Park University Master Plan Update

W
Document Sample
scope of work template
							   Park University
   Master Plan Update



 Master Plan
Commission
April 10, 2006
Inspiration
Section 1.
Inspiration

          •   1.1   Executive Summary
          •   1.2   Process
          •   1.3   Goals & Objectives
          •   1.4   Campus Overview
          •
Plan
Section 2.
Plan

         • 2.1 Campus Assessment
         • 2.2 Conceptual Options
         • 2.3 Final Option
         •
Section 2.
Plan

         • 2.1 Campus Assessment

         Current Parkville Campus Data
         - Student Peak Load:           1200
         - Teaching Station Ratio:      0.87
            optimum is 0.75
            range Runs 0.65 to 1.22
         - Full Time Classroom %:       35%
            utilization goal is 60%
         - Teaching Station Size:       34.22 sft.
            typical range is 22-35 sft.
Section 2.
Plan

         • 2.1 Campus Assessment
         Enrollment Projections

         FA 2005              1225

         FA 2012       1950
Section 2.
Plan

         • 2.1 Campus Assessment
                                Today’s Park     Improved
                                Efficiency       Efficiency
         2012 Campus Peak Load 1950              1950
         Teaching Station Ratio 0.87             0.75

         Net Teaching Stations  1697             1426
         Size Factor (nsf)      34.22            34.22
         Teaching Space (nsf)   58,054           48,798
         Less Current               <35,895 sft.>
         New Teaching Space (nsf)      22,159           12,902

         GrossSF(@1.3 net to gross)     28,806            16,773
Section 2.
Plan

         • 2.1 Campus Assessment
                                Today’s Park       Improved
                                Efficiency         Efficiency
         2012 Campus Peak Load 1950                1950
         Teaching Space Need (nsf) 22,159                   12,902

         Ratio of Office to
         Teaching Space          1.30              1.44
         Office Space Need (nsf) 28,806            18,578
         Plus Current Deficit      0               5,168
         New Office Space (nsf) 28,806             23,746

         GrossSF(@1.3 net to gross)       37,448            30,869
Section 2.
Plan

         • 2.1 Campus Assessment
                               Today’s Park        Improved
                               Efficiency          Efficiency
         2012 Campus Peak Load 1950                1950

         Teaching Space Need (gsf) 28,806                   16,773

         Office Space Need (gsf) 37,448            30,869

         Total Teaching and Office        66,254            47,642
Section 2.
Plan

         • 2.3 Final Option
Section 2.
Plan

         • 2.3 Final Option

         3 KEY PROGRAM AREAS:

         RESIDENTIAL
         ACADEMICS AND
          ADMINISTRATION
         STUDENT LIFE AND ATHLETICS
Section 2.
Plan

         RESIDENTIAL

         Copley Quad – Phased 500 Beds
         Shephard II Development
Plan
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Business and Management
          Key Variables are Qualitative
          Goal
          and Administration Space
          Needs -- Scenario A : Expand in
          Mackay
          - Scenario B : New Building
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Business and Management
          Key Variables are Qualitative
          Goal
          and Administration Space
          Needs -- Scenario A : Expand in
          Mackay
          - Scenario B : New Building
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Mackay Hall
          - Option 1 : Administration Only
          - Option 2 : Business &
          Management and Administration
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Mackay Hall
          - Option 1 : Administration Only
          - Option 2 : Business &
          Management and Administration
Section 2.
Plan

         ACADEMICS AND ADMINISTRATION

         Norrington Hall
          - Option 1: Arts & Humanities
          - Option 2: Social Sciences
          - Option 3: Both
              Faculty and Key Teaching
                   Resources in Norrington
               General Classroom Space
                         Underground
Section 2.
Plan

         ACADEMICS AND ADMINISTRATION

         Norrington Hall
          - Option 1: Arts & Humanities
          - Option 2: Social Sciences
          - Option 3: Both
              Faculty and Key Teaching
                   Resources in Norrington
               General Classroom Space
                         Underground
Plan
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Herr House
          - International Studies
          - Faculty Offices for Education
          - Faculty Lounge
          - CETL
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Hawley Hall
          - Youth Conservatory for Music
          - Theatre Education
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Global Institute - New Building
         Parking Garage – New Building
Plan
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Findlay Wakefield
           - Natural and Applied Sciences
           Learning and Office Spaces
Section 2.
Plan

         ACADEMICS AND
          ADMINISTRATION

         Potential Building Acquisition
          - Interior Design and Fine Arts in
          Renovated Space
Section 2.
Plan

         ACADEMICS AND ADMINISTRATION

         Park Academic Underground
           - Learning Spaces for Education,
           Social Sciences, and Arts &
           Humanities (option)
           - Business & Management (option)
           - Student Services
           - Redeveloped McAfee Library
           - Expanded IT
           - Underground Commons
Section 2.
Plan

         ACADEMICS AND ADMINISTRATION

         Park Academic Underground
           - Learning Spaces for Education,
           Social Sciences, and Arts &
           Humanities (option)
           - Business & Management (option)
           - Student Services
           - Redeveloped McAfee Library
           - Expanded IT
           - Underground Commons
Section 2.
Plan

         ACADEMICS AND ADMINISTRATION

         Park Academic Underground
           - Watson Literacy Center
           - Board Room
           - Relocated Dock
           - Relocated Physical Plant
Plan
Section 2.
Plan

         STUDENT LIFE and ATHLETICS
         Thompson Commons
          Redevelopment
          - Student Center
         Breckon Sports Center
          - Athletics
         Labor Hall Redevelopment
          - Recreation and Wellness
Plan
Section 2.
Plan

         STUDENT LIFE and ATHLETICS
         Softball
           - move to sports precinct (long term)
         Athletic Training
           - new sports precinct team center
         Track & Field (short term)
           - renew existing track
         Track & Field and Stadium
           - land bank with current uses
           - cooperative plan for ultimate
           scenario
Plan
Section 2.
Plan

         TRANSPORTATION & PARKING

         Circulation Changes
         Realignment of Existing
          Roadways
         Access Control
         Parking
Plan
Implement
Section 3.
Implement

         Phasing / Implementation
Section 3.
Implement

         • 3.3 Phasing / Implementation
         Dependent Phases
         - Stage 1: New Residential and
           Student Center
         - Stage 2: Expand Academic and
           Office Capacity
Section 3.
Implement

         Phase 1

         Housing – 250 Beds
          Copley Quad
          Shephard II
Section 3.
Implement

         Phase 2A – Student Commons

             Herr House Residential to New
                Copley Quad
             Renovate Herr House
             Build Commons Link
             Move Thompson Food Service
             to Commons Link
Section 3.
Implement

         Phase 2B – Student Commons

             Renovate Thompson Commons
Section 3.
Implement

         Phase 3A – Underground Traffic
          Modification (optional)

         Create New Emergency Truck
          Egress (north entrance)
         Covert President Condit Entrance
          (pedestrian only)
         Reroute Internal Truck Trafficways
Section 3.
Implement

         Phase 3B – Underground Renovation

         Redevelop McAfee Library (raw space)
         Relocate Dock and Physical Plant
         New Classroom Space (former library)
         Renovate/Update Public Areas
         Develop New Underground Commons
         New Student Services (former library)
Section 3.
Implement

         Phase 4 – Norrington Renewal

             Renovate Norrington
             Move Education Offices from Copley
             to Herr House
             Move Art & Humanities and Social
                Sciences from Copley to
             Norrington
Section 3.
Implement

         Phase 6 – Building X Renewal

             Renovate Building X
             Move Fine Arts to Building X
             Move Interior Design to Building
             X
             Remove Alumni Hall
Section 3.
Implement

         Phase 7 – Transportation
          Makeover

             New Loop Road
Section 3.
Implement

         Phase 8 – Residential Expansion

             New Residential Completes
             Copley Quad
Section 3.
Implement

         Phase 9 – Business &
          Management

             New Building
Section 3.
Implement

         Phase 10 – Mackay Renewal

             Renovate Mackay Hall
Section 3.
Implement

         • 3.3 Phasing / Implementation
         Independent Phases
         - Stage 1: Global Institute
         - Stage 2: Hawley Renewal
         - Stage 3: Recreation and
           Athletics
   Park University
   Master Plan Update



 Master Plan
Commission
April 10, 2006

						