                                  1 petfood plant cowra


                                                                           unit cost   unit cost
process step description          brand and model                          $usdollar   $AUS        sub total


             auger feed
     1       conveyor             fabricated auger conveyor with hopper                   40,000      40,000

             auger outfeed belt   incline belt                                            20,000      20,000


   2,3,4     dicing plant         infeed conveyor                                         19,200
                                  treiff raptor                                          163,400
                                  15 mm grid set                                           7,860
                                  outfeed conveyor                                        14,400     204,860


              dusting infeed      flat belt conveyor stainless steel, 2m
     5       conveyor             long                                                    15,000      15,000

             heat and control
             quot30501593         excluding items 17 &20                               1,083,670 1,083,670


             meat ball mixer with
             loading              ribbon blender with 200L tipper                        140,000     140,000

             feed conveyor                                                                20,000      20,000
             meat micer with
             loading              cbs                                                     60,000       60000


             gravy make up
             plant and dose filler purpose build plant                                    85,000
                                   dose filler 16 head                                   200,000     285,000
    12
             weighing system      yamato as per quote 05VP040                            650,000     650,000

    13
             form fill seal       cryovac
                                  multivac thermoformer                                  500,000
   14&15                          bulk nitrogen                                            5,000
                                  heusch cooler                                           10,000
                                  co2 chiller                                             10,000
                                  air piping 60m^3/hour at 7 bar                           5,000
    16                            vacuum pump bush 630                                    30,000
                                  installation                                            10,000     570,000
        spiral chiller   eurotech CPF8                              200250    487,929
 18     chilling plant   tri tech 230 k plus 50k install                      280,000   767,929



        m/d infeed
        beltconveyor     finished product conveyor 3m long say                 15,000    15,000

19&20

        metal detector   safeline metal detector and reject belt               40,000    40,000



        packing          heat shrink                                          600,000   600,000

                         electrical

 21                      electrical engineer                                   50,000    50,000
                         design                                                20,000    20,000
                         trades                                               150,000   150,000
                         materials                                            100,000   100,000
 22
 23                      floor coverings                                       20,000
 24                      lighting improvements                                 10,000
                         structural repairs                                    10,000    40,000


                         mechanical
                         10 days per site 6 men 10 hour days at
                         time and a half                                       45,000    45,000

                         living costs say 3 electricians 6 mech 1
                         eng                                                   15,000    15,000

                         mechanical materials                                  50,000    50,000

                         freight and cranage costs allowance                   30,000    30,000


                         grand totals                                        5,011,459 5,011,459


                         contingency 10%



                         project management fee                         5 percent            5%


                         total
number                            power          delivery
off          sub total            estimate       weeks



         1               40,000         1.5                 8

         1               20,000              2


                                             1              12
                                             8

         1          204,860                  1



         1               15,000              1              8


         1        1,083,670                                 22



         1          140,000                  1

         1               20,000              1

         1               60,000



                          0                  3              14
         1          285,000

         1           650000


                                         35                 19




         1          570,000
                  24
1    767,929      91        23


           0

1     15,000       1         8
           0


1     40,000       1        12



1    600,000

           0
           0
1     50,000                 4
1     20,000                 4
1    150,000
1    100,000
           0
           0
           0
1     40,000
           0
           0
           0

1     45,000                 3
           0

1     15,000
           0
1     50,000

1     30,000            500,000


    5,011,459   171.5


     501,146



     250,573



    5,763,178

								