Receipts

Document Sample
Receipts
Shared by: John Bennett
Stats
views:
39
posted:
3/5/2009
language:
English
pages:
4
Entering InterUnit Receipts Job Aid



Purpose: Use this procedure to enter a manual interunit receipt into Core-CT. At

this time, the Department of Correction is the only agency that will enter interunit

receipts.



Prerequisite: Catalog Management items must be loaded in Inventory Business Unit

storage locations.



Procedure:



1. Begin by selecting Inventory  Putaway Stock  InterUnit and RMA

Receiving to display the InterUnit and RMA Receiving Search page.



2. Complete the Add a Receiver ID and Find an Existing Receiver ID tab.



Selection Data Entry Required

Find an existing Receiver Type or select the Destination Business Unit and Receipt Number. Do

ID not use the Bill of Lading field. Click .







Add a Receiver ID Type or select the Destination Inventory Business Unit. Do not

change the default value of NEXT in the Receipt Number field. Do not

change the default value of InterUnit Transfer in the Receipt Type

field. Click to display the Receipt Header tab. This will

create the receipt.









Updated January 2007

3. Click the Search link to display the InterUnit Transfer Search page.









4. Type or select the Source Business Unit and InterUnit ID. The Item ID field is

optional. Click . The Receipt Header page displays.









Updated January 2007

5. Select the checkbox next to the InterUnit ID line you want to receive against in

the Receipt Header Details group box, Receipts tab. Edit the Receipt Quantity and

Unit of Measure, if necessary, then click the Putaway Details tab. The Putaway

Details page displays.









6. Verify that the Putaway Action defaults in as Putaway at Receipt Save Time (this

is a configured value). Edit the Quantity, Unit of Measure and Storage Area fields, as

necessary, in the Putaway Information group box, Location tab. Do not use the Item

Tracking tab.







Updated January 2007

7. Click . Once the receipt is saved, the Receipt Number changes from NEXT

to an auto-generated number.



8. The procedure is complete.



Additional Information



 The Department of Transportation will be utilizing Auto-generated Inter-Unit

Receipts. Core-CT will automatically create the inter-unit receipts, the

Department of Transportation will be responsible for running all of the

Putaway processes for these receipts.









Updated January 2007


Share This Document


Related docs
Other docs by John Bennett
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!