Project Execution Progress Report

Document Sample
Project Execution Progress Report Powered By Docstoc
					                                                                                                         1 of 2
Project Execution Progress Report:

Project Name:                     Location:           Prepared By:                 Date:
Owner:                                                Owner project contact:

Project Objectives agreed upon by owner, contractor and major subs:




Brief scope description:




Progress to date:
Design status:



Procurement/contracting status:



Permitting status:



Field work status:




 Contract Status:                                           number         $ amount            Time (+/-)
                                                Original:
                              Changes approved to date:
                     Changes submitted but not approved:
                               Changes to be submitted:
                                 Projection to complete:
                                           Project Total:




                                                  1                   171aa244-a3c8-4d81-acd0-82371f31f7ad.doc
                                                                                                            2 of 2
Field Staff:
       Site Management;
       Supervision
       Foremen
       Craftworkers (average)
       Recruiting needs for the next period:

Major equipment and materials received at the site (during this period):

Site facilities & security: (describe)

Safety:       Training & Orientation (discuss)
              Substance abuse program
              Safety training planned
              Incentives
              Incidents & emergencies investigated

Quality:      Approvals status (attach a copy of the latest submittals log)
              Inspections status (attach a copy of any inspection reports)
              Testing status (summarize test results)

Tools and construction equipment status:
      Special tools needed:                                    date on        date off


       Rental equipment list:              planned                   actual
                                     date on   date off        date on      date off


Cost status: (attach a copy of the latest labor cost report and materials/subcontract commitment reports)

Special problems encountered (describe problem and how it was resolved):


Special problems unresolved:                                          action plan:



Schedule status: