YES Youth Engagement Services NET WORK PAKISTAN
Document Sample


YES
Youth Engagement Services
NET WORK PAKISTAN
PARTICIPATION
PROPOSAL FOR THE SOCIAL
ENTERPENURSHIP PROGRAM
BY
GOVERNAMENT POLYTECHNIC INSTITUTE
KARAK (NWFP)
Proposal Theme
TO COMBATE THE PROBLUM OF
DEFICIENCY OF PURE DRINKG WATER
IN KARAK DISTRICT AND IT VACINITY
BY SUPPLYING PURIFIED AND
TREATED WATER AT LOW COST.
Idea’s sheet
Idea:
to combat the problems of impure drinking water in Karak
city and its vicinity.
Impure (Salty) water has been are acute problem in Karak
city. Water in the said city & its surrounding is composed of
different minerals and turbidity which is health hazard and
unhygienic.
Purified water is the basic need of health, so in order to
control different diseases, Purification & Filtration Plant is the dire
need of the day here to provide with the pure water to the
residents of the locality as they are nowadays buying only
unsalted water from different water supplier untreated are
purified. In this connection we are putting forward the above-
mentioned idea under the Social Entrepreneurship Program to
provide pure water free of turbidity and other germs and bacteria
etc to the residents of Karak city. This will provide us a chance to
find a source of income generation and social service to the
community.
Total population that will be benefited from the project are
estimated as numbering 7500 and approximately 1500 families
per day.
COMPITATOR OUTLINE
1. SHUKAT HUSSAIN (G RO UP L EADER)
FA THER NAME:- U M AR DARAZ
M O BILE NO . 0 3 4 6-9778135
C A LSS 3 RD Y E AR E LECTRICAL
RO L L N o. 02
2. M E HTAB A NJUM
FA THER NAME : N A SAR KHAN
M O BILE N o. 0 3 4 3-9507923
C A LSS 3 RD Y E AR E LECTRICAL
RO L L N o. 25
3. M U HAMMAD T ASHFEEN
FA THER NAME : M U HAMMAD SHAEEN KHAN
M O BILE N o. 0 3 3 2-8683481
C A LSS 3 RD Y E AR E LECTRICAL
RO L L N o. 71
E mail tas hfeensardar007@ YAHOO.CO M
4. M U HAMMAD SADDAM H USSAIN
FA THER NAME : A BD UL KARIM
M O BILE N o. 0 3 4 3-9715331
C A LSS 2 ND Y E A R E LECTRICAL
RO L L N o. 16
5. KH A LIL ZADA
FA THER NAME : JA HAN ABAD SHAH
M O BILE N o. 0 3 3 3-9715331
C A LSS 3 RD Y E AR E LECTRICAL
RO L L N o. 83
Financial Statement
Expenditure Estimated income
Initial Plant installation cost
1.
2.
Filtration & treatment plant Rs.40000/-
Delivery and supply bottle cost with
per month
packing Rs.10,000/-
– For estimated supply of 10,000 ltrs per
3. Installation cost Rs.10,000/- day to the 7500 persons
4. Cane (30 ltr) Rs.10,000/-
1. Number of 30 ltrs canes supplied/
Total Plant fixation / distributed per day =500 appr:
installation cost: Rs. 70,000/-
2. Cost per cane =Rs.10/-
Running cost 3. Income per day =Rs.5000/-
1. Transportation charges with
4. Income per month
2. Fuel Rs. 35,000/-
=Rs.1,50,000/-
3. Labor charges Rs.
30,000/- Net profit per month
4. Electricity bills Rs. 10,000/-
5. Office utility etc Rs. 5000/- Total income per month =Rs. 15,0000/-
Total running cost Rs.70,000/- Net Running Expenditure
per month =Rs. 70,000/-
Net profit per month =Rs.80,000/-
Related docs
Get documents about "