Outcome at WP8F Berlin meeting and future work pertaining to Spectrum calculation methodology
Hitoshi Yoshino, ARIB WP8F Preparation Group
3rd CJK B3G Meeting July 6th, 2004
Outcome at WP8F Berlin meeting(1)
• Two working documents were developed;
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/TEMP/120Rev.1), which proposes the following process; - Market segment analysis, - Radio Access Technique identification, - Traffic distribution among RAT, - Spectrum requirement estimation,
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123), which describes; - Guidelines for methodology to be developed (incl. generic flow chart), - Limitations of the existing Rec. M.1390 methodology, - (Proposed) detailed calculation methodology.
Outcome at WP8F Berlin meeting(2)
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/120R1);
Market Segments Access Techniques
•Pre IMT Cellular Mobile Pre IMT •Terrestrial Component •Satellite Component •Enhanced IMT-2000 •New Mobile Access •MSS Nomadic
a) Considers Various market segments,
Mobile Market
Public
Communication
Mobile
IMT-2000
b) Identifies Access Techniques, taking into account the market segments,
Distribution
•RLAN Hot Spots •New Nomadic Access / Local Area Wireless Access capabilities •Digital broadcast •BSS •RLAN •cordless devices •short-range devices •[UWB]
FWA
Private / home environment
Non public market
Outcome at WP8F Berlin meeting(3)
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/120R1);
c) Proposes “only elements of mobile and nomadic communication technology having bi-directional capabilities shall be considered”, as for spectrum requirements in the context of WRC-07 A.I. 1.4,
Outcome at WP8F Berlin meeting(4)
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/120R1);
d) Concludes that traffic volume shall be considered for the following systems; 1) Terrestrial cellular mobile
- pre-IMT-2000 cellular, - Terrestrial-IMT-2000, - Enhanced ITM-2000, and - New Mobile Access capabilities,
Market of Mobile Communication
Distribute Traffic amongst Market Segments
Market Segmentation Features
Communication
•Cellular Mobile •Nomadic •Mobile Satellite Systems
Distribution
Others
2) Terrestrial Nomadic
- R-LAN hot spots, - New Nomadic/Local Area Wireless Access capabilities,
Cellular Mobile
•Pre-IMT Cellular Mobile •Terrestrial IMT-2000 •Enhanced IMT-2000 •New Mobile Access
Distribute Traffic amongst RATs
RAT Distinguishing Features
Short Range
•RLAN Hot Spots •New Nomadic Access / Local Area Wireless Access capabilities
Satellite
•IMT-2000 Satellite Component and its evolution •MSS
3) Satellite Applications
Traffic Volume of RATs
- IMT-2000 Satellite component and its evolution, - MSS.
Distribution of Traffic amongst RATs
Outcome at WP8F Berlin meeting(5)
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/120R1);
5) Identifies IMT-relevant Radio Access Techniques (RAT), which fall into IMT2000 relevant segments, within ITU-R Rec. M.1645 (Framework Rec.) ; 1) IMT-2000 terrestrial component, 2) IMT-2000 satellite component, 3) Enhancements of IMT-2000, 4) Nomadic public RLAN, 5) New Mobile Radio Access Capabilities, 6) New Nomadic/Local Area Wireless Access Capabilities. 6) The following distinguishing feature should be considered in order to determine which RAT is suitable or not for a specific service type or applications; 1) Radio Frequency bands, 2) Max cell size/range, 3) Max/Min transmit power, 4) Min sensitivity, 5) Error robustness, 6) Max user density per give spectrum, 7) Target deployment env.(coverage), 8) mobility, 9) vertical HO support, 10) channel char. and QoS, 11) Duplex scheme, 12) NW topology, 13) multicast support, 14) current commercial footprint
Outcome at WP8F Berlin meeting(6)
1) Elements to be used for the development of IMT.ESTIMATE (Doc.8F/120R1);
7) Prposes that IMT-relevant Radio Access Techniques (RAT), should be considered for Spectrum Requirement Estimation;
Traffic Volume of RATs
Identify IMT relevant Traffic Volume
Vision on IMT-2000 and Systems Beyond IMT-2000
IMT-2000 and its Enhancements (Terrestrial and Satellite)
New Mobile Access Capabilities
New Nomadic Access / Local Area Wireless Access Capabilities
IMT relevant Traffic Volume
Spectrum Requirement Estimation
IMT-2000 identified Bands
Spectrum for Future Development of IMT-2000 and Systems Beyond IMT-2000
Candidate Bands
Spectrum Requirement Estimation
Outcome at WP8F Berlin meeting(7)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
1. Definitions a) Services, b) Service environments, c) Radio environments, d) Radio Access Technique
5.3 Generic flow chart
This section was revised.
RAT #2
2. Analyze the collected market data
3. Compute traffic demand by service environment and services
4. Distribute traffic among Radio Access Techniques
Determine distribution coefficients , which distribute traffic to different RAT according to possible deployment scenarios, by using Monte-Carlo based simulations, if necessary
RAT #1
5. Compute spectrum requirement per RAT a) Distribute traffic within RAT b) Determine system capacity required to carry traffic
RAT #3
6. Apply any additional weighting factors
Determine distribution coefficients Rk,r,n , which distribute traffic within RAT according to the characteristics of possible RAT group, by using MonteCarlo based simulations, if necessary
7. Spectrum requirements for RAT #1
Deterministic approach
8. Aggregate spectrum 8.Employ requirements
Monte-Carlo approach, if necessary
weighting factors
9.Spectrum requirements
Outcome at WP8F Berlin meeting(8)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
5.4 Definitions; this section was revised;
- Service category, - Service type 1) Speech, 2) Low rate Data & low multimedia, 3) Medium multimedia, 4) high multimedia, 5) super high multimedia), - Traffic class (CBR, VBR, ABR, UBR) - Service environment : the idea of reduction was included. - Service usage patterns 1) Home, 2) Office, 3)Public area, 4) Wide area, - Teledensity 1) Dense urban, 2) Urban, 3) Sub-urban, 4) Rural, 5) Remote
Service environments
Service environment consists of Service Usage patterns and Teledensity.
The number of the environments can be reduced, taking into account their commonality.
1) Service Usage Patterns:
• • • • • • • • •
Home Office, Public Area, and Wide Area Dense urban, Urban, Sub-urban, Rural Remote
Radio Environments
Macro-cell
2) Teledensity:
Micro-cell Pico-cell
Service environment (combination of service usage pattern and topographic area, blue plain)
Urban Dense urban Rural Sub-urban
Hot spot Wide area
Home
Office
Public area
Service Usage Patterns Service usage patterns Fig. 1 Environment Space
ic ph ra og p s To rea A
Outcome at WP8F Berlin meeting(9)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
5.4 Definitions (continued);
- Radio environment, 1) Macro cell, 2) Micro cell, 3) Pico cell, 4) hot spot, 5) Local area cell, 6) Broadcast cell, 7) Satellite area cell,
- RATG : the idea of RAT group was included. - Group 1: IMT-2000 and its enhancements (incl. satellite) - Group 2: Systems beyond IMT-2000 RATs, - Group 3: pre IMT-2000, - Group 4: Existing local area RLAN technologies, - Group 5: Digital broadcasting services,
Radio environments
Service environments can be defined as areas exhibiting common propagation conditions.
- According to the general principles and guidelines for spectrum calculation methodology, the methodology should have flexibility to handle different combinations of Radio Access Techniques (RATs). - Each service environment can be supported by multiple RATs as shown below;
• • • •
Hotspots, Pico cell, Macro cell, and Micro cell
Service environments SE#1 Adu Bdu Cdu Au SE#2 Bu Cu Asu SE#3 Bsu Csu SE#4 Ar Br Cr
Traffic Radio Access Techniques RAT #1 Adu Au Asu Ar
RAT #2 Bdu Bu Bsu Br
RAT #3 Cdu Cu Csu Cr
Traffic Radio environments within RAT
Pico cell
Macro cell Micro cell Macro cell Hot spot
Pico Micro cell cell
Macro cell
Hot spot
Pico cell
Micro cell
Hot spot
Traffic Spectrum per RAT
Spectrum
Outcome at WP8F Berlin meeting(10)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
5.6 Analyse the collected market data, and 5.6 Compute traffic demand by service environment and services;
The process on how to analyse the collected market data and how to compute traffic demand, were included and explained by using an example scenario.
A possible steps to get traffic demands
The following would be a process to get traffic demands; 1) Define service categories (Q2 in “service view doc.”) and produce categorization table (shown as table 1, later) 2) Service and Market forecast (Q3 in “service view doc.”) a) forecast future applications with service scenarios b) their functionality – what are future applications – (Q.3.1), c) their service environment(s), d) their market scale, in association with time scale (Q.3.2) e) their deployment scenario, (Q.3.2) f) possible enablers and requirements (system capabilities), g) overall requirements, h) possible RAT(s) to support the capabilities, i) preliminary traffic forecast (Q.3.3) The above items should be provided by Answers to Q3s in service view document 3) Mapping the applications onto service categories (table 1) 4) Calculate traffic demands on a service env. by service env. basis,
Service categorization
TABLE 1 Mapping table using service categorization
Traffic class Service types CBR Realtime VBR Non realtime With minimum rate guarantee ABR Without any gurantees UBR
Speech & SMS (<16kbps)
Multimedia & Low rate data (<144kbps)
Medium Multimedia (<2Mbps) High multimedia (<30 Mbps)
Super High Multimedia (30 Mbps to 100M/1G bps)
Analyzing the collected market data (1)
Possible answer example to the questionnaires in
Service View Document. - Take the application example (3) in “Service
Perspective on systems beyond IMT-2000”, ITU-R WP8F Workshop on Services and Market Aspects, Oct. 2003, for an example, (the next slide)
(http://www.itu.int/ITU-R/study-groups/rsg8/rwp8f/workshop-edinburgh/index.asp)
Analyzing the collected market data (2)
Application examples – Service Scenario
Mobile Town Monitoring Systems (High data rate, huge number of terminals) - Scene: Urban town, Individual terminal linking with a town monitoring system - Enablers and their requirements:
1) Embedded mobile terminal: Town monitor: < 1 kbps, < 1 sec. Video phone: < 1Mbps, 50 – 100 msec File transfer: (3D video file) < 1 – 45 Mbps, < 2 sec. * Terminal density: 2 – 3 units/ 10 m 2
Mobile Town Monitoring System
- Overall requirement: Data rate: < 45 Mbps, Latency: 50 msec.
Analyzing the collected market data (3)
- The following example answer may be obtained from the service scenario example; (the next two slides)
Analyzing the collected market data (4) - Answer example (1/2)
1. Example:
Mobile Town Monitoring Systems
2. Functionality:
Town information monitoring (e.g. current state of restaurants or parking lots available), reservation (e.g. restaurant), video phone, and file transfer
3. Service environment:
- Usage Scenario: In Public area or wide area, individual terminal is linking with a town monitoring system.
- Mobility: Low (less than 4 km/h) or HIGH (less than 100 km/h)
4. Market scale
This service will start at around 2010. Its deployment area rapidly increase within 2 to 3 years are expected, particularly urban area. Around 2015, it will widely be pervasive in urban city in this country. Expected customers are forecasted XXX users/km2 (2010), YYY users/km2 (2015) and ZZZ users/km2 (2020) , Terminal density in dense urban area: 2 – 3 units /10 m2,
Analyzing the collected market data (5) - Answer example (2/2)
5. Deployment scenario:
Mainly deployed by hotspots and pico cells,
6. Possible enablers:
Mobile video terminal embedded, Town monitor: < 1 kbps (bit rate), < 1 sec. (latency), Video phone: < 1 Mbps (bit rate), < 50-100 m sec. (latency), File transfer (3D video catalogue): < 1-45 Mbps (bit rate), < 2 sec. (latency),
7. Overall requirements:
Data rate: <45 Mbps, Latency: 50 m sec.
8. Possible RATs: Nomadic/Local Area Wireless access, and New Mobile Access,
Analyzing the collected market data (6)
Determine potential applications and their requirements IMT-2000 Systems beyond IMT-2000 - Key components analysis
Service categories
Examples Voice Video phone) IM, e-mail Video mail Packet mobile broadcasting Intranet access 3-D video communication Ambient communication Hologram video communication Peripheral nerve The info five senses Brain – brain Remote control
Existing services
Major requirements of network infrastructure E-E transmission delay Terminal Bit rate / Connection delay density 100 ms/ < 2 s ~ 64 Kb/s - 64 Kb/s~1Mb/s 50ms~100ms/ < 2 s - ~1 Kb/s - ~1Mb/s - < 1 s* / < 2 s (* : Delay between server - and end terminal) ~10 Mb/s - 1Mb/s~45 Mb/s 100 ms / < 2 s -
50Mb/s~1Gb/s 500Mb/s~ 30Gb/s 1Mb/s~ 100Mb/s ~2Tb/s ~10Mb/s 50ms~100ms/ < 2 s -
Reality
100 ms /less than 2 s ≒ 50 ms / ≒ 50 ms
50 ms~/50 ms~
- -
Bioinformatio n Virtual alter ego
quasi alwa ys-on
- -
Tele-existence Control of home appliances
~10Mb/s -
-
1ms~50ms /10ms~50ms -/-
-/-
~20 / 10m2 ~20 / 10m2 ~1000 /
2
Ubiquitous
Ubiquitous directory service
Analyzing the collected market data (7)
Mapping the application onto categories
Traffic class Service types CBR Realtime VBR Non realtime With minimum rate guarantee ABR Without any gurantees
Unit: Mbit/s/km2
UBR
Speech & SMS (<16kbps)
Voice
Low data transmission for restaurant reservation in Town monitoring system
Low data transmission for Town monitoring
Low priority Email
Multimedia & Low rate data (<144kbps) Medium Multimedia (<2Mbps) Video phone
High multimedia (<30 Mbps)
Super High Multimedia (30 Mbps to 100M/1G bps) File Transfer
Analyzing the collected market data (8)
Estimate traffic (T) and Service request density (P)
Service type
Speech & SMS
Traffic class
CB R VB R
Rural
Sub Urban
Urban
Dense Urban
T1,1,1, P1,1,1
rtVBR
T1,1,2, P1,1,2
T1,1,3, P1,1,3
T1,1,4, P1,1,4
T1,2,1, P1,2,1 T1,3,1, P1,3,1 T1,4,1, P1,4,1 T1,5,1, P1,5,1 T1,6,1, P1,6,1 T2,1,1, P2,1,1
nrtVBR
AB R w/ min. rate guarantee w/ no guarantee s UB R
Multimedia & Low rate data
CB R VB R rtVBR nrtVBR AB R w/ min. rate guarantee w/ no guarantee s
T
,
Outcome at WP8F Berlin meeting(11)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
5.6.2 Time-varying traffic and regionally-varying traffic;
The detailed text is requested, which keeps consistency with other parts.
Outcome at WP8F Berlin meeting(12)
2) Working document towards Methodology for Calculation of spectrum requirement (Doc.8F/TEMP/123),
5.7 Distribution of traffic among RATs and within RATs, and 6. Determine required system capacity 7. Applying additional weighting factors, 8. Determine required spectrum
- The detailed algorithm, which employs “delay percentile approach” was included in these sections. The approach was originally proposed by Finland (Doc.8F/227) on behalf of CEPT. It is said by Finland that it can handle packet based traffic well. - The comment from the floor was raised during WP8F meeting, which requests validation check for the detailed algorithm. - The algorithm should be examined from the viewpoint of whether or not it is appropriate for Spectrum Calculation for WRC-07 A.I. 1.4.
Future work
The following items should be discussed in future CJK-B3G meetings and WP8F meetings; • To review the following; - the identification of service parameters, - the definition of service environments, - the categorization of services, • To draft preliminary application scenarios, • To map applications onto service categories • To determine a service requirement table to be used for application mapping • To check proposed algorithm from the viewpoints of; - the technical validation, - the balance among complexity, technical strictness, and future market ambiguity, - the appropriateness for the ITU-R spectrum calculation in terms of transparency, • To develop spread sheet based on the calculation algorithm, • To preliminarily calculate traffic demands on a service environment by service environments basis, by using the spread sheet. The above would be reviewed at Shanghai and finalized at Geneva.
Methodology timeframe
July,2004
5th meeting Jul.6th 6th meeting End of Aug.
Jan.,2005
7th meeting Mid-Nov. 8th meeting Mar.17th
Jun.,2005
CJKB3G
Shanghai Oct. 12-20
Initial draft of methodology (to other SWG) Review the results of SWG SpeCalc of WP8F (Methodology issues)
WP8F
Geneva Feb. 1-8
Revise the initial draft of methodology
Quebec Jun. 1-8
Focus on Methodology and its related Radio Aspects. Start discussion on our Phase 2 collaboration