HESCO JSC VIETNAM

Document Sample
HESCO JSC VIETNAM Powered By Docstoc
					PROFILE
COMPANY
&
PROJECT
QUALITY
CONTROL
HESCO JSC VIETNAM
Milestone 10
Ha Noi - Ha Dong road
Nguyen Trai street
Tel: 84-4-38544883
E-mail: xnck2@yahoo.com



QUALITY CONTROL
TEAMWORK
                                     HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                                    Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
         Tel: 84-4-38544883                                                                         E-mail: xnck2@yahoo.com




Project Quality Plan


Project Name:                               FLAP GATE VALVES AND STOPLOGS FOR TDC
Department:                                 ISO & QUALITY CONTROL

Focus Area:                                 PROJECT OF TDC IN HO CHI MINH CITY

Product-Process:                            DESIGN-MANUFACTURING-DELIVERY-INSTALLATION




Prepared By:                                M. Tech. LY THANH HA

                                            Mobile 0912336758



Project Quality Plan Version Control

 Version
 0
 B                   Date
                     1
                     B              Author
                                    2
                                    B                                              Change Description
                                                                                   3
                                                                                   B




     1
     8
     B                   10/09/08
                         9
                         B              M. Tech. LY THANH HA
                                        B
                                        0
                                        1                                              N/A
                                                                                       B
                                                                                       1




                                                                                                                              Chapter 1




                                                                                                                              2
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




Chapter 1                                                                                                        5

LEGAL DOCUMENTS                                                                                                  5

1.1 GENERAL INFORMATION                                                                                          6

1.2 FINANCIAL DATA                                                                                               9

1.3 ORGANIZATION CHART                                                                                       10

1.4 KEY PERSONNEL                                                                                            12

Chapter 2                                                                                                    14

PRODUCE PROCEDURES                                                                                           14

2.2 FLAP GATE MANUFACTURING PROCEDURE                                                                        16

2.3 STOPLOG MANUFACTURING PROCEDURE                                                                          17

Chapter 3                                                                                                    18

PROJECT QUALITY CONTROL                                                                                      18

3.1 PROJECT QUALITY PLAN PURPOSE                                                                             19

3.2 QUALITY MANAGEMENT METHOD                                                                                19

3.3 PROJECT QUALITY ASSURANCE                                                                                24

3.4 PROJECT QUALITY CONTROL                                                                                  27

3.5 PROJECT AUDITS & QUALITY REVIEWS                                                                         29

3.6 MANAGEMENT ESCALATION PLAN                                                                               30

3.7 QUALITY TEAM ROLES & RESPONSIBILITIES                                                                    31

3.8 QUALITY PLAN AUDIT LOG                                                                                   31

3.9 QUALITY PLAN APPROVALS                                                                                   32

3.10 DESIGNATION PROCEDURE                                                                                   33

Chapter 4                                                                                                    34

KEY PERSONELS FOR PROJECT                                                                                    34
                                                                                                                     Chapter 1




Chapter 5                                                                                                    36

EQUIPMENT FOR PROJECT                                                                                        36
                                                                                                                     3
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


5.1 EQUIPMENT PROPOSED FOR THIS PROJECT                                                                      38

5.2 PICTURES                                                                                                 40

Chapter 6                                                                                                    43

EXPERIENCES FOR PROJECT                                                                                      43

6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS                                                              44

6.2. PRODUCT PICTURES                                                                                        49




                                                                                                                  Chapter 1




                                                                                                                  4
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


Chapter 1


LEGAL DOCUMENTS




                                                                                                                Chapter 1




                                                                                                                5
                            HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                           Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                       E-mail: xnck2@yahoo.com




1.1 GENERAL INFORMATION

1.1.1. Name of company: Hydraulic Equipment Joint Stock Company

                                   (HESCO)

        Address        :           Milestone 10, Nguyen Trai Street, Ha Noi-Ha Dong

        Tel No.        :           04.38544883

        Fax No.        :           04.38544422

        Email          :           xnck2@yahoo.com



1.1.2. Period of development

        Hydraulic Equipment Joint Stock Company was established in 1963 under old
        name being Hydraulic Equipment Repair Plant. In 1996 it is changed into
        Hydraulic Equipment Repair & Manufacture Company according to the
        Decision 117/QD/TC-CB-LD of Minister of Ministry for Agriculture and Rural
        Development dated 16th July 1996. On 27th December 2002 it is changed into
        Hydraulic Equipment Joint Stock Company according to the Decision
        5984/QD/TC-CB-LD of Minister of Ministry for Agriculture and Rural
        Development

1.1.3. Main lines of Business

   -    Repair, fabrication, renew, manufacture of hydraulic equipment;

   -    Repair of pump, motor, construction equipment;

   -    Assembly, repair of electro-mechanical equipment of pumping station, hydro-
                                                                                                                     1.1 GENERAL INFORMATION




        power station, overhead crane, penstock (pressure pipeline) for hydraulic,
        agriculture, processing of product of agriculture and forestry;

   -    Construction and installation of small & medium pumping stations and hydro-
        power stations;



                                                                                                                     6
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com


   -    Construction and installation of irrigation, agriculture & rural development
        Works;

   -    Construction of Works of supplying water, irrigation channels, dykes
        infrastructure development Works;

   -    Construction & installation low & medium voltage;

   -    Manufacture and installation of steel structure; workshop frame, microwave
        column, high tension column;

   -    Cast, zinc coating;

   -    Construction of hydropower works, rural infrastructure, civil works;

   -    Trade of house, hotel, tourist; hire of office, storing area, workshop;

   -    Local travel and tourist services;

   -    Consulting, design of mechanical equipment for hydraulic works, hydropower
        works

   -    Trade of materials as steel, industrial equipment, machines.



1.1.4. Charter capital:

   -    Charter capital                              : 12.000.000.000 VND

        In which capital of the State is 5.520.000.000 VND

1.1.5. Main Managers

   -    Chairman                                               : Le Van An

   -    Director                                               : Nguyen Huy Quan
                                                                                                                    1.1 GENERAL INFORMATION




   -    Deputy Director (Technical management): Do Cong Ba

   -    Deputy Director (Financial management) : Tran Van Thai

   -    Head of Technical Department                           : Nguyen Thi Dao

   -    Head of Admistration & personnel dept : Nguyen Gia Cu

                                                                                                                    7
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


1.1.6. Time and experience of activities

Item No.                            Experience of activities                                          Time

     1         Repair, fabrication, renew, manufacture of hydro-mechanical From 1976
               equipment for irrigation and rural works

     2         Assembly, repair of electro-mechanical equipment of From 1980
               pumping station, hydro-power station, overhead crane,
               penstock (pressure pipeline) for hydraulic, agriculture,
               processing of product of agriculture and forestry

     3         Design, manufacture, installation of steel structure, hydro- From 1990
               mechanical equipment such as sluice gates, spillway radial
               gates, automatic gates, trash rake machine, penstock, lifting
               mechanism devices such as hoist, overhead cranes, gantry
               cranes with capacity from 10-100T for agriculture, irrigation,
               hydropower works


                                                                 Hanoi, dated 10th October, 2008

                                                                         On behalf of Hesco




                                                                                                                 1.1 GENERAL INFORMATION




                                                                                                                 8
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
     Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




1.2 FINANCIAL DATA
1.2.1. Summarize actual assets and liabilities in VND for last three years
                                                                                              Unit: Vietnam dong

                Item                      Year 2004                    Year 2005                   Year 2006
1. Total Assets                         38.814.761.493               60.669.679.051               80.804.094.781
2. Working Assets                       34.661.413.974               33.879.000.121               57.450.543.907
3. Total Capital                        32.126.502.310               53.176.901.077               59.254.970.203
4. Short Item liability                 31.477.351.310               52.966.901.077               46.620.417.320
5. Total revenue                        27.971.394.177               39.251.965.284               53.662.985.053
6. Profit before taxes                    1.099.385.677                1.552.242.119               2.332.457.615
7. Profit after taxes                     1.099.385.677                1.334.928.222               1.679.369.483
1.2.2. Total credit amount and name of Bank providing credit
1.         Name of Banks providing credit:

      -    Thanh Xuan Industrial & Commercial Branch of Vietnam Bank

           Address: 275 Nguyen Trai Street, Ha Noi City

      -    Exchange of Bank for Investment & Development of Vietnam

      -    Viet Nam International Bank, Ha Dong Branch

2.         Total credit amount: 80.000.000.000 VND (Eighty billion Vietnam dong)

                                                                    Hanoi, dated 10th October, 2008

                                                                            On behalf of Hesco
                                                                                                                    1.2 FINANCIAL DATA




                                                                                                                    9
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


1.3 ORGANIZATION CHART




Organization apparatus of company includes:

   -   Five (05) departments:

       + Admistration & Personnel Department

       + Financial Department

       + Technical Planning Department

       + Business Department

       + ISO & Quality Control Department

   -   Five (05) factories
                                                                                                                1.3 ORGANIZATION CHART




       + Mechnanical Factory No.1

       + Mechnanical Factory No.2

       + Mechnanical Factory No.3

       + Mechnanical Factory No.4

                                                                                                                10
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com


        + Mechnanical Factory No.5

Total workforce of company is 234 persons. Professional staffs are 55 persons in
which:

   -    Machine manufacture engineers                                 : 23 persons

   -    Electrical engineers                                          : 05 persons

   -    Construction, hydro-construction engineers                    : 09 persons

   -    Financial – economic bachelors                                : 15 persons

   -    Economic middle-ranking executive                             : 03 persons

   -    Technical workers                                             : 179 persons

        + Turner, miller, planer, grinder                             : 19 persons

        + Fitter, caster, painters, forgers                           : 26 persons

        + Welders                                                     : 35 persons

        + Installer, mechanical repairer                              : 35 persons

        + Workers of electrical construction                          : 14 persons

        + Workers of construction and installation                    : 45 persons

          of irrigation and hydropower project

        + Driver                                                      : 05 persons



                                                                  Hanoi, dated 10th October, 2008

                                                                          On behalf of Hesco
                                                                                                                  1.3 ORGANIZATION CHART




                                                                                                                  11
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com




1.4 KEY PERSONNEL

                                     Date                                                         Years of
                         Full                                                                   experience in
    Position                          of                     Experience
                        name                                                                  proposed position
                                     birth
1. Managing            Nguyen                  General management in business                          20
Director                Huy          1959      of company
                        Quan
2. Deputy              Do Cong                 Being in charge of technique                            25
                                     1953
director                 Ba                    and production
2.1. Head of           Nguyen        1952      - Managing in design and                                30
Technical              Thi Dao                 designing supervise.
planning dept                                  - Manage and coordinate
                                               material and equipment for the
                                               works
2.2. Production                                Manage directly in production
division
Director of             Nguyen       1953      Being in charge of manufacture                          15
Machnanical            Hong Phu                and installation of lifting
Factory No.1                                   equipment such as hoist,
                                               overhead      crane,    gantry
                                               crane,…etc
Director of            Nguyen        1973      Being in charge of manufacture                          10
Machnanical            The Hieu                and installation of types of gates
Factory No.2                                   as stoplog, spillway gates,
                                               automatic gates, flap gate, roller
                                               gates...etc
Director of            Bui Van       1956      Being in charge of manufacture                          20
Machnanical             Hoa                    and installation of penstock
Factory No.3                                   (pressure pipeline)
Director of            Nguyen        1959      Being in charge of manufacture                          20
Machnanical             Trong                  and installation of electrical
                                                                                                                    1.4 KEY PERSONNEL




Factory No.4             Lan                   equipment as generator, lighting
                                               system, low and high voltage
                                               system for hydraulic works and
                                               hydropower works.
Director of            Lai Quoc      1956      Being in charge of manufacture                          13

                                                                                                                    12
                          HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                         Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                     E-mail: xnck2@yahoo.com


                                    Date                                                         Years of
                         Full                                                                  experience in
    Position                         of                     Experience
                        name                                                                 proposed position
                                    birth
Machnanical              Sy                   and installation of equipment as
Factory No.5                                  trash rake machine, gates,
                                              agriculture equipment for food
                                              processing.
3. Deputy              Tran Van     1949      Being in charge of finance                              25
director                 Thai
4.                     Nguyen       1956      Being      in     charge     of                         30
Administration         Gia Cu                 administration and personnel of
division                                      company


                                                                    Hanoi, dated 10th October, 2008

                                                                           On behalf of Hesco




                                                                                                                   1.4 KEY PERSONNEL




                                                                                                                   13
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




Chapter 2



PRODUCE PROCEDURES




                                                                                                                Chapter 2




                                                                                                                14
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


2.1 CAST IRON MOLDING PROCEDURE




                                                                                                                PRODUCE PROCEDURES




                                                                                                                15
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




2.2 FLAP GATE MANUFACTURING PROCEDURE




                                                                                                                2.2 FLAP GATE MANUFACTURING PROCEDURE




                                                                                                                16
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


2.3 STOPLOG MANUFACTURING PROCEDURE




                                                                                                                2.3 STOPLOG MANUFACTURING PROCEDURE




                                                                                                                17
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


Chapter 3



PROJECT QUALITY CONTROL




                                                                                                                Chapter 3




                                                                                                                18
                             HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                            Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
    Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com




3.1 PROJECT QUALITY PLAN PURPOSE
The purpose of this Quality is:

-    To provide the guidelines and methods necessary for planning, organizing, implementing,
     monitoring and auditing the Quality Program.

-    To ensure that all activities for which HESCO and TDC is responsible are constructed, inspected,
     tested and maintained in compliance with the contractual scope of works and applicable
     documents.

-    To achieve this objective, the methods and controls described in this Quality Assurance Manual
     are established. They are implemented at predetermined points, as necessary to prevent, detect and
     correct deficiencies and to document achieved quality.

-    To discover and prevent unsatisfying points (flaws) in producing process, makr sure that all
     products which are supplied for the project to meet the quality according to the annouced
     standards.




3.2 QUALITY MANAGEMENT METHOD
Quality management method is the way to manage, operate labours, equipment, materials in our
company to implement checking, making reports of product quality in the project according to the
issued standards.

Managing project quality requires an approved quality plan encompassing three major quality
processes defined in Section 3.1. The quality plan is developed and approved during the project
planning phase to confirm major deliverables/milestone acceptance criteria and manage approved
project processes.

3.2.1. Quality Plan Processes



     •    Quality Assurance
                                                                                                                      PROJECT QUALITY CONTROL




          Quality assurance activities focus on the processes being used to manage and deliver the
          solution to evaluate overall project performance on a regular basis. Quality assurance is a
          method to ensure the project will satisfy the quality standards and will define and record
          quality reviews, test performance, and customer acceptance.



     •    Quality Control


                                                                                                                      19
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com


        Quality control activities are performed continually to verify that project management and
        project deliverables are of high quality and meet quality standards. Quality assurance also
        helps uncover causes of unsatisfactory results and establish lessons learned to avoid similar
        issues in this and other projects.



    •   Project Deliverables and Processes Acceptance Criteria

        Project team members and key stakeholders agree at the project planning stage on formal
        project processes and major deliverable acceptance criteria that will be used to evaluate final
        deliverable results before the results are formally approved.



3.2.2. Project Overview

Waste water treament project in Ho Chi Minh City, Thi Nghe sluice, includes 43 rectangular flap gates
from 0,8m x 0,8m to 3,0m x 2,5m. The least weight of gate is 784,3kg and most weight is 7625, 5kg.
The biggest overall dimension of valves is 3465 x 3514 x 830mm. Total weight of flap gate valve is
154.263kg. All flap gate valves are designed according to AWWA C501-80 standard.

The project also includes stoplogs made from stainless steel ASTM A276 from 6 to 12mm thickness.
All stoplogs is complexed from 2 to 5 logs with the maximum dimension is 3144x505, and the biggest
weight of log is 389kg.

Hesco will make a system for testing, checking all process from buying materials, machining,
assemblying, installation at factories, and test according to the following flowchart:




                                                                                                                    3.2 QUALITY MANAGEMENT METHOD




                                                                                                                    20
                      HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                     Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




                                                                                                               3.2 QUALITY MANAGEMENT METHOD




                                                                                                               21
                          HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                         Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                     E-mail: xnck2@yahoo.com


3.2.3. Quality Standards

Applied standard for flap gates:

1. ASTM A126 – Standard Specifications of cast iron, class B

2. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals

3. ASTM B584 C865 – Standard Specifications of Copper Alloy Sand Castings For General
    Applications

4. ASTM A276 – Standard Specifications of type 316 stainless steel, ANSI/AWWA C501-80 –
    AWWA standard for gates

            a. Design standards

            b. Reference materials

            c. Equipment

            d. Paint

            e. Manufacture

            f.   Checking, testing

            g. Installation

            h. Transportation

Applied standard for stoplogs:

5. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals

6. ASTM A276 – Standard Specifications of Stainless steel

7. ANSI/AWWA C501-80 – AWWA standard for sluice gates

            i.   Design standards
                                                                                                                   3.2 QUALITY MANAGEMENT METHOD




            j.   Reference materials

            k. Equipment

            l.   Paint

            m. Manufacture

            n. Checking, testing

            o. Installation

            p. Transportation
                                                                                                                   22
                            HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                           Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
    Tel: 84-4-38544883                                                                     E-mail: xnck2@yahoo.com




3.2.4. Quality Tools

To ensure quality for the project, we use the following tools:

     1. Sonic tester for welding

     2. Welding ruler

     3. Stainless steel tape ruler 5m long

     4. Calipper 0,02mm accuracy class

     5. Palme 0,01mm accurecy class

     6. Adjustment ruler

     7. Leakage test bench for flap gates and stoplogs which are design for the project only

3.2.5. Quality Manager’s Responsibilities

HESCO has adopted, and is committed to a quality system with the aims to conform to contractual
requirement and providing consultant with confidence that the products and services provided are fit
for their intended purpose.

It is part of HESCO‘s consolidation and constant development to carry out and maintain quality to
effect client’s expectation of optimum price, timely delivery and fulfillment of contractual
specification.

The policies and guidelines described in this manual are mandatory.

The Management is responsible for Quality Assurance irrespective of whether quality specialists of
quality section are established. In arriving at decisions, the quality and personal integrity of staff are of
fundamental importance and management shall ensure that each person:

-    Everyone understands that quality assurance is important.

-    Know how to assist in the achievement of adequate quality. Is stimulated and encourage doing so.
                                                                                                                     3.2 QUALITY MANAGEMENT METHOD



-    This Quality Assurance Manual has been accepted and approved by the Management.

-    The leader of Quality Control for the project is M. Tech. Lee Thanh Ha who have 15 experienced
     years in water hydraulic products.

-    The leader of Manufacturing Control, Supervisor is The Chief of Engineer, Mr. Ta Khac Ap, who
     is 30 experienced years in manufacturing, machining, design, testing…water hydraulic product.

-    A process of manufacturing will deliver to a team leader in factories who is a supervisor directly
     through the process, checking, testing for each part.



                                                                                                                     23
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com


3.3 PROJECT QUALITY ASSURANCE
Quality assurance helps to establish if a deliverable is acceptable based on the processes used to create
it. Quality assurance processes are used to evaluate overall project performance frequently and to
determine that quality reviews were held, deliverables tested, and customer acceptance acquired.

3.3.1. Quality Assurance Procedures




                                                                                                                    3.3 PROJECT QUALITY ASSURANCE




                                                                                                                    24
                             HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                            Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
    Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com




3.3.2 Project Monitoring Processes

After signing the contract with sub-contractor or supplier, project manager will set up a detail project
quality control from buying materials, step-by-step, to machining, installation to each team. Each
procedure will give responsibilities of team, personels and interlink together.

-    Team of material for buying and pre-test materials, making plan to buy materials

-    Team of pre-machining or welding for preparing raw foils, plates,sheets according detail drawing

-    Team of machining to milling surfaces of cast iron pieces, pivotlugs, link arm

-    Team of assemblying to assemble parts becomes complete products

-    Team of test for testing leakage and making certificates, 3rd test certificates

-    Team of quality control

-    Team of logistics for transportation, insurance and delivery the goods



3.3.3. Project In-Process Quality Monitoring

A store keeper will check input importing materials

-    by tools with accurrecy 0, 05 for plates or sheets:

              o    Width, length, thickness, certifacate of origin, certificate of content

-    by visual with/whitout ruler on surfaces for cast iron:

              o    Surfaces of cast iron pieces, geometric telorances, clearances of contact surfaces

-    by supersonic tester for important pices from cast iron:

              o    Internal structure of pivotlugs

-    by palme 0,02mm; calip up to 0,01mm for machining parts:
                                                                                                                      3.3 PROJECT QUALITY ASSURANCE




              o    Surfaces of machined parts

-    by calibrator, lamp:

              o    Clearances of seating faces and seats, seals and seats

-    by test bench with pumps, valves

              o    Leakage of complete flap gates, stoplogs

-    by thickness tester:

                                                                                                                      25
                            HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                           Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                       E-mail: xnck2@yahoo.com


            o     Painting layer thickness, adhension of painting by A-X cutting method

Acceptant test for input materials:

    1. Stainless steel ASTM A276

        For example:

        Engineer will check the equivalent code of stainless steel material baesd on certificates which
        are notarised by suppliers or contractor:

        AS2837-1986-316L; AISI TYPE 316L; BS970-316 S11 & S13; ASTM A276-316L

        W.Nr 1.4404 X2CrNiMo17 13 2; W.Nr 1.4435 X2CrNiMo 18 14 3

        The contents are follows:

        Content                 C         Si      Mn        Ni        Cr       Mo          Ni      P        S

        Min (%)                  0        0         0       10        16        2          0       0        0

        Max (%)                0,03       1         2       14        18        3          0,1   0,045    0,03

        Every procedure will be the same for other materials and parts

    2. ASTM A126 – Standard Specifications of cast iron, class B

    3. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals

    4. ASTM B584 C865 – Standard Specifications of Copper Alloy Sand Castings For General
       Applications

    5. ASTM A276 – Standard Specifications of type 316 stainless steel,

    6. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals

    7. ASTM A276 – Standard Specifications of Stainless steel

Acceptant test for welding:

    1. ASME
                                                                                                                     3.3 PROJECT QUALITY ASSURANCE




Acceptant test for leakage measurement:

8. ANSI/AWWA C501-80 – AWWA standard for sluice gates




                                                                                                                     26
                             HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                            Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                        E-mail: xnck2@yahoo.com




3.4 PROJECT QUALITY CONTROL

3.4.1. Project Deliverables

Testing is includes test of materials, welding submerge and/or electrodes and/or wires, cast iron
pieces, telorances, bolts, clearances, seals, leakages, surfaces quality, thickness of paint, adhension of
painting according to the following table:

Milestone                            Deliverable

Test of plates / sheets for a lot    •    Checking namplates, sign, certificates of contents, origin.
of container
                                     •    Checking thickness with symmetric telorances.

                                     •    Making test content to ASTM standards, a sample per a lot.

Test of welding submerge,            •    Weight of welding electrodes to discover humidity content
electrodes, wires
                                     •    Codes of wires, electrodes.

                                     •    Status of welding material pakages.

Test of cast iron pieces             •    Quantitive analysys of content before refining cast iron.

                                     •    Checking flaws of cast iron pieces.

                                     •    Checking telorances to machine.

Test of telorances, geometric        •    Cheking thichness of covers, seat, seating faces with
parameters                                symmetric telorances.

                                     •    Checking roughness of seating faces, machined faces of
                                          covers…not under Rz80; bushes is not under Rz40,
                                          clearances of link arm and pivotlugs/link arms and cover
                                          holes up to 0,1mm accuracy, dimensions between bolt holes
                                          not up to 0,1mm.

                                     •
                                                                                                                      3.4 PROJECT QUALITY CONTROL




Test of bolts                             Checking the length of bolts, clearances bolts and screws,
                                          quantity, types for each product.

Test of seals                        •    Checking material certificates

                                     •    Checking co-linear of seals not bigger than 0,5..1mm/m
                                          depending on each length

Test of leakage through              •    Checking leakage of complete flap gate valves or
welding line                              stoplogs+groove not exceed 0,02Lpm/m (0,1 gpm/ft)

                                                                                                                      27
                             HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                            Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
    Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com


Milestone                            Deliverable

                                     •    Checking dimension of width, length of welding line
                                          according to ASME section XIII

Test of blasting method              •    Checking quality of surfaces after sand blasting spray
                                          process exceed Sa2.5;

                                     •    Checking by compararative method with sample according
                                          to BS7079 part A1 supplement 1: 1989.

Test of paint thickness              •    Checking the thickness of dryed paint layer according to
                                          SSPC-PA2 or ISO 2808

Test of adhension of painting        •    Checking by A-X cutting method and sticking-plater tape
                                          30x75mm according to ASTM-D 3359-2



3.4.2. Project Quality Control Procedures

List the major quality control activities and processes that this project will include:

-    Test procedures for materials

-    Test procedures for welding

-    Test procedures for sand blasting

-    Test procedures for painting

-    Test procedures for supersonic test of welding

-    Test procedures for leakage

-    Procedures for package or transportation

-    Procedure for installation

-    Procedure for test at side
                                                                                                                      3.4 PROJECT QUALITY CONTROL




3.4.3. Project Deliverables Test & Acceptance Process

The planned test and acceptance processes that will be used to validate project deliverable quality, and
these processes will verify deliverable quality.

-    Test of materials:

              o    Test stainless steel materials, welding rod/wires/flux, paint with certificates from
                   suppliers or sub-contractor;

                                                                                                                      28
                              HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                             Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
    Tel: 84-4-38544883                                                                       E-mail: xnck2@yahoo.com


              o    Test certificates by Hesco for non-standard products buy from market.

-    Test of cast iron pieces:

              o    Test mechanical and/or chemical properties of cast iron;

              o    Quality certificates for all cast iron parts;

-    Test of dimensions:

              o    Internal test report of dimensions, telorances of mechanical parts after machining;

              o    Assembly test report of complete part units

-    Test of welding:

              o    Test report of ultrasonic result

              o    Final test report for mechanical properties of welding

-    Test of paint and/or sand blasting works:

              o    Test report of adhension of painting by A-X cutting method

              o    Report of cleaning result, final painting



3.4.4. Project Deliverables Acceptance Criteria

The deliverable quality acceptance criteria based on quality standards for project deliverables as the
criteria will be used in acceptance testing. The standards of criteria will be used to assess project
quality:

-    Test of steel mechanical properties according to ISO 6892-1998;

-    Test of steel chemical properties according to ASTM E415-95;

-    Mechanical test according to AWS D1.1.;
                                                                                                                       3.5 PROJECT AUDITS & QUALITY REVIEWS



-    Cleaness test of steel sheet according to ISO 8501-1-1988;

-    Test for manufacturing and assemblying of stoplogs and flap gates according to AWWA C501-80;

-    Ultrasonic test for welding according to ASTM section XIII;

-    Leakage test according to AWWA C501-80 section 7;


3.5 PROJECT AUDITS & QUALITY REVIEWS
Identifying of the project quality audits and reviews that will be performed. The results of these audits
and reviews will be factored into project planning and implementation. The process of lessons-learned
reviews and those lessons can benefit the project team as the project continues.
                                                                                                                       29
                                  HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                                 Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
         Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com




                                                   Planned
                                                   B
                                                   5




 Project Quality Audit Review
 4
 B                                                               Quality Review Auditor
                                                                 B
                                                                 6                                       Comments
                                                                                                         B
                                                                                                         7




                                                   Date
     Manufacturing flap valves and stoplogs
     B
     2
     1                                                 3 month
                                                       1
                                                       8
                                                       B             Project manager
                                                                     B
                                                                     9
                                                                     1




     from 0,8x0,8 to 1,2x1,2m                          ARO           QC leader
                                                                     0
                                                                     2
                                                                     B




     Foundry
     3
     1
     B


                                                                     Head of Technical Department
                                                                     1
                                                                     2
                                                                     B




     Machining
     1
     B
     4




     Assemblying
     5
     1
     B




     Finishing
     1
     B
     6




     Test
     7
     1
     B




     Manufacturing flap valves and stoplogs
     2
     B                                                 5 month
                                                       B
                                                       8
                                                       2             Project manager
                                                                     B
                                                                     2
                                                                     9




     from 1,5x1,5 to 3x2,5m                            ARO           QC leader
                                                                     0
                                                                     3
                                                                     B




     Foundry
     3
     2
     B


                                                                     Head of Technical Department
                                                                     1
                                                                     3
                                                                     B




     Machining
     2
     B
     4




     Assemblying
     2
     B
     5




     Finishing
     2
     B
     6




     Test
     2
     B
     7




3.6 MANAGEMENT ESCALATION PLAN
The plan for escalating unresolved quality noncompliance issues up the management chain. The
standard initial level of escalation is from the project manager to their immediate manager.

Escalation Level              Management Title                               Name

Mechanical                    Ordering of raw materials,welding
engineer                      materials

Metallurgy                    Test and receiving cast iron pieces
engineer                      from Minh Bach foundry company

Mechanical                    Machining parts of flap gates
engineer
                                                                                                                           3.6 MANAGEMENT ESCALATION PLAN


                              Forming parts of stoplogs

Mechanical                    Order of standard procducts: bolts,
engineer                      screws, seals

Mechanical                    Assemble of flap gate units and logs
engineer

Mechanical                    Finishing of flap gate valves and
engineer                      stoplogs

Mechanical                    Test


                                                                                                                           30
                                   HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                                  Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
     Tel: 84-4-38544883                                                                             E-mail: xnck2@yahoo.com


Escalation Level          Management Title                                     Name

engineer



3.7 QUALITY TEAM ROLES & RESPONSIBILITIES
Identifying of quality-related responsibilities of the project team and list specific task-related quality
responsibilities, including responsibility for specific acceptance tests and project audits.

Project Team Role                          QA Responsibilities                          QC Responsibilities

QC Team                                                                                 Test of input raw materials

QC Team                                                                                 Test of cast iron pieces

QC Team                                                                                 Ultrasonic test

QC Team                                                                                 Test of telorances

QC Team                                                                                 Leakage test

QC Team leader                                                                          Finishing test



3.8 QUALITY PLAN AUDIT LOG
List all quality-related issues and resolutions resulting from quality plan audits and reviews.

 Quality Review
                          Activity Reviewed            Issue                            Resolution
 Date

 7-10 days after sign
 2
 3
 B                        Checking materials:
                          3
                          B                                Certificates for stainless
                                                           4
                                                           B
                                                           3                            -    Checking certificates
                                                                                             7
                                                                                             B
                                                                                             3




 the                      stainless steel, welding         steel, welding flux,         -    Checking outside
                                                                                             B
                                                                                             3
                                                                                             8




 contract/order/renew     flux, wires, rods…               wires, rods…
                                                                                        -    Checking dimensions
                                                                                             B
                                                                                             9
                                                                                             3
                                                                                                                              3.7 QUALITY TEAM ROLES & RESPONSIBILITIES
 -order                                                    Store reports for
                                                           5
                                                           3
                                                           B




                                                                                        -    Test sample for a lot
                                                                                             0
                                                                                             4
                                                                                             B




                                                           materials.
                                                                                        -    Checking mechanical,
                                                                                             B
                                                                                             1
                                                                                             4




                                                           Test report and results
                                                           B
                                                           6
                                                           3




                                                                                             chemical properties
 11-15 days after
 B
 4
 2                        Checking cast iron
                          B
                          3
                          4                            Dimensions
                                                       B
                                                       4                                -    Checking by ruler, tape,
                                                                                             7
                                                                                             4
                                                                                             B




 sign the                 pieces                       Flaws
                                                       4
                                                       B
                                                       5
                                                                                             palme…
 contract/order/renew                                                                   -    Ultrasonic checking
                                                       Test report for cast iron
                                                       6
                                                       4
                                                       B
                                                                                             8
                                                                                             B
                                                                                             4




 -order
                                                       pieces
 16-30 days after
 4
 B
 9                            Checking machined
                              B
                              0
                              5                            Design dimensions
                                                           5
                                                           1
                                                           B                            -    Checking by palme 1:50 for
                                                                                             B
                                                                                             5
                                                                                             4




 sign the                     cast iron parts              Telorances
                                                           5
                                                           B
                                                           2
                                                                                             outside dimension, holes
 contract/order/renew
                                                           Roughness
                                                           B
                                                           3
                                                           5




 -order
 31-40 days after
 5
 B                            Checking units after
                              6
                              B
                              5                            Assemblying
                                                           5
                                                           B
                                                           7                            -    Checking by ruler class II,
                                                                                             B
                                                                                             5
                                                                                             9




 sign the                     assemble                     dimensions                        palme 1:50, samples,

                                                                                                                              31
                               HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                              Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
     Tel: 84-4-38544883                                                                       E-mail: xnck2@yahoo.com


 Quality Review
                          Activity Reviewed         Issue                         Resolution
 Date

 contract/order/renew                               Linear dimensions, co-
                                                    B
                                                    5
                                                    8                                 calibation plates
 -order                                             linear dimensions of          -   Rotating cover and seating
                                                                                      0
                                                                                      6
                                                                                      B




                                                    faces, seating faces,             faces
                                                    covers, holes of covers
 41-45 days after
 B
 6
 1                        Leakage test
                          6
                          B
                          2                         AWWA standard
                                                    B
                                                    6
                                                    3                             -   Test bench with pump, tank,
                                                                                      6
                                                                                      B




 sign the                                           ≤ 0,01 gpm/m seal
                                                    4
                                                    6
                                                    B
                                                                                      valves
 contract/order/renew
                                                    ≤ 0,02 Lpm/m seal
                                                    5
                                                    6
                                                    B




 -order
                          Finising surface before
                          B
                          7
                          6                         ≥ Sa 2.5
                                                    B
                                                    6
                                                    8                             -   Test by compared samples
                                                                                      9
                                                                                      6
                                                                                      B




                          painting
                          Protection layer
                          0
                          B
                          7                         Adhension of painting
                                                    1
                                                    7
                                                    B                             -   Test by A-X cutting method
                                                                                      3
                                                                                      7
                                                                                      B




                                                    up to 4A according to             and electromagnetic tester
                                                    ASTM-D3359-2
                                                    Thickness ≥ 300 micron
                                                    2
                                                    7
                                                    B




                                                    after drying
                          Packaging and
                          4
                          B
                          7                         Covering all machined
                                                    7
                                                    B
                                                    5                             -   Checking tensions of
                                                                                      B
                                                                                      7




                          handling before           faces, seals, fixing plates       packages
                          transportation            Making robust for all
                                                    7
                                                    B
                                                    6




                                                    parts, units, valves,
                                                    stoplogs before
                                                    transportation



3.9 QUALITY PLAN APPROVALS

Prepared by        ____________________________________________________                          Project Manager


Approved by          ___________________________________________________                         Project Sponsor

                     ___________________________________________________                         Executive Sponsor

                     _______________________________________________ Client Sponsor
                                                                                                                        3.9 QUALITY PLAN APPROVALS




                                                                                                                        32
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


3.10 DESIGNATION PROCEDURE




                                                                                                                3.10 DESIGNATION PROCEDURE




                                                                                                                33
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


Chapter 4

KEY PERSONELS FOR
PROJECT




                                                                                                                Chapter 4




                                                                                                                34
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com


4.1 KEYPERSONEL FOR PROJECT

                                                                                                  Years of
                                     Date
                         Full                                                                   experience in
    Position                          of                     Main Duty
                        name                                                                      proposed
                                     birth
                                                                                                   position
Deputy director        Do Cong                 - General management                                    25
                                     1953
                         Ba
Chief of               Ta Khac       1952      - Managing in design and                                30
Engineer                 Ap                    designing supervise
                                               - Manage and coordinate
                                               material and equipment for the
                                               works
                                               - Machining production and
                                               supervisor
Cast Iron Expert       Nguyen        1972      - Cast iron production                                  16
                        Van                    - Quality control for cast iron
                        Minh
Design Leader          M. Tech.      1973      - Quality control leader                                15
                         Lee                   - Quality control for machining,
                       Thanh Ha                assemblying,               testing,
                                               transportation,       installation,
                                               erection at site
Director of            Nguyen        1973      - Welding management and                                15
Mechanical             The Hieu                materials for welding
Factory No.2                                   - Standardization
Senior Quality         Nguyen        1973      - ISO expert                                            15
Control                Van Luc




                                                                                                                    35
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




Chapter 5



EQUIPMENT FOR PROJECT




                                                                                                                Chapter 5




                                                                                                                36
                      HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                     Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




                                                                                                               EQUIPMENT FOR PROJECT




                                                                                                               37
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                     E-mail: xnck2@yahoo.com




5.1 EQUIPMENT PROPOSED FOR THIS PROJECT

Item                                                                                             Manufacture‘s
                      Name of equipment                             Capacity            Q’ty
 No.                                                                                               country

1.     Vertical lathe 1516-2611                                        40kW             01            Poland

2.     Bending machine WE67Y-600/6000                                  30kW             01             China

3.     Shearing machine QC11Y-16x600                                   22kW             02             China

4.     Lathe T6M20                                                     10kW             01           Vietnam

5.     Oil Country lathe Mazak 3000                                    10kW             01             Japan

6.     Lathe 1D6 2M 2895                                              4,5kW             01             China

7.     Lathe T6M12                                                    3,7kW             02           Vietnam

8.     CNC turning lathe 600x1300, A35N                                14kW             01             Japan

9.     Lathe TUD-40-216                                                10kW             01            Poland

10.    Horizontal milling machine 6M83                               14,7kW             01            Poland

11.    Milling machine FU315                                           8kW              01           German

12.    Vertical milling machine X51                                   6,2kW             01             China
                                                                                                                  5.1 EQUIPMENT PROPOSED FOR THIS PROJECT
13.    Horizontal milling machine 3x2m table                         14,5kW             01            Poland

14.    Multi-function drilling machine 2A592                          1,7kW             01           Vietnam

15.    Vertical drilling machine Z525-261                             2,8kW             01             China

16.    Semi-automatic welding machine SAF 400                        18,5kW             01             Korea

17.    DC welding machine                                              18kW             04           Vietnam

18.    DC welding machine (One pliers)                                 15kW             02           America

19.    Welding generator EW190                                        7KVA              01             Japan


                                                                                                                  38
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                     E-mail: xnck2@yahoo.com


Item                                                                                             Manufacture‘s
                      Name of equipment                             Capacity            Q’ty
 No.                                                                                               country

20.    Welding machine 23550                                           18kW             01           Vietnam

21.    Welding generator - Japan                                     10KVA              01             Japan

22.    Vertical lathe 3,5mHx3,7m dia.                                 4,5kW             02            Poland

23.    Compressor 2907                                                3,5kW             01           German

24.    Compressor 100 HP2 - 163229                                    7,5kW             01             Italy

25.    CNC plasma cut. machine 3000x12000mm                            4kW              01             Japan

26.    Overhead crane 10T                                                               01           Vietnam

27.    Overhead crane 5T                                                                03           Vietnam

28.    CNC Milling machine H500xW700xL400                                               01             Japan

29.    Manual overhead crane 3T                                                         01           Vietnam

30.    Hoist 10T                                                                        02           Vietnam

31.    Heat treament equipment 5 tons/lot                                               01             China

32.    Electric foundry equipment 15 tons/lot                                           01             China

33.    Medium frequency foundry 0,5T/1T/1,5T                                            03             China

34.    Uninterrupted cast iron foundry 8T                                               01             USA        5.1 EQUIPMENT PROPOSED FOR THIS PROJECT

35.    Spectrometer Fison ARL2460                                                       01             Swiss

36.    Metal blasting line                                                              01             USA


                                                                  Hanoi, dated 10th October, 2008

                                                                          On behalf of Hesco




                                                                                                                  39
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




5.2 PICTURES




Pic 1. Hydraulic bending machine WE67Y-600/6000, China 2006




Pic 2. Hydraulic shearing machine QC11Y-16x600, China 2006

                                                                                                                 5.2 PICTURES




Pic 3. CNC plasma cutting machine 3000x12000mm, Maxigraph Japan 2006


                                                                                                                 40
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com




Pic 4. Vertical lathe 3,5mHx3,7m dia., Poland 1981




Pic 5. Horizontal milling machine 3x2m table, Poland 1981




                                                                                                                  5.2 PICTURES




Pic 6. CNC vertical milling machine H500xW700xL400 table




                                                                                                                  41
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com




Pic 7. Oil Country lathe Mazak 3000, Japan 1981




Pic 8. CNC turning lathe 600x1300, IKEGAI A35N, Japan 1981
                                                                                                                  5.2 PICTURES




                                                                                                                  42
                       HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                      Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
 Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com



Chapter 6



EXPERIENCES FOR PROJECT




                                                                                                                Chapter 6




                                                                                                                43
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com




6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS
                                                                                 Completion
           Name of contract                           Customer                                         Place
                                                                                   time

Manufacture,        transport     and        Bac Hung Hai Hydraulic                    8/2001          Hai
installation of 06 sets of sluice gate         Works Exploitation                                     Duong
for An Tho sluice and 04 sets of gate              Company                                           province
for Cau Cat sluice.

Manufacture and installation of 01 set         Hydraulic project                       3/2001       Vinh Phu
of radial gate BxH = (10x5,5)m for           Management Board 404
Thanh Lanh reservoir – Vinh Phu

Manufacture and installation of 03               PMB – Thai Binh                   10/2001          Thai Binh
sets of gate and hoisting equipment             Agriculture & Rural
for Tan Lap sluice                              development Dept.

Design, manufacture and installation            Thanh Ha Hydraulic                     2001            Hay
of gates for Huong river’s sluice               Works Exploitation                                    Duong
                                                      factory

Manufacture and installation of gates Nam Thai Binh Hydraulic                          2001         Thai Binh
for Lan sluice                          Works Exploitation
                                            Company

Manufacture and installation of                    Long Tuu PMB                        2002           Ha Bac
hydro-mechanical          equipment
including 03 sets of gate and
electrical system for Long Tuu Bac
Ha sluice

Manufacture and installation of 01 set                 PMB 408                         2002           Quang
of radial gate and stop log lowering                                                                  Binh
equipment for Phu Hoa reservoir
                                                                                                                 EXPERIENCES FOR PROJECT




Manufacture and installation of 01 set                 PMB 408                         2002         Quang tri
of radial gate and electrical system,
transformer for Ai Tu reservoir

Manufacture and installation of flat           Thai Binh Hydraulic                     2002         Thai Binh
gates and 06 sets of 20VD2 screw              Construction Company

                                                                                                                 44
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com


                                                                                  Completion
           Name of contract                            Customer                                         Place
                                                                                    time

hoist for Nhu Trac sluice

Manufacture and installation of 03               Nghe An hydraulic                      5/2003        Nghe An
sets of radial gate for Sao river’s            Construction Electrical
sluice                                          mechanical company

Supply and installation of equipment             PMB of Hydraulic                       8/2002         Quang
for Sa Vang sluice including 04 sets             Construction Works                                    Binh
of radial gate.

Construction of mechanical items of                     PMB 414                         5/2003        Phu Yen
spillway under Dong Tron reservoir –
Phu Yen including 03 sets of radial
gate and 03 sets of flat gate

Manufacture and installation of 03                      PMB 406                         4/2003         Thanh
sets of radial gate and low and high                                                                    Hoa
voltage system for Bao Van sluice

Manufacture and installation of gate              PMB – Thai Binh                       6/2003       Thai Binh
and hoisting for Hoai river’s dam                Agriculture & Rural
                                                 development Dept.

Manufacture and installation of gate           PMB of repairing Nghi                    8/2003        Nghe an
and hoisting for Nghi Quang sluice                Quang sluice

Manufacture and installation of                  PMB of Ninh Thuan                      8/2004         Ninh

                                                                                                                  6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS
electro-mechanical equipment for                 Rural Infrastructure                                  Thuan
Trau river’s reservoir: sets of radial                 branch
gate, trash screen, pipe line, electric
pulley + hoist

Construction of Iaring Channel                          PMB 412                         6/2004         Gia Lai
includes gates, 02 sets of screw hoist
V1, pipelines,

Manufacture and installation of               Dong Son Investment &                 12/2004            Son La
intake basin, pressure pipelines,               Construction JSC
downstream discharge gate, hoist,
crane 12T

Manufacture of 06 sets of control                   Construction &                  12/2004            Ha Noi

                                                                                                                  45
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


                                                                                 Completion
           Name of contract                           Customer                                         Place
                                                                                   time

gate under the routes from Lang Ha -         Mechanical Factory No.3
Thanh Xuan – Ha Noi

Manufacture and installation of                                                        5/2006        Ha Tinh
hydro-mechanical equipment: Radial
gates, automatic gates, generator,
crane 40T for Do Diem Sluice – Ha
Tinh

Manufacture,       transport     and           Lung Lo Construction                11/2005           Phu Yen
installation of sluice gates, screw                    JSC
hoist (01 set screw hoist V5 + 01 set
of screw hoist VD30) for Vinh Son
hydropower project

Manufacture and installation of                Nhue river Hydraulic                    4/2005         Ha Tay
mechanical equipment includes lock             Works Exploitation
gates, 04 sets of screw hoist V3, and               Company
04 sets of screw hoist V5 for Nhue
river irrigation system.

Manufacture and installation of                    North Electrical                    4/2007         Quang
hydro-mechanical equipment for Ho                  development &                                       Binh
Ho hydropower project including                    Investment Jsc
gates and electrical hoist 45T, crane,
hoist, electrical pulley, hydraulic

                                                                                                                 6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS
control system

Manufacture and installation of                  Ba river Electrical               11/2005           Da nang
intake gates, discharge gates for Khe             development &
Dien hydropower Project                           Investment Jsc

Manufacture and installation electro-                  PMB 401                         3/2006         Ha Tay
mechanical equipment for Hiep
Thuan Intake sluice – Day river key
Works: Intake gates and electrical
system

Manufacture of 02 sets of radial gate        Ba Ha river hydro-power               10/2006           Phu yen
BxH=(15 x 16,82) for Ba Ha river                       Jsc
hydro-power Project – Phu Yen

                                                                                                                 46
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com


                                                                                  Completion
           Name of contract                            Customer                                         Place
                                                                                    time

Repair and improvement of key                   Quang Binh PMB of                       7/2006         Quang
works of Minh Cam reservoir: Gates             Hydraulic Construction                                   Binh
and screw hoist                                       Works

Manufacture and installation of                     Tan An Co.Ltd                       1/2007        Lao Cai
hydro-mechanical equipment: gates,
trash rake machine, hoist for Phu
Mau hydro-power Project

Supply and installation of hydro-             Hoang Son Construction                    9/2007         Lao cai
mechanical equipment for Coc Dam                     Co.Ltd
Hydropower Project: Gates and
lifting equipment

Construction         of      mechanical       Hydraulic construction &                  6/2008         Quang
equipment for spillway – Rao Da               Investment Management                                     Binh
reservoir: gates, trash screen, hoist            Project Board No.5

Manufacture, installation of gates,              Ha Dong PMB of                         8/2007         Ha Tay
hoist for Ha Dong regulator – Nhue             Regulator Construction
river irrigation system

Supply, manufacture and installation          Hong river Construction                   8/2007        Dak Lak
of mechanical equipment for sluice,                Corporation
spillway and electrical system for
lighting, operation – Buk Ha

                                                                                                                  6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS
reservoir

Supply and installation of hydro-                   Tan An Co. Ltd                  11/2007           Lao Cai
mechanical equipment for Phu Mau 1
Hydro-power Project: Gates, pressure
basin, penstock

Manufacture and installation of 04                Son Tay Phu Sa                        5/2008         Son tay
sets of flat gate, 04 sets of hoist 10T          Hydraulic Company
for Phu Sa irrigation Works

Manufacture and installation of lock          Ninh Binh PMB of Flood                    4/2008       Ninh Binh
gates and low voltage for Cau Hoi                    protection
irrigation Sub-project



                                                                                                                  47
                        HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                       Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                   E-mail: xnck2@yahoo.com


                                                                                 Completion
           Name of contract                           Customer                                         Place
                                                                                   time

Supply and installation of hydro-               Muong Sang Hydro-                      9/2007         Lao cai
mechanical equipment for Muong                      power Jsc
Sang Hydro-power Project: Repaired
gates, flat gates, trash screen, crane
30T

Supply and installation of hydro- Ba river Hydro-power Jsc                             7/2008        Da nang
mechanical equipment for Krong
H’nang Hydro-power Project: Intake
gates, flow gates, hydraulic control
equipment

Manufacture and installation of              Hydraulic construction &                  1/2008         Khanh
hydro-mechanical equipment for               Investment Management                                     Hoa
spillway No.1 and intake sluice under           Project Board No.7
Da Ban irrigation system: Radial
gates, repair gates, cranes…



                                                                  Hanoi, dated 10th October, 2008

                                                                         On behalf of Hesco




                                                                                                                 6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS




                                                                                                                 48
                           HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                          Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                      E-mail: xnck2@yahoo.com




6.2. PRODUCT PICTURES




Pic 1. Radial gates for reservoir




Pic 2. Stoplogs for hydropower




Pic 3. Flap gates for waste water treatment
                                                                                                                    6.2. PRODUCT PICTURES




                                                                                                                    49
                         HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO)
                        Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
  Tel: 84-4-38544883                                                                    E-mail: xnck2@yahoo.com




Pic 4. Round flap gate 3D-model




Pic 5. Rectangular flap gate 3D-model




Pic 6. Stoplog gate 3D-model
                                                                                                                  6.2. PRODUCT PICTURES




Pic 7. Stoplog guide 3D-model
                                                                                                                  50

				
DOCUMENT INFO