FORE COURT (95.90 m)E 0.0
ENTR
BENCH
NEW PAVING
96
-300 (95.60 m)EL:
BICYLCES
BICYLCES
BICYLCES
BICYLCES
BICYLCES
BICYLCES
2.500EL: 2.500EL:
12
7.5m Upper Storeys Setback 4.7m Entry Canopy Setback
SLOPED PLANTING
3050
11
10.5m Entry Door Setback
BENCH BENCH
SH
95
BENCH
96
94
CANOPY ABOVE
ISSUE / REVISION:
No.
94
Date
Description
TEMPORARY HARDSCAPE
95
JUL 29-08
95
ISSUED FOR AUDP ISSUED FOR DP APPLIC.
JUL 29-08
EXISTING SIDEWALK
96
95
EXISTING CURB
E
D
C
B
A
+12.890
U/S Roof Deck (low point)
96
96
3790
EXISTING AMPLE BUILDING
96
+9.075
3rd Floor
95
New Tree beyond
+-14,000 (DP BUILDING HEIGHT)
CONSULTANTS:
Proposed Future Trees by Others
+5.075
96
13915
4000
Existing Trees
Existing Trees
Existing Tree New Tree beyond
Proposed Future Trees by Others
96
2nd Floor
ENGINEER'S LANE
EXISTING CEME BUILDING
6125
0.000 95.37 (average street grade at site) -1.050
East Mall
95.900 (Geodetical)
Main Floor
97
EAST ELEVATION
LOOKING WEST FROM EAST MALL
LARRY McFARLAND ARCHITECTS LTD. (including its employees and agents) can take no responsibility for the accuracy or use of any information on this drawing pertaining to existing site conditions, including buildings, services and utilities. It is the responsibility of the person using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence. This drawing, as an instrument of service, is the property of LARRY McFARLAND ARCHITECTS LTD. and may not be reproduced without their permission and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specified project only and shall not be used otherwise without written permission of this office.
1
2
3
4
5
6
7
8
9
10
+12.890
U/S Roof Deck (low point)
Green Wall Wires
3790
+9.075
3rd Floor
Bridge (seperate price)
4000
13915
New Tree Beyond EXISTING CEME BUILDING
Proposed Trees (Foreground)
+-14,000 (DP BUILDING HEIGHT)
+5.075
2nd Floor Future Tree by Others
Future Tree by Others
Recycling / Garbage Beyond
Benches
0.000
6125
COURTYARD ENTRY
EAST MALL
East Mall
95.900 (Geodetical) 95.37 (average street grade at site) -1.050
Street Elevation Main Floor
EXISTING CHEM/BIO BUILDING
SOUTH ELEVATION
LOOKING NORTH FROM ENGINEERS LANE
programming | planning | architecture
303 - 2930 Arbutus Street Vancouver, BC, V6J 3Y9 t. 604 733 1115 f. 604 733 9345 www.mcfarlandarchitects.com
A
B
C
D
E
+12.890
U/S Roof Deck (low point)
3790
+9.075
3rd Floor
LMAL Project No.:
+-14,000 (DP BUILDING HEIGHT)
0803
Green Wall
4000
File name:
EXISTING AMPLE BUILDING
0803 Design SITE PLANS
13915
+5.075
2nd Floor
PROJECT TITLE:
Proposed Trees (Foreground)
6125
COURTYARD
ENGINEER'S LANE
WAYNE and WILLIAM WHITE ENGINEERING DESIGN CENTRE UBC
PROJECT PHASE:
0.000
East Mall
95.900 (Geodetical)
95.37 (average street grade at site) -1.050
EXISTING CEME BUILDING
700
Main Floor
WEST ELEVATION
12
11
10
9
8
7
6
5
4
3
2
1
Desgin Development
+12.890
U/S Roof Deck (low point)
Green Wall Wires
3790
DRAWING TITLE:
+9.075
Open
3rd Floor
+-14,000 (DP BUILDING HEIGHT)
Bridge beyond (seperate price)
4000
Reading Rm
CONTEXT ELEVATIONS
EXISTING CEME BUILDING
13915
EXISTING CHEM/BIO BUILDING
2.5
0
+5.075
2nd Floor
Future Trees by Others
EAST MALL
6125
COURTYARD
Benches
0.000 95.37 (average street grade at site)
East Mall
95.900 (Geodetical)
Planter
-1.050
LINE OF CEME BLDG IN
Outline of CEME FOREGROUND Building in Foreground
Main Floor
Date Plotted: Scale: Drawn: Checked:
NORTH WEST ELEVATION NORTH ELEVATION
1:200
DRAWING NUMBER:
A2.0
10