2009 ITRS Kickoff
Instructions, Website Information,
Key Dates, ITRS Membership Policy
and More…
ITRS Announcements
• NEW Look for the ITRS
– Tables will stay in Excel files :
• Focus ITWGS files
• CrossCut ITWGs files
• ORTC file
– Links to the 2007 ITRS chapters files
– Links to each other files
– Text for future chapters will link to the tables files
• The ITRS is now all electronic
• WEBSITE
– ITRS website transition is wrapping up and the new working group
login is ―2008 ITRS‖, ―roadmap‖. It is case sensitive.
2009 ITRS Kickoff
► Difficult Challenges Table Guidelines
► Near-term ( ≥16nm)
► Long-term (<16nm)
► TEN total challenges
Target the Top 5 most difficult challenges for near-term ( ≥16nm) and
the Top 5 most diffcult challenges for long-term (<16nm)
2009 ITRS Kickoff
► Timeframe advances two years 2009—2024
► Numbering for Tables, Figures, and Citations are self-consistent
within each chapter.
► Tables and Figures use a prefix for each chapter, e.g.,
FEP tables start at FEP1; Lithography tables start at LITH1
Technology Requirements Guidelines:
Manufacturable solutions exist, and are being optimized
Manufacturable solutions are known
Interim solutions are known
Manufacturable solutions are NOT known
► Yellow cannot exist in next 1 year (2009)
► Red cannot exist in next 3 years (2009, 2010, 2011**)
** An ITWG can have an exception approved through the IRC:
―Solution NOT known, but does not prevent production
manufacturing.‖
2009 ITRS Kickoff
Potential Solutions Guidelines
► Review solutions for assessed needs– do not select only one solution;
provide for innovative answers
► Template for Potential Solution is provided as an EXCEL worksheet.
Research Required
Development Underway
Qualification / Pre-Production
Continuous Improvement
2009 ITRS Kickoff : Templates
• Outline for ITWG chapters [same as 2007 ITRS]
– Scope
– Difficult Challenges
– Technology Requirements
– Potential Solutions
– Cross TWG Issues
– Inter-focus ITWG Discussions
– Impact of Future Emerging Research Devices
– References/Works Cited
• File types: Microsoft 2003 or 2007 Office –
Word, Excel, Visio, Powerpoint
2009 ITRS Kickoff
IRC NEEDS
– extracted from each ITWG chapter:
► 1 page summary of Key Challenges or Revisions to be
included in the Executive Summary
► Any content regarding energy [savings, conservation,
waste reduction, targets, costs, etc.]
2009 ITRS Kickoff : Templates
TABLE TEMPLATES
• An EXCEL provided after all tables are approved, with all
Technology Requirements tables
– Already annualized and formatted for 2009 years with
correct timeline.
TEXT TEMPLATES
• A WORD file provided contains the 2007 ITWG chapter text,
any 2008 Update text and figures and text tables.
► All text-based tables such as the DIFFICULT
CHALLENGES tables are included in this WORD file.
CHART TEMPLATES
• A EXCEL template provided for Potential Solutions figures.
The ITRS team then redraws in Visio.
– Refer to the Word chapters for 2007 Potential Solutions
as a start
ITRS Page Allocations
• There are limitations on chapter size.
• Each chapter will remain at the size of their 2007 chapter.
• Each ITWG chair must decide how best to allow for new
material by summarizing and deleting outdated material
– Chapters that submitted with too many pages will be edited to
the 2007 length for readability
2009 Edition – SPRING Schedule
Jan 2009 ITWGs receive pre-formatted for 2009 table files
begin review for 2009 chapter
Jan – Apr IRC teleconferences/TWG member meetings
are held to review/update tables
► Mar 18-20 ITRS ITWG/IRC meeting in Brussels, Belgium
at the Dolce La Hulpe Hotel
2009 First DRAFT TABLES ARE DUE to be reviewed by ITWGs
and CrossTWGs
2009 Edition – SUMMER Schedule
June 30 Presentation Drafts due for preparing
the July meeting materials
Includes 1 page text summary of key changes
to tables
► July 13 – 14 ITRS ITWG/IRC meeting in San Francisco
at the Hotel Marriott
► July 15 ITRS Public Conference at the Hotel Marriott
July 20 ALL FINAL TABLES DUE
2009 Edition – FALL Schedule
SEP 15 2009 ITRS CONTENT IS FROZEN ,
SUPPLEMENTAL FILES DUE
[late chapter material deferred to 2010 ITRS]
Oct Regional Executives Advisory board approve ITRS
Nov Presentation Drafts due for preparing for
December Public meeting materials
► Dec ITRS ITWG/IRC meetings TBD in Taiwan
► Dec ITRS Public Conference TBD in Taiwan
December 2009 ITRS is posted online for the public
Why Schedules Matter…
2009 ITRS Content is Written over 9 months
Each chapter is ~70 pages per TEAM (10-20 people)
Jan Feb Mar Apr May Jun
Jul Aug
due by Sep 15
~1,000 pages per EDITOR (1 person) in under 2 months
due by
Oct Nov Dec 15
Why Schedules Matter…
2009 ITRS after it is frozen:
~1000 pages
~200+ Tables
~500+ citations that have to be validated
Web page preparation and crosslinking
And More…..
2009 ITRS Events Calendar
SPRING 2009
• Host – ESIA
• ---DATES
– March 18, 2009 evening reception
– March 19-20, 2009 ITRS ITWG/IRC workshop
• ---LOCATION
– Dolce La Hulpe Hotel, near Brussels, Belgium
SUMMER 2009
• Host -- SIA
• ---DATES
– July 13-14, 2009 [Monday and Tuesday before SEMICON]
– July 15, 2009 [Wednesday during SEMICON]
• --- LOCATION
– Marriott Hotel, San Francisco
WINTER 2009
• Host – TSIA
• ---DATES
– December 14-15, 2009 Monday and Tuesday Workshop
– December 16, 2009 2009 ITRS Winter Public Conference
• ---LOCATION
– To be announced !
ITRS ITWG / IRC Membership Policy
• Formal ITRS members are part of the technology working group teams as determined by the
IRC representatives of the five regional co-sponsors of the ITRS: Europe, Japan, Korea,
Taiwan, and the U.S.A. ITRS TWG members--both regional and international TWG [ITWG]
representatives--are only from these regions.
Their eligibility for membership is confirmed by the TWG chair and co-chair based on needed
expertise and regional affiliation. Regional IRC representatives can also confirm their region's
representatives for TWGs.
• Informal work is conducted through contacts and relationships with other roadmapping efforts
and teams, for example, iNEMI; however, the current formal ITRS membership is limited to
the five regions.
• Additionally, the ITRS teams should continue to encourage review and commentary from the
industry at large, while maintaining the "work-in-progress, do not publish" position for all
draft ITRS materials until regional IRC approval of the Roadmap and formal release during
our Winter Public Conference.
• Ask for the Roadmapping Process presentation for your team and for clarification.