2009 Calendar Template Excel

W
Description

2009 Calendar Template Excel document sample

Document Sample
scope of work template
							  2009 ITRS Kickoff
Instructions, Website Information,
Key Dates, ITRS Membership Policy
                       and More…
                       ITRS Announcements
• NEW Look for the ITRS
   – Tables will stay in Excel files :
       • Focus ITWGS files
       • CrossCut ITWGs files
       • ORTC file
   – Links to the 2007 ITRS chapters files
   – Links to each other files
   – Text for future chapters will link to the tables files
• The ITRS is now all electronic
• WEBSITE
    – ITRS website transition is wrapping up and the new working group
      login is ―2008   ITRS‖, ―roadmap‖.     It is case sensitive.
                     2009 ITRS Kickoff
► Difficult Challenges Table Guidelines

   ► Near-term ( ≥16nm)

   ► Long-term (<16nm)

   ► TEN total challenges
     Target the Top 5 most difficult challenges for near-term ( ≥16nm) and
     the Top 5 most diffcult challenges for long-term (<16nm)
                               2009 ITRS Kickoff
► Timeframe advances two years 2009—2024
► Numbering for Tables, Figures, and Citations are self-consistent
  within each chapter.
   ► Tables and Figures use a prefix for each chapter, e.g.,
     FEP tables start at FEP1; Lithography tables start at LITH1
Technology Requirements Guidelines:
         Manufacturable solutions exist, and are being optimized
                            Manufacturable solutions are known
                                     Interim solutions are known   
                       Manufacturable solutions are NOT known


► Yellow cannot exist in next 1 year (2009)
► Red cannot exist in next 3 years (2009, 2010, 2011**)
  ** An ITWG can have an exception approved through the IRC:
  ―Solution NOT known, but does not prevent production
  manufacturing.‖
                          2009 ITRS Kickoff

Potential Solutions Guidelines
► Review solutions for assessed needs– do not select only one solution;
provide for innovative answers

► Template for Potential Solution is provided as an EXCEL worksheet.

  Research Required
  Development Underway
  Qualification / Pre-Production
  Continuous Improvement
               2009 ITRS Kickoff : Templates
• Outline for ITWG chapters [same as 2007 ITRS]
   – Scope
   – Difficult Challenges
   – Technology Requirements
   – Potential Solutions
   – Cross TWG Issues
   – Inter-focus ITWG Discussions
   – Impact of Future Emerging Research Devices
   – References/Works Cited

• File types: Microsoft 2003 or 2007 Office –
                Word, Excel, Visio, Powerpoint
                       2009 ITRS Kickoff
IRC NEEDS
 – extracted from each ITWG chapter:


   ► 1 page summary of Key Challenges or Revisions to be
     included in the Executive Summary


   ► Any content regarding energy [savings, conservation,
     waste reduction, targets, costs, etc.]
              2009 ITRS Kickoff : Templates
TABLE TEMPLATES
• An EXCEL provided after all tables are approved, with all
  Technology Requirements tables
   – Already annualized and formatted for 2009 years with
     correct timeline.
TEXT TEMPLATES
• A WORD file provided contains the 2007 ITWG chapter text,
  any 2008 Update text and figures and text tables.
   ► All text-based tables such as the DIFFICULT
     CHALLENGES tables are included in this WORD file.
CHART TEMPLATES
• A EXCEL template provided for Potential Solutions figures.
  The ITRS team then redraws in Visio.
   – Refer to the Word chapters for 2007 Potential Solutions
     as a start
                 ITRS Page Allocations
• There are limitations on chapter size.
• Each chapter will remain at the size of their 2007 chapter.
• Each ITWG chair must decide how best to allow for new
  material by summarizing and deleting outdated material

   – Chapters that submitted with too many pages will be edited to
     the 2007 length for readability
           2009 Edition – SPRING Schedule


Jan 2009       ITWGs receive pre-formatted for 2009 table files
               begin review for 2009 chapter

Jan – Apr      IRC teleconferences/TWG member meetings
               are held to review/update tables

► Mar 18-20    ITRS ITWG/IRC meeting in Brussels, Belgium
               at the Dolce La Hulpe Hotel

2009 First DRAFT TABLES ARE DUE to be reviewed by ITWGs
  and CrossTWGs
            2009 Edition – SUMMER Schedule

June 30        Presentation Drafts due for preparing
               the July meeting materials
               Includes 1 page text summary of key changes
               to tables

► July 13 – 14 ITRS ITWG/IRC meeting in San Francisco
               at the Hotel Marriott

► July 15      ITRS Public Conference at the Hotel Marriott

July 20        ALL FINAL TABLES DUE
           2009 Edition – FALL Schedule

SEP 15    2009 ITRS CONTENT IS FROZEN ,
          SUPPLEMENTAL FILES DUE

  [late chapter material deferred to 2010 ITRS]
Oct       Regional Executives Advisory board approve ITRS
Nov       Presentation Drafts due for preparing for
          December Public meeting materials
► Dec     ITRS ITWG/IRC meetings TBD in Taiwan
► Dec     ITRS Public Conference TBD in Taiwan
December 2009 ITRS is posted online for the public
               Why Schedules Matter…
2009 ITRS Content is Written over 9 months
Each chapter is ~70 pages per TEAM (10-20 people)



      Jan      Feb       Mar       Apr        May          Jun


                 Jul         Aug
                                     due by       Sep 15


~1,000 pages per EDITOR (1 person) in under 2 months
                                         due by
                       Oct     Nov                   Dec 15
                 Why Schedules Matter…
2009 ITRS after it is frozen:
~1000 pages
~200+ Tables
~500+ citations that have to be validated
Web page preparation and crosslinking
            And More…..
                   2009 ITRS Events Calendar
SPRING 2009
• Host – ESIA
• ---DATES
    – March 18, 2009 evening reception
    – March 19-20, 2009 ITRS ITWG/IRC workshop
• ---LOCATION
    – Dolce La Hulpe Hotel, near Brussels, Belgium

SUMMER 2009
• Host -- SIA
• ---DATES
    – July 13-14, 2009 [Monday and Tuesday before SEMICON]
    – July 15, 2009 [Wednesday during SEMICON]
• --- LOCATION
    – Marriott Hotel, San Francisco

WINTER 2009
• Host – TSIA
• ---DATES
    – December 14-15, 2009 Monday and Tuesday Workshop
    – December 16, 2009 2009 ITRS Winter Public Conference
• ---LOCATION
    – To be announced !
                ITRS ITWG / IRC Membership Policy

•   Formal ITRS members are part of the technology working group teams as determined by the
    IRC representatives of the five regional co-sponsors of the ITRS: Europe, Japan, Korea,
    Taiwan, and the U.S.A. ITRS TWG members--both regional and international TWG [ITWG]
    representatives--are only from these regions.
    Their eligibility for membership is confirmed by the TWG chair and co-chair based on needed
    expertise and regional affiliation. Regional IRC representatives can also confirm their region's
    representatives for TWGs.

•   Informal work is conducted through contacts and relationships with other roadmapping efforts
    and teams, for example, iNEMI; however, the current formal ITRS membership is limited to
    the five regions.

•   Additionally, the ITRS teams should continue to encourage review and commentary from the
    industry at large, while maintaining the "work-in-progress, do not publish" position for all
    draft ITRS materials until regional IRC approval of the Roadmap and formal release during
    our Winter Public Conference.

•   Ask for the Roadmapping Process presentation for your team and for clarification.

						
Related docs