YES Youth Engagement Services NET WORK PAKISTAN

W
Document Sample
scope of work template
							              YES
      Youth Engagement Services
         NET WORK PAKISTAN

        PARTICIPATION
    PROPOSAL FOR THE SOCIAL
   ENTERPENURSHIP PROGRAM
              BY
GOVERNAMENT POLYTECHNIC INSTITUTE
         KARAK (NWFP)
       Proposal Theme

TO COMBATE THE PROBLUM OF
DEFICIENCY OF PURE DRINKG WATER
IN KARAK DISTRICT AND IT VACINITY
BY    SUPPLYING   PURIFIED   AND
TREATED WATER AT LOW COST.
                            Idea’s sheet

Idea:
        to combat the problems of impure drinking water in Karak
city and its vicinity.
        Impure (Salty) water has been are acute problem in Karak
city. Water in the said city & its surrounding is composed of
different minerals and turbidity which is health hazard and
unhygienic.
        Purified water is the basic need of health, so in order to
control different diseases, Purification & Filtration Plant is the dire
need of the day here to provide with the pure water to the
residents of the locality as they are nowadays buying only
unsalted water from different water supplier untreated are
purified. In this connection we are putting forward the above-
mentioned idea under the Social Entrepreneurship Program to
provide pure water free of turbidity and other germs and bacteria
etc to the residents of Karak city. This will provide us a chance to
find a source of income generation and social service to the
community.
Total population that will be benefited from the project are
estimated as numbering 7500 and approximately 1500 families
per day.
          COMPITATOR OUTLINE
1.   SHUKAT HUSSAIN (G RO UP L EADER)
     FA THER NAME:-      U M AR DARAZ
     M O BILE NO .                  0 3 4 6-9778135
     C A LSS             3 RD Y E AR E LECTRICAL
     RO L L N o.         02
2.   M E HTAB A NJUM
     FA THER NAME : N A SAR KHAN
     M O BILE N o.       0 3 4 3-9507923
     C A LSS             3 RD Y E AR E LECTRICAL
     RO L L N o.         25
3.   M U HAMMAD T ASHFEEN
     FA THER NAME :      M U HAMMAD SHAEEN KHAN
     M O BILE N o.       0 3 3 2-8683481
     C A LSS             3 RD Y E AR E LECTRICAL
     RO L L N o.         71
     E mail              tas hfeensardar007@ YAHOO.CO M
4.   M U HAMMAD SADDAM H USSAIN
     FA THER NAME :                 A BD UL KARIM
     M O BILE N o.       0 3 4 3-9715331
     C A LSS             2 ND Y E A R E LECTRICAL

     RO L L N o.         16
5.   KH A LIL ZADA
     FA THER NAME :                 JA HAN ABAD SHAH
     M O BILE N o.       0 3 3 3-9715331
     C A LSS             3 RD Y E AR E LECTRICAL
     RO L L N o.         83
                      Financial Statement
     Expenditure                                                Estimated income
     Initial Plant installation cost
    1.
    2.
         Filtration & treatment plant     Rs.40000/-
         Delivery and supply bottle cost with
                                                                per month
         packing                          Rs.10,000/-
                                                                –    For estimated supply of 10,000 ltrs per
    3.   Installation cost Rs.10,000/-                               day to the 7500 persons
    4.   Cane (30 ltr)                    Rs.10,000/-
                                                                1.   Number of 30 ltrs canes supplied/
         Total Plant fixation /                                      distributed per day =500 appr:
         installation cost:               Rs. 70,000/-
                                                                2.   Cost per cane        =Rs.10/-
    Running cost                                               3.   Income per day       =Rs.5000/-
    1.   Transportation charges          with
                                                                4.   Income per month
    2.   Fuel                             Rs. 35,000/-
                                                                                         =Rs.1,50,000/-
    3.   Labor charges                                Rs.
         30,000/-                                              Net profit per month
    4.   Electricity bills                Rs. 10,000/-
    5.   Office utility etc               Rs. 5000/-            Total income per month    =Rs. 15,0000/-
               Total running cost         Rs.70,000/-           Net Running Expenditure
                                                                per month                 =Rs. 70,000/-
                                                                Net profit per month      =Rs.80,000/-

						
Related docs