Diesel Mechanic Resume Templates RESUME

Document Sample
Diesel Mechanic Resume Templates RESUME Powered By Docstoc
					                              RESUME
                DIONESIO S. OAMILDA JR.
                  Cantabaco, Lutopan, Toledo Cebu city
                  Cell No. 09192860813 / 09192382003


PERSONAL DATA

Age                          :      43 years old
Date of Birth                :      October 4, 1963
Sex                          :      Male
Civil Status                 :      Married
Height                       :      5’5’’
Weight                       :      165 lbs.
Provincial                   :      Cantabaco, Lutopan, Toledo City, Cebu
Occupation                   :      PIPE, STRUCTURAL, WELDER / FITTER /
                                    FABRICATOR / SMAW / GTAW / FCAW /GMAW
SSS Number                   :      06-0987770-2
TIN Number                   :      123-820-255


EDUCATIONAL QUALIFICATION:

Elementary                   :      Valladolid Elementary School
                                    1973 – 1979
High School                  :      Naga Provincial High School
                                    1980 – 1984
Welding Course               :      Don Bosco Technical School
                                    October – December 1984
Automotive & Diesel          :      ASMS de la Salle
                                    July 1, 1987 – March 30, 1988


TRAINING & SEMINARS ATTENDED:

Basic Offshore Safety        :      Consolidated Training Center
Induction & Emergency               Cavite Phil.
Training (BOSIET)                   Nov. 4 – 6, 2004

Person In Charge of          :      F.P.S.O. BONGA
Worksite (PICWS)                    April 2, 2005

Confine Space                :      F.P.S.O. BONGA
Safety Training                     May 8, 2005
BST with PSSR         :   UC-METC
                          January 19 – 27, 2004

Basic Welding         :   Don Bosco Technical School
                          December 1984

First Aid Standard    :   Porgera Gold Mine Safety Dept.
                          March 20-21, 1992

SMAW – GTAW           :   ACMDC Machine Shop
WELDING                   Sangi, Toledo City
                          January 1-30, 1979

TIG                   :   National Manpower & Youth Council
                          September 11-12, 1993

Safety Training       :   Mannai Marine Fabrication Yard
Observation Program       May 9-10, 2001

Hydrogen Sulfide      :   Dukhan Fields Qatar Office
Breathing Apparatus       May 14-15, 2001

GIS Training          :   Back Safety                 (11-1-2005)
                          Confined Space              (11-3-2005)
                          Fail Protection             (11-1-2005)
                          GIS Safety Policy Review (11-3-2005)
                          Haz. Comm.                  (11-1-2005)
                          Hearing Conservation        (11-102005)
                          Housekeeping Slips, Trips & Falls (11-3-2005)
                          Lead Safety                 (11-3-2005)
                          LOTO                        (11-3-2005)
                          PPE                         (11-1-2005)
                                              th
                          Rigging API RP2D 5 Edition June (11-3-2005)
                          Scaffold User               (11-3-2005)

WORKING EXPERIENCE:

Company               :   GRAND ISLE SHIPYARD
                          Galliano, Louisiana, USA
Position              :   STRUCTURAL, PIPE WELDER / FABRICATOR
                          GTAW, SMAW, FCAW, GMAW, SAW
Date                  :   Nov. 1, 2005 – until present
Project               :   GULF OF MEXICO OIL INDUSTRY RECOVERY
                          FLATFORMS, OIL RIGS DAMAGE BY
                          HURRICANE KATRINA & RITA
Project Assign        :   FLATFORM VK-900-CHEVRON, ST-177-E-
                                      CHEVRON, SHELL MARS, E1-299- CHEVRON
                                      GIS FABRICATION SHOP.


WORKING EXPERIENCE :

Company               :       SHELL NIGERIA EXPLORATION AND
                              PRODUCTION CO.
                              Lagos , Nigeria
Agency                :       Pacific Ocean Manning St. , Ermita , Manila
Position              :       Plater / Fabricator
Date                  :       March 19, 2005 – October 5, 2005
Project               :       Floating Production Storage Offloading
                              F.P.S.O. BONGA Project

DUTIES AND RESPONSIBILITIES:

      Lay-out , fabricate , assembles as per blueprint drawings.
      Install structural cat walks , deck support steel , umbilical instrument pipe support ,
       ladders , handrails , deck grating , kick plates , cable tray supports for various
       system and modules.
      Lay-out fabricate, install pipe shoe and guides, pipe support pipe spools renew
       install valves and gasket.
      Assist vendors in pre-commissioning of various piping system (leak-test)
      Lay-out fabricate, install of free fall life boats structure, cat walk, handrail and
       gratings.
      P.I.C.W.S. (Person In Charge of Work Site) responsible for overall control worksite
       and employees involve in the work in land.
      Fire watcher

Company               :       KEPPEL CEBU SHIPYARD, INC.
                              Dad Cleveland Ave. Lapu-Lapu, Cebu City
Position              :       Welder / Fitter
Date                  :       February 4, 2003-April 2, 2004
Project               :       Superferry 14, 16, 17, 18, MV Filipina Princess,
                              Molunat IV & V, and Supercat, etc.



DUTIES AND RESPONSIBILITIES:



      Responsible fitter, welder of dried duct cargo and passenger vessels at shipyard.
      Fitting, welding of fire protection piping from manifolds to branch line sprinkler
       heads.
      Fitting / welding of engines resigned fuel and cooling lines.
      Assist in installation of ship escalator and railings.
      Fitting / welding of redesigned ramps and ladders.
      Assist in re-alignment of engines accessories pumps, purifiers and piping.
      Re- planting works, ships air conditioning duct repair.
      Full welding of ballast tank side cial (confine space).



DUTIES AND RESPONSIBILITIES:

          Perform full welding (X-Ray, UT, PT) of pressurized Oil, Air, Water Pipeline,
           Vessels, Tanks, Heat Exchanger, Boiler, Flatform Structure Ladders, Railing
           and other heavy metals at GIS fabrication shop and different flatform
           assignment.
          Perform template layout, fabricate assemble different piping system, diagonal
           bracing support mitering, square to round concentric & eccentric. T & Y
           Lateral, Cone, Chute, Flanges etc.
          Reading and interpreting blueprint & isometric drawing.
          Awarded received plaque of excellence by CHEVRON OIL COMPANY.



Company                      :      MIDEAST CONSTRUCTION (MECON)
                                    MANNAI CORPORATION
                                    P.O Box 3225 Doha State of Qatar
Position                     :      TIG Welder / GTAW SMAW
Date                         :      March 10, 2001 – October 25, 2002
Project                      :       Petrochemical & Gas Plant Expansion Project
                                    Refinery NGL 3,4 Qatar Gas Sulfur Recovery,
                                    Qatar


DUTIES AND RESPONSIBILITIES:

          Assist pipe fitters preparation before welding
          Tig & Arc Welder of stainless, carbon steel chrome, ally metals assign at any
           project of (MECON),
          Qatar Gas Sulfur Recovery Expansion Project (RAS LAFFAN), NGL 4 Dukhan
           Projects, Qatex Tank & Pipe line Project MESAIEED, MANNAI MARINE
           Fabrication Yard Messaieed Qatar.
          Assigned as Offshore Welder for 3 months at MAERSKFLATFORM under
           MANNAI MARINEDEPT. Full welding of 12”, 16”, 20”, 24” diameter heavy
           wall pipe over floating barge before pipe laying.
Company                      :        AL SALEEM CORP.
Position                     :       Tig Welder
Date                         :       July 28, 1999 – December 22, 1999
                                     (SCECO) Expansion Projects K.S.A


DUTIES AND RESPONSIBILITIES:

          Responsible TIG Welder of Engines pressured pipe lines.
          Starting Air pipe lines.
          Lube oil lines.
          Radiator pipe lines.
          Fuel oil pipe lines.
          Engine Auxiliaries piping
          Tank Farm Piping
          H2O Piping
          Smoke stacks (EXHAUST)
          Boiler Piping etc.
       

Company                       :       Engineering and Construction of Asia
                                      (ECCO-ASIA)
Project Undertaken            :       APO Cement Power Plant Project
                                      (66 Mega watt in Tinaan Naga, Cebu, Phil.)
                                      Panay Power Plant Project
                                      (72 Mega watt in Lapaz, Ilo-ilo, Phil.)
Position                      :       TIG Welder – GTAW / SMAW
Date                          :       March 28, 1998 – Sept. 30,1998
                                      (72 MW Panay Power Plant – Ilo-ilo, Phil.)
                                      April 19, 1997 – Feb. 14, 1998
                                      (66 MW APO Power Plant, APO Main Plant&
                                      Jetty Plant)

DUTIES AND RESPONSIBILITIES:

          Full welding of many sizes power plant, pressured fuel pipe lines (x-ray),
           starting air pipelines, raw water pipelines, steam lines. Lube oil pipe lines,
           exhaust duct, add tanks, IFO tanks, tank yard pipings.
          Full welding of cement cylus, cylus pipings, air pipe lines & ducts.


Company                       :       Campenon Bernard SGE / MAEDA Corp. J.V.
                                      Kowloon, Hongkong
Position                      :       Mechanic / TIG / ARC Welder
Date                          :       August 11, 1996 – December 4, 1996
Project                       :       Seawage Disposal Scheme Project
DUTIES AND RESPONSIBILITIES:

          Full welding of stainless & carbon steel pipes at KOWLOON FAB SITE.
          Welding maintenance and fault intervention of:
          Robins 3.4 meter Boring Tunnel Boring Machine (TBM)
          Alimak Cage Lift
          ATLAS Copco Jumbo Drilling PIG
          Hagglumds Loader and Cars
          Harrison Western Diesel Locomotives
          C.G.P. Kone Mucking Gantry Crane
          Shanska 6 Tonnage Gantry Crane
          Fabrication Fill Welding
          Welding Services including Pumps, Fans Compressors, Equipments


Company                      :      ATLAS Consolidated Mining & Development
                                    Corp
Position                     :      Pipe Welder GTAW / SMAW
Date                         :      December 3, 1987 – March 22, 1993
Project                      :      Power Plant Expansion Project


DUTIES AND RESPONSIBILITIES:

          Selected as class A welder, rigger, mechanic, assigned at Porgera Mining Papua
           New Guinea under ATLAS Ventures Incorporated.
          Full welder of Porgera Power Plant Pipelines.
          Regular Employee as TIG Welder at Construction Srvices Department assigned
           any big Project inside Atlas Mining.
          ATLAS Masbate Gold Mine Power Plant Project.

           1 Unit 4.5 MW NIIGATA Engine
           2 Units 1.5 MW NIIGATA Engine
           3 Units 2 MW Fairbank Morse Engine
           1 Units 18 MW PILSTIK Engine


Company                      :      DIESEL ELECTRIC SYSTEM INC.
Position                     :      Piping Leadman
Date                         :      September 15, 1993 – April 15, 1994
Project                      :      5 Units NEW SCUDA ZULCER DIESEL (Angeles
                                    Power Plant).
DUTIES AND RESPONSIBILITIES:

          Installation of boiler and pipings full welding.
          Responsible in installation of all engines pipings.
          Assist in TIG Welder of stainless, carbon steel, all pipes of power plant.



Company               :       SALCON POWER CORP/FORMER NATIONAL
                              POWER CORPORATION.
Position              :       TIG Welder – GTAW / SMAW
Date                  :       March 20, 1995 – August 1, 1996
Project               :       Thermal I & Thermal II Rehabilitation Project

DUTIES AND RESPONSIBILITIES:

          TIG Welder of assorted piping of boiler, fuel lines, water lines, air lines, oil
           lines, etc. at CT PP # 1, CT PP #2 (Thermal Plant).

Company               :       RCP Manufacturing Co. Inc.
Position              :       6G Welder
Date                  :       June 5, 1994 – November 25, 1994
Project               :       Fire Protection Project

DUTIES AND RESPONSIBILITIES:

          Full welder of Fire protection assigned at Mactan International Aiport,
           GAISANO MANDAUE DEPT. STORE SALCON POWER CORP.

				
DOCUMENT INFO
Description: Diesel Mechanic Resume Templates document sample