									Entergy Transmission
  Planning Summit

        Randy Helmick
 Vice President, Transmission
     Entergy Services Inc.

        New Orleans, LA
         July 29, 2008


               1
             Progress Toward Target Zero
                    Transmission RAI/LWDIR
                        2005 - 2008 YTD

1.8
1.6
      1.64
1.4
                                                              61% Decrease
1.2
1.0
0.8                   0.89
0.6                                                        0.75
0.4          0.48                                                        60% Decrease

0.2                                          0.52
                             0.2                    0.21          0.19
0.0
        2005            2006                     2007       Jun-08

                               RAI       LWDIR



                                     2
            Progress Toward Target Zero

              Transmission Contractors RAI/LWDIR
                        2005 - 2008 YTD

4.0
3.5
3.0                                                          46% Decrease

2.5
      3.7
2.0
1.5                   2.32
1.0         1.27
                                                                    54% Decrease

0.5                          0.77           1.6   0.8
                                                        0.89 0.59
0.0
       2005             2006                  2007       Jun-08

                             Series1    Series2




                                    3
         Transmission Investments
                                                    5 Year Total ($MM)
                                                        2003-2007
Transmission O&M Expense                                         512.5
Distribution Substation O&M Expense                               63.0
  Total Transmission Business O&M Expense                        575.5

Transmission Capital Additions                                 1,078.4
Distribution Substation Capital Additions                        300.2
  Total Transmission Business Capital                          1,378.6


IPP (Reimbursement CIAC)                                         (63.6)


  Total Transmission Business Capital (Inc. CIAC)              1,315.0


Transmission (O&M + Capital)                                   1,527.3
Dsub (O&M + Cap                                                  363.2
  Total Transmission Business (O&M + Capital)                  1,890.5


   Nearly $1.9 billion spent in the last 5 years
                                        4
     Sample Major Transmission Investments
RECENTLY COMPLETED OR ONGOING PROJECTS
• Amite South Import (ASI) Improvement Plan: Phases 2 & 3 (ELL)
     – New Panama to Dutch Bayou 230 kV line
     – Upgrade Coly to Vignes 230 kV line
     – Upgrade Conway to Bagatelle 230 kV Line
•   Little Rock Area Var Support (EAI)
     – Capacitor bank upgrades or additions at four Little Rock area substations

PLANNED PROJECTS *
• 2011 – Holland’s Bottom EHV (Cabot): (EAI)
• 2011 – Western Region Phase 3 Interim: (ETI)
• 2011 – Tillatoba to South Grenada 230 kV line: (EMI)
• 2012 – Loblolly to Hammond 230 kV line: (EGSL/ELL)


*   Projects are subject to regulatory and/or Company review. Some projects still required
    detailed scoping and analysis. Thus, proposed in-service dates could change.


                                            5
                                                                       SAIFI (T Line)

                   Ja




                              0.0000
                                       0.0200
                                                0.0400
                                                         0.0600
                                                                           0.0800
                                                                                    0.1000
                                                                                             0.1200
                                                                                                      0.1400
                                                                                                               0.1600
                                                                                                                        0.1800
                                                                                                                                 0.2000
                      n-
                         0
                   Ap 2
                      r- 0
                          2
                    Ju
                       l-0
                   O 2
                     ct
                       -0
                   Ja 2
                      n-
                         0
                   Ap 3
                      r- 0
                          3
                    Ju
                       l-0
                   O 3
                     ct
                       -0
                   Ja 3
                      n-
                         0
                   Ap 4
                      r- 0
                          4
                    Ju
                       l-0
                   O 4
                     ct
                       -0
                   Ja 4
                      n-
                         0
                   Ap 5




6
                      r- 0
                          5
                    Ju
                       l-0
                   O 5




    Tim e Period
                     ct
                       -0
                   Ja 5
                      n-
                         0
                                                                                                                                                   Transmission Lines




                   Ap 6
                      r- 0
                          6
                    Ju
                       l-0
                   O 6
                     ct
                       -0
                   Ja 6
                      n-
                         0
                                                                                                                                          12 ME Transmission SAIFI - System View




                   Ap 7
                      r- 0
                          7
                    Ju
                       l-0
                   O 7
                                                                                                                                                                                   Transmission Line SAIFI




                     ct
                       -0
                   Ja 7
                      n-
                         0
                   Ap 8
                      r- 0
                          8
                                                                  System
                                                 SAIDI (T Line)

                   Ja




                              0.00
                                     5.00
                                                     10.00
                                                             15.00
                                                                     20.00
                                                                             25.00
                      n-
                         0
                   Ap 2
                      r- 0
                          2
                    Ju
                       l-0
                   O 2
                     ct
                       -0
                   Ja 2
                      n-
                         0
                   Ap 3
                      r- 0
                          3
                    Ju
                       l-0
                   O 3
                     ct
                       -0
                   Ja 3
                      n-
                         0
                   Ap 4
                      r- 0
                          4
                    Ju
                       l-0
                   O 4
                     ct
                       -0
                   Ja 4
                      n-
                         0
                   Ap 5
                      r- 0
                          5




7
                    Ju
                       l-0
                   O 5




    Tim e Period
                     ct
                       -0
                   Ja 5
                      n-
                         0
                                                                                              Transmission Lines




                   Ap 6
                      r- 0
                          6
                    Ju
                       l-0
                   O 6
                     ct
                       -0
                   Ja 6
                      n-
                         0
                                                                                     12 ME Transmission SAIDI - System View




                   Ap 7
                      r- 0
                          7
                    Ju
                                                                                                                              Transmission SAIDI




                       l-0
                   O 7
                     ct
                       -0
                   Ja 7
                      n-
                         0
                   Ap 8
                      r- 0
                          8
                                            System
             2008 Arkansas Storms


Significant Damage to the Arkansas transmission system:
   – 36 Wood H-Frame Structures down (115 kV and 161 kV)
   – 11 Lattice Towers down, 5 damaged (230 kV)
   – 12 Lattice Towers down (500 kV)
   – 8 Guyed Aluminum Towers down (500 kV)


2008 Year to Date Storm Spending (Arkansas)
   Transmission Capital:    $ 9,317,094
   Transmission O&M:        $    799,331
   Vegetation O&M:          $    362,372
                            $ 10,478,797


                               8
              Transmission Challenges
• Implications of Expanding Global Economies
   – Chinese and Indian expanding systems at unprecedented rates
   – Increased demand for key commodities and components
   – Driving huge cost increases on material & components required to
     expand U.S. infrastructure
   – Lead times for key components increasing

• Increasing difficulty in obtaining right-of-way for lines and substations

• Fuel costs/focus on energy infrastructure

• Workforce demographics


                                    9
          Compliance with Industry
            Standards/Practices

• Entergy’s transmission planning process adheres to the
  Company’s and industry’s principles regarding reliability,
  safety, and comparability.

• This philosophy also applies to other Transmission-related
  functions such as design, operations, and maintenance.

• Entergy’s continued focus will be compliance with the
  industry standards and the subsequent changes/successors
  to those standards.



                               10
          Meeting Customer Needs
•   Entergy’s objective is to equitably meet the transmission needs of
    all of our customers.

•   The Transmission Planning Summit provides an opportunity to share
    our planning process and transmission expansion plan with all
    interested parties.

•   Entergy has continued to enhanced its transmission planning
    process through the involvement of the ICT.

•   Your inputs are instrumental to this process. Thanks for
    your participation!