FORE COURT m E ENTR BENCH NEW PAVING m

FORE COURT (95.90 m)E 0.0 ENTR BENCH NEW PAVING 96 -300 (95.60 m)EL: BICYLCES BICYLCES BICYLCES BICYLCES BICYLCES BICYLCES 2.500EL: 2.500EL: 12 7.5m Upper Storeys Setback 4.7m Entry Canopy Setback SLOPED PLANTING 3050 11 10.5m Entry Door Setback BENCH BENCH SH 95 BENCH 96 94 CANOPY ABOVE ISSUE / REVISION: No. 94 Date Description TEMPORARY HARDSCAPE 95 JUL 29-08 95 ISSUED FOR AUDP ISSUED FOR DP APPLIC. JUL 29-08 EXISTING SIDEWALK 96 95 EXISTING CURB E D C B A +12.890 U/S Roof Deck (low point) 96 96 3790 EXISTING AMPLE BUILDING 96 +9.075 3rd Floor 95 New Tree beyond +-14,000 (DP BUILDING HEIGHT) CONSULTANTS: Proposed Future Trees by Others +5.075 96 13915 4000 Existing Trees Existing Trees Existing Tree New Tree beyond Proposed Future Trees by Others 96 2nd Floor ENGINEER'S LANE EXISTING CEME BUILDING 6125 0.000 95.37 (average street grade at site) -1.050 East Mall 95.900 (Geodetical) Main Floor 97 EAST ELEVATION LOOKING WEST FROM EAST MALL LARRY McFARLAND ARCHITECTS LTD. (including its employees and agents) can take no responsibility for the accuracy or use of any information on this drawing pertaining to existing site conditions, including buildings, services and utilities. It is the responsibility of the person using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence. This drawing, as an instrument of service, is the property of LARRY McFARLAND ARCHITECTS LTD. and may not be reproduced without their permission and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specified project only and shall not be used otherwise without written permission of this office. 1 2 3 4 5 6 7 8 9 10 +12.890 U/S Roof Deck (low point) Green Wall Wires 3790 +9.075 3rd Floor Bridge (seperate price) 4000 13915 New Tree Beyond EXISTING CEME BUILDING Proposed Trees (Foreground) +-14,000 (DP BUILDING HEIGHT) +5.075 2nd Floor Future Tree by Others Future Tree by Others Recycling / Garbage Beyond Benches 0.000 6125 COURTYARD ENTRY EAST MALL East Mall 95.900 (Geodetical) 95.37 (average street grade at site) -1.050 Street Elevation Main Floor EXISTING CHEM/BIO BUILDING SOUTH ELEVATION LOOKING NORTH FROM ENGINEERS LANE programming | planning | architecture 303 - 2930 Arbutus Street Vancouver, BC, V6J 3Y9 t. 604 733 1115 f. 604 733 9345 www.mcfarlandarchitects.com A B C D E +12.890 U/S Roof Deck (low point) 3790 +9.075 3rd Floor LMAL Project No.: +-14,000 (DP BUILDING HEIGHT) 0803 Green Wall 4000 File name: EXISTING AMPLE BUILDING 0803 Design SITE PLANS 13915 +5.075 2nd Floor PROJECT TITLE: Proposed Trees (Foreground) 6125 COURTYARD ENGINEER'S LANE WAYNE and WILLIAM WHITE ENGINEERING DESIGN CENTRE UBC PROJECT PHASE: 0.000 East Mall 95.900 (Geodetical) 95.37 (average street grade at site) -1.050 EXISTING CEME BUILDING 700 Main Floor WEST ELEVATION 12 11 10 9 8 7 6 5 4 3 2 1 Desgin Development +12.890 U/S Roof Deck (low point) Green Wall Wires 3790 DRAWING TITLE: +9.075 Open 3rd Floor +-14,000 (DP BUILDING HEIGHT) Bridge beyond (seperate price) 4000 Reading Rm CONTEXT ELEVATIONS EXISTING CEME BUILDING 13915 EXISTING CHEM/BIO BUILDING 2.5 0 +5.075 2nd Floor Future Trees by Others EAST MALL 6125 COURTYARD Benches 0.000 95.37 (average street grade at site) East Mall 95.900 (Geodetical) Planter -1.050 LINE OF CEME BLDG IN Outline of CEME FOREGROUND Building in Foreground Main Floor Date Plotted: Scale: Drawn: Checked: NORTH WEST ELEVATION NORTH ELEVATION 1:200 DRAWING NUMBER: A2.0 10

Related docs
M A C L E A R
Views: 1  |  Downloads: 0
FORE
Views: 0  |  Downloads: 0
EMBARGOED FOR RELEASE January a m E S T For
Views: 16  |  Downloads: 0
Agency a g r e e m e n t
Views: 6  |  Downloads: 0
T E L EC O M M U N I
Views: 5  |  Downloads: 0
Key Market Trends Impacting Fore
Views: 1  |  Downloads: 0
The Fore Bios
Views: 0  |  Downloads: 0
Other docs by johan petro
Daily Exit Security Checklist
Views: 385  |  Downloads: 5
Job requirements checklist
Views: 395  |  Downloads: 20
CHECK REGISTER
Views: 361  |  Downloads: 20
Driving record check
Views: 219  |  Downloads: 0
Employee reference phone script
Views: 442  |  Downloads: 18
Employee Complaint Procedures Re Sarbanes Oxley
Views: 293  |  Downloads: 5
Macrovision Corp Ammendments and Bylaws
Views: 177  |  Downloads: 1
SALES FOLLOW UP LETTER
Views: 814  |  Downloads: 57
Notice of Annual Shareholders Meeting
Views: 156  |  Downloads: 1
Demand to Guarantor for Payment
Views: 230  |  Downloads: 3
NOTICE OF BUYER S DISPOSITION OF REJECTED GOODS
Views: 229  |  Downloads: 0
FinanceCorporateStrategy-RM
Views: 166  |  Downloads: 0