					Strategic Action Plan – adopted by the BOD 5th October 2009




           Le Bocage International School, Mauritius




     Strategic Action Plan for School Improvement




                                                     2010 - 2014



Strategic Action Plan – version 1 5th October 2009
                                                              Contents


Contents                                             page 1       Section A: Philosophy and Objectives    page 6

Preamble                                             page 2       Section B: Curriculum                   Page 7

Vision Statement: LBIS in 2015                       page 3       Section C: Governance and Management    Page 10

Our Mission                                          page 4       Section D: Staff                        Page 14

Our Philosophy                                       page 4       Section E: Student Support Services     Page 16

Key to the initials used in the report               page 5       Section F: Resources                    Page 18

                                                                  Section G: Student and Community Life   Page 20




Strategic Action Plan – version 1 5th October 2009                                                                  1
Preamble

The new Strategic Action Plan for School Development follows on from the first such strategic plan that was intended to cover the
period from 2004 to 2010. As a starting point for the new plan it was agreed that the school should look critically at what had been
achieved from the existing plan and what was still valid and in need of achieving. Thus, there are elements of the old strategic plan
carried over into the new plan.

The format of the plan has also changed slightly, in order that it matches with the Council of International Schools Accreditation
process. The recent CIS Five Year Report produced by the school identified action plans for key areas of the school. These have been
incorporated into the new strategic plan. This will help in the self-study stage of the accreditation process as well as being beneficial to
the visiting team from CIS. There are seven main sections. The information in brackets refers to the relevant section in the Strategic
Action Plan for School Improvement 2004-2010.

    A        Philosophy and Objectives
    B        Curriculum (Focus Area 4: Student Learning and Performance)
    C        Governance and Management (Focus Area 1: Governance and Management and Focus Area 2: Finance)
    D        Staff (Focus Area 3: Human Resource)
    E        Student Support Services
    F        Resources (Focus Area 6: School Facilities)
    G        Student and Community Life (Focus Area 5: School Community, Life and Culture)

In reviewing the old plan, there was an acceptance that it was in some ways over ambitious and that many aspects were not achieved.
There will also be a need to monitor more closely the implementation of the plan to ensure that it is carried out or is amended
regularly.

The updated plan has involved consultation with representatives from all the major sections of the school. This has included teaching
and non-teaching staff, parents, students and Board members. However it is acknowledged that to maintain consistency and to ensure
an overview the Head has been responsible for coordinating the writing of the report and has been responsible for submitting it to the
Board of Governors for final approval.




Strategic Action Plan – version 1 5th October 2009                                                                                        2
Vision Statement: Le Bocage International School in 2015

Le Bocage International School (LBIS) will continue to be the preferred international school in Mauritius and a leading international
school in the region. This will be built on continued Council of International Schools accreditation and the drive for self-improvement,
and also a desire from those within the LBIS community to provide a quality international education.

The school will strongly adhere to the core values of excellence of teaching and learning, teamwork, personal commitment, ethical
behaviour, mutual respect and intellectual honesty, intellectual growth and a focus on creating a stimulating learning environment. A
sense of pride, loyalty and commitment to the distinctive mission of the school will be evident throughout the LBIS community.

The point of convergence for all of the strategies and action plans is the prospect that LBIS will prepare all students to think
creatively, reason critically, communicate effectively and learn enthusiastically throughout life. We will transform our students to be
highly successful in the workplace and the world throughout their lives.

The LBIS Strategic Plan aims to balance the desire for a quality teaching and learning environment and infrastructure with the wish to
offer an international education to as wide a range of students as possible.




Strategic Action Plan – version 1 5th October 2009                                                                                        3
Our Mission

To provide An Education for Citizens of a Better World

Our Philosophy

LBIS is committed to providing, in English, a high quality international secondary education that challenges students to realize their
full potential in a caring and supportive environment.

Our School:
    Emphasizes creative thinking, critical reasoning and effective communication
    Values and encourages behaviour that is ethical, responsible and respectful of the rights of others
    Seeks to foster a positive partnership between student, parents and the school
    Appreciates cultural diversity, as well as promoting pride and a sense of belonging to the school in Mauritius
    Prepares students to be community-spirited and successful citizens of a changing world
    Encourages awareness of global and environmental issues
    Strives for continuous learning and improvement

We believe that…
   all people have intrinsic worth.
   diversity is a strength when people are committed to shared goals.
   individual and cultural diversity enriches life.
   individuals are both responsible and accountable for their choices.
   learning is a natural, life-long process.
   all people have the capacity to learn and improve.
   open, honest and respectful communication is essential to mutual understanding.
   society benefits when people seek to excel.




Strategic Action Plan – version 1 5th October 2009                                                                                       4
Key to initials used in the report

Initials         Group or person                     Initials   Group or person

A-C                                                  H-O
ACC              Activities Coordinator              HD         Head
ACCM             Activities Committee                HOD        Heads of Department
ALU              LBIS Alumni                         IGC        IGCSE Coordinator
APC              Appraisal Committee                 LBISSA     LBIS Staff Association
ASC              Assessment Coordinator              LSC        Lifeskills Coordinator
BOD              Board of Governors                  MMA        Maintenance Manager
BODC             Chair of the Board of Governors     MSC        Middle School Coordinator
BUSO             LBIS Business Office                MYPC       IB MYP Coordinator
CAC              Careers Counselor                   NYAAC      NYAA Coordinator
CAPEX            Capital Expenditure Budget
CISC             LBIS Chair of CIS Committee         P-W
CISSC            CIS Steering Committee              PTA        Parent, Teacher Association
CC               Curriculum Coordinators             RCO        Recruitment Committee
COMC             Communications Committee            SENCO      SEN Coordinator
                                                     SMT        Senior Management Team
D-G                                                  SRC        Student Representative Council
DIPC             IB Diploma Coordinator              SRCC       SRC Coordinator
ESLC             ESL Coordinator                     STF        All staff employees at LBIS
FAC              Faculty (teaching staff)            STU        All students at LBIS
FC               Form Coordinator                    TECC       Technology Committee
FO               LBIS Finance Office                 TTC        Timetable Coordinator
GUC              Guidance Counselor                  WBM        Webmaster
                                                     WBT        Website Team




Strategic Action Plan – version 1 5th October 2009                                               5
Section A:          Philosophy and Objectives


Overall aim: To ensure that the philosophy and objectives of LBIS are an integral and living part of all aspects of the school
             community

Critical            Strategies                Indicators and expected                  Carried out by   Timeline          Resources       Ways of ensuring
Success Factor                                outcomes                                                                                    this will continue
A.1                 A.1.a
To ensure all       Conduct a review of the         Review carried out and agreed     SMT, BOD         Begin 2011 in     Meeting time    A regular review of
areas of the        Mission Statement,               upon                                               preparation for                   the Mission
school              Philosophy and                  Representatives from all          STF, SRC, PTA,   CIS self-study    Meeting time    Statement every five
community are       Objectives                       sections of the LBIS              ALU                                                years
aware of and                                         community involved
understand the      A.1.b
mission             Ensure that the Mission         As documentation is reviewed      SMT, FAC         Ongoing           Planning time   A consistent review
statement,          Statement, Philosophy            specific reference is made to                                                        cycle of
philosophy and      and Objectives are an            how the documents reflect the                                                        documentation
objectives of the   integral part of school          Mission Statement
school.             planning and life               Students, teachers & parents      LBISSA, PTA,     Ongoing           Meeting time    HD reports to BOD
                                                     look critically at how the        SRC, HD, BOD
                                                     Mission Statement relates to
                                                     teaching and learning
                    A.1.c
                    Ensure that the Mission         Mission statement is in view      SMT, HOD         Ongoing           No specific     Identification of
                    Statement is prominent           in the reception area and                                            resource        students’ mother
                    around the school                classrooms                                                           implications    tongue on entry and
                                                    Mission Statement is              HOD Mod Lang     Jan 2010          Preparation     the inclusion of a
                                                     translated into other languages                                      time            translated statement
                                                     spoken at the school                                                                 of the language
                    A.1.d
                    Ensure that the school          Conduct an opinion survey of      SMT, BOD         March 2012        Use CIS         Ensure it is part of
                    community gives                  the LBIS community                                                   survey          the CIS cycle
                    feedback on the school                                                                                instrument      HD reports to BOD
                    and its programmes




Strategic Action Plan – version 1 5th October 2009                                                                                                             6
Section B:        Curriculum


Overall aim: To develop and maintain a quality educational programme that ensures continuous improvements in teaching and
             learning

Critical           Strategies                Indicators and expected                    Carried out by   Timeline   Resources       Ways of ensuring
Success Factor                               outcomes                                                                               this will continue
B.1                B.1.a
Establish a        Maintain structured              Established on-going insets to     CC, HOD, SMT     2010       PD time         Placed in school
strong             professional                      refresh existing teachers and                                                  calendar annually
‘Assessment for    development                       train new teachers to use
Learning’          programme with                    formative assessment                                                           Annual evaluation
culture in LBIS    specific targets                  techniques
classroom          B.1.b
practice           Review and improve               Revised policy developed and       ASC, HOD,        2010       Meeting time    Placed in review
                   the format of                     agreed                             SMT, CC                                     cycle
                   assessment and                   Introduce subject criterion-       ASC, HOD,        2010       Planning time
                   reporting                         referenced reports                 SMT, CC
                                                    ATL reports for all students at    ASC, HOD, CC     2010       Planning time
                                                     transition points e.g. F1, 4 & 6
                   B.1.c
                   Review Teaching &                Reviewed Teaching and              CC, MYPC,        2010       Planning &      Placed in review
                   Learning policy                   learning policy agreed and         SMT, HOD                    prep. time      cycle
                                                     implemented
                                                    New SCF documents with             CC, HOD          2010       Planning &
                                                     MYP                                MYPC                        prep. time
                                                    Updated appraisal system to        SMT, CC, HOD     2010       Planning &
                                                     monitor implementation                                         prep. time




Strategic Action Plan – version 1 5th October 2009                                                                                                       7
Critical           Strategies                 Indicators and expected                  Carried out by   Timeline   Resources      Ways of ensuring
Success Factor                                outcomes                                                                            this will continue
B.2                B.2.a
Establishment      Benchmark value-                 Predictive and diagnostic         CC, HOD, SMT     Ongoing    Preparation    Annual report to
of a               added student                     analysis of external exam                                     time           BOD
performance        performance at each               results, & internal assessments
management         level of transition              IB Dip against world mean         DIPC             Ongoing    Prep. Time
infrastructure     within the school’s              University entrance data          CAC              Ongoing    Prep. Time
within the         curriculum                       Parent and Student survey         SMT              2010       Planning and
school culture                                       results                                                       prep. time
                   B.2.b
                   Track university                 Accurate list of university and   CAC              Ongoing    Prep. Time     Annual report to
                   entrance of students and          college placements                                                           SMT
                   qualifications required          Accurate list of offers of        CAC              Jan 2010   Prep. time
                                                     places and requirements
                   B.2.c
                   Develop greater                  Classroom visits based on key     SMT, HOD, CC     Ongoing    Classroom      Annual report to
                   awareness of the                  indicators                                                    time           BOD
                   teaching and learning            Showcasing of best practices      HOD              2010       Planning and   HOD report to HD
                   experiences of students           on the school’s website                                       prep. time
                   B.2.d
                   Develop annual targets           Institution and department        SMT, HOD, CC     Ongoing    Planning and   Annual report to HD
                   for the school and                targets agreed by whole                                       prep. time
                   departments                       faculty and departments.




Strategic Action Plan – version 1 5th October 2009                                                                                                     8
Critical           Strategies                Indicators and expected                 Carried out by   Timeline   Resources       Ways of ensuring
Success Factor                               outcomes                                                                            this will continue
B.3                B.3.a
Review and         Review Contents                  Curriculum group established    CC, HOD          2010       Meeting time    Report to SMT
evaluate the       Standards Framework              Meetings calendared.
programmes         for Forms 1-3
that the school    B.3.b
offers to ensure   Continue to implement            Further develop a format.       CC, HOD          Ongoing    Plan & prep     Report to SMT
relevance and      a cycle of curriculum            Identify 3 learning areas per
the highest        review.                           subject.
quality            B.3.c
international      Expand & develop the      Priority given in the short-term to
educational        curriculum.               the development and/or addition of
opportunities                                the following curriculum offerings:
for students at                              - Values Education                      LSC, CC          2011       Plan & prep     Report to SMT
LBIS                                         - A third language                      SMT, CC, HOD     2011       Plan & prep     Report to SMT
                                             - Environmental awareness 1-7           SMT, CC, HOD     2011       Plan & prep     Report to SMT
                   B.3d
                   Implementation of a              Draw up an implementation       HD               2009       Plan & prep     HD report to BOD
                   pilot MYP for Forms 1-            plan
                   3                                Identify teachers for pilot     SMT, HOD         2009       Staffing cost
                                                    Appoint MYP Coordinator         SMT              2010
                                                    Train MYP teachers              HODs             2010       Training cost
                                                    Allocation of time for          SMT              2010       Staffing cost
                                                     preparation
                   B.3.e
                   Review timetable                 Conduct a survey to assess      TTC              2010       Plan & prep     Report to SMT
                   structure across the              effectiveness of change                                     time
                   school




Strategic Action Plan – version 1 5th October 2009                                                                                                    9
Section C:         Governance and Management



Overall aim: To provide governance and management known for its vision, collaboration, efficiency, clarity and transparency.

Critical           Strategies                Indicators and expected                   Carried out by   Timeline     Resources      Ways of ensuring
Success Factor                               outcomes                                                                               this will continue
C.1                C.1.a
To ensure all      Ensure the                       Up to date and relevant job       SMT, BOD         2010         Prep. time     Establish a review
areas of the       administration has                descriptions                                                                   cycle
school             defined and visible              Up to date organizational chart   HD               2010         Prep time
community are      areas of responsibility          Updated job descriptions on       HD & WBM         2010         Prep. time
aware of and                                         the website
understand the     C.1.b
structure,         Ensure effective                 BOD feedback on school            BODC             2010         Meeting time   Established in BOD
organization       communication                     projects.                                                                      calendar
and practices of   between BOD &
the school.        management & staff
                   C.1.c
                   Establishing clear               Feeder schools better informed    SMT              2010         Meeting time   Establish clear remit
                   communication                    Web site informative              WBM              Ongoing      Prep. time
                   channels                         Suggestion Box                    HD               2010         Prep. time
                                                    Parental retreats/social even.    LBISSA , PTA     2010         Plan & prep.
                                                    Alumni                            ALU              Ongoing      Meeting time
                                                    Handbooks updated                 SMT, CC, HOD     2010         Prep. time

C.2                C.2.a
Ensure best        Provide in-service               Yearly in-service sessions        BOD, HD          Begin 2010   Meeting time   In-service included
practices in       training for BOD on a             after a BOD meeting                                                            in the BOD calendar
school             regular basis                    Guidelines & procedures for       BODC, HD         2010         Plan & prep    Written induction
governance                                           induction of new BOD                                                           procedures
                   C.2.b
                   Establish an annual              Calendar established              HD, BODC         2010         Plan & prep    Annual review by
                   BOD calendar                     Calendar adhered to               HD, BOD          Ongoing                     BOD




Strategic Action Plan – version 1 5th October 2009                                                                                                    10
Critical Success   Strategies                 Indicators and expected                Carried out by   Timeline   Resources        Ways of ensuring
Factor                                        outcomes                                                                            this will continue
C.2 (cont.)        C.2.c
Ensure best        Create development               Plan reviewed by School         HD, BOD, STF,    2010       Meeting time     Regular item on
practices in       plan and calendar based           Community                       PTA, SRC                                     BOD agenda
school             on strategic objectives          BOD discussion and decision     BOD              Dec 2010   Meeting time
governance         and the funding
                   priorities agreed by the
                   BOD

C.3                C.3.a
Market and         Create new marketing             Consult a Marketing Firm/ and   BOD, HD          2010       Financial cost   Set up a marketing
promote LBIS       strategies                        give our terms of reference                                                  committee
effectively        C.3.b
                   Identify and promote             Updated brief guide to LBIS     SMT, CC, HOD     2010       Prep. Time       Set up a marketing
                   those programmes that             programmes                      HD,                                          committee
                   make LBIS                        Positively market IB Diploma    SMT, DIPC        Ongoing    Meeting time
                   differentiated in the            Positively market IB MYP        SMT, MYPC        2010       Meeting time
                   Mauritian/ International         Positively market CIS           SMT, STF,        Ongoing    Meeting time
                   marketplace                       Accreditation
                   C.3.c
                   Update school website            Create a website team           WBM              2010       Meeting time     The creation of a
                   to make it a functional          All activities on the website   WBM & WBT        2010       Prep. Time       website team will
                   and informative tool              within 2 days.                                                               help to ensure an
                                                    Alumni section                  WBM, ALU         2010       Plan & prep.     up-to-date website
                   C.3.d
                   Continue to raise                Sci fairs, Nat Comp, NYAA       HOD, NYAAC       Ongoing    Plan & prep      Ensure events are
                   profile locally                  Plays & Art exhibitions etc     FAC              Ongoing    Plan & prep      calendared
                                                    Attend functions                HD               Ongoing    Meeting time
                   C.3.e
                   Raise profile                    School exchanges overseas       FAC              Ongoing    Plan & prep      Calendar events
                   internationally                  Regular update of website       WBM              Ongoing    Prep time        Webmaster
                                                    Network created with other      HD               2010       Plan & prep      Attend regional
                                                     International schools                                       time             conferences




Strategic Action Plan – version 1 5th October 2009                                                                                                    11
Critical Success      Strategies                  Indicators and expected           Carried out by    Timeline    Resources      Ways of ensuring
Factor                                            outcomes                                                                       this will continue
C.4                   C.4.a
Develop stronger      Conduct a collaborative        Create a formal study team    BOD LBIS,         June 2010   Meeting time   Regular meeting
links between         feasibility study with         Increase collaboration and    BOD Clavis, HD                               with the two BOD
LBIS and other        Clavis International            educational ties              LBIS, HD Clavis
institutions          Primary School
                      C.4.b
                      Maintain links with            Students exchange programme   FAC               Ongoing     Meeting time   Ensure that events
                      institutions that have a       Partnerships with outside     HD, BOD, SMT                                 and meetings are
                      common area of interest         agencies and international                                                 regularly calendared
                      with LBIS                       educational bodies

C.5                   C.5.a.
Achieve a school      Update promotional             Set up marketing committee    BOD, HD           2010        Meeting time   Annual review by
image that            material                       Ensure clarity of mission,                                  Cost of        BOD
supports and                                          philosophy & vision                                         materials
reinforces the        C.5.b
school mission        Re-evaluate the                PD calendar for admin staff   SMT, BOD, HD      2010        Time           Report to BOD
statement,            structure of the                and clear job description
philosophies and      administration staff to
vision                ensure efficient services

C.6                   C.6.a
Ensure the            Update and revise the          Plan is stress tested         BOD, HD, FO       2010        Plan & prep    Annual update for
financial stability   LBIS 5 year financial                                                                                      BOD
and longevity of      plan
the school




Strategic Action Plan – version 1 5th October 2009                                                                                                12
Critical Success   Strategies                Indicators and expected                   Carried out by   Timeline       Resources       Ways of ensuring
Factor                                       outcomes                                                                                  this will continue
C.7                C.7.a
Ensure that LBIS   Prepare for the                  Select a Chair for CIS Steering   HD               2011           Staffing cost   Report to BOD
successfully       Preparatory Visit from            Committee                                                         (time)
gains re-          CIS                              Organise Main Committees          HD, CISC, HOD,
accreditation                                        and chairs of committees          CC               2011           Prep & plan     Report to BOD
from CIS                                            Prepare info for CIS              CISC, CISSC      2012 (early)   Prep & plan     Report to HD
                   C.7.b
                   Successfully complete            CIS committees prepare            CISC, CISSC,     2012           Prep & plan     Report to HD
                   CIS Self-study                    documentation                     HOD, CC
                                                    Self-study completed              CISC, CISSC      2013 (early)   Prep & plan     Report to HD, BOD
                   C.7.c
                   Successfully fulfill             Team Visit organized and          CISC, CISSC,     2013 (late)    Prep & plan     Report to HD, BOD
                   requirements of CIS               carried out                       HOD, CC
                   Team visit                       CIS re-accreditation gained                        2013                           Report to HD, HOD
                   C.7.d
                   Successfully fulfill             Report completed and              CISC, CISSC,     2014           Prep & plan     Report to HD, BOD
                   requirements of CIS               accepted                          HOD, CC
                   One Year Report




Strategic Action Plan – version 1 5th October 2009                                                                                                      13
Section D:          Staff


Overall aim: To recruit, develop, reward and retain quality staff

Critical Success     Strategies                Indicators and expected                Carried out by   Timeline   Resources      Ways of ensuring
Factor                                         outcomes                                                                          this will continue
D.1                  D.1.a
Identify staffing    Establish a human              Recruitment Committee            SMT,             2010       Meeting time   HD to provide
needs and            resources framework to         HR policy established            HD, BOD, RCO                               annual reports to
employ well          guide all recruitment          Parental expertise used to       HD & PTA                                   BOD
qualified staff.                                     support staff recruitment.
                     D.1.b
                     Investigate ways to            Define LBIS staff profile in     SMT, CC, HOD,    2010       Meeting time   HD annual report to
                     improve the recruitment         line with School’s Philosophy    PTA, SRC                                   BOD
                     procedures for staff           Create interview panels                                      Meeting time
                     D.1.c
                     Create a support system        Develop a mentoring program      HOD, CC          2010       Plan & prep    In HOD job
                     for new staff                   for new teachers.                                                           descriptions

D.2                  D.2.a
Investigate ways     Recommend new                  Study of needs of staff with     BOD, HD,         2010       Plan & prep    Annual reports to
to improve           remuneration                    expert HR advice and             LBISSA                                     BOD from HD man.
conditions of        framework.                      establishment of new criteria.
employment to        D.2.b
attract, retain      Ensure there are equal         Written equal opportunities      SMT, LBISSA,     2011       Plan & prep    Included in Board
and reward high      opportunities for all           policy                           BOD                                        Policy File
quality faculty      staff members
and
administration




Strategic Action Plan – version 1 5th October 2009                                                                                                   14
Critical Success    Strategies                Indicators and expected                 Carried out by   Timeline   Resources      Ways of ensuring
Factor                                        outcomes                                                                           this will continue
D.3                 D.3.a
Create a positive   Identify the means to           Mid-year interaction session     BOD, HD, STF,    2010       Meeting time   Calendar event
working             develop a more                   Board/staff.                     HOD, CC
environment         collaborative culture.
                    D.3.b
                    Regular meetings                Specific Time-tabled slots.      SMT, CC, HOD,    2010       Curric time    Develop this within
                    between teachers of                                               TTC                                        an IB MYP
                    same year group to              Subject interaction built into   CC                          Curric time    framework
                    develop collaborative            the curriculum.
                    teaching and learning.
                    D.3.c
                    Create a structure to           Creation of a PD development     SMT, CC, HOD     2010       Plan & prep    Place on school
                    ensure an effective              calendar published at the                                                   calendar
                    Professional                     beginning of the academic
                    Development                      year that establishes PD
                    programme.                       themes
                                                    PD committee established to      SMT, CC, HOD     2010       Meeting time   Report to HM
                                                     look at PD requests.




Strategic Action Plan – version 1 5th October 2009                                                                                                 15
Section E:         Student Support Services


Overall aim: To provide services that support the delivery of a quality education for all students at LBIS

Critical           Strategies                 Indicators and expected                   Carried out by   Timeline   Resources         Ways of ensuring
Success Factor                                outcomes                                                                                this will continue
E.1                E.1.a
Explore,           To develop ESL across            ESL coord. Appointed               HD               2010       Increased         Quarterly report
develop, and       the school                                                                                       staffing costs    from ESLC to HM
implement                                           Committee with one teacher         ESLC             2010       Meeting time
strategies to                                        from every Depart.set up
differentiate                                       Training of at least one teacher   ESLC, HOD        2010       PD costs
curriculum and                                       from every Depart
instruction to     E.1.b
meet a variety     Reinforce differentiated         To be included in SOW              HOD, FAC, CC     2010       Plan & prep       Report to HD from
of student         teaching and learning             (Schemes of Work)                                                                HOD
needs,             E.1.c
especially those   Develop Gifted &                 Committee with at least one        SENCO, FAC,      2010       Meeting time      Quarterly report
students with      Talented Program                  teacher from every Dept            HOD                                           from SENCO to HD
English as a
                                                    G & T students identified          SENCO            2010       Prep time
Second
                                                    Implementation of Programme        SEN Dept         2011       Plan and prep
Language and
students with      E.4.d
special learning
                   Introduce Braingym               Staff & parents introduced to      SEN Dept.        2010       Meeting time      Quarterly report
                                                     Brain gym techniques                                                             from SENCO to HD
needs and
talents.                                            Part of SEN lessons                SEN Dept         2011       Plan & prep

E.2                E.2.a
Develop a          Review school uniform            Re-design a smart school           SMT, PTA, STF,   Dec 2010   Meeting time      Annual report to HD
greater sense of                                     uniform                            SRC                         Plan & prep       and PTA
school identity    E.2.b
for LBIS           Student card                     Issue student cards to students    SMT              2010       Plan & prep       Place in school
students                                                                                                            Financial costs   budget




Strategic Action Plan – version 1 5th October 2009                                                                                                      16
Critical           Strategies                  Indicators and expected            Carried out by   Timeline   Resources      Ways of ensuring
Success Factor                                 outcomes                                                                      this will continue
E.3                E.3.a
Review and         Regularly review the             Better services              HM, BUSO,        Ongoing    Meeting time   Calendar meetings
improve            bus contract with                More community involvement   PTA, SRC
transport          outside provider
arrangements       E.3.b
                   Appoint a traffic                Improve traffic flow         HRM              2010       Prep & plan    Quarterly report to
                   facilitator at peak times                                                                                 HD

E.4                E.4.a
Review and         Regularly review the             Better services              HM, BUSO,        Ongoing    Meeting time   Calendar meetings
improve            canteen contract with            More community involvement   PTA, SRC
canteen services   outside provider




Strategic Action Plan – version 1 5th October 2009                                                                                             17
Section F:         Resources


Overall aim: To provide a well resourced school that supports its mission and programme

Critical           Strategies                Indicators and expected                 Carried out by   Timeline   Resources       Ways of ensuring
Success Factor                               outcomes                                                                            this will continue
F.1                F.1.a
Identify the       Develop a master plan            Development committee           HD and BOD       2010       Meeting time    Quarterly report to
resource needs     for the upgrade and               established                                                                 BOD
of LBIS that can   development of the               Learning areas upgraded         MMA              2010       Budget cost     CAPEX budget
be achieved        LBIS site                        Acoustics of MPH improved       MMA              Ongoing    Budget cost     CAPEX budget
within its                                          Sports facilities extended      MMA              2010       Budget cost     CAPEX budget
financial                                           School vehicles upgraded        MMA              2010       Budget cost     CAPEX budget
capabilities                                        New security shelter provided   HD and BOD       2011       Budget cost     CAPEX budget
                                                     for security staff              HD and BOD       2011       Budget cost     CAPEX budget

F.2                F.2.a
Extend the use     Explore and develop              Establish a technology          HD               2010       Meeting time    Calendared
of technology      strategies to integrate           committee                                                                   meetings
within the         technology across the            Develop a three year ICT        HD, TECC         2011       Meeting time,   Quarterly report to
school             curriculum                        development plan                                            Plan & prep     HD
                                                    Implementation of ICT PD        HD, TECC                    PD time         Calendared events
                                                     days                                             2010
                                                    Upgrade of room IT3             HD, BOD,                    Budget cost     CAPEX budget
                                                                                     TECC             2011
                                                    Upgrade and improve IT          HD, BOD,                    Budget cost     CAPEX budget
                                                     access for staff                TECC             2011




Strategic Action Plan – version 1 5th October 2009                                                                                                 18
Critical           Strategies                Indicators and expected                 Carried out by   Timeline   Resources        Ways of ensuring
Success Factor                               outcomes                                                                             this will continue
F.2                F.2.b
Extend the use     Use technology to make           Appoint an IT Manager           HD               2010       Staffing costs
of technology      management &                     Make Integris more accessible   TECC             2010       Plan & prep      Quarterly report to
within the         administration systems            to other relevant users                                                      HD
school (cont.)     more efficient.
                   F.2.c
                   Provide resources for            Central resource area created   TECC             2010       Budget           CAPEX budget
                   purchase of hardware             Introduction of IC3 course      Tech Dep         2011       Staffing costs   CAPEX budget
                   and software for use in           from Form 4                                                 & Budget
                   delivery of educational
                   programmes.




Strategic Action Plan – version 1 5th October 2009                                                                                                  19
Section G:       Student and Community Life


Overall aim: To provide a stimulating and productive environment with opportunities for all

Critical          Strategies                 Indicators and expected            Carried out by        Timeline   Resources      Ways of ensuring
Success Factor                               outcomes                                                                           this will continue
G.1               G.1.a
Promote           Establish committee to        Committee set up               HD                    2010       Meeting time   Annual Reports to
learning and      evaluative & report on        Recommendations made on        COMC                  2011       Plan & prep    BOD
engagement for    current vehicles of            more effective means of
all in the        communication                  information sharing
community in      G.1.b
support of        Develop parental            Initiate Parent-Partnership      HD, PTA, WBM          2010       Meeting time   Quarterly report to
collaborative     awareness, interest and       Network through PTA                                                             PTA
school            involvement in varied       Focus meetings with parents at   FC, SMT               Ongoing    Meeting time   Annual reports to
improvement       activities that support       year level, subject level,      PTA                                             BOD
                  school life and culture.      initiative level
                                               Interactive PTA page on         PTA, HD, WBM          2010       Prep time      Quarterly report to
                                                website                                                                         PTA
                                               Collaborative fundraising       PTA                   Ongoing    Plan & prep
                                               Parental involvement through    Transport             Ongoing    Meeting time
                                                PTA in school services          Officer/H&S officer
                  G.1.c
                  Develop Alumni                Updated database               SRC, HD, ALU          2010       Prep time      Annual report to
                  Association                   Alumni page on website         President             2010       Plan & prep    BOD
                  G.1.d
                  Develop student             SRC constitution reviewed        SRCC, SRC             2010       Meeting time   Annual report to
                  governance                   and agreed on                                                                    HD
                                              Constitution published for       SRCC, SRC             2010       Plan & prep    Placed on website
                                               whole school




Strategic Action Plan – version 1 5th October 2009                                                                                                 20
Critical           Strategies               Indicators and expected             Carried out by   Timeline   Resources      Ways of ensuring
Success Factor                              outcomes                                                                       this will continue
G.2                G.2.a
Maintain and       Develop wider                Setting up an activity         SMT, ACC, SRC    2010       Plan & prep    Annual report to
enrich the         involvement in the            committee composed of act.                                                SMT
extracurricular    planning of the               supervisor, students
student            activities programme
activities, e.g.   G.2.b
music, sports,     Improve the quality of       Producing a clear philosophy   ACCM             2010       Meeting time   Report to SMT
teams, theatre.    the act. Prog                 and rational of the program
                                                Review the signing up          ACCM             2010       Meeting time   Report to SMT
                                                 process
                   G.2.c
                   Develop a sense of           Greater student choice         ACCM             2010       Prep time      Report to SMT
                   involvement by               Choice for teachers            ACCM             2010       Prep time
                   teachers and students-       Set of guidelines outlining    ACCM             2010       Plan & prep
                   (motivation)                  expectations of the teachers
                   G.2.d
                   Develop more                 Electronic delivery systems    ACCM             2010       Prep & plan    Report to SMT
                   effective ways of             in place including e-mails
                   communicating about          Use of board displays          ACC              2010       Prep time
                   activities through the       Letters to parents             ACC              2010       Prep time
                   LBIS community               Use of students diary          FAC              2010       Prep time




Strategic Action Plan – version 1 5th October 2009                                                                                            21