FY08 Forecast for GRC

Shared by: kimbrozic
-
Stats
views:
60
posted:
3/13/2009
language:
English
pages:
4
Document Sample
scope of work template
							                                                                                                              FY09 Forecast for GRC




FY09 ACQUISITION FORECAST for GLENN RESEARCH CENTER (GRC), Cleveland, OH

---Note: This forecast is "globally" updated in October and April (for the mid-year update). The "global" update is shown in Section 1.
       Interim updates, displayed in Section 2, are made more frequently as new information becomes available.

         Do NOT rely on this Forecast as representative of GRC's estimated procurement needs of the future. It is only the "tip of the iceberg." You should be periodically reviewing the
         GRC Business Opportunities web site and/or subscribe to NASA's e-mail notification service -- both available at http://procurement.nasa.gov/. Or, you may visit FedBizOpps @ http://www.fedbizopps.gov/.

COLOR-CODING (background)* is provided to clarify changes in status:
--W (WHITE) background means an addition, i.e, new forecasted procurement, to the previous forecast or "no change" from the previous forecast.
--Y (YELLOW) background means a change to a previously forecasted item.
--B (BLUE) background means an award or deletion from the previous forecast.

  COLOR
  CODE*       CNTR        PSCODE TYPE             VALUE       RELQTR     RELFY SET-ASIDE         COMP                   POC                PHONE                                  DESCRIPTION                                UPDATED


Section 1:

     Y        GRC         6635       SUPS                 1         3         09 TBD             Y          Patrick Dunlap/RXMO         216-433-3017 Seal Performance Test Rig                                                    4

     B        GRC         Z182       SERV                 1         4         09 FULL**          Y          Jeff Schultz/FDP            216-433-5553 Fire Alarms & Sprinklers, Bldgs 8, 21 and 86                                 3

     B        GRC         Z182       SERV                 2         1         08 FULL**          Y          Douglas Dolch/DFP           216-433-5449 Modify Chilled Water System, B142                                            3
                                                                                                                                                     Improvements in the Quality and Cost of Germanium Substrates for
     B        GRC         AR22       R&D                 2          1         08 NONE            TBD        Michael Piszczor/RPV        216-433-2237 Use in Multijunction Solar Cell Fabrication                                  3

     Y        GRC         Z182       SERV                2          3         09 NONE            Y          David E. Taylor/H           419-621-2101 Test Facility Upgrades, Including Building B-2, at Plum Brook Station        3

     B        GRC         F108       SERV                3          1         08 FULL            Y          Keith Peecook/QD            419-621-3277 Completion of Plum Brook Station Reactor Decommissioning                     2

     Y        GRC         AS13       R&D                 1          3         09 NONE            Y          Robert Schutte /FA           216-433-2020 RVSM Modification for Lear 23                                               3

     Y        GRC         A18        R&D                  1         4         09 NONE            N          Bruce Steinetz /RX          216-433-3302 Full-Scale Spacecraft Seals                                                  2

     B        GRC         6695       SUPS                1          2         08 NONE            Y          James Johnston/RXP          216-433-5029 Supercritical Fluid Extraction System                                        1

     B        GRC         AR13       R&D                 1          3         08 FULL            N          Bruce Steinetz /RX           216-433-3302 Seal Aerothermal Analyses                                                   1
                                                                                                                                                      PACES III (Professional, Administrative, Computational, Engineering,
     B        GRC         R499       SERV                3          2         08 FULL****        Y          Leahmarie Stervagi/CHC       216-433-2137 Support Services)                                                           1



     Y        GRC         AR34       R&D                 3          3         08 TBD             Y          Richard DeLombard/MAH        216-433-5285 Space Flight Systems Development and Operations Contract                    1

     Y        GRC         Y182       SERV                3          1         09 FULL            N          Bill Spilker/FDP            216-433-5741 General Construction Services (Multiple Contract Awards)                     2
                                                                                                                                                     Disassembly and Replacement of a High Bay Overhead Crane at
     Y        GRC         3950       SUPS                 1         4         09 FULL**          Y          Richard Sorge/H000          419-621-3270 Plum Brook Station Space Power Facility in Sandusky, OH                      2

     Y        GRC         6625       SUPS                1          4         09 NONE            Y          David Larkin/RHS0           216-433-8718 Instrumentation and Equipment (UHV Electron Column System)                   1

     Y        GRC         5999       SUPS                1          1         09 NONE            Y          John E. Thomas/DSI0         216-433-2658 1 Data Acquisition Unit                                                      1

     B        GRC         5999       SUPS                2          1         08 NONE            Y          John E. Thomas/DSI0         216-433-2658 9 Telemetry Systems Consisting of 3 Separate Pieces of Hardware              0

     B        GRC         6140       SUPS                1          1         08 NONE            Y          John E. Thomas/DSI0         216-433-2658 9 Batteries (Made from Multiple Battery Cells)                               0

     B        GRC         6640       SUPS                1          1         08 TBD             Y          David Bents/RPC0             216-433-6135 High Pressure Water Electrolyser                                            0

     B        GRC         D301       SERV                2          3         08 NONE            Y          Leslie Main/FMD0             216-433-6345 Database Management Services                                                0

     Y        GRC         R408       SERV                3          3         08 NONE            Y          Lori Conroy/CHC              216-433-3086 Safety, Reliability, and Quality Assurance Services                         1

     B        GRC         R709       SERV                1          2         08 TBD             Y          Lisa Hicks/S                 216-433-5352 Audit Services                                                              1




                                                                                                                      Page 1
                                                                                                              FY09 Forecast for GRC




FY09 ACQUISITION FORECAST for GLENN RESEARCH CENTER (GRC), Cleveland, OH

---Note: This forecast is "globally" updated in October and April (for the mid-year update). The "global" update is shown in Section 1.
       Interim updates, displayed in Section 2, are made more frequently as new information becomes available.

         Do NOT rely on this Forecast as representative of GRC's estimated procurement needs of the future. It is only the "tip of the iceberg." You should be periodically reviewing the
         GRC Business Opportunities web site and/or subscribe to NASA's e-mail notification service -- both available at http://procurement.nasa.gov/. Or, you may visit FedBizOpps @ http://www.fedbizopps.gov/.

COLOR-CODING (background)* is provided to clarify changes in status:
--W (WHITE) background means an addition, i.e, new forecasted procurement, to the previous forecast or "no change" from the previous forecast.
--Y (YELLOW) background means a change to a previously forecasted item.
--B (BLUE) background means an award or deletion from the previous forecast.

  COLOR
  CODE*       CNTR        PSCODE TYPE             VALUE      RELQTR      RELFY SET-ASIDE         COMP                  POC                 PHONE                                  DESCRIPTION                            UPDATED


     B        GRC         3020       SUPS                1          1         08 NONE            Y          Peter.M.Pachlhofer/FTB0     216-433-5705 Gearbox Procurement for Single Spool Turbine Rig                         0

     Y        GRC         Y182       SERV                2          2         09 TBD             Y          Douglas Dolch/FDP           216-433-5449 Single Spool Turbine Facility Construction                               1

     Y        GRC         3447       SUPS                1          4         09 NONE            Y          Ronald D. Noebe/RXA0         216-433-2093 Ram EDM (electrical discharge machine)                                  0

     B        GRC         6650       SUPS                1          2         08 NONE            Y          Mike Lewis/DPI              216-433-6602 Helmet Mounted Display for EVA                                           0

     Y        GRC         S201       SERV                3          3         08 FULL            Y          Richard Flaisig/CO           216-433-3088 Janitorial Services                                                     1

     Y        GRC         AG54       R&D                 3          1         09 NONE            N          Wayne A. Wong/RPT           216-433-6318 Advanced Stirling Convertor – Engineering Follow-on Procurement          0
                                                                                                            Lee S.Mason/RPT and         216-977-7106
     B        GRC         AR33       R&D                 1          1         08 NONE            Y          Franklin Vergilii/MAH       & 433-6733 Technology Demo. Unit; Preliminary Design Power Conversion                 0

     Y        GRC         AR33       R&D                 2          2         09 NONE            Y          Lee S.Mason/RPT             216-977-7106 Full-Scale Power Conversion Unit Fabrication and Test                    0
                                                                                                                                                     Fiber Optic Concentrated Light Transfer System Development (Ph. 3
     B        GRC         AR33       R&D                 1          1         08 NONE            N          Aloysius.F.Hepp/RPV         216-433-3835 SBIR)                                                                    0

     B        GRC         6150       SUPS                1          2         08 NONE            Y          Paul Senick/ML              216-977-7024 CLV Upper Stage Battery LRUs                                             2

     B        GRC         6150       SUPS                2          2         08 NONE            Y          Paul Senick/ML              216-977-7024 CLV Upper Stage Power Distribution LRUs                                  2

     B        GRC         6150       SUPS                1          3         08 NONE            Y          Paul Senick/ML              216-977-7024 CLV Upper Stage Pump Inverter LRUs                                       2

     B        GRC         6150       SUPS                1          3         08 NONE            Y          Paul Senick/ML              216-977-7024 CLV 1st Stage Battery LRUs                                               2

     B        GRC         V124       SERV                1          1         08 NONE            Y          Jeanine.P.Hanzel/CO00       216-433-3077 Water Shipment of Flight Hardware to the Kennedy Space Center            0

     B        GRC         9515       SUPS                1          1         08 NONE            Y          Bill Foster/ML00            216-433-2368 Ballast (Steel Plates) For ARES I-X                                      0

     B        GRC         AR35       R&D                 1          1         08 NONE            Y          Dave Frate/ML00             216-433-8329 CLV TVC for 8 Hydraulic Reservoirs                                       0

     B        GRC         AR35       R&D                 1          1         08 NONE            Y          Dave Frate/ML00             216-433-8329 CLV TVC for 8 Hydraulic Accummulators                                    0

     B        GRC         AR35       R&D                 1          1         08 NONE            Y          Dave Frate/ML00             216-433-8329 CLV TVC for 8 Hydraulic Circulation Pums                                 0

     Y        GRC         AR35       R&D                 1          1         09 NONE            N          Bruce Steinetz /RX           216-433-3302 Medium-scale Spacecraft Seals                                           1

     B        GRC         AR35       R&D                 1          1         08 NONE            Y          Patrick Dunlap/RXMO         216-433-3017 Seal Arc Jet Test Fixtures                                               0

     B        GRC         5985       SUPS                1          1         08 NONE            N          Robert Romanofsky/RCA0      216-433-3507 Smart Primary Reflector                                                  0

     B        GRC         AR45       R&D                 2          1         08 NONE            Y          Lawrence Wald/MS0           216-433-5219 Radio 1 for CoNNeCT Program                                              0

     B        GRC         AR45       R&D                 2          1         08 NONE            Y          Lawrence Wald/MS0           216-433-5219 Radio 2 for CoNNeCT Program                                              0

     B        GRC         AR45       R&D                 1          3         08 NONE            Y          Lawrence Wald/MS0           216-433-5219 Payload Controller                                                       0




                                                                                                                      Page 2
                                                                                                              FY09 Forecast for GRC




FY09 ACQUISITION FORECAST for GLENN RESEARCH CENTER (GRC), Cleveland, OH

---Note: This forecast is "globally" updated in October and April (for the mid-year update). The "global" update is shown in Section 1.
       Interim updates, displayed in Section 2, are made more frequently as new information becomes available.

         Do NOT rely on this Forecast as representative of GRC's estimated procurement needs of the future. It is only the "tip of the iceberg." You should be periodically reviewing the
         GRC Business Opportunities web site and/or subscribe to NASA's e-mail notification service -- both available at http://procurement.nasa.gov/. Or, you may visit FedBizOpps @ http://www.fedbizopps.gov/.

COLOR-CODING (background)* is provided to clarify changes in status:
--W (WHITE) background means an addition, i.e, new forecasted procurement, to the previous forecast or "no change" from the previous forecast.
--Y (YELLOW) background means a change to a previously forecasted item.
--B (BLUE) background means an award or deletion from the previous forecast.

  COLOR
  CODE*       CNTR        PSCODE TYPE             VALUE       RELQTR     RELFY SET-ASIDE         COMP                   POC                 PHONE                                  DESCRIPTION                                UPDATED


     B        GRC         AR45       R&D                 1          3         08 NONE            Y          Lawrence Wald/MS0            216-433-5219 Data Manager                                                                 0

     B        GRC         AR45       R&D                 2          2         08 NONE            Y          Lawrence Wald/MS0            216-433-5219 Ka Band TWTA                                                                 0

     B        GRC         AR42       SERV                3          1         08 NONE            Y          Teresa Monaco/CHC            216-433-8293 Science and Space Exploration Technology Support                             0

     B        GRC         C118       SERV                 2         4         08 NONE            Y          Bill Spilker/FDP             216-433-5741 Hypersonics Upgrade, PSL, B125 (Design-Build)                                1

     B        GRC         Z182       SERV                 2         2         07 FULL**          Y          Bill Spilker/FDP             216-433-5741 Insulate Tunnel Walls & Rebuild Corners A&B                                  0

     B        GRC         C118       SERV                 1         4         08 NONE            Y          Kim Kearns/FDP               216-433-3145 Icing Capability, PSL, B125 (Design)                                         1

     Y        GRC         Z182       SERV                 1         4         07 FULL**          Y          John Selby/FDP               216-433-6807 Construct New Management Conference Center                                   1

     B        GRC         Z182       SERV                 1         4         07 FULL**          Y          Bryan Coates/FDP             216-433-6548 Demolish Guerin House                                                        0

     B        GRC         Z182       SERV                 2         1         08 FULL**          Y          Dave Ebner/FDP               216-433-5463 Rehab Bldg 14 Phase 4                                                        0

     B        GRC         Z182       SERV                 2         2         08 FULL**          Y          Kim Kearns/FDP               216-433-3145 Rehab B21 Annex                                                              0

     B        GRC         Z182       SERV                 2         2         08 FULL**          Y          Kim Kearns/FDP               216-433-3145 Demolish Building 28                                                         0

     B        GRC         Z182       SERV                 2         1         08 NONE            Y          Dave Ebner/FDP               216-433-5463 Rrehab Building 60                                                           0

     B        GRC         Z182       SERV                 1         2         08 FULL            Y          Joe Viera/FDP                216-433-8586 Rehab HV Subststions B & G                                                   0

     Y        GRC         6640       SUPS                1          4         09 NONE            Y          David Larkin/RHS0            216-433-8718 Ultra High Vacuum Manipulator System                                         1

     Y        GRC         3408       SUPS                 1         3         09 NONE            Y          Andrew Eckel/RXC             216-433-8185 Rapid Prototyping Equipment                                                  2

     Y        GRC         6640       SUPS                 1         4         09 NONE            Y          Andrew Eckel/RXC             216-433-8185 Scanning Electron Microscope                                                 2

     Y        GRC         3408       SUPS                 1         4         09 NONE            Y          Andrew Eckel/RXC             216-433-8185 Composite Fabricating Equipment                                              2
                                                                                                                                                      Implementation, Maintenance, Operation of Central Process Systems
     W        GRC         J061       SERV                 3         3         09 FULL            Y          Robert Gedeon/FD             216-433-3116 (IMOC)                                                                       0

     W        GRC         J061       SERV                 3         3         09 TBD             Y          Robert Gedeon/FD             216-433-3116 Glenn Pressure System Recertification (GPSC)                                 0

     W        GRC         AR22       R&D                 2          3         09 NONE            Y          Concha Reid/RPC              216-433-8943 NRA for Component Development - multiple awards                              0

     W        GRC         AR22       R&D                 2          3         09 NONE            Y          Tom Miller/RPC               216-433-6300 Li-Ion Scale Up Cell Build Contract                                          0

                                                                                 (Note **): Competition Restricted to Pre-awarded On-site 8(a) and HUB Zone Construction Contractors.

                                                                                 (Note ****): Competition Restricted to Select Firms on a Government-wide Multiple Award Contract. Contact Contracting Officer for Details.




                                                                                                                      Page 3
                                                                                                                                                     FY09 Forecast for GRC




FY09 ACQUISITION FORECAST for GLENN RESEARCH CENTER (GRC), Cleveland, OH

---Note: This forecast is "globally" updated in October and April (for the mid-year update). The "global" update is shown in Section 1.
       Interim updates, displayed in Section 2, are made more frequently as new information becomes available.

          Do NOT rely on this Forecast as representative of GRC's estimated procurement needs of the future. It is only the "tip of the iceberg." You should be periodically reviewing the
          GRC Business Opportunities web site and/or subscribe to NASA's e-mail notification service -- both available at http://procurement.nasa.gov/. Or, you may visit FedBizOpps @ http://www.fedbizopps.gov/.

COLOR-CODING (background)* is provided to clarify changes in status:
--W (WHITE) background means an addition, i.e, new forecasted procurement, to the previous forecast or "no change" from the previous forecast.
--Y (YELLOW) background means a change to a previously forecasted item.
--B (BLUE) background means an award or deletion from the previous forecast.

   COLOR
   CODE*          CNTR             PSCODE TYPE                     VALUE         RELQTR           RELFY SET-ASIDE                  COMP                          POC                    PHONE                                               DESCRIPTION   UPDATED


Section 2: INTERIM UPDATES




Forecast Curator: Tim Pierce, Small Business Officer                            UPDATED: September 30, 2008

BELOW are definitions for columns on this spreadsheet:

*COLOR CODE- W = WHITE background which means that this is an "addition" of an item to the previous forecast or "no change" to a previously forecasted item.
             Y = YELLOW background which means that this is a "change" to a previously forecasted item.
                  B = BLUE background which means that this is an award or deletion of a previously forecasted item.


CNTR – This stands for the GRC field center -- Glenn Research Center at Lewis Field, Cleveland, OH


PSCODE – This is the Product and Service Code (PSC) which are alpha-numeric characters categorizing the type of product or service. These generally correspond to coding used in the Commerce Business Daily.


TYPE – "SERV" is for services, "R&D" is for research and development, "SUPS" is for supplies and equipment.


VALUE – "1" = $100,001 to $1,000,000; "2" = $1,000,001 to $5,000,000; "3" = above $5,000,000.


RELQTR – This indicates the anticipated time, by Gov’t FY quarter, of the expected release of the solicitation. "1" is for first quarter, "2" is for second quarter, etc.


RELFY – This is the Gov’t FY.


SET-ASIDE – "FULL" means exclusively set aside for small, HUB Zone, SDVOB, WOB, or small disadvantaged businesses, i.e., 8(a); a partial set-aside is "PART"; no set-aside is "NONE"; and "TBD" means that no preliminary determination has been made.


COMP – "Y" is used if this procurement is expected to be competitive; "N" if it is expected to be non-competitive.


POC – Identifies the name & office code, e.g., Tim Doe/5400, of the person knowledgeable of this procurement requirement and who could assist interested parties in assessing their abilities to participate in the procurement either as prime or sub.


PHONE – The POC’s commercial telephone number.


DESCRIPTION – Identifies the principal requirements of the procurement and any other information considered useful to potential sources.


UPDATE – This shows if this procurement data has been updated since a previous forecast. For example, if this is a new listing, "0" will be shown; if it has been modified, say twice, since it was originally listed, "2" will be shown.




                                                                                                                                                               Page 4

						
Related docs