Federal Aid Construction Contracts by qru15075

VIEWS: 23 PAGES: 14

Federal Aid Construction Contracts document sample

More Info
									                                                                            Recurring Special Provisions and
                                                                                 Recurring Plan Details
                                                                                 Menu and Basis for Use
                                                                      For Use with the 2010 Standard Specifications
                                                                              Effective September 1, 2009
                                                                                                                                                                                             7/7/2010



Contract
                                                                                           NOTE: This Menu is divided into two sections:
                                                                      SECTION I - Standard Recurring Special Provisions and Recurring Plan Details
                                                                                                                and
District
                                                                                SECTION II - Contract Specific Recurring Special Provisions.
                                                                    Please review both sections to locate and ensure the correct items are placed in the contract.

                                                                                       Adopted (A)
Place In   Attach.                                                                                      Letting
                       RSP                                                                 or
Contract   Req'd.                                         Title                                        Effective                                      Basis for Use
                      Number                                                           Revised (R)
  (X)        (X)                                                                                         Date
                                                                                          Date


   SECTION I:                                                     Standard Recurring Special Provisions and Recurring Plan Details

                                                                                                                   Required for all projects in Lake, LaPorte, Porter and St. Joseph counties except
                                  Payment of Predetermined Minimum Wage
                     100-C-146                                                        R 03-16-10      04-01-10     building construction.
                                  Determination (Davis-Bacon Act) IN 100001
                                                                                                                   Do not use with mowing, herbicide, sweeping, & light bulb replacement.
                                                                                                                   Required for all projects in counties other than Lake, LaPorte, Porter and St.
                                  Payment of Predetermined Minimum Wage
                     100-C-147                                                        R 03-16-10      04-01-10     Joseph except building construction.
                                  Determination (Davis-Bacon Act) IN 100006
                                                                                                                   Do not use with mowing, herbicide, sweeping, & light bulb replacement.

                     100-C-151A   FHWA-1273                                           R 03-10-94      09-01-09     Required for all federal aid contracts.


                                  Disadvantaged Business Enterprise Procedure and
                     100-C-151B                                                   R       04-09-07    09-01-09     Required for all federal aid contracts with DBE goal.
                                  Good Faith Efforts



                     100-C-151C   DBE Record Keeping and Timely Pay                   R 09-01-05      09-01-09     Required for all federal aid contracts without DBE goal.



                     100-C-151D   Executive Order 11246                               R 03-09-06      09-01-09     Required for all federal aid contracts.



                     100-C-151E   Title VI Assurances                                 A 05-01-08      09-01-09     Required for all federal aid contracts.



                     100-C-166    As-Built Traffic Signal Plans                       R 08-15-07      09-01-09     Required for all contracts with permanent traffic signal installations.



    X                100-C-188    Standard Specifications                             R 04-09-09      09-01-09     Required for all contracts.


                                  Indiana Department of Administration M/WBE
                                                                                                                   Required on 100% state funded contracts $200,000 and over with MBE/WBE
                     100-C-203    Participation Policy for Indiana Department Of      R 06-19-09      09-01-09
                                  Transportation Construction Projects
                                                                                                                   goals greater than 0%.




                                                                                         Page 1 of 14
                                                                         Recurring Special Provisions and
                                                                              Recurring Plan Details
                                                                              Menu and Basis for Use
                                                                   For Use with the 2010 Standard Specifications
                                                                           Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                      Title                                     Effective                                      Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date


   X                 100-C-214   Construction Letting E-mail Box                   R 04-23-08    09-01-09    Required for all contracts.


                                 Contract Identification for 2009 Federal Recovery
                     101-C-221                                                     A 02-01-09    09-01-09    Required for any contract as identified by Contract Administration.
                                 Act Contracts



                     102-C-170   Prequalification                                  A 09-01-05    09-01-09    Required for all building construction.


                                 Contractor Reporting Requirements for 2009
                     103-C-222                                                     R 06-13-09    09-01-09    Required for all ARRA contracts let on or after July 1, 2009.
                                 Federal Recovery Act Contracts


                                                                                                             Geotechnical report has been developed and approved for contracts let on or
                     104-C-139   Geotechnical Evaluation Report                    R 05-22-08    09-01-09
                                                                                                             after July 1, 2008.

                                 Submittal of Shop Drawings and Falsework
                     105-C-223                                                     A 06-11-09    09-01-09    All LPA Contracts
                                 Plans for LPA Projects


                                 Construction Engineering and Inspection for                                 Pay Item: 105-09645.
                     105-C-224                                                     A 03-01-10    06-01-10
                                 Utility Relocation                                                          For contracts let on or after June 1, 2010


   X                 106-C-126   Buy America Requirement                           A 03-18-10    05-01-10    Required for all contracts.



                     107-B-040   Environmental Restrictions                        R 04-01-08    09-01-09    As determined necessary by Project Designer.



   X                 107-C-208   Use of Cones in Lieu of Drums                     A 03-30-07    09-01-09    Required for all contracts.


                                                                                                             As determined necessary by Contract Services personnel who will process
                     108-C-089   Percentage of Work Required of Prime Contractor R   09-01-05    09-01-09
                                                                                                             contracts shortly before letting.


                     108-C-192   Temporary Erosion Control Measures                R 03-20-08    09-01-09    Required for all contracts except mowing and herbicide.


                                 Working Restrictions Memorial Day, July Fourth,
                     108-C-202                                                     A 02-07-07    09-01-09    Required for all Fort Wayne contracts.
                                 Labor Day Weekends



   X                 108-C-209   Reporting Subcontract Payments                    A 07-11-07    09-01-09    Required for all contracts.



                                                                                     Page 2 of 14
                                                                          Recurring Special Provisions and
                                                                               Recurring Plan Details
                                                                               Menu and Basis for Use
                                                                    For Use with the 2010 Standard Specifications
                                                                            Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                       Title                                    Effective                                      Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date


                     108-C-215   Critical Path Method Schedule                     R 03-24-10    04-01-10    Required for contracts as determined by Division of Construction Management.



                     108-L-012   Specialty Pay Items                               A 09-01-05    09-01-09    Pay Item: 202-01261. Testing for asbestos removal.



                     108-R-148   Construction Equipment in Park Areas              R 09-01-05    09-01-09    Required for all park contracts.


                                                                                                             Required for all contracts with more than 1 project with lettings on or after
                     109-C-212   Project Estimate Adjustment                       A 07-27-07    09-01-09
                                                                                                             September 19, 2007.


   X                 109-C-213   Contract Liens                                    A 07-27-07    09-01-09    Required for all contracts.

                                                                                                             Required for all contracts with a 304, 401, 402, 410 or 610 Pay Item or Item
                     109-C-219   PG Asphalt Binder Material Cost Adjustments       R 12-11-08    09-01-09    Code 718-06526 let on or after February 1, 2009.
                                                                                                             Do not place in LPA ARRA contracts.

                     111-C-178   Stockpiled Materials                              R 04-08-09    09-01-09    Required for all contracts except mowing, herbicide, and painting.


                                                                                                             As determined necessary by Contracts Services.
                     112-C-122   State Funded Contract Requirements                R 09-01-05    09-01-09
                                                                                                             Do not use with mowing herbicide or bulb change.


                     200-R-401   Recycled Foundry Sand                             R 01-12-07    09-01-09    Required for all pay items of Borrow or B Borrow.



                     201-M-030   Debris Removal at Bridge Structures               R 09-01-05    09-01-09    Required for all debris removal maintenance contract.



                     201-R-021   Open Burning of Natural Growth Permitted          R 09-01-05    09-01-09    Required for all debris removal maintenance contract.


                                 Air-Curtained Open-Pit Incineration of Natural                              IDEM has issued permit to Department for burning by means of air-curtained
                     201-R-179                                                     R 09-01-05    09-01-09
                                 Growth Required                                                             open-pit incinerator.


                     202-L-013   Inspection and Testing for Asbestos Materials     R 09-01-05    09-01-09    As determined necessary by Pre-Engineering and Environment.


                                                                                                             As determined necessary by District Construction.
                     202-R-544   Election to Produce Recycled Concrete Aggregate   A 11-01-07    09-01-09
                                                                                                             Select either 202-R-544 or 202-R-545. Do not use both.


                                                                                    Page 3 of 14
                                                                           Recurring Special Provisions and
                                                                                Recurring Plan Details
                                                                                Menu and Basis for Use
                                                                     For Use with the 2010 Standard Specifications
                                                                             Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                       Title                                    Effective                                       Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date

                                 Mandatory Production of Recycled Concrete                                   As determined necessary by District Construction.
                     202-R-545                                                     A 11-01-07    09-01-09
                                 Aggregate                                                                   Select either 202-R-544 or 202-R-545. Do not use both.


                     203-B-025   Marion County Borrow Areas                        R 09-01-05    09-01-09    Pay Item: 203-02070. Required for all project limits in Marion County.



                     203-R-121   Borrow Area Wetland Enhancement                   R 09-01-05    09-01-09    Required for all borrow pit excavation expected to reach water table.


                                 Embankments Constructed of Coal Combustion By-
                     203-R-360                                                  R    09-01-05    09-01-09    Required for all pay items of 5000 CYS (3800 cubic meters) or more of Borrow.
                                 Products



                     203-R-550   Approval of Borrow and Disposal Sites             A 03-20-08    09-01-09    Required for all contracts with a 201, 202 or 203 pay items.


                                 Dynamic Cone Penetrometer Testing for
                     203-R-562                                                     A 04-16-09    09-01-09    As determined by District.
                                 Embankment



                     206-B-026   Steel Sheet Piling at Railroad Grade Separation   R 09-01-05    09-01-09    Required for all steel sheet piling required, railway within project limits.



                     206-B-113   General Bridge Requirements                       R 04-08-09    09-01-09    Required for all bridge replacement or new bridge construction.


                                 Subgrade Treatment for Trails                                               Required for all contracts with 207-09895 pay item.
                     207-R-575                                                     A 01-21-10    07-01-10
                                 on Abandoned-Railroad Corridor                                              Must include RPD 402-R-572d

                                                                                                             Required for all contracts with a 207 or 215 pay items
                     207-R-577   Subgrade and Chemically Modified Soils            A 04-15-10    09-01-10
                                                                                                             let on or after September 01, 2010


                     208-R-111   Gore Area Treatment                               R 09-01-05    09-01-09    Pay Item: 208-02046. Required for all grading of gore area.



                     211-R-415   Crushed Glass as Bedding Material                 A 09-01-05    09-01-09    As determined necessary by Office of Materials Management.


                                                                                                             Required for all contracts with a 211-09266 or 731 pay items
                     211-R-570   Structure Backfill for MSE Wall                   A 12-17-09    09-01-10
                                                                                                             let on or after September 01, 2010.

                                                                                                             Pay item: 211-09266 Structural Backfill, Type 3.
                     211-R-570   Structure Backfill for Retaining Wall             R 06-17-10    10-01-10
                                                                                                             For contracts let on or after October 01, 2010.


                                                                                     Page 4 of 14
                                                                         Recurring Special Provisions and
                                                                              Recurring Plan Details
                                                                              Menu and Basis for Use
                                                                   For Use with the 2010 Standard Specifications
                                                                           Effective September 1, 2009
                                                                                  Adopted (A)
Place In   Attach.                                                                               Letting
                       RSP                                                            or
Contract   Req'd.                                        Title                                  Effective                                     Basis for Use
                      Number                                                      Revised (R)
  (X)        (X)                                                                                  Date
                                                                                     Date

                                  Dynamic Cone Penetrometer Test for Compaction
                     215-R-543                                                    A 05-31-07    09-01-09    As determined necessary by District.
                                  of Chemically Modified Soils


                                                                                                            Required for all contracts with a 301, 303-01180 or 303-07449 pay items
                     300-R-580    Lift Depth for Shoulders                        A 04-15-10    09-01-10
                                                                                                            let on or after September 01, 2010.


                     305-R-431    Cement Concrete Pavement Cracking and Seating   R 07-20-06    09-01-09    Pay Item: Required for all concrete Pavement Cracking and Seating.


                                                                                                            Required for all contracts with any 306 pay items
                     306-R-524    Milling Depth Requirements                      A 04-15-10    09-01-10
                                                                                                            let on or after September 01, 2010.

                                                                                                            Required for all contracts with a 401, 402 or 410 pay items
                     400-R-553    HMA Provisions                                  R 12-17-09    04-01-10
                                                                                                            let on or after April 1, 2010.

                                                                                                            Required for all contracts with a 401, 402 or 410 pay items
                     400-R-553    HMA Provisions                                  R 04-01-10    09-01-10
                                                                                                            let on or after September 1, 2010.

                                                                                                            Required for all contracts with a 401 or 402 pay items
                     400-R-553    HMA Provisions                                  R 06-17-10    01-01-11
                                                                                                            let on or after January 1, 2011.

                                  Full Depth Pavement Coring For Pavement                                   All Contracts that are both LPA and ARRA and also
                     400-R-565                                                    A 06-25-09    09-01-09
                                  Inventory                                                                 have any 400 or 500 pay items.

                                  HMA Nonmotorized-Vehicle-Used Facility
                     402-R-571d                                                   A 01-21-10    07-01-10    Required for all Trail Projects with a 402 pay items.
                                  Pavement Section

                                  HMA Nonmotorized-Vehicle-Used Facility
                     402-R-572d   Pavement Section on Abandoned-Railroad          A 01-21-10    07-01-10    Must be included with RSP 207-R-575.
                                  Corridor

                                                                                                            Required for all contracts with a 408 pay items or pay items 507-07481 or 507-
                     408-R-564    Sealing Cracks and Joints                       A 05-21-09    09-01-09
                                                                                                            07482.

                                                                                                            Required for all contracts with a 411 pay items
                     411-R-432    Warranted Micro-Surfacing                       R 05-28-09    09-01-09
                                                                                                            let on or after January 1, 2009.

                                                                                                            Required for all contracts with a 412 pay items
                     412-R-549    Fog Seal                                        R 08-20-09    01-01-10
                                                                                                            let on or after January 1, 2010.

                                                                                                            Required for all contracts with a 501 pay items
                     501-R-540    QC/QA PCCP Air Content                          R 01-05-07    09-01-09
                                                                                                            let on or after September 1, 2007.


                                                                                   Page 5 of 14
                                                                          Recurring Special Provisions and
                                                                               Recurring Plan Details
                                                                               Menu and Basis for Use
                                                                    For Use with the 2010 Standard Specifications
                                                                            Effective September 1, 2009
                                                                                    Adopted (A)
Place In   Attach.                                                                                 Letting
                       RSP                                                              or
Contract   Req'd.                                        Title                                    Effective                                     Basis for Use
                      Number                                                        Revised (R)
  (X)        (X)                                                                                    Date
                                                                                       Date

                                                                                                              Required for all contracts with a 501 pay items
                     501-R-540    PCCP Provisions                                   R 12-17-09    09-01-10
                                                                                                              let on or after September 1, 2010.

                                  PCCP Nonmotorized-Vehicle-Used Facility
                     502-R-573d                                                     A 01-21-10    07-01-10    Required for all Trail Projects with 502 pay items.
                                  Pavement Section


                                                                                                              As determined necessary by pavement engineering section.
                     503-R-516    PCCP Stitching                                    R 04-08-09    09-01-09
                                                                                                               Must include RPD 503-R-516d.


                     503-R-516d   PCCP Stitching                                    A 03-24-06    09-01-09    Must be included with RSP 503-R-516.

                                                                                                              To be included in contracts as requested by District Operations for salvage
                     601-R-146    Removal of Guardrail                              A 09-01-05    09-01-09    guardrail to become property of the Department. The designer should contact
                                                                                                              District Operations for guidance.

                                                                                                              Pay Item: Spare Parts Package for Guardrail End Treatment.
                     601-R-237d   Spare Parts Package for Guardrail End Treatment   R 07-12-07    09-01-09
                                                                                                              Must be included with RSP 601-R-237.


                     601-R-338    Guardrail Blockouts                               R 09-01-05    09-01-09    Pay Item: Guardrail.


                                                                                                              Pay Item: Guardrail.
                     601-R-338    Guardrail Blockouts                               R 06-17-10    09-01-10
                                                                                                              For contracts let on or after September 01, 2010.

                                                                                                              Pay Item: Impact Attenuator Spare Parts Package.
                     601-R-497d   Spare Parts Package for Impact Attenuators        R 07-12-07    09-01-09
                                                                                                              Must be included with RSP 601-R-497.


                     603-R-109    Gate Barricade                                    R 09-01-05    09-01-09    Required for all gate barricade contracts.



                     603-R-414    Polyvinyl Chloride Coated Chain Link Fence        R 12-08-06    09-01-09    Pay Item: Required for all contracts with vinyl coated chain link fence.


                                                                                                              For use only in LPA contracts as requested by the LPA.
                     606-R-563    Milled Centerline Corrugations                    A 05-21-09    09-01-09
                                                                                                              Must include RPD 606-R-563d.

                                                                                                              For use only in LPA contracts as requested by the LPA.
                     606-R-563d   Milled Centerline Corrugations                    A 07-13-09    09-01-09
                                                                                                              Must be included with RSP 606-R-563


                     610-R-100    Median Crossovers                                 R 09-01-05    09-01-09    Required for all median crossovers as shown on plans.



                                                                                     Page 6 of 14
                                                                           Recurring Special Provisions and
                                                                                Recurring Plan Details
                                                                                Menu and Basis for Use
                                                                     For Use with the 2010 Standard Specifications
                                                                             Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                         Title                                  Effective                                     Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date


                     615-R-020    Wood Post Parking Barrier                        R 09-01-05    09-01-09    Pay Item: Required for all contracts with parking barrier wood post.



                     619-B-181    Painting Bridge Steel                            A 05-18-09    09-01-09    Required for all contracts with a 619 pay items.



                     620-R-483    Sound Barrier Systems                            R 05-21-09    09-01-09    Required for all contracts with a 620 pay items.



                     620-R-483A   Sound Barrier Systems                            A 06-15-06    09-01-09    Use in conjunction with 620-R-483 as determined by the designer.



                     621-R-398    Capping Cut and Fill Slopes Steeper than 3:1     A 09-01-05    09-01-09    As determined necessary by Project Engineer.



                     624-M-024    Herbicide Treatment                              R 09-01-05    09-01-09    Required for all maintenance contracts for herbicide treatment.


                                                                                                             Required for all contracts with a 625 pay items
                     625-R-194    Gabions                                          R 03-20-08    09-01-09
                                                                                                             let on or after July 1 2008.


                     626-R-165    Modified Section Concrete Median Barrier         R 04-08-09    09-01-09    Concrete median barrier required of other than standard shape.


                                                                                                             Required for all contracts with a 627 pay items.
                     627-R-546    Cable Barrier System                             R 04-08-09    09-01-09
                                                                                                             Must include RPD 627-R-546d.


                     627-R-546d   Cable Barrier System                             R 07-09-09    09-01-09    Must be included with RSP 627-R-546.



                     701-B-068    Bitumen Coating for Piles                        R 09-01-05    09-01-09    Required for all contracts with bitumen coated piles.


                                  Oversized Predrilled Pile Holes and Bentonite
                     701-B-154                                                     R 01-15-09    09-01-09    As determined necessary by Project Designer.
                                  Grout for Reduction of Pile Downdrag



                     701-B-182    Driven Piling                                    A 05-18-09    09-01-09    Required for all contracts with a 701 pay items.



                     703-C-138    Reinforcing Bars for Metric Designed Contracts   R 04-08-09    09-01-09    Required for all projects designed with hard metric reinforcing steel.



                                                                                     Page 7 of 14
                                                                              Recurring Special Provisions and
                                                                                   Recurring Plan Details
                                                                                   Menu and Basis for Use
                                                                        For Use with the 2010 Standard Specifications
                                                                                Effective September 1, 2009
                                                                                      Adopted (A)
Place In   Attach.                                                                                   Letting
                       RSP                                                                or
Contract   Req'd.                                        Title                                      Effective                                      Basis for Use
                      Number                                                          Revised (R)
  (X)        (X)                                                                                      Date
                                                                                         Date

                                  Bridge Railing Type TS-1 & Guardrail Transition
                     706-B-140d                                                       R 07-25-05    09-01-09    Pay Item: Bridge Railing Type TS-S.
                                  Type TGS-1


                                  Bridge Railing Type TS-1 & Guardrail Transition                               Pay Item: Bridge Railing Type TS-1.
                     706-B-140d                                                       R 04-15-10    09-01-10
                                  Type TGS-1                                                                    For contracts let on or after September 01, 2010.

                                  Alternate Prestressed Precast Concrete I-Beam to
                     707-B-085    Standard AASHTO Type IV Prestressed Precast      R    09-01-05    09-01-09    Required for all alternate beam section permitted in local agency project.
                                  Concrete I-Beam


                     707-B-172    Interior Diaphragms                                 A 05-24-06    09-01-09    As determined necessary by the Design Engineer.



                     707-B-183    Adjacent Prestressed-Concrete Box Beams             A 06-18-09    09-01-10    All contracts with a pay item for prestressed-concrete box beams.



                     709-M-019    Surface Seal for Steel Bridge to be Painted         R 09-01-05    09-01-09    Pay Items: Clean Steel Bridge, Paint Steel Bridge.



                     713-B-076    Temporary Pipe                                      R 09-01-05    09-01-09    Required for all temporary pipe specified on plans in lieu of temporary bridge.


                                                                                                                Required for all contracts with a 714 pay items
                     714-R-578    Concrete Box Scour Protection                       A 04-15-10    09-01-10
                                                                                                                let on or after September 1, 2010.

                                                                                                                Required for all contracts with a 715, 716 or 718 pay items
                     715-R-574    Mandrel Testing of Thermoplastic Pipes              R 03-18-10    09-01-10
                                                                                                                let on or after September 1, 2010.

                                                                                                                Required for all contracts with a 715 pay items
                     715-R-579    Pipe Culvert Scour Protection                       A 04-15-10    09-01-10
                                                                                                                let on or after September 1, 2010.


                     717-R-152    Alternates to Structural Plate Structures           R 11-01-06    09-01-09    Pay Item: Pipe Structural Plate.



                     720-M-021    Extension of Cast Iron Floor Drains                 R 09-01-05    09-01-09    Pay Item: Drain Extension Cast Iron.



                     720-R-104    Capped Inlet                                        R 09-01-05    09-01-09    Pay Item: 720-44296 Cap Inlet.



                     720-T-021    Drainage Structures                                 R 09-01-05    09-01-09    Required for all Traffic contracts - drainage structures required.



                                                                                        Page 8 of 14
                                                                             Recurring Special Provisions and
                                                                                  Recurring Plan Details
                                                                                  Menu and Basis for Use
                                                                       For Use with the 2010 Standard Specifications
                                                                               Effective September 1, 2009
                                                                                     Adopted (A)
Place In   Attach.                                                                                  Letting
                       RSP                                                               or
Contract   Req'd.                                         Title                                    Effective                                      Basis for Use
                      Number                                                         Revised (R)
  (X)        (X)                                                                                     Date
                                                                                        Date

                                  Price Adjustment for Bridge Deck Overlay,                                    Pay item: 722-51846 Bridge Deck Overlay, Additional.
                     722-B-581                                                       A 06-17-10    09-01-10
                                  Additional                                                                   For contracts let on or after September 01, 2010.

                                                                                                               Required for all contracts with a 723 pay items
                     723-R-568    Three-Sided Scour Protection                       R 04-15-10    09-01-10
                                                                                                               let on or after September 1, 2010.


                     723-R-569d   Scour Protection and Sump Details                  A 10-15-09    05-01-10    Required for all contracts with a 714, 715, 717, or 723 pay items.



                     724-B-086    Approved Expansion Joint SS Devices                R 03-21-06    09-01-09    Pay Item: 724-51925 Expansion Joint SS.



                     724-B-145    Expansion Joint Sealing System                     R 07-14-06    09-01-09    Pay Item: Expansion Joint Sealing System.



                     724-B-147d   Alternate SS Joint                                 A 01-22-01    09-01-09    As determined necessary by bridge rehab section.



                     725-R-541    Slip Lining of Existing Pipe                       R 01-04-08    09-01-09    Required for all 725 pay items with contracts let on or after February 6, 2008.



                     727-B-012    Concrete Repair by Epoxy Injection                 R 09-01-05    09-01-09    Pay items for epoxy injection equipment, crack preparation, epoxy material.



                     729-B-009    Concrete for Patching Bridge Structures            R 04-08-09    09-01-09    Pay Item: Concrete, A, Patching.


                                  Quality Control/Quality Assurance, QC/QA,
                     730-B-157                                                       R 04-08-09    09-01-09    Pay Item: Concrete, QC/QA, Superstructure.
                                  Superstructure Concrete


                                                                                                               Details for proprietary mechanically stabilized earth wall systems included in
                     731-R-202    Mechanically Stabilized Earth Retaining Walls      R 04-08-09    09-01-09
                                                                                                               plans with contracts.

                                                                                                               As determined by Project Designer.
                     731-R-202    Mechanically Stabilized Earth Retaining Walls      R 06-17-10    10-01-10
                                                                                                               For contracts let on or after October 1, 2010.

                                                                                                               As determined by Project Designer.
                     732-R-310    Modular Concrete Block Retaining Wall              R 08-18-09    10-01-09
                                                                                                               For contracts let on or after October 1, 2009.

                                                                                                               As determined by Project Designer.
                     732-R-310    Modular Concrete Block Retaining Wall              R 06-17-10    10-01-10
                                                                                                               For contracts let on or after October 1, 2010.


                                                                                       Page 9 of 14
                                                                            Recurring Special Provisions and
                                                                                 Recurring Plan Details
                                                                                 Menu and Basis for Use
                                                                      For Use with the 2010 Standard Specifications
                                                                              Effective September 1, 2009
                                                                                       Adopted (A)
Place In   Attach.                                                                                    Letting
                       RSP                                                                 or
Contract   Req'd.                                        Title                                       Effective                                       Basis for Use
                      Number                                                           Revised (R)
  (X)        (X)                                                                                       Date
                                                                                          Date


                     732-R-433    Metal Bin-Type Retaining Walls                       R 02-16-06    09-01-09    Pay Items for Retaining Wall Bin Type ____ Design ____.


                                  Silica Fume Modified Structural Concrete Bridge
                     733-B-104                                                         R 04-06-06    09-01-09    As determined by INDOT bridge rehab section.
                                  Deck Overlay


                                  Permanent Earth Retention System For Cut-Wall                                  Required for all contracts with a 734 pay items.
                     734-R-566                                                         A 08-20-09    03-01-10
                                  Application                                                                    Must include RSP 734-R-567


                     801-C-157    Certification of Temporary Traffic Control Devices   R 09-01-05    09-01-09    Pay Item: Maintenance of Traffic.


                                  Maintaining Traffic for Maintenance or Resurface
                     801-M-006                                                         R 09-01-05    09-01-09    Maintenance or resurface pay items for maintaining traffic.
                                  Work



                     801-R-030    Temporary U-Turns for Contractor's Vehicles          R 09-01-05    09-01-09    As determined necessary by Department personnel who set contract time.



                     801-R-253    Mobile Construction Signs                            A 09-01-05    09-01-09    Pay Item: 801-92448 Construction Signs, Mobile.


                                  Material Used for Temporary Ingress/Egress to
                     801-R-471                                                         A 09-01-05    09-01-09    As determined necessary by District Construction.
                                  Properties


                                                                                                                 Required for all contracts with an 801 pay items
   X                 801-R-542    Worksite Added Penalty Signs                         R 06-25-07    09-01-09
                                                                                                                 let on or after September 1, 2007.


   X                 801-R-542d   Worksite Added Penalty Sign 78 x 42                  R 07-26-07    09-01-09    Use in conjunction with RSP 801-R-542.



   X                 801-R-543d   Worksite Added Penalty Sign 60 x 36                  R 07-26-07    09-01-09    Use in conjunction with RSP 801-R-542.



   X                 801-R-544d   Worksite Added Penalty Sign 48 x 48                  R 07-26-07    09-01-09    Use in conjunction with RSP 801-R-542.

                                                                                                                 Any of the following Pay Items: Temporary Traffic Signal Installation, Maintain;
                     801-T-089    Maintaining Existing Traffic Signal Installation     R 09-01-05    09-01-09    Temporary Pole, Wood, with Down Guys and Anchors; Signal Head, Relocate;
                                                                                                                 Controller, Reset Timing.

   X                 801-T-150d   Traffic Control Device Report                        A 09-01-05    09-01-09    Required for all contracts.



                                                                                        Page 10 of 14
                                                                          Recurring Special Provisions and
                                                                               Recurring Plan Details
                                                                               Menu and Basis for Use
                                                                    For Use with the 2010 Standard Specifications
                                                                            Effective September 1, 2009
                                                                                  Adopted (A)
Place In   Attach.                                                                               Letting
                       RSP                                                            or
Contract   Req'd.                                          Title                                Effective                                       Basis for Use
                      Number                                                      Revised (R)
  (X)        (X)                                                                                  Date
                                                                                     Date


                     801-T-164    Temporary Roll-Up Signs                         A 01-03-07    09-01-09    Required for all mowing and herbicide contracts only.


                                                                                                            Required for all contracts with an 802 pay items
                     802-T-171    Sign Sheeting Material                          R 11-19-09    01-01-10
                                                                                                            let on or after January 1, 2010.


                     805-T-039d   Loop Testing Table                              A 09-01-05    09-01-09    Pay Item: 805-01439 Microloop Detector.



                     805-T-078    Electrical Insulation Sealant                   A 09-01-05    09-01-09    Required for contracts with traffic signal or lighting installations.



                     805-T-086    Traffic Signal Maintenance and Repair           R 09-01-05    09-01-09    Required for traffic maintenance contract for non-bulb signal maintenance.



                     805-T-093    Detector Card Rack and Detector Modules         A 09-01-05    09-01-09    Pay Item: Detector Module.



                     805-T-105    Conversion of Metric Standards                  A 09-01-05    09-01-09    Required for all english designed contracts; pay items for traffic signal.



                     805-T-123    Video Vehicle Detector System                   A 09-01-05    09-01-09    Pay Item: Video Vehicle Detector System.



                     805-T-124    Integrated Video Vehicle Detector System        A 09-01-05    09-01-09    Pay Item: Integrated Video Vehicle Detector System.


                                                                                                            Required for all contracts with an 805 pay items
                     805-T-169    Traffic Signals                                 R 08-20-09    01-01-10
                                                                                                            let on or after January 1, 2010.

                                                                                                            All contracts with either pay item 805-02262, Flasher Installation
                     805-T-169d   Solar Powered Flashing Beacon                   A 08-20-09    01-01-10
                                                                                                            or 805-08475, Flasher Modernization.


                     807-T-087    Highway Illumination Maintenance and Repair     R 04-08-09    09-01-09    Required for traffic maintenance contract for lighting maintenance.


                                                                                                            Required for bridge contract; pay item for line solid yellow 4 in. used as no-
                     808-B-114    Repainting No-Passing Zone Pavement Markings    R 09-01-05    09-01-09
                                                                                                            passing zone marking.

                                                                                                            As determined by District Traffic for RS contracts with at least 50,000 lineal feet
                     808-R-551    Performance Based Paint Pavement Markings       R 11-21-08    09-01-09
                                                                                                            of painted pavement markings; All contracts let on or after February 1, 2009.


                                                                                   Page 11 of 14
                                                                          Recurring Special Provisions and
                                                                               Recurring Plan Details
                                                                               Menu and Basis for Use
                                                                    For Use with the 2010 Standard Specifications
                                                                            Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                       Title                                    Effective                                      Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date

                                                                                                             Required for all contracts with an 808 pay items or for Temporary Pavement
                     808-R-551   Performance Based Pavement Markings               R 03-18-10    09-01-10
                                                                                                             Markings let on or after September 01, 2010.

                                 Removal of Snowplowable Raised Pavement
                     808-T-141                                                     R 09-01-05    09-01-09    Pay Item: Snowplowable Raised Pavement Marker, Remove.
                                 Markers


                                 Refurbished Snowplowable Raised Pavement
                     808-T-151                                                     R 09-29-05    09-01-09    As determined necessary by Project Manager.
                                 Marker Castings


                                                                                                             Pay items: 401-09086, -09530 or -09877 SMA.
                     904-R-560   SMA Coarse Aggregate Requirements                 A 06-17-10    01-01-11
                                                                                                             For contracts let on or after January 01, 2011.

                                                                                                             Required for all contracts with 621-06570, plant or seedling pay items
                     914-R-576   PH Requirement for Topsoil                        A 03-18-10    09-01-10
                                                                                                             let on or after September 01, 2010.

                                                                                                             Pay item: Light Pole, High Mast,____ft (m)E.M.H.
                     920-T-162   High Mast Poles                                   A 04-15-10    09-01-10
                                                                                                             For contracts let on or after September 01, 2010.

                                                                                                             Required for all contracts with an 805 pay items
                     922-T-168   Traffic Signal Materials and Equipment            A 05-05-08    09-01-09
                                                                                                             let on or after August 1, 2008.


 SECTION II:                                                                Contract Specific Recurring Special Provisions

                                 Payment of Predetermined Minimum Wage
                                                                                                             Required for all building construction projects as determined by Contract
             X       100-C-148   Determination                                     A 10-26-06    09-01-09
                                 (Davis-Bacon Act) IN_________
                                                                                                             Administration.

                                                                                                             Required for more than one bridge file number in contract, and lump sum pay
             X       101-B-042   Bridge Numbers for Pay Items                      R 09-01-05    09-01-09
                                                                                                             items shown to be required for each such bridge file.


             X       102-C-082   Schedule of Pay Items for Alternate Bids          R 09-01-05    09-01-09    Required for pay items in contract which require alternate bids.

                                 Owner's and Contractor's Protective Liability
             X       103-C-036   Insurance Coverage for Operations of Designated   R 03-09-06    09-01-09    Required for all federal aid local public agency contracts.
                                 Contractor

                                 Traffic Control Changes and On-Call Maintenance                             Required for all traffic being maintained on present roadway with no watchman
             X       104-C-112                                                     R 09-01-05    09-01-09
                                 of Traffic Control Devices                                                  required.

                                 Schedule of Operations and Traffic Control for
                                                                                                             Required for all pavement undersealing, patching, shoulder drain placement,
             X       104-R-168   Undersealing, Concrete Patching, Placing          R 09-01-05    09-01-09
                                 Underdrains, and Resurfacing
                                                                                                             and resurfacing specified.


                                                                                    Page 12 of 14
                                                                           Recurring Special Provisions and
                                                                                Recurring Plan Details
                                                                                Menu and Basis for Use
                                                                     For Use with the 2010 Standard Specifications
                                                                             Effective September 1, 2009
                                                                                      Adopted (A)
Place In   Attach.                                                                                   Letting
                       RSP                                                                or
Contract   Req'd.                                        Title                                      Effective                                     Basis for Use
                      Number                                                          Revised (R)
  (X)        (X)                                                                                      Date
                                                                                         Date


             X       105-C-164   Cellular Telephones/Radios                           A 01-30-06    09-01-09    As determined necessary by District Construction.


                                 Statements About Existing Conditions of Utilities,
   X         X       107-R-169                                                        R 02-18-08    09-01-09    Required for all contracts.
                                 Additional Right-of-Way, and Encroachments


                                 Incentive for Opening Project to Traffic Ahead of
             X       108-C-043                                                        R 09-01-05    09-01-09    As determined necessary by department personnel who set contract time.
                                 Schedule



             X       108-C-090   Latest Date to Begin Work                            R 09-01-05    09-01-09    Delayed start of work desired.


                                 Failure to Complete on Time for Restriction-One
             X       108-C-091                                                        R 08-21-06    09-01-09    Required for lane restrictions on one lane, phase, or direction.
                                 Structure


                                 Failure to Complete on Time for Restriction-Two
             X       108-C-092                                                        R 08-21-06    09-01-09    Required for lane restrictions on more than one structure, phase, or direction.
                                 or More Structures


                                                                                                                As determined necessary by department personnel who set contract time for
             X       108-C-093   Failure to Complete on Time for Road Closure         R 08-21-06    09-01-09
                                                                                                                contract which includes detour.

                                                                                                                As determined necessary by department personnel who set contract time for
                                 Failure to Complete on Time for Intermediate
             X       108-C-094                                                        R 09-01-05    09-01-09    contract in which a certain portion of the work is to be completed before the
                                 Completion Date
                                                                                                                entire contract is.

                                 Failure to Complete on Time for Calendar
             X       108-C-095                                                        R 09-01-05    09-01-09    As determined necessary by department personnel who set contract time.
                                 Completion Date



             X       108-C-127   Earliest Date to Begin Work                          R 09-01-05    09-01-09    As determined necessary by District Construction.



             X       201-C-052   Clearing Right-of-Way                                R 09-01-05    09-01-09    Required for all pay items for Clearing right-of-way.


                                                                                                                Required for all contracts where existing traffic signal equipment is to be
             X       202-T-161   Removal of Existing Traffic Signal Equipment         A 11-30-06    09-01-09
                                                                                                                completely/partially removed.

                                                                                                                As determined necessary by Department personnel who set contract time.
             X       601-R-237   Spare Parts Package for Guardrail End Treatment      R 01-01-06    09-01-09
                                                                                                                Recurring Plan Detail 601-R-237d must be included.

                                                                                                                Pay Item: Impact Attenuator Spare Parts Package.
             X       601-R-497   Spare Parts Package for Impact Attenuators           A 01-01-06    09-01-09
                                                                                                                Recurring Plan Detail 601-R-497d must be included with this recurring.


                                                                                       Page 13 of 14
                                                                          Recurring Special Provisions and
                                                                               Recurring Plan Details
                                                                               Menu and Basis for Use
                                                                    For Use with the 2010 Standard Specifications
                                                                            Effective September 1, 2009
                                                                                   Adopted (A)
Place In   Attach.                                                                                Letting
                       RSP                                                             or
Contract   Req'd.                                      Title                                     Effective                                     Basis for Use
                      Number                                                       Revised (R)
  (X)        (X)                                                                                   Date
                                                                                      Date


             X       622-R-209   Wildlife Habitat Species and Spacing              A 09-01-05    09-01-09    Pay Item: 622-91786. Seedling; species and spacing not shown on plans.



             X       623-M-025   Roadside Mowing                                   R 09-01-05    09-01-09    Required for all maintenance contracts for mowing.


                                 Mowing Cycles, Starting Dates, and Failure to
             X       623-M-039                                                     R 09-01-05    09-01-09    Required for all maintenance contracts for mowing.
                                 Complete Mowing on Time



             X       624-M-040   Herbicide Formula and Application Period          R 09-01-05    09-01-09    Required for all maintenance contracts for herbicide treatment.



             X       701-B-132   Pile Driving                                      R 03-18-10    05-01-10    As determined necessary by project designer.


                                 Limiting Movement Criteria For Permanent Earth                              Required for all contracts with a 734 pay items.
             X       734-R-567                                                     A 08-20-09    03-01-10
                                 Retention System For Cull-Wall Application                                  Must be included with RSP 734-R-566


             X       805-T-036   Department Furnished Materials                    R 09-27-05    09-01-09    As determined necessary by Traffic Design.


                                 Traffic Signal Equipment Salvaged by the                                    Pay Item: 805-01300 Traffic Signal Equipment, Remove.
             X       805-T-084                                                     R 10-24-07    09-01-09
                                 Department                                                                  Pay Item: 805-02087 Transportation of Salvageable Signal Equipment.

                                 Signal Lamp Replacement, Aerial Inspection, and
             X       805-T-085                                                     R 01-13-06    09-01-09    Required for traffic maintenance contract for signal bulb replacement.
                                 Loop Replacement




                                                                                    Page 14 of 14

								
To top