Study Area




                                                                            1
                   CTI ENGINEERIGN INTERNATIONAL CO., Ltd.
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER    MoES



  Flooding Area in June-July, 2005
                                                                Moskvasky,H
                                                                 amadoni




         More than 10,000 people evacuated; 4,000 ha affected
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                   2
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER   MoES



  STUDY OBJECTIVES
    1. Formulate a master plan for flood disaster
       prevention in the Study area, which includes a
       flood control plan, a flood fighting plan and a flood
       forecasting , warning and evacuation plan
    2. Implement a pilot project to evaluate validity of
       river training in the Study area.
    3. Implement the feasibility study for the short-term
       plan.
    4. Carry out technical transfer to the staff of MoES
       and other relevant agencies through the Study
       activities.

CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                 3
   JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER   MoES



Technical Challenges to Study on Structures

          Flood-dike, guide-dike and spur-dike, Re;
          Position, direction, height, and protection of
          Numerical analysis with micro model
          hydraulic test on river morphology
          Banking materials for impermeable zone
          (soil or soil cement etc.)
          Slope protection with concrete block,
          connected concrete block, gabion, stone-rip-
          rap, and geotextile considering local
          availability
          Influence to Afghanistan side
 CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                 4
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER   MoES

  Challenges on Non-Structural Measures
         Disaster Management
            Hazard/Risk Mapping
            Evacuation
            Manual
         Emergency countermeasures system
            Monitoring and evaluation system
            Emergency works
         Land Use, Institution, Organization
            Flood-proof land use based on hazar/risk map
            Government-Resident partnership
            Monitoring, forecasting and warning system
            Inter-agency disaster management system
            Disaster Management in community level
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                 5
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER   MoES



   Method of Analysis

            Satellite Image Analysis
            Runoff Analysis on Snow Melting
            Riverbed Variation Analysis
            Sediment Runoff Analysis
            Flooding Analysis
            Hazard/Risk Mapping
            Micro Model Simulation
            GIS data base


CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                 6
  JICA         THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER          MoES


         Process of Flood Risk Management Planning
         Analysis on                                              Flood Risk
          Institution/                                         Management Plan
         Organization
                                                                  Warning/
                                                                Communication
         Analysis on
         Resident's
         Awareness                                                  Rescue


      Satellite Image         Sedimentl                           Restoration
         Analysis              Analysis

                            Topographical                         Hazard/Risk
                              Analysis         Flooding              Map
                                               Analysis
                              Past Floods                          Land Use
                               Analysis

         Hydro-meteological                                        Evacuation
              Analysis

CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                         7
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER                MoES

 Present Institutional Structure for Flood Risk Management
                                                                MoWR
                                            MoES

                   Hydromet                                 Design Center




         Information
                       Communication       Resue      Coordination   Civil Defense
           Analysis
                          Center           Center       Center         Services
            Center

                                                        Budget/
                       Oblats/Rayons                                   Logistic
                                                       Contract
                                                                       Supports
                                                      Management
                          Villages


                                           Rescue
                                                      Restoration
                         Residents        Dangerous
                                                        Works
                                            Works


CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                              8
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER                                MoES

   Capacity Building of Information Management and Analytical Center (IMAC)


                                           MoES
                                          Decision
                                          System                                     MoES
                                                                                   Engineering




                                             Recommend
                                                                                     Section
                                                                        t   i on
                                                                     ma
                                                                or
                                                         I nf


                          Capacity                                           FRMP
           UN-DRMP        Building         IMAC                              GIS DB     JICA-Study


                                             Training


                                                                                    Sustainablity?


                                      Communities



CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                                              9
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER     MoES

      Exercise Plan on Community Flood Risk Management

         Central Government




                                                        JICA-Study
           Jamoats/Rayon/
                                                           IMAC
              Oblast
                                                         UN-DRMP


                         Flood Risk Management
                         Plan (Flood Risk Map,          JICA-Study
                         Evacuation)


                                                      Rescue Center
                                      Logistic     Other Governmental
             Communities
                                      Support     Agencies under MoES's
                                                     Emergency Plan


CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                   10
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER       MoES

         Workshop/Seminar Plan
          Phase       When                  Title                 Place
                      2006
                      July        Hazard Mapping Workshop        Hamadoni
                     3 days
            Ist
                      2006
                                River Engineering (design and
                     August                                   Dushanbe
                                planning)
                      1 day
                      2007
                                Flood disaster      management
                    February                                     Dushanbe
                                seminar
                      1 day
           2nd
                      2007
                                Flood disaster      management
                     March                                       Hamadoni
                                Workshop
                      1 day
                      2007
                                Exercise of Community Flood
                      May                                   Hamadoni
                                Management
                        2
           3rd
                      2007
                                River              Engineering
                      July                                     Dushanbe
                                Seminar(construction)
                      1 day
CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                     11
  JICA               THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER                       MoES


        Study Time Schedule
           Year                         2006                                       2007

             month
.                      Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJun Jul Aug Sep Oct Nov Dec
Stage

Inception Stage

Preparation     .
Data Collection

Analysis


Master Plan


Feasibility Study


Pilot Project

Draft Final Report
.
Final Report

CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                                            12
  JICA        THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER   MoES




                              Thanks




CTI ENGINEERIGN INTERNATIONAL CO., Ltd.                                 13