									P1609.0 Proposed Outline


February 2007

IEEE P1609 Working Group Meeting,
San Antonio
Presented by
John Moring
TechnoCom Corporation
jmoring@technocom-wireless.com
                  Outline
•   Objective of this discussion
•   1609.0 PAR
•   Objectives of 1609.0
•   Document outline and contents
•   Comments received
•   Next steps


February 2007         1609.0        Page 1
      Objective of this Discussion
• Agree on the objectives of the new architecture
  standard
• Review proposed outline
     – See document posted to email reflector 1/26 by T
       Kurihara
     – Adjust working outline as needed
• Agree on next steps
     – Identify coordinator
          • J Moring volunteers
     – Solicit contributions for specific sections
     – Develop project milestones

February 2007                     1609.0                  Page 2
                 1609.0 PAR
• Title: Trial-Use Standard for Wireless Access in
  Vehicular Environments (WAVE) - Architecture
• Status: New Standard Project
• Project scope: This standard describes the Wireless
  Access in Vehicular Environments (WAVE/DSRC)
  architecture and services necessary for multi- channel
  DSRC/WAVE devices to communicate in a mobile
  vehicular environment.
• Project purpose: The purpose of this standard is to
  describe the architecture of the DSRC/WAVE operations
  currently represented by the family of IEEE 1609
  standards and IEEE P802.11p.

February 2007             1609.0                    Page 3
                Objectives of 1609.0
• Capture system-level material not appropriate
  for any of the lower layer standards
     – Descriptive material
     – Requirements
     – Development, deployment and operational guidance
• Serve as introduction to, and context for, the
  WAVE standards family
• Provide information helpful to the success of the
  WAVE community

February 2007              1609.0                   Page 4
                Outline Development
• Leverage WAVE work done to date
     – W Fisher architecture doc
     – R Roebuck system-level PICS requirements
     – System descriptive material from 1609.3 et al.
     – Etc.
• IEEE 802 Overview and Architecture
  document as example


February 2007             1609.0                 Page 5
                Outline Status
• First draft distributed
     – As follows
• Comments received
     – Discussed following the outline




February 2007             1609.0         Page 6
    Outline 1: Boilerplate Material
• 1. Overview
     –   1.1 Scope
     –   1.2 Purpose
     –   1.3 Document organization
     –   1.4 Document conventions

• 2. References

• 3. Definitions, abbreviation, and acronyms
     – 3.1 Definitions
     – 3.2 Abbreviations and acronyms

February 2007                  1609.0          Page 7
  Outline 2: Substantive Material
  • 4. System components and connectivity
  • 5. Overview of the standards
       – 5.1 Overview of Intelligent Transportation Systems
       – 5.2 WAVE standards
       – 5.3 Relation to other standards
  • 6. Concept of operation
       –   6.1 System features
       –   6.2 Responsible entities
       –   6.3 System planning and deployment
       –   6.4 Operations
  • 7. Usage examples
  • 8. System level requirements
  • 9. Ongoing work

February 2007                       1609.0                    Page 8
     Comments Received to Date
• Update Figure 1; add new figures better representing
  1609 in context, including VII network diagram and
  logical interfaces to VII network components
• Relate WAVE stack to OSI model
• Include VII network context in clause 4
• Incorporate registration (certificate, PSID) and
  certification info
• Make sure system-level requirements identified in the
  PICS development process are captured; add PICS
• Include material on roadside to roadside
  communications
• Fix, document purpose, mistakenly copied from 1609.3
• Clarification of wording, etc.

February 2007             1609.0                     Page 9
                Proposed Milestones
• 2/07 Kickoff
• 3/07 Updated outline with initial
  contributions
• 5/07 Section material contributed
• 6/07 Draft document
• 7/07 Comments
• 8/07 “Final” document ready for WG
  approval
February 2007           1609.0         Page 10
                Review of Objectives
• Agree on the objectives of the new
  architecture standard
• Review proposed outline
     – Adjust working outline as needed
• Agree on next steps
     – Identify coordinator
     – Solicit contributions for specific sections
     – Develop project milestones

February 2007              1609.0                    Page 11

								