					                NATIONAL CERTIFICATE (VOCATIONAL)

                                     NQF LEVEL 2




            INTEGRATED SUMMATIVE ASSESSMENT TASK



                                SUBJECT ISAT:

                                     MASONRY

                                        2009




This document consists of 6 pages.
                                          1
TASK SHEET
TASK:
BUILD DIFFERENT TYPES OF MASONRY WALLS USING SOLID UNITS.


EXECUTION OF TASK:
   This is a group task but the group number should not exceed 5.
   The groups should develop a drawing (Elevation, Plan view and Section) for this task
     based on specifications provided below.


DURATION OF THE TASK:
     Seven hours (7) which could be split over two to three days.


SPECIFICATIONS:


          220 mm Damp Proof Course.
          Brick wall in stretcher bond: 3000mm x 1500mm.
          Wall height: 1500mm.
          Brick force at four course intervals.
          Coping: brick on edge header course.
          External face is jointed with square jointers.


INSTRUCTIONS TO LECTURERS:
     1.    Provide the working drawings with specifications to the students.
     2.     Make the resources available to the students.
     3.    Inform the students of the duration of the project (time).
     4.    Observe the students while they conduct the building project.
     5.    Lecturers must have a checklist to allocate marks.
     6.    Lecturers must give a mark as per items listed in the rubric.
     7.    Ensure that groups develop their own Elevation, Plan view and Vertical section
           of the brick wall based on the given specifications.




                                             2
INSTRUCTIONS TO STUDENTS:


       1.     Read and understand the specification clearly.
       2.     Select the applicable tools and equipment.
       3.     Build 220 brick garden wall built in stretcher bond.
       4.     Adhere to time allocation.
       5.     Work effectively in a team or a group.
       6.     Use applicable tools and equipment.


PROJECT OBJECTIVES:
       1.     Install damp proof course in accordance with the drawing and in accordance
              with the provisions of national standards.
       2.     Build a single leaf wall in stretcher bond using brick-force at intervals specified.
       3.     Build a double leaf wall in stretcher bond using brick-force to comply with the
              minimum requirements of prescribed national standards.
       4.     Use appropriate size units and build a double leaf wall in English bond and
              Flemish bond garden wall bond.


TOOLS, EQUIPMENT AND MATERIALS:

The following tools and equipment will be required:

 Measuring tape, spirit level, builder’s square, buckets, spades, straight edge, wheel barrow,

 concrete mixer, club hammer, chisel, chalk/ pencil, builder’s lines, bricklaying trowel, gauge

 rod, steel rods, claw hammer, and any other suitable tools.



The following materials will be required:

Timber or steel boards, sand, stone, cement, water, Steel nails, 76mm x 50mm

treated timber, lime, brick force.




                                                3
ASSESSMENT RUBRIC
Evaluation criteria       Outstanding             Highly            Competent            Not Yet           Not Achieved
                                                Competent                               Competent
                               5                    4                    3                  2                     1
                            80-100%              60-79%               50-59%             40-49%                 0-39%
  1. Install damp        Displayed            Install damp proof   Install damp       Do some              Cannot do
     proof course in     outstanding          course in            proof course in    installation of      installation of
     accordance with     ability to adhere    accordance with      accordance         damp proof           damp proof
     the drawing and     to the               the drawing          with the           course in            course in
     in accordance       requirements of      correctly to         drawing            accordance with      accordance with
     with the            installing DPC in    demonstrate          correctly to       the working          the drawing
     provisions of       accordance with      awareness of         demonstrate        drawings             working
     national            drawing and          safety and           awareness of                            drawings
     standards.          provisions of        neatness beyond      safety and
                         national             expectations.        neatness.
                         standards to
                         maximum.
  2. Build a single      Displayed an         Displayed an         Displayed an       Partly display       Cannot build a
     leaf wall in        outstanding          ability to build     ability to build   ability to build a   single leaf wall
     stretcher bond      ability to build     perfectly a single   a single leaf      single leaf wall     in stretcher bond
     using brick-force   correctly a single   leaf wall in         wall in            in stretcher bond    using brick-force
     at intervals        leaf wall in         stretcher bond       stretcher bond     to expectation       at intervals
     specified.          stretcher bond       using brick-force    using brick-       using brick-force    specified at all.
                         using brick-force    at intervals         force at           at specified
                         at intervals         specified.           intervals          intervals.
                         specified as per                          specified.
                         specification.
  3. Build a double      An outstanding       A high level of     A competency        Some                 Cannot build a
     leaf wall in        competency is        competency is       is                  competency is        double leaf wall
     stretcher bond      demonstrated in      demonstrated in     demonstrated        demonstrated in      in stretcher
     using brick-force   building double      building double     in building         building double      bond.
     to comply with      leaf wall in         leaf wall in        double leaf         leaf wall in
     the minimum         stretcher bond       stretcher bond      wall in             stretcher bond
     requirements of     using brick-force    using brick-force   stretcher bond      using brick-force
     prescribed          to comply with       to comply with the  using brick-        to comply with
     national            the minimum          minimum             force to comply     the minimum
     standards.          requirements of      requirements of     with the            requirements of
                         prescribed           prescribed          minimum             prescribed
                         national             national            requirements        national
                         standards. .         standards. .        of prescribed       standards. .
                                                                  national
                                                                  standards. .
  4. Distinguish         Distinction          Distinction         Distinction         Some distinction     No distinction
     between solid       between solid        between solid unit between solid        between solid        made between
     unit sizes that     unit sizes that      sizes that are      unit sizes that     unit sizes that      solid unit sizes
     are appropriate     are appropriate      appropriate and     are appropriate     are appropriate      that are
     and not             and not              not appropriate for and not             and not              appropriate and
     appropriate for     appropriate for      English bond and appropriate for        appropriate for      not appropriate
     English bond        English bond         Flemish bond is     English bond        English bond         for English bond
     and Flemish         and Flemish          made beyond         and Flemish         and Flemish          and Flemish
     bond.               bond is made to      expectations.       bond is made.       bond is made.        bond.
                         maximum
                         expectations.

                                                         4
Evaluation criteria        Outstanding            Highly              Competent           Not Yet          Not Achieved
                                                Competent                                Competent
                                5                   4                      3                 2                    1
                             80-100%             60-79%                 50-59%            40-49%                0-39%
  5. Practical            Mastered the        Mastered the           The required      Some required       Lacks the ability
     knowledge and        required skills     required skills well   skills are well   skills are well     to demonstrate
     application skills   outstandingly       and consistently       and               and consistently    basic applicable
                          well and            uses them in most      consistently      used in given       skills in a given
                          consistently        contexts.              used in given     contexts.           context.
                          uses them in all                           contexts.
                          contexts.
  6. Safety practices.    Candidate           Candidate              Candidate         Candidate           Candidate
                          demonstrates        demonstrates high      demonstrates      demonstrates        demonstrates
                          outstanding         level of               required          some required       insufficient
                          safety skills and   competency in          competency in     competency in       safety skills and
                          takes               safety skills and      safety skills     safety skills and   precautionary
                          precautionary       precautionary          and               precautionary       measures in the
                          measures in the     measures in the        precautionary     measures in the     performance of
                          performance of      performance of a       measures in       performance of      a given task.
                          a given task.       given task.            the               a given task.
                                                                     performance of
                                                                     a given task.

                                                                                              6 x 5 marks = 30




                                                         5
                                      RECORD OF PERFORMANCE
                                           SUBJECT ISAT: MASONRY L2

 1      ISAT Task
 2      College
 3      Campus
 4      Candidate's Surname and First Name/s

                                                                       Highly                              Not Yet
                                                  Outstanding                         Competent                            Not Achieved
                                                                     Competent                            Competent
                                   Evaluation
                                                        5                4                 3                 2                    1
                                    Criteria
                                                    80-100 %          60-79%          50 – 79 %            40– 49 %             0-39%

                                                Candidate’s Total:
                                                                                                                   TOTAL:


                                                                                                                                      / 30

                                                                       Final Total (Candidates total / Possible total x 100)            %

                                                                                    Rating Code           Rating                Marks %
Candidate’s competence level:      …………………………………………………………………………………                       5              Outstanding            80 – 100%
                                                                                         4           Highly Competent          70 – 79%
Candidate’s signature:             …………………………………………………………………………………                       3               Competent             50 – 69 %
                                                                                         2           Not Yet Competent         40 – 49 %
Lecturer’s/Assessor’s signature:   …………………………………………………………………………………                       1             Not Achieved             0 – 39 %

Date:                              …………………………………………………………………………………


                                                                6

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:31
posted:8/5/2010
language:English
pages:6
Description: Masonry Department of Education precautionary measures