Scotts Valley Unified School District Strategic Plan 2006­07

Document Sample
scope of work template
							Scotts Valley Unified School District 
           Strategic Plan 
              2006­07
                                                    SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                                                 4444 Scotts Valley Drive, Suite 5B 
                                                                                   Scotts Valley, CA  95066­4529 
                                                                   (831) 438­1820  • FAX: (831)438­2314 • svusd@santacruz.k12.ca.us 
                                                            SUPERINTENDENT       EDUCATIONAL SERVICES    BUSINESS SERVICES      PERSONNEL 
                                                              (831)  438­1820        (831) 438­2055        (831) 438­2312       (831) 438­1822



June 1, 2006 


Dear Colleagues, Students, and Members of the Scotts Valley Community, 

It is with great pleasure that we present the First Annual Strategic Plan for the Scotts Valley Unified School District. This document is the culmination of several 
months’ work by staff, students, parents and community volunteers, all committed to helping the school district define a clear sense of direction. 

During the 2005­2006 school year, the district experienced declining enrollment for the first time in recent history. Since funding is tied directly to the number of 
students in our schools, the decrease in enrollment means less funding for the district. It is therefore more important than ever for us to focus our energies and align 
our diminishing resources with our goals. 

To that end, the Board of Trustees initiated a Strategic Planning process toward the end of 2005. Volunteers were solicited through school newsletters, local 
newspapers, community meetings and word of mouth. Many people offered their services, and twenty­six of them, representing a cross­section of the community, 
were invited to participate on the Strategic Planning Committee. Members represented teachers, classified staff, students, administrators, parents, higher education, 
the City of Scotts Valley, the Chamber of Commerce, the Scotts Valley Education Foundation, and other school and community groups. The committee met two 
full days in February to discuss the district’s strengths and needs, and envision opportunities for the district in the current environment. 

As a result of this meeting, five major areas of focus were determined for the 2006­07 school year. Those areas are Student Achievement, Fiscal Stability, 
Facilities Needs, Human Resources, and Communication/Outreach. Over the last three months, ninety­three volunteer Task Force members have been meeting to 
develop action plans in each of these five areas. While the 2006­07 action plan does not address ALL our needs, it addresses those that were deemed by the 
Committee to be the most important, and the ones to which we should assign our limited resources during the 2006­07 school year. Based on the discussions held 
in February, the Board was also able to draft a district Mission Statement, Vision Statement, and Core Beliefs, which were recently presented to the Strategic 
Planning Committee. 

The entire package­­­Mission, Vision, Beliefs, Action Plans and list of participating members—was adopted by the Board at its May 23, 2006, meeting and is 
presented in this document. It represents our commitment as a school district to our students, staff, and community members. 

On behalf of the Board of Trustees, I sincerely thank the many people who devoted their energies to this process. We look forward to meeting with our Strategic 
Planning Committee again in the spring of 2007 to report on our progress and develop the Second Annual Strategic Plan! 


Susan Silver, Ed.D. 
Superintendent 
                                          Table of Contents 
                                                                                    Pages 


Strategic Planning Committee Members         ...................................       1 

Environmental Analysis                       ...................................      2­3 

Strategic Plan Goals                         ...................................       4 

Mission, Vision and Beliefs                  ...................................       5 

Student Achievement Plan                     ...................................     6­17 

Fiscal Stability Plan                        ...................................     18­25 

Facilities Needs Plan                        ...................................     26­34 

Human Resources Plan                         ...................................     35­39 

Communication/Outreach                       ...................................     40­46 

Glossary of Acronyms Used In This Plan       ...................................      47
                    STRATEGIC PLANNING COMMITTEE 
                         Scotts Valley School District 
                                   2006­07 
                             Babs Kavanaugh – Facilitator 


                           COMMITTEE MEMBERS 

Ernie Alexander              Steve Ando                      Brenda Armstrong 
Valerie Bariteau             Roy Blaine                      Enid Brock 
Vickie Clark                 Mark Collishaw                  Jack Dilles 
Joseph Espinola              Kathy Frandle                   Randy Johnson 
Cathy Levy                   Allison Niday                   Krista Patterson 
Elizabeth Poser              Margery Regalado­Rodriguez      Sue Roth 
Nathan Scalla                Susan Silver                    Glenn Soma 
Brenda Spalding              Chuck Walker                    Sheryl Wobber 
Marshall Wolf
·


                                ·    Scotts Valley Unified School District
· 

Environmental Analysis – Key Highlights 
The Strategic Planning Team participated in an exercise to develop a common understanding of the environment in which the district operates, as 
well as to identify the major issues that the strategic plan will address. The highlights from this discussion are listed below. 

The strengths and weaknesses are internal to the district; the opportunities and threats are considered as external factors affecting the educational 
system.  The purpose of this discussion in strategic planning is to maximize the strengths and opportunities while minimizing the weaknesses and the 
threats. 

District Strengths 
The district strengths are leadership of the board and management team; sound fiscal management; quality staff; an intelligent and diverse student 
body with high average test scores; a K­12 district; the K­8 curriculum; a safe learning environment; a highly engaged parent community and 
community support for the schools. 

Weaknesses 

The weaknesses and challenges that were highlighted are a need for better integration of the high school with K­8 schools; creating consistency in 
systems and curriculum across all Scotts Valley school sites; finances and the many issues associated with restricted revenues and declining 
enrollment; improving and strengthening communication; and increasing community support. 

The financial challenges affect multiple areas. Those identified include the need to offer competitive salaries and professional development 
opportunities in order to retain staff; addressing impending retirements; obtaining the resources needed to serve the needs of all students 
academically, vocationally and in developing life skills; and providing for overall facility needs including developing new facilities and maintaining 
existing facilities. Issues specific to the high school include the need for more vocational and life skills training as well as  additional curriculum and 
enrichment options to meet the needs of all students.
Opportunities 
Opportunities  include  financial  support  from  the  community  (parcel  tax  and/or  bond  measures)  and  expanded  grant  writing;  extended  learning 
opportunities for students, including partnerships with institutions of higher learning; relations with the media; developing business partnerships and 
intern opportunities for students; and sharing of services with other local districts. 

Threats 
The financial threats stem from the high costs of living in the local area, thus affecting the district’s ability to recruit and retain staff; the 
increasingly high costs of benefits for staff; the encroachment on general funds due to unfunded mandates; declining enrollment and 
restrictions on inter/intra district transfers; and the loss of district students to charter and private schools. The media and some negative 
community perceptions of the schools pose an additional threat to the district. 

Criteria to prioritize – Major Issues Focus Areas 
The following criteria were developed to prioritize the major issues and determine which of those issues would be addressed during 2006­07 in the 
strategic plan:
    °   Supports unification
    °   Provides an opportunity to match or leverage resources
    °   Defines clear expectations, a way to measure the goal, and efforts that are sustainable
    °   Demonstrates balanced focus across the educational system
    °   Includes items that affect all students
    °   Appears possible to implement with a specified time frame
    °   Appears financially feasible
    °   Achieves general consensus among participants
    °   Was raised a number of times as an issue during the discussion 

Prioritized Major Issues Facing the District 
Overarching Issue ­ District Unification and Consistency across All Schools 
1.  Student Achievement 
2.  Financial Stability 
3.  Facilities Needs 
4.  Human Resources 
5.  Communication/Outreach
                           Scotts Valley Unified School District 
                                   Strategic Plan Goals 
                                         2006­07 



                                                  GOALS 
Ø    We will  improve student achievement and opportunities for all students K­12. 

Ø    We will promote and maintain fiscal stability in the district. 

Ø    We will provide facilities that meet the needs of all students in our 
     K­12 Unified District. 

Ø    We will attract, develop and retain well qualified employees 
     throughout the district. 

Ø    We will enhance the opportunities and services our schools can provide K­12 
     through collaboration, community engagement and advocacy.
                                                       Scotts Valley Unified 
                                                           School District 
                                                     Mission, Vision and Beliefs
              MISSION 

Scotts Valley Unified School District will                               BELIEFS 
provide each student with quality educational 
opportunities by maximizing the use of all of 
                                                 We believe that…
our resources. 
                                                    ·  Our focus will be consistently student centered and forward 
                                                       looking.
                                                    ·  Our role is to develop academically capable students who are 
                                                       socially responsible.
                                                    ·  Learning occurs best in a safe and nurturing environment.
              VISION                                ·  Quality educational opportunities are differentiated to meet the 
                                                       needs of individual students.
                                                    ·  Decisions will be fair, equitable, and transparent.
     Our students will achieve 
                                                    ·  The district appreciates and encourages responsive, 
     their personal best, and will 
                                                       knowledgeable, proactive leaders.
     be socially responsible, 
                                                    ·  We are accountable to our public for setting clear expectations 
     contributing members of their 
                                                       and aligning our resources to meet our goals.
     communities. 
                                                    ·  We are a “learning community,” with expectations and 
                                                       opportunities for staff and students to learn and grow.
                                                    ·  There is strength in diversity.
                                                    ·  We are a unified school district, working together to provide an 
                                                       optimal K­12 experience for our students.
                                                    ·  Commitment from students, home, school, and community is 
                                                       essential to student success. 
SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
          2006­07 STRATEGIC PLAN 
          STUDENT ACHIEVEMENT 


                 Committee Members 

          Valerie Bariteau – Co­Chairperson 
                     Lynn Beebe 
                    Kathy Dunton 
                    Peg Edwards 
           Kathy Frandle – Co­Chairperson 
                     Jondi Gumz 
                    Carole Harris 
                    Jane Hoffman 
                     Cathy Levy 
                     Anita Long 
                      Lynn Near 
                    Tracy Palmer 
                   Valerie Quandt 
                     Suzy Quinn 
                     Kelly Reiner 
                       Sue Roth 
                   Richard Salome 
                    Nathan Scalla 
                      Lori Scher 
                    Susan Walker 
                 Jeannie Wiechmann 
                   Sheryl Wobber
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                             Student Achievement 

Goal:  To improve achievement and opportunities for all students K­12 
Objective #1:  To align curriculum and instructions to State Standards K­12 

STEP                                                              ASSIGNED               BEGIN                   RESOURCES 
 NO.                  ACTION STEP                                     TO                 DATE      DUE DATE         NEEDED 
1     Develop district­wide awareness of State             Superintendent          Sept. 06         June 07    Planning & 
      Standards                                            Asst. Superintendent                                collaboration time 
         ·  Post Standards on district and site            Site Administration                                 Possible contract 
             websites                                      Teacher Reps K­12                                   negotiations for 
         ·  Identify/define Standards­based                                                                    formalization of 
             instruction – “What does it look like” K­                                                         teacher 
             12                                                                                                collaboration time 
         ·  Identify a major area for district wide                                                            (could have fiscal 
             focus                                                                                             impact) 
         ·  Develop a teacher check­list – who has 
             been “in­serviced” on Standards
         ·  Standards addressed in 
             course/curriculum, models of year 
             plans/Standards check­off 
             *  Identify gaps 
             * Identify research based “best 
               practices” with Standards­based 
               instruction and materials
         ·  Identify/recommend models to allow 
             time for study
         ·  Develop/implement a plan for use of 
             student data to identify gaps 
2       Develop a district­wide Curriculum Council for     Superintendent          Sept. 06       June 07      Planning and 
        the purpose of:                                    Asst. Superintendent                                collaboration: 
            ·  Standardizing the procedure for offering    Site Administration                                 potential fiscal 
               new courses K­12 to recommend to the        Teacher Reps K­12                                   impact
               Board 
        ·  Reviewing current curriculum K­12
        ·  Approving textbook adoptions and 
           supplemental materials for 
           recommendation to the Board 

3    Identify gaps/overlaps in K­12 curriculum in the    Superintendent          Sept. 07      June 08        Planning and 
     identified focus area                               Asst. Superintendent                                 collaboration time: 
         ·  Identify gaps and overlaps within and        Site Administration                                  potential fiscal 
             between grade levels                        Teacher Reps K­12                                    impact 
         ·  Identify extension opportunities
         ·  Develop/implement process for 
             identifying effective curriculum 
             materials, textbooks, courses
         ·  Research/identify data/research based 
             best practices in teaching State 
             Standards K­12 
4    Develop a plan to provide appropriate and           Superintendent          January 07    June 07        Planning and 
     effective K­12 Staff Development                    Asst. Superintendent                  And ongoing    collaboration time, 
                                                         Site Administration                                  possible fiscal 
         ·  All appropriate teachers/staff participate
                                                         Teacher Reps K­12                                    impact for 
         ·  Provides for grade level and subject 
                                                                                                              purchase of 
             matter alignment
                                                                                                              programs, etc. 
         ·  Identifies expertise needed 


     Investigate how State and Federal review            Superintendent          January 07    December 08    Planning and 
5
     processes coordinate/support plans to improve       Asst. Superintendent                                 collaboration time, 
     student achievement                                 Site Administration                                  possible fiscal 
         ·  Identify district wide needs in areas of     Teacher Reps K­12                                    impact for 
             focus                                       (Coordinate with                                     purchase of 
         ·  Develop a plan with available resources      Objective #3)                                        programs, etc. 
             to address needs
         ·  Investigate additional 
             resources/expertise needed
         ·  Coordinate with WASC, Single School 
             Plans for Student Achievement 
             (SSPSA), Coordinated Compliance                                                                  TBD
             Reviews (CCR) as appropriate 
6    Develop a plan for the development and                                                   June 08 and 
     implementation of standardized, district wide    Superintendent          September 07    ongoing
     benchmark assessments for key Standards          Asst. Superintendent 
     (begin with identified curricular focus)         Site Administration 
        ·  Agreement of key/power standards           Teacher Reps K­12 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                              Student Achievement 

Goal:  To improve achievement and opportunities for all students K­12 
Objective #2:  To increase student achievement K­12 using data 

STEP                                                               ASSIGNED               BEGIN                     RESOURCES 
 NO.                   ACTION STEP                                     TO                 DATE       DUE DATE         NEEDED 
1     Identify a target curricular area to focus the        Superintendent          Sept. 06        June 08       Collaboration time 
      process of increasing student achievement             Asst. Superintendent                                  Staff Development 
         ·  Study/analyze STAR data, report card            Site Administration                                   time, study time 
              data, Standards/benchmark assessment          Teacher Reps K­12 
              data, CAHSEE, IB assessments, AP
         ·  Identify current data used to inform 
              instruction at each grade level and across 
              grade levels 
              *  Identify gaps and needs 
              *  Develop a plan for teacher support in 
                 using and gathering data
         ·  Develop a consistent practice within and 
              across grade levels 

2       Research and potentially implement technology       Superintendent          September 06    July 07       Cost of software 
        based data management systems to support            Asst. Superintendent                                  and training 
        assessment development and analysis                 Site Administrators                                   (TBD) 
        (summative and formative)                           Teachers 

3       Research best practices using technology to         Superintendent          January 07      January 08    TBD
        increase student achievement                        Asst. Superintendent 
            ·  Assess current practice                      Site Administration 
            · Develop a plan to implement teacher           Teacher Reps K­12 
               readiness, equipment/software needs, and 
               Professional Development 
                                             SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                     2006­07 STRATEGIC PLAN 
                                                             Student Achievement 

Goal: To improve achievement and opportunities for all students K­12 
Objective #3:  To provide varied academic opportunities and support to meet students’ needs K­12 

STEP                                                              ASSIGNED                  BEGIN                   RESOURCES 
 NO.                   ACTION STEP                                    TO                     DATE     DUE DATE        NEEDED 
  1   Identify current academic programs, resources        Superintendent              Dec. 06       June 07      Planning time 
      and services K­12                                    Asst. Superintendent 
          ·  Determine what can be expanded,               Site Administrators 
              combined or changed to be more               Site Teacher Reps 
              efficient                                    Parent Representation 
          ·  Identify gaps and needs in services 
              offered (including EL Programs) 

2       Investigate K­12 programs/courses/strategies to    Superintendent              Sept. 07      June 08      Planning Time 
        expand/extend achievement opportunities in         Asst. Superintendent 
        focus area for all students (e.g., mentoring,      Site Administrators 
        Differentiated Instruction, study halls, etc.)     Site Staff 
                                                           Parent Representation 

3      Explore opportunities and partnerships with         Superintendent              Sept. 06      June 07      Planning time 
       neighboring districts, post­secondary               Asst. Superintendent 
       institutions, Santa Cruz County Office of           Site Administrators 
       Education to expand program offerings to meet       Site Counselors 
       the needs of all students K­12
           ·  Investigate alternative education options
           ·  Create a vehicle for collaborating and 
                articulating K­12 program options to 
                meet student needs 

4      Evaluate current Special Education program K­       Asst. Supt. Ed. Services    Sept. 07      June 08      Planning time 
       12                                                  Counselors                                             Consultant to audit
          ·  Assess the process used for                   Support Staff 
              communication between staff, students        Site Administrators 
           and parents                                  General Education 
        ·  Identify gaps and needs in student           Teachers 
           support                                      Parent Advocates 
        ·  Investigate what services can be 
           streamlined
        ·  Report recommendations to 
           Superintendent 

5    Evaluate current English Language Learners         Assistant Superintendent    May 06    January 08    Local ELL 
     program K­12                                       Site Administrators                                 Consultant
        ·  Identify/evaluate current models and 
            strategies in place to teach EL students 
            and ensure legal compliance
        ·  Identify “best practices” for EL 
            instruction
        ·  Determine staff development needed for 
            teachers
        ·  Identify gaps and needs in student 
            support
        ·  Report recommendations to 
            Superintendent 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                            Student Achievement 

Goal:  To improve student achievement and opportunities for all K­12 students 
Objective #4a:  To evaluate current graduation requirements and options at SVHS and recommend viable options 

STEP                                                          ASSIGNED                     BEGIN                     RESOURCES 
 NO.                   ACTION STEP                                 TO                       DATE       DUE DATE        NEEDED 
1     Investigate rationale and consequences for        Counselors, Admin.,           Spring 06       June 06       Meeting time
      Science courses requiring or recommending         General and Special Ed 
      Algebra I proficiency                             Teachers 
          ·  Identify Science Options for all Students 

2       To gather and report data from other schools 
        requiring 1 year or less of a Foreign Language    Assistant Superintendent    September 06    January 07 
           ·  Number of students enrolled                 & Staff 
           ·  Number of sections
           ·  FTE 

3       Study and report the impact of students taking    HS Admin., Foreign         Spring 06        Ready for 
        fewer Foreign Language and more Visual and        Language, Visual &                          Student 
        Performing Arts courses and sections              Performing Arts Teachers,                   Course 
            ·  Identify elective options and classes/     Counselors                                  Selection 
               sections needed 


4       To collect data and report to the Board, and      Assistant Superintendent    May 06          June 06 
        SVHS regarding:                                   & Staff 
           ·  Interdistrict requests for entry into 
               SVHS because of IB or other program 
               options
           ·  Requests for release because of 
               graduation requirements or other 
               program issues 
5    Review the recommended changes for            Assistant Superintendent,    Spring 06    Spring 06
     graduation requirements as currently being    HS Admin., HS 
     proposed by the SVHS committee                Graduation Task Force 
                                               SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                       2006­07 STRATEGIC PLAN 
                                                               Student Achievement 

Goal:  To improve student achievement and opportunities for all K­12 students 
Objective #4b:  To evaluate current retention and promotion policy and practice 

STEP                                                                ASSIGNED                   BEGIN                        RESOURCES 
 NO.                    ACTION STEP                                     TO                      DATE       DUE DATE           NEEDED 
1     To identify, develop and implement a system or         Assistant Superintendent,    Spring 06       February 07     Staff time
      profile to communicate student progress within         Counselors, Site Admin., 
      the district and to parents over time and              General and Special Ed 
      especially at transitions between school sites         Teachers, Parent 

2      To collect and analyze data on students who           Assistant Superintendent,    September 06    Ongoing, 
       have failed at the Middle School and their            Admin., Counselors                           collect data 
       current progress at the High School                                                                each year 




3      To identify current program options and best          Assistant Superintendent,    September 06    February 07 
       practices for at­risk/failing students to make­up     Counselors, Site Admin., 
       failed course work prior to promotion to the          General and Special Ed 
       next grade level                                      Teachers 
           ·  Current programs for remediation – 
               students who are lacking content 
               knowledge
           ·  Programs/sanctions for students failing 
               or at risk due to attitude/study/work 
               habits
           ·  Investigate/identify best practices for at­ 
               risk/failing students 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                               Student Achievement 

Goal:  To improve achievement and opportunities for all students K­12 
Objective #5:  To increase number of grades 9­11 students taking (seriously) the standards tests 

STEP                                                                ASSIGNED                  BEGIN                     RESOURCES 
 NO.                    ACTION STEP                                      TO                   DATE         DUE DATE      NEEDED 
        To educate and recruit student groups to create a    Assistant Principal         February ‘06     April ‘06        $200 
1       marketing campaign for the purpose of                Journalism class­editors 
        encouraging the student body to participate and      Marketing class 
        do well on the STAR testing in April.                ASB leadership class 

2       To educate and recruit parent groups to              Assistant Principal         February ‘06     April ‘06        $100 
        publicize the importance of STAR testing and to      SV Parent Club 
        discourage parents from “opting out” their           SVHS School Advisory 
        students.                                            Council 

3       To determine possible rewards and                    Assistant Principal         February ‘06     March ‘06     snacks/water
        consequences for students taking or not taking       Student Groups 
        the tests in order to further encourage the          Parent Club 
        participation rate to reach 95%.                     School Advisory Council 
                                                             High School Staff 

4       Determine needs for the teaching staff to be able  High School                   February ‘06     March ‘06 
        to promote and encourage students to participate  Administration 
        in the testing and do their best                   Teacher Leaders 

5       Assess success of Spring ‘06 campaign and            High School                 September ‘06    Spring ‘07 
        develop plan for Spring ‘07                          Administration                               Ongoing 
                                                                                  Student Achievement 
                                                                                COST/BENEFIT ANALYSIS 

Goal:          To improve achievement and opportunities for all students K­12 

                                                                                                         COST 

               ITEM                             2006­2007                           2007­2008                    2008­2009    2009­2010    2010­2011 

 Personnel                                Potential substitute cost        Potential substitute costl 


 Contracted Professional                                                   Consultant Special Ed Audit 

 Services 
 Supplies                                                                  $20,000 Software Package 



 Equipment                                                                 $3,500 Equip Needs (scanners, 
                                                                           upgraded server) 

 Facility Costs 

 Transportation 

 Other 

 * Approx. Sub Costs if Common  Staff Development time is not available 
                                                                                                   BENEFIT 

               ITEM                             2006­2007                           2007­2008                    2008­2009    2009­2010    2010­2011 

 Expense Reduction 

 Additional Income 

 Intangible Benefits:                     Aligned Staff Development 


 Tangible Benefits:                       Increased Student 
                                          Achievement 
                                          Aligned Programs/Curric.
SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
          2006­07 STRATEGIC PLAN 
             FISCAL STABILITY 


               Committee Members 

            Patricia Kelban, Chairperson 
                     Enid Brock 
                      Jack Dilles 
                     Nancy Lentz 
                   Krista Patterson 
                     Liann Reyes 
                     Kim Shultz 
                  Brenda Spalding 
                   Beth Trenchard 
                    Marshall Wolf
                                             SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                     2006­07 STRATEGIC PLAN 
                                                          FISCAL STABILITY 

Goal:  To promote and maintain fiscal stability in the district 
Objective #1:  To maximize revenues to support the Strategic Plan 

STEP                                                       ASSIGNED               BEGIN                       RESOURCES 
 NO.                ACTION STEP                                 TO                DATE         DUE DATE        NEEDED 
1     Maximize enrollment and ADA revenues
        ·  Promote school attendance by educating  CBO, Management Team, 
           teachers, parents and the community the  Outreach Committee            9/1/2006     12/31/2006      Staff time and 
           financial impact of students being absent                                            Ongoing           supplies 
           (e.g., doctor appointments, family 
           vacations)
        ·  Develop/implement voluntary absence                 CBO                5/1/2006      9/1/2006         Customize 
           donation campaign                                                                                 envelopes, postage 
        ·  Market existing district programs to       CBO, Management Team, 
           increase enrollment                          Outreach Committee        9/1/2006      2/1/2007         Staff time 



2      Investigate additional or enhanced programs to     CBO, Management Team    9/1/2007     5/31/2008         Staff time 
       increase enrollment
           ·  Full­day kindergarten
           ·  Preschool and before/after school child 
               care
           ·  Magnet programs
           ·  College courses on high school campus 
               (i.e., community college or university 
               satellite programs) 


       Analyze changes in enrollment                      CBO, Management Team    10/1/2006    4/30/2007        Staff Time 
3 
          ·  Determine reasons for loss of enrollment
                                                                                                                  $10,000
          ·  Procure demographic projections
          ·  Analyze inter­district transfers (in/out) 
4    Investigate procurement of additional revenues
        ·  Development of district properties                     CBO               9/1/2007    5/31/2007     Consultant 
        ·  Development and implementation of                                                                  Staff Time 
             appropriate facility use fees                        CBO               9/1/2006    12/31/2006 
        ·  Taxes to support district programs (sales,   CBO, Board, City Schools    9/1/2007    5/31/2008 
             parcel)                                     & Volunteer Committee 
        ·  Legislative advocacy (e.g., equalization)    Board, Leg. Action Com.     9/1/2006    On­going      Staff Time
        ·  Development of adult education program  Management Team, Supt,           9/1/2007    5/31/2008 
             than can serve the community                         Board 
        ·  Increasing donations (e.g., development        Ed Foundation, CBO,       9/1/2007    6/30/2008 
             director for Ed Foundation, grant writer,   Supt. Board , Committee 
             endowments) and sponsorships                       Volunteers 
        ·  Increasing revenues for new housing           CBO, Supt., Board, City    9/1/2007    6/30/2008 
                                                             of Scotts Valley 
             developments (e.g., Mello­Roos)
                                                                  CBO               5/1/2006    On­going 
        ·  Maximizing interest (e.g., LAIF)
        ·  District­wide vs. school­specific                      CBO               9/1/2006    6/30/2007 
             donations 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                            FISCAL STABILITY 

Goal:  To promote and maintain fiscal stability in the district 
Objective #2:  To optimize use of resources K­12 

STEP                                                              ASSIGNED               BEGIN                     RESOURCES 
 NO.                   ACTION STEP                                     TO                DATE        DUE DATE       NEEDED 
1     Educate staff, Board, families and community         CBO, Director of Business    10/1/2006     5/31/2007 
      about scope of resources and potential uses          Services; Fiscal Advisory 
         ·  Revenue limit                                  Committee 
         ·  Basic Aid vs. revenue limit
         ·  Categorical funds and restrictions
         ·  Donations (site­specific and district­ 
             wide)
         ·  Begin discussion on “Equitable” funding        Management Team, Supt.,      10/1/2006     5/31/2007 
             to all schools through district funds and        Board, Committee 
             donations                                           Volunteers 

2       Assess costs/benefits of specialized programs 
        (including through use of student/parent survey)      Management Team           10/1/2006     3/31/2007     Staff Time 
            ·  K­3 Class Size Reduction (staff, 
                facilities, administration, maintenance 
                costs)                                                                  9/1/2007      2/28/2008     Staff Time 
            ·  International Baccalaureate (IB)
            ·  Advanced Placement courses (AP)
            ·  Transportation of students (SVHS             CBO, Assist. Supt. Ed. 
                to/from SVMS)                                     Services              10/1/2006    12/31/2006     Staff Time
            ·  Minimum/maximum class sizes by 
                section at secondary schools 

3       Investigate potential benefits of economy of 
        scale for purchases/leases and partnerships                  CBO 
            ·  Central purchasing vs. site­based           Dir. of Business Services 
        ·  Investigate the effective use of district 
           resources in processing vendor payments               CBO               9/1/2006    10/31/2006 
           through alternative procedures
        ·  Bidding process for cafeteria food                   CBO 
           supplies and other large purchases             Food Services Mgr.       3/1/2006    12/31/2007 
        ·  Partnerships with other districts for 
           human resources, payroll, purchasing,                                   4/1/2006    6/30/2008 
           Special Ed transportation 

4    Develop/implement standards for technology           Management Team, 
     purchase/leases/services                            Superintendent, Board,    1/1/2007    6/30/2008 
        ·  Hardware and software standards                District Technology 
        ·  Centralized contracts                              Committee 
        ·  Centralized purchases/leases of 
            technologies (including copy machines, 
            phones, projectors, etc.) 
5    Review/recommend lease vs. purchase of major 
     items                                                       CBO               1/1/2007     1/1/2008 
         ·  Portables/Modulars
         ·  Office space (District Office)
         ·  Copy machines (multi­year plan) 
            including funding 
6                                                        CBO, Superintendent, 
     Develop a district Fiscal Advisory Committee        Committee Volunteers      1/1/2007     6/1/2008
     that will:
         ·  Understand federal, state, local funding 
             sources and requirements as they relate 
             to SVUSD
         ·  Present objective information to our 
             communities about school funding and 
             the district’s fiscal situation
         ·  Solicit specific information from parents 
             and community as needed
         ·  Make recommendations to the Board 
             and superintendent as appropriate 
                                               SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                       2006­07 STRATEGIC PLAN 
                                                             FISCAL STABILITY 

Goal:  To promote and maintain fiscal stability in the district 
Objective #3: To define, develop and maintain an adequate fiscal reserve to promote district stability 

STEP                                                            ASSIGNED                 BEGIN                          RESOURCES 
 NO.                ACTION STEP                                     TO                    DATE            DUE DATE       NEEDED 
1     Determine what constitutes an adequate General         CBO, Superintendent,        9/1/2006          6/30/2007 
      Fund reserve                                                 Board 

2       Investigate options for building a reserve for 
        Economic Uncertainties beyond the 3% required        CBO, Superintendent,        9/1/2006          6/30/2007 
           ·  Percentage of one­time funding                       Board 
           ·  Percentage of carryover funds
           ·  Portion of interest on lawsuit
           ·  Percentage of General Fund
           ·  Possibilities of increasing interest earned 
                on district funds                                    CBO                 7/1/2006          9/30/2006 
           ·  Others 


3       Develop a plan for funding deferred 
        maintenance (sinking fund), through options                  CBO                9/1/2006           On­Going 
        such as                                              Superintendent, Board      11/1/2007          6/30/2008 
           ·  Extreme hardship funding for projects                  CBO 
           ·  Bond or parcel tax funding
                                                             CBO, Superintendent, 
           ·  Ongoing schedule to increase Fund 14                 Board 
                balances
           ·  Decreasing/eliminating portables hence 
                reducing deferred maintenance costs 
4 
        Develop/ recommend to Board options for 
        addressing GASB 45 post­retirement benefits                  CBO                 9/1/2006          On­Going
        liabilities, such as 
·  Contributions to be made to a new fund              CBO              9/1/2006    6/30/2007 
   designated for post­retirement benefits
·  Including the cost of retiree health        Superintendent, Board    1/1/2008    6/30/2008 
   benefits in negotiations for “total 
   compensation”                                      CBO               9/1/2006    On­Going 
·  Designating a portion of a future parcel     Legislation Action      7/1/2006    6/30/2007
   tax to fund liability                           Committee 
·  Use of one­time monies
·  Legislative advocacy to mitigate costs 
                                                           FISCAL STABILITY 
                                                         COST/BENEFIT ANALYSIS 

Goal: To promote and maintain fiscal stability in the district 

                                                                     COST 

           ITEM                    2006­2007               2007­2008          2008­2009    2009­2010    2010­2011 

 Personnel                     2.2 $10,000 Bus 
                               Driver 

 Contracted Professional       1.3  $10,000 
 Services 
 Supplies                      1.1  $700 

 Equipment                     2.2  $70,000 Bus      2.5  $20,000 Copiers 

 Facility Costs 

 Transportation 

 Other 


                                                                   BENEFIT 

           ITEM                    2006­2007               2007­2008          2008­2009    2009­2010    2010­2011 

 Expense Reduction             2.0  TBD              2.0  TBD 

 Additional Income             1.0  TBD              1.0 TBD 

 Intangible Benefits:          2.0  TBD              2.0 TBD 

 Tangible Benefits:            3.0 TBD               3.0 TBD
SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
          2006­07 STRATEGIC PLAN 
             FACILITIES NEEDS 


                Committee Members 

                 Ernest  Alexander 
                    Roy Blaine 
                  Wendy Brannan 
                Nancy Carr­Gordon 
                  Mark Collishaw 
                   Joe Espinola 
                     Renae Fish 
           Gregg Gunkel – Co­Chairperson 
                   Jill Hitchman 
                   Rick Hochler 
                  Randy Johnson 
           Mary Lonhart – Co­Chairperson 
                  Janice Marshall 
                  John McMillan 
                  Gene Scothorn 
                     Beth Seib 
                    Mike Smith 
                    Glenn Soma 
                    John Waite 
                   Peter Worden 
                      Sue Roth 
                    Susan Silver
                                                   SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                          2006­07 STRATEGIC PLAN 
                                                                 FACILITIES NEEDS 

Goal:  To provide facilities that meet the needs of all students in our K­12 Unified District 
Objective #1:  To identify and prioritize facilities construction needs K­12 

STEP                                                                   ASSIGNED                       BEGIN                        RESOURCES 
 NO.                 ACTION STEP                                          TO                          DATE         DUE DATE         NEEDED 
1a    Develop a Facilities Construction Needs 
      Committee 
                                                               District Administrative Staff, 
1b      Create and develop a method for data collection  Construction Committee                  September ‘06    October ‘06 
                                                               volunteers 

                                                               District Administrative 
1c      Collect data from site staff, teachers, principals,    Staff, Construction               October ‘06      November ‘06 
        parents, public safety agencies and district           Committee volunteers 
        administration to identify facilities construction 
        needs K­12 
                                                               Facilities Construction 
1d      Compile and disaggregate data                          Needs Committee                   November ‘06     December ‘06 

                                                               Facilities Construction 
1e      Summarize data and report out to District              Needs Committee                   January ‘07      February ‘07 
        Administration 
                                                               Chief Business Officer,                                            Documents 
2       Gather existing documents related to facilities        District Leadership Team,  October ‘06             January ‘07 
        construction development:                                                                                                 described in 
                                                               Construction Committee                                             minutes of 2/27/06 
                                                               volunteers                                                         Fac. TF Mtg 
                                                               District Attendance Clerk                                          Enrollment data
3       Gather Enrollment Data to determine physical                                             November ‘06     June ‘07 
        needs (1996­2011)
           ·  Include demographic study information 
               from Developer Fee Study 
STEP                                                              ASSIGNED                        BEGIN                       RESOURCES 
 NO.                  ACTION STEP                                      TO                         DATE        DUE DATE            NEEDED 
4     Collect, review, summarize “As­Built”                Chief Business Officer,           October ‘06     January ‘07    Building plans, 
      infrastructure                                       Construction Committee                                           master plans, 
                                                           volunteers                                                       utility bills, 
                                                                                                                            described in 
                                                                                                                            minutes of 2/27/06 
                                                                                                                            Fac. TF Mtg, 

5      Investigate comparable construction projects        District Administration,          December ‘06    On­going       Consultant Cost 
                                                           Chief Business Officer, 
                                                           Consultant 

6      Evaluate cost efficiency of systems and create a    District Administration,          November ‘06    March ‘07      Service provider 
       baseline of usage expense                           Chief Business Officer,                                          consultation, 
                                                           Construction Committee                                           described in 
                                                           volunteers                                                       minutes of 2/27/06 
                                                                                                                            Fac. TF Mtg,


7      Itemize needs identified from above processes       District Administration,          March ‘07       April. ‘07 
                                                           Chief Business Officer, 
                                                           Construction Committee 
                                                           volunteers 

8      Develop and implement a process for                 District Administration, Chief    April ‘07       May ‘ 07 
       Prioritization                                      Business Officer, 
                                                           Construction Committee 
                                                           volunteers 

                                                           District Administration, Chief 
9      Prioritize based on:                                Business Officer,                 May ‘07         June ‘07 
           ·  Fiscal stability                             Construction Committee 
           ·  Enrollment data                              volunteers 
           ·  Staff input
           ·  Community input
           ·  Board goals/priorities 
STEP                                                        ASSIGNED                  BEGIN                     RESOURCES 
 NO.                  ACTION STEP                               TO                     DATE        DUE DATE      NEEDED 
10    Develop a Plan to meet Facilities Needs        District Administration,    June ‘07         August ‘07 
      (5 year plan) means of funding included        Chief Business Officer 

11     Present report w/ recommendations to Board    District Administration,    September ‘07    October ‘07
                                                     Chief Business Officer 
                                                 SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                         2006­07 STRATEGIC PLAN 
                                                                FACILITIES NEEDS 

Goal:  To provide facilities that meet the needs of all students in our K­12 Unified District 
Objective #2:  To identify and prioritize facilities maintenance needs K­12 
STEP                                                              ASSIGNED                  BEGIN                             RESOURCES 
 NO.                    ACTION STEP                                   TO                    DATE              DUE DATE         NEEDED 

1a      Create and Develop method for data collection          District Administrative      August ‘06       September ‘06  Data Collection 
                                                               Staff, Maintenance                                           Tool 
                                                               Committee volunteers 

1b      Collect data from site staff, teachers, principals,    District Administrative      September ‘06    November ‘06 
        parents to identify facilities maintenance needs       Staff, Maintenance 
        K­12                                                   Committee volunteers 

1c      Compile and disaggregate data                          Facilities Maintenance       November ‘06     December ‘06 
                                                               Needs Committee 

1d      Summarize data and report out to district              Facilities Maintenance       January ‘07      February ‘07 
        administration                                         Needs Committee 

2       Gather existing documents related to                   Chief Business Officer,    October ‘06        January ‘07 
        maintenance                                            District Leadership Team, 
                                                               Maintenance Committee 
                                                               volunteers 

3       Research Maintenance Standards (CASBO,                 District Administration,     November ‘06     February ‘07 
        CASH, other)                                           Chief Business Officer 

                                                                District Administration,    November ‘06     June ‘07,       Service provider 
4       Evaluate maintenance cost efficiency of systems         Chief Business Officer,                      semi­annual     consultation
        and determine baseline of expenses                      Maintenance Committee 
                                                                       volunteers 
STEP                                                             ASSIGNED                  BEGIN                         RESOURCES 
 NO.                   ACTION STEP                                  TO                     DATE        DUE DATE           NEEDED 

5       Audit Maintenance Tasks of 2001­2006              District Administration,    December ‘06    Mar. 2007        Historical 
                                                          Chief Business Officer                                       maintenance 
                                                                                                                       records 

                                                                                                                       Established data 
6       Survey and analyze current operational plans for  District Administration,    January ‘07     Jan. 2007, then  collection
        facilities management                             Chief Business Officer,                     annually 
                                                          Maintenance Committee 
                                                          volunteers 


7       Develop a calendar and checklist of               District Administration,    February ‘07    March 2007 
        maintenance functions                             Chief Business Officer 



8       Develop a Plan to meet Maintenance Needs          District Administration,    March ‘07       June 2007 
           ·  5 year maintenance plan, means of           Chief Business Officer 
              funding included 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                             FACILITIES NEEDS 

Goal:  To provide facilities that meet the needs of all students in our K­12 Unified District 
Objective #3:  To review and revise as needed the district’s Facilities Master Plan and previous facilities studies and plans 

STEP                                                              ASSIGNED                  BEGIN                            RESOURCES 
 NO.                    ACTION STEP                                  TO                     DATE           DUE DATE           NEEDED 

1       Summarize information from Objective #1 and        Chief Business Officer.     December ‘06       February ‘07 
        Objective #2                                       Committee volunteers        October 07         December 07 


2       Prepare a draft of District Facilities Master Plan  Chief Business Officer.    January ‘08        June ‘08         Prioritization List, 
        from Objective #1, step 10 and Objective #2,        Committee volunteers                                           clerical support 
        step 8 

3       Revise and update District Facilities Master       Chief Business Officer.     June ‘08           December ‘08     District Facilities 
        Plan                                               Committee volunteers                           and then         Master Plan,
                                                                                                          annually 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                             FACILITIES NEEDS 

Goal:  To provide facilities that meet the needs of all students in our K­12 Unified District 
Objective #4:  To identify options for providing appropriate facilities and recommend a plan, including time line 

STEP                                                          ASSIGNED                       BEGIN                     RESOURCES 
 NO.                    ACTION STEP                                TO                        DATE        DUE DATE       NEEDED 
1     Investigate options for providing appropriate K­  Construction Committee          February ‘07    June ‘07 
      12 facilities – survey community                  Volunteers, District 
                                                        Administration, Chief 
                                                        Business Officer 

2       Determine viability of options and fiscal impact    District Administration,    March ‘07       June ‘07      Collaboration with 
                                                            Chief Business Officer,                                   Fiscal TF 
                                                            Fiscal Advisory 
                                                            Committee                   June ‘07        August ‘07    Collaboration with 
                                                                                                                      Fiscal & Outreach 
3       Draft Facilities Needs Plan                         Community Construction                                    TF
                                                            Committee Volunteers, 
                                                            District Administration, 
                                                            Chief Business Officer 

4       Present recommendations to Board for                                            Spring ‘08 
        consideration 
                                                           FACILITIES NEEDS 
                                                         COST/BENEFIT ANALYSIS 

Goal:  To provide facilities that meet the needs of all students in our K­12 Unified District 
                                                                       COST 

              ITEM                   2006­2007              2007­2008                2008­2009      2009­2010      2010­2011 

    Personnel 

    Contracted Professional           $10,000 
    Services 
    Supplies                            $500                   $500                     $500          $500           $500 

    Equipment                            $0                     $0                       $0            $0             $0 

    Facility Costs                       $0                     $0                       $0            $0             $0 

    Transportation                       $0                     $0                       $0            $0             $0 

    Other 

                                                                       BENEFIT 

              ITEM                   2006­2007              2007­2008                2008­2009      2009­2010      2010­2011 

    Expense Reduction 

    Additional Income 

    Intangible Benefits: 

    Tangible Benefits:               Productivity           Efficiency               Efficiency     Efficiency     Efficiency 
                                    improvement            improvement              improvement    improvement    improvement
SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
          2006­07 STRATEGIC PLAN 
            HUMAN RESOURCES 


                Committee Members 

                   Sheila BuswelL 
           Kathy Dunton ­ Co­Chairperson 
               Mary Ann Dominguez 
                 Suzanne Herzman 
                     Jan Keating 
           Carolyn Lewis ­ Co­Chairperson 
                 Samantha Sommer 
                  Terry Sovulewski 
                    Chuck Walker 
                   Sharon Walker
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                          HUMAN RESOURCES 

Goal:  To attract, develop and retain well qualified employees throughout the district 
Objective #1:  To provide appropriate professional development to all staff 

STEP                                                               ASSIGNED                   BEGIN                         RESOURCES 
 NO.                   ACTION STEP                                       TO                    DATE          DUE DATE          NEEDED 
1     Determine professional development needs              up  ri  te  de  t, 
                                                           S  pe  in en  en , 
                                                           Su  er nt  nd  nt               January 2007    June 2007       Time/ 
       ­  Identify components of professional              A  st  up . E  . S  rv ce 
                                                             ss . S  pt  d.  er  ic  s 
                                                           As  t. Su  t. Ed  Se  vi  es                    and on­going    Personnel
          development plan                                 S te Ad  in st  at  rs 
                                                            it  dm ni  tr  to  s 
                                                           Si e A  mi  is ra or 
       ­  Determine current professional development       H  ma  es  ur  es 
                                                             um  n R  so  rc  s 
                                                           Hu  an Re  ou  ce 
          practice in the District                         C  O 
                                                            BO 
                                                           CB 
       ­  Review Board Policy and employee group           T  ac  er 
                                                            ea  he  s 
                                                           Te  ch  rs 
          agreements 
       ­  Review current models/research on best 
          professional development practices 
       ­  Survey for needs/compile data 
       ­  Coordinate with Student Achievement Task 
          Force on professional development priorities 

2        Determine professional development resources       ea  er  hi  ea 
                                                           L  ad  rs  ip Te  m 
                                                           Le  de  sh p T  am              January 2007    May 2007 
          ­  General Fund and other funding resources      C  O 
                                                            BO 
                                                           CB 
          ­  External resources (COE, other districts, 
             New Teacher Project) 

3        Recommend short/long term plan to                  ea  er  hi  ea 
                                                           L  ad  rs  ip Te  m 
                                                           Le  de  sh p T  am                              June 2007 
         Superintendent                                    C  O 
                                                            BO 
                                                           CB 
                                                SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                        2006­07 STRATEGIC PLAN 
                                                           HUMAN RESOURCES 

Goal:  To attract, develop and retain well qualified employees throughout the district 
Objective #2:  To provide appropriately for succession 

STEP                                                             ASSIGNED                 BEGIN                       RESOURCES 
 NO.                      ACTION STEP                                 TO                  DATE        DUE DATE          NEEDED 
1         Provide opportunity for succession and           Leadership Team           July 2006      November 2008    Time/Personnel
          leadership among staff                                                                    ongoing 
          ­  Identify current opportunities for 
              certificated and classified employees 
          ­  Investigate cross­training/shadowing 
              opportunities 
          ­  Communicate opportunities to potential 
              and current employees 
          ­  Review approaches from other districts 
          ­  Develop plans and paths to fill retirement 
              vacancies 

2        Re­evaluate vacant positions for effective use of  Leadership Team          November 2007  November 2008 
         resources 

3        Develop a plan for effective transitions into 
         positions 
          ­  Expectations 
          ­  Written procedures 
          ­  Training 
                                              SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                      2006­07 STRATEGIC PLAN 
                                                          HUMAN RESOURCES 

Goal:  To attract, develop and retain well qualified employees throughout the district 
Objective #3:  To develop appropriate means to provide recognition to staff 

STEP                                                            ASSIGNED               BEGIN                            RESOURCES 
 NO.                  ACTION STEP                                    TO                 DATE           DUE DATE           NEEDED 
1     Survey staff for suggestions on meaningful          Human Resources           November 2006    February 2007    Time/ 
      ways to recognize employees (formally and           Leadership Team                                             Personnel
      informally) 




2       Investigate recognition events implemented in     Human Resources           November 2006    June 2007 
        other districts and at county and state levels 




3       Investigate ways for community recognition        HR Task Force             November 2006    June 2007 
        and support for district employees 


4       Develop employee recognition program              Human Resources           October 2007     June 2008 
                                                          Leadership Team 
                                                       HUMAN RESOURCES 
                                                     COST/BENEFIT ANALYSIS 

Goal: To attract, develop and retain well qualified employees throughout the district. 

                                                                    COST 

           ITEM                  2006­2007             2007­2008                 2008­2009           2009­2010            2010­2011 

 Personnel 

 Contracted Professional 
 Services 
 Supplies 

 Equipment 

 Facility Costs 

 Transportation 

 Other 


                                                                 BENEFIT 

           ITEM                  2006­2007             2007­2008                 2008­2009           2009­2010            2010­2011 

 Expense Reduction 

 Additional Income 

 Intangible Benefits:        Improved morale      Improved morale           Improved morale      Improved morale      Improved morale 
                             and cohesiveness.    and cohesiveness.         and cohesiveness.    and cohesiveness.    and cohesiveness. 
                             Sense of unity.      Sense of unity.           Sense of unity.      Sense of unity.      Sense of unity. 
 Tangible Benefits:
SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
        2006­07 STRATEGIC PLAN 
     COMMUNICATION/OUTREACH 


             Committee Members 

              Brenda Armstrong 
             Caroline Bombardieri 
         Shannon Calden ­ Chairperson 
              Darshana Croskrey 
                Amy Hedrick 
                Allison Niday 
               Elizabeth Poser 
              Michael Shulman
                                                       SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                               2006­07 STRATEGIC PLAN 
                                                              COMMUNICATION/OUTREACH 

Goal:  To enhance the opportunities and services our schools can provide K­12 through collaboration, community engagement and advocacy 
Objective#1:  To create vehicles for timely two­way communication as appropriate for all levels of the district. 

STEP                                                                          ASSIGNED                   BEGIN                               RESOURCES 
 NO.                       ACTION STEP                                           TO                      DATE             DUE DATE            NEEDED 
1.1     Develop a Communication/Outreach Committee                                                     September 2006 

1.2     Identify existing forms of two­way communication and          District Administrative Staff      July 2006        December 2006    Meeting time 
        evaluate their effectiveness.  Look at communication in       Communication/Outreach                                               Small budget for 
        the following four areas:                                     Committee                                                            copying, supplies, etc. 
                 n  Internal                                                                                                               ($100 for activities for 
                 n  District/School Sites to School community                                                                              the year) 
                 n  District/School Sites to Scotts Valley                                             September 2006    December 2006 
                      community 
                 n  District/School Sites to Outside Scotts 
                      Valley community 

1.3     Identify stakeholders and determine the effectiveness of      District Administrative Staff    September 2006     December 2006    Meeting time 
        communication with that group                                 Communication/Outreach 
                                                                      Committee 
1.4     Identify areas lacking in communication and the value of      District Administrative Staff    September 2006     December 2006    Meeting time 
        receiving communication in those areas. (i.e. Alumni,         Communication/Outreach 
        outside the Scotts Valley Community)                          Committee 

1.5     Develop an information process and timeline that details      District Administrative Staff     January 2007        June 2007      Meeting time 
        for district staff and the community how information will     Communication/Outreach 
        be disseminated and accepted                                  Committee 

1.6     Identify what structures are in place, and what structures    District Administrative Staff     January 2007        June 2007      Meeting time
        need to be created in order to automate the information       Communication/Outreach 
        process that is created                                       Committee 
                                                        SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                                2006­07 STRATEGIC PLAN 
                                                              COMMUNITCATION/OUTREACH 

Goal:  To enhance the opportunities and services our schools can provide K­12 through collaboration, community engagement and advocacy 
Objective #2:  To collaborate with other agencies to provide opportunities and services for our schools 

STEP                                                                          ASSIGNED                     BEGIN                              RESOURCES 
 NO.                         ACTION STEP                                         TO                        DATE            DUE DATE            NEEDED 
2.1 A.    Identify agencies that are stakeholders in school system      District Administrative Staff    September 2006      June 2007      Small budget for 
          success                                                        Communication/Outreach                                             supplies and copying 
          ·  Public (city, county, state, federal, international)                Committee                                                  Meeting time 
          ·  Non­Governmental organizations (foundations, 
              service clubs) that are education, cultural, social, 
              cultural, or child­focused.
          ·  Private business (local, regional, national, 
              international 

2.1 B.    Identify existing collaborations within the District 
          and their functionality. 

2.1 C.    Research existing models of outreach in similar districts 
          (i.e. Carmel, Pacific grove), and determine which may be 
          useful for SVUSD 

2.2       Conduct initial research on agencies to prioritize best       District Administrative Staff    September 2006      June 2007          Meeting time 
          candidates based on shared values, practical opportunities     Communication/Outreach 
          to collaborate, apparent capacity to collaborate, and                  Committee 
          likelihood of interest, as well as willingness to offer 
          monetary contributions 
2.3       Organize and prioritize information gained from               District Administrative Staff    September 2007    December 2007        Meeting time 
          stakeholder surveys and research on agencies, to make a        Communication/Outreach 
          list of priorities and possibilities for student and                   Committee 
          community involvement (see objective 3, step 1) 

2.4       Develop contact strategy for agencies:                        District Administrative Staff     January 2008      March 2008          Meeting time
           ·  Form for tracking agencies, what they offer, and the       Communication/Outreach 
              contact person in that agency                                      Committee 
           ·  Process for students to contact agencies
           ·  Process for updating needs of students and agencies 
2.5    Assign target agencies to specific staff for supplemental    District Administrative Staff    March 2008    June 2008    Meeting time 
       research as needed and to develop detailed contact            Communication/Outreach 
       strategy, resources needed to implement, and desired                  Committee 
       outcomes 

2.6    Submit contact strategy outlines to Board for approval       District Administrative Staff    March 2008    June 2008    Meeting time
                                                      SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                              2006­07 STRATEGIC PLAN 
                                                             COMMUNICATION/OUTREACH 

Goal:  To enhance the opportunities and services our schools can provide K­12 through collaboration, community engagement and advocacy 
Objective #3:  To engage the community in providing opportunities and services for our schools 

STEP                                                                       ASSIGNED                     BEGIN                             RESOURCES 
 NO.                       ACTION STEP                                        TO                        DATE            DUE DATE           NEEDED 
3.1     Gather information (survey, meeting, workshop) from K­       District Administrative Staff    September 2006      June 2007        Small Budget for 
        12 students and other stakeholders regarding areas of         Communication/Outreach                                             supplies and copying 
        interest of involvement in the community                              Committee                                                     Meeting time 


3.2     Organize and prioritize information gained from              District Administrative Staff    September 2007    December 2007       Meeting time 
        stakeholder surveys and research on agencies, to make a       Communication/Outreach 
        list of priorities and possibilities for student and                  Committee 
        community involvement (see objective 2, step 3) 

3.3     Create methods for:                                          District Administrative Staff     January 2008      March 2008         Meeting time 
            · Matching interests with opportunities for               Communication/Outreach 
                student, e.g., web page bulletin board,                       Committee 
                workshop for students
            · Allowing students to lobby for an unidentified 
                interest 
3.4     Collaborate with Chamber of Commerce to develop              District Administrative Staff     March 2008         June 2008         Meeting time 
        incentives for local/regional businesses to work with         Communication/Outreach 
        students                                                              Committee 

3.5     Assign District staff members to serve as liaison between    District Administrative Staff     March 2008         June 2008         Meeting time 
        community agencies and students/stakeholders                  Communication/Outreach 
                                                                              Committee 
3.6     Develop protocol and any necessary board policy for          District Administrative Staff     March 2008         June 2008         Meeting time
        students to work with outside agencies                        Communication/Outreach 
                                                                              Committee 
                                                     SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                                                             2006­07 STRATEGIC PLAN 
                                                            COMMUNICATION OUTREACH 

Goal:  To enhance the opportunities and services our schools can provide K­12 through collaboration, community engagement and advocacy 
Objective # 4:To advocate for K­12 district needs 
STEP                                                          ASSIGNED                 BEGIN                         RESOURCES 
 NO.                  ACTION STEP                                 TO                   DATE            DUE DATE        NEEDED 
4.1    Work with the Legislative Action Committee to increase        Site District Administrators    September 2006    September 2007      Small budget for 
       network of members for LAC contacts:                           Communication Outreach                                             copying and supplies 
           a.  Find a contact person in each school­based                     Committee                                                     Meeting Time 
               community group (PTA, each school, SVEF,             Legislative Action Committee 
               etc.) to use as a contact for information 
               distribution.  Determine the special interests of 
               each of the contact group and how they can be 
               used by LAC to disseminate information 

           b.  Out of the network, create a LAC “Working 
               Group” to disseminate information and advocate 
               for K­12 district needs 

           c.  Once working groups have been established, 
               periodically review to create “Best Practices” so                                                          Ongoing 
               the group can continue advocacy even with 
               change in leadership 

4.2    Bolster current, and create new “Giving Programs”             Site District Administrators    September 2007      June 2008          Meeting time 
       for the District.                                              Communication Outreach 
            a.  Work with the Scotts Valley Education                        Committee 
                Foundation to determine what is already in place     In conjunction with SVEF 
                and works well for giving programs 

           b.  Identify individuals and businesses who are 
               willing to monetarily contribute to the District 
               based on the survey information from Obj. 2.2. 

           c.  Research giving programs that are successful in 
                other districts 
4.3    Research the feasibility of hiring a “fund Development        Site District Administrators    September 2007      June 2008          Meeting time
       Director” for the District                                     Communication Outreach 
                                                                             Committee 
                                                                Communication/Outreach 
                                                               COST/BENEFIT ANALYSIS 



                                                                                    COST 

          ITEM                   2006­2007                         2007­2008                   2008­2009    2009­2010    2010­2011 

Personnel 

Contracted Professional 
Services 
Supplies                   $250                           $250 

Equipment 

Facility Costs 

Transportation 

Other 


                                                                                 BENEFIT 

          ITEM                   2006­2007                         2007­2008                   2008­2009    2009­2010    2010­2011 

Expense Reduction 

Additional Income 

Intangible Benefits:       Improved communication         Better training opportunities for 
                           inside and outside district    students 

Tangible Benefits:
          SCOTTS VALLEY UNIFIED SCHOOL DISTRICT 
                STRATEGIC PLANNING 2006­07 
          GLOSSARY OF ACRONYMS USED IN THIS PLAN 

ADA          Average Daily Attendance 
AP           Advanced Placement 
ASB          Associated Student Body 
CAHSEE       California High School Exit Exam 
CASBO        California Association of School Business Officials 
CASH         Coalition of Adequate School Housing 
CBO          Chief Business Officer 
CCR          Coordinated Compliance Reviews 
COE          County Office of Education 
ELL          English Language Learner 
FTE          Full Time Employee 
GASB         Government Accounting Standards Board 
HR           Human Resources 
HS           High School 
IB           International Baccalaureate 
K­12         Grades Kindergarten through Twelfth 
LAC          Legislative Action Committee 
LAIF         Local Agency for Investment Funds 
NGO          Non­Governmental Organization 
NTP          New Teacher Project 
PC           Parent Club 
PTA          Parent Teacher Association 
REP          Representative 
SCCOE        Santa Cruz County Office of Education 
SSPSA        Single School Plans for Student Achievement 
STAR         Standardized Testing and Reporting System 
SVEF         Scotts Valley Educational Foundation 
SVHS         Scotts Valley High School 
SVMS         Scotts Valley Middle School 
SVUSD        Scotts Valley Unified School District 
TBD          To Be Determined 
TF           Task Force 
WASC         Western Accreditation of Schools and Colleges