Fresh air l/s Suction static pressure Pa Discharge static pressure Pa External static pressure Pa Total static pressure Pa Fan speed rpm Motor speed rpm WITNESSED i2i Eng. Date: Date: Name: Name: Signature: Signature: **Indicates not stated QA-A001 of % l/s l/s l/s Pa Pa Pa Pa rpm rpm - * Indicates unobtainable Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 AHU PERFORMANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Model Serial no. Ordered duty l/s Pa MOTOR Manufacturer Frame size Serial no. Power Kw Electrical supply volts / phase / hertz Motor current amps STATIC DETAILS Belt manf. Belt type / size No. of belts Motor pulley dia. mm Motor shaft dia. mm Motor bush Fan pulley dia. mm Fan shaft dia mm Fan bush Pulley centers mm Motor adjustment mm Ref Date Job ref Sheet OVERLOAD Type Range Setting Fuse Amps PERFORMANCE Design Total system duty Suction static pressure Discharge static pressure External static pressure Total static pressure Fan speed Motor speed - QA-A002 of Amps Amps Amps MEASURED CURRENT R-Y-B Actual l/s Pa Pa Pa Pa rpm rpm l/s Pa Pa Pa Pa rpm rpm % - WITNESSED i2i Eng. Date: Name: Signature: Date: Name: Signature: **Indicates not stated * Indicates unobtainable Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 PRESSURE DROPS TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving Fresh Pa A B C D E F Supply Deg C. Ref Date Job ref Sheet QA-A003 of G Fan Discharge Off Cw Coil / Fan Suction Off Bag Filter / On Cw Coil Off Panel Filter / On Bag Filter Mixing Chamber/On Panel Filter Return Air Return Pa G Deg C. Fresh Air F E D C B A Pa Total External A+B A+F+G i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 FAN PERFORMANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Size Serial No. Ordered Duty MOTOR Manufacturer Frame Size Serial No. Power Electrical Supply Motor Current Belt Manf. Belt Type / Size No. of Belts Motor Pulley Di. Motor Shaft Dia. Motor Bush Fan Pulley Dia. Fan Shaft Dia Fan Bush Pulley Centers Motor Adjustmt. Type Range Setting Fuse Ref Date Job ref Sheet OVERLOAD Amps Amps Amps MEASURED CURRENT amps R-Y-B PERFORMANCE design actual System Volume l/s Suction Static Pressure Pa Discharge Static Pressure Pa External Static Pressure Pa Fan Speed rpm Motor Speed rpm WITNESSED i2i eng. Date: Date: Name: Name: Signed: Signed: Date: Name: Signed: ** indicates not stated QA-A004 of l/s Pa % l/s Pa Pa Pa rpm rpm kW volts / phase / hertz amps STATIC DETAILS mm mm mm mm mm + / - mm Date: Name: Signed: * indicates unobtainable Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 DIRECT DRIVE FAN PERFORMANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Size Serial No. Ordered Duty MOTOR Manufacturer Frame Size Serial No. Power Electrical Supply Motor Current 1 PERFORMANCE Total System Duty Suction Static Pressure Discharge Static Pressure External Static Pressure Fan Speed Motor Speed OVERLOAD Type Range Setting Fuse 7 8 9 design - Ref Date Job ref Sheet actual l/s Pa. Pa. Pa. rpm rpm QA-A005 of % l/s Pa. Pa. Pa. rpm rpm MEASURED CURRENT R Y B l/s Pa 2 3 Kw volts / phase / hertz amps 4 5 Amps Amps Amps DESIGN 6 10 Design Duty Design Velocity ACTUAL l/s m/s mm m2 m/s l/s Pa % L>R in to air flow Duct Size Duct Area Actual Velocity Actual Duty Static Pressure Percentage of Design TEST HOLE LOCATION i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 TRAVERSE TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving L>R 1 1 2 3 4 5 6 7 8 9 10 i2i Eng. Date Name Signed Ref Date Job ref Sheet 2 3 4 5 6 7 8 9 10 DESIGN Design duty Design velocity ACTUAL Duct size (mm) Duct area Actual velocity Actual duty Static pressure % of Design COMMENTS QA-A006 of l/s m/s m2 m/s l/s Pa % Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 DOUBLE TRAVERSE TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving L>R 1 2 1 2 3 4 5 6 3 4 5 6 1 2 3 Ref Date Job ref Sheet 4 QA-A007 5 of 6 DESIGN Design Duty Design Velocity ACTUAL Duct Size Duct Area Actual Velocity Actual Duty Static Pressure Percentage of Design i2i Eng. Date Name Signed l/s m/s mm m2 m/s l/s Pa % Date Name Signed DESIGN Design Duty Design Velocity ACTUAL Duct Size Duct Area Actual Velocity Actual Duty Static Pressure Percentage of Design Date Name Signed l/s m/s mm m2 m/s l/s Pa % Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 DRIVE CHANGE TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving Design 1 2 3 4 5 6 7 8 Measure % Ref Date Job ref Sheet Comments QA-A008 of air volume total s.p motor speed fan speed fan pulley dia motor pulley dia motor amperage *take shaft size then refer to bush manufacturers details for any size difference to calculate new required motor pulley size (PD) Q1 PD2 = PD1 x Q2 to calculate power consumption Q2 Q1 3 to calculate max motor pulley given max motor amp PD2 = design amp actual amp PD1 kW 1 = kW 2 x i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 AIR BALANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving Design Design Initial Ref Size Area l/s Ref Date Job ref Sheet Initial % QA-A009 of Comments Final Vel - m/s Final l/s Vel - m/s Vel - m/s l/s % i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 ELECTRIC VAV BOX TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving Box Box Box Ref Size Type Ref Date Job ref Sheet Location Design Design Test Max Min Voltage Volume Volume Min QA-A010 of Comments Min i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 FAN COIL PERFORMANCE SHEET DIRECT DRIVE www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Model Serial no. Ordered Duty MOTOR Manufacturer Frame Size Serial No. Power Electrical Supply Motor Current Ref Size Area Ref Date Job ref Sheet PERFORMANCE High Speed Medium Speed Low Speed External Static Pressure Fan speed Motor speed OVERLOAD Type Range Setting Fuse Design l/s l/s l/s Pa rpm rpm Actual QA-A011 of % l/s Pa l/s l/s l/s Pa rpm rpm MEASURED CURRENT R Y B Kw volts / phase / hertz amps Design Design Initial Low Speed Vol-l/s Vel-m/s Vel-m/s l/s % Amps Amps Amps High Speed l/s % Medium Speed l/s % Comments i2i Engineer Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 FAN COIL PERFORMANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Model Serial no. Ordered Duty MOTOR Manufacturer Frame Size Serial No. Power Electrical Supply Motor Current DRIVE Belt Manf. Belt Type / Size No. of Belts Ref Size Area Ref Date Job ref Sheet Motor Pulley Dia. Motor Shaft Dia. Motor Bush Fan Pulley Dia. Fan Shaft Dia l/s Pa Fan Bush Pulley Centers Motor Adjustment +/PERFORMANCE Design Volume l/s Kw External Static Pressure Pa. volts / phase / hertz Fan Speed rpm amps Motor Speed rpm OVERLOAD Type Range Amps Setting Fuse Amps Design Design Initial Initial Final Final Vol-l/s Vel-m/s Vel-m/s l/s % Vel-m/s l/s % mm mm mm mm mm mm actual QA-A012 of % l/s Pa. rpm rpm MEASURED CURRENT R Y B Comment i2i Engineer. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 FAN COIL PERFORMANCE SHEET www.i2ime.com Contract Client Plant reference Location / area serving FAN Manufacturer Type Model Serial no. Ordered Duty MOTOR Manufacturer Frame Size Serial No. Power Electrical Supply Motor Current Ref Size Area Ref Date Job ref Sheet PERFORMANCE Volume Fresh Air Return air External Static Pressure Fan speed Motor speed OVERLOAD Type Range Setting Fuse Design l/s l/s l/s Pa rpm rpm Actual QA-A013 of % l/s Pa l/s l/s l/s Pa rpm rpm MEASURED CURRENT R Y B Kw volts / phase / hertz amps Design Design Initial Initial Vol-l/s Vel-m/s Vel-m/s l/s Amps Amps Amps % Final Final Vel-m/s l/s % Comment i2i Engineer. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 PACKAGE AIR CONDITIONERS SHEET www.i2ime.com Contract Client Plant reference Location / area serving UNIT DATA Ref Date Job ref Sheet MOTOR DATA QA-A014 of Manufacturer model no. Serial no. Type Fan pulley mfr Fan pulley dia Fan shaft dia no. of belts TEST DATA EVAPORATOR Total air - fan l/s Outle total air l/s External Pa. Total s.p. fan Discharge s.p Suction s.p Outside air l/s Return air l/s Ent. Air db/wb temp Lvg. Air db/wb temp Outside air db/wb Fan r.p.m Voltage Amperage Design Measured Manufacturer kW RPM Volts F.L.C mm Motor pulley mfr mm Motor pulley dia Motor shaft dia TEST DATA COMPRESSOR Manufacturer model no. Serial no. Suction pres' Discharge pres' Crank case hter A Compress'r volts l.p/h.p cutout set'g no.cond'r fans Cond'r fan h.p Cond'r fan volts Cond'r fan amps Design mm mm Measured i2i Engineer Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 ENVIRONMENTALS TEST SHEET www.i2ime.com Contract Client Plant reference Location / area serving Room number / Identification Temperature Ref Date Job ref Sheet Deg. C Humidity % RH Sound Level dBA Comments QA-A015 of i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 HOOD CONSTRUCTION SIZES SHEET www.i2ime.com Contract Client Plant reference Location / area serving Hood A no. mm 1 150x150 2 200x200 3 300x300 4 600x300 5 400x400 6 450x450 7 600x600 8 600x600 9 800x800 B mm 100x100 85 x 85 130x130 260x130 180x180 195x195 260x260 400x400 360x360 C mm 140 220 330 700/740 440 500 700 360 880 D mm 140 170 250 350 330 380 500 540 660 Neck area Extract m2 factor 0.010 0.0098 0.0075 0.0069 0.017 0.0158 0.034 0.031 0.032 0.029 0.038 0.035 0.0655 0.06 0.162 0.148 0.13 0.118 Ref QA-A016 Date Job ref Sheet of Supply Approx volume range m3/s factor min max 0.0118 0.010 0.040 0.0083 0.007 0.030 0.019 0.015 0.070 0.037 0.03 0.130 0.035 0.03 0.130 0.042 0.035 0.150 0.072 0.060 0.300 0.178 0.200 0.650 0.142 0.120 0.550 C D B A i2i Date Name Signed Date Name Signed Date Name Signed Date Name Signed Installation Integrity 2000 H.V.A.C Commissioning Management Tel:- +971 (0) 4 338 4806 Fax:- +971 (0) 4 338 4830 AIR BALANCE SUMMARY SHEET www.i2ime.com Contract Client Plant reference Location / area serving Micromanometer Anemometer Flow hood Ref Date Job ref Sheet design design initial volume velocity velocity final correction final velocity factor volume QA-A017 of ref size area % % comments i2i Eng. Date Name Signed Date Name Signed Date Name Signed Date Name Signed

Related docs
MTE commissioning in 2008
Views: 1  |  Downloads: 0
LHC Progress and Commissioning Plans
Views: 9  |  Downloads: 0
TEL- Cooler- Installation- Manual
Views: 2  |  Downloads: 0
Integrity Journal
Views: 62  |  Downloads: 3
Installation
Views: 128  |  Downloads: 10
getting started cpu31xc commissioning
Views: 0  |  Downloads: 0
installation requirements
Views: 7  |  Downloads: 0
Other docs by acslater