					Status of the MMUTIS Projects
                    under the
Medium Term Development Plan
                (MTDP 1999-2004)



  Office of the Assistant General Manager for Planning
 METROPOLITAN MANILA DEVELOPMENT AUTHORITY
PROJECT NAME        : LRT CAPACITY EXPANSION (PHASE 1)
                     PURCHASING OF NEW AIRCONDITIONED COACHES



IMPLEMENTING AGENCY : LRTA
                                                 Valenzuela City
SUPPORTING AGENCY   : DOTC
                                                                               Quezon City
                                          Navotas
                                                Malabon

                                                     Caloocan                                 Marikina




                                                     Manila              San Juan



                                                                                          Pasi
                                                                      Makati              g
                                                                                    Pateros

                                                                 Pasay         Taguig



                                                              Paranque




                                                          Las Pinas




                                                                       Muntinlupa
PROJECT NAME   : LRT CAPACITY EXPANSION (PHASE 1)
               PURCHASING OF NEW AIRCONDITIONED COACHES




                                   STATUS 2002

                                   COMPLETED




                                   STATUS 2005

                                   COMPLETED (2002)
PROJECT NAME        : LRT CAPACITY EXPANSION (PHASE 2)



IMPLEMENTING AGENCY : LRTA                Valenzuela City
SUPPORTING AGENCY   : DOTC
                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME           : LRT CAPACITY EXPANSION (PHASE 2)



STATUS 2002

Loan Agreement signed April 7, 2000

Package A :     Consultancy Agreement with winning bidder led by Pacific
                Consultants International (PCI) signed 28 November 2001

Package B :     Evaluation of Technical Proposal on-going

STATUS 2005

Package A:      Ongoing (Target 2006) LRVs Related System & Civil Works

Package B:      Completed (2004) Air-conditioning of Original Fleet
PROJECT NAME        : EDSA METRO RAIL TRANSIT 3
                      (PHASE 1)


IMPLEMENTING AGENCY : DOTC                Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME            : EDSA METRO RAIL TRANSIT 3
                          (PHASE 1)


STATUS 2002

Project Substantially Completed

Full Operation started July 20, 2000




STATUS 2005

Completed (2002)
PROJECT NAME        : METRO MANILA STRATEGIC MASS
                      TRANSIT DEVELOPMENT PROJECT
                      (MRT 2)


IMPLEMENTING AGENCY : LRTA               Valenzuela City

SUPPORTING AGENCY   : DOTC        Navotas
                                                                       Quezon City
                                        Malabon

                                             Caloocan                                 Marikina




                                             Manila              San Juan



                                                                                  Pasi
                                                              Makati              g
                                                                            Pateros

                                                         Pasay         Taguig



                                                      Paranque




                                                  Las Pinas




                                                               Muntinlupa
PROJECT NAME        : METRO MANILA STRATEGIC MASS
                      TRANSIT DEVELOPMENT PROJECT
                      (MRT 2)

STATUS 2002

PACKAGE   1:   38.20% COMPLETE
PACKAGE   2:   83.24% COMPLETE
PACKAGE   3:   53.77% COMPLETE
PACKAGE   4:   24.24% COMPLETE
OVERALL :      44% COMPLETE



STATUS 2005

COMPLETED (2004)
PROJECT NAME        : EDSA METRO RAIL TRANSIT 3
                      (PHASE 2) EXTENSION PROJECT


IMPLEMENTING AGENCY : DOTC                Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME            : EDSA METRO RAIL TRANSIT 3
                          (PHASE 2) EXTENSION PROJECT


STATUS 2002
DOTC has approved the BT Contract for Civil works proposed by MRTC with
windows for LRV’s and development rights. Project Deliberation by ICC.

STATUS 2005
The ICC-CC in its 25 August 2004 meeting, however, conferred national
priority status on the Closing of the LRT Line 1 and MRT Line 3 Loop” upon
the recommendation of the ICC-TB. It was further clarified that the project
will proceed under a solicited mode.

DOTC to prepare an FS for the extension of MRT3 from North Avenue station
to the Caloocan station of Northrail.
PROJECT NAME        : METRO RAIL TRANSIT LINE 4



IMPLEMENTING AGENCY : DOTC                Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME            : METRO RAIL TRANSIT LINE 4



STATUS 2002
Unsolicited BOT Proposal approved on “First Pass” as BT-BOO Project by
NEDA in January 1998. Refinements on the updated proposal are being
undertaken by French Consortium. DOTC to re-endorse the project to ICC in
March 2002



STATUS 2005
In view of the failure of the proponent to implement the project within the 18
month rule as prescribed by NEDA, the project is required for resubmission
for “First Pass” approval.
PROJECT NAME        : LRT LINE 1 EXTENSION PROJECT
                      (LRT 6)


IMPLEMENTING AGENCY : LRTA                Valenzuela City
SUPPORTING AGENCY   : DOTC
                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME                  : LRT LINE 1 EXTENSION PROJECT
                                (LRT 6)


STATUS 2002
Implementation Agreement signed 20 December 2001. Construction to start
immediately after the financial closing in June 2002

STATUS 2005
The NEDA-ICC approved the project on 22 July 1999 while the JV scheme
was approved on 13 December 1999. JV between the GOPand SNC Lavalin
has been signed.
•          ARSA was signed on 27 January 2003 between and among LRTA , SNC Lavalin and the
Manila Bay Area Rapid Transport Corporation.
•          OGCC issued opinion no. 047 on 18 March 2004 confirming the legality, validity,
enforceability of ARSA while DOJ confirmed said opinion on 28 April 2004. Finally, ARSA took
effect on 30 April 2004.
•          On-going negotiation on the Unsolicited Proposal in which major issues on the proposed
AJV/AIA amendment has been sent to SNC Lavalin for their response, prior to the submission to
ICC/NEDA Board for approval.
PROJECT NAME         : MANILA-CLARK RAPID RAIL SYSTEM
                       (NORTHRAIL SECTION 1)

IMPLEMENTING AGENCY : DOTC, BCDA
SUPPORTING AGENCY   : PNR
                                          Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME           : MANILA-CLARK RAPID RAIL SYSTEM
                         (NORTHRAIL SECTION 1)

STATUS 2002
(Caloocan-Calumpit) Section 1 approved by NEDA and is preparing the
required document for submission to Japanese Government to fund the civil
work portion under the OBUCHI loan

STATUS 2005
On 01 August 2003, the ICC-CC approved Phase 1 Section 1, subject to some
conditions.
•       Loan agreement signed 26 February 2004.
•       HUDCC and BCDA/Northrail in the process of relocating affected
        informal settlers along PNR ROW.
•       Securing of construction site in Caloocan started 02 November 2004.
PROJECT NAME          : MANILA – CALAMBA
                        COMMUTER SYSTEM (MCX)


IMPLEMENTING AGENCY   : PNR
SUPPORTING AGENCY     : DOTC               Valenzuela City

                                                                         Quezon City
                                    Navotas
                                          Malabon

                                               Caloocan                                 Marikina




                                               Manila              San Juan



                                                                                    Pasi
                                                                Makati              g
                                                                              Pateros

                                                           Pasay         Taguig



                                                        Paranque




                                                    Las Pinas




                                                                 Muntinlupa
PROJECT NAME          : MANILA – CALAMBA
                        COMMUTER SYSTEM (MCX)


STATUS 2002
Terms of Reference (TOR) for hiring of consultants re: conduct of F/S,
detailed engineering, project management, resettlement programs,
assistance in bidding, and maintenance supervision submitted to NEDA-ICC
for review and approval.

STATUS 2005

NO UPDATE
PROJECT NAME        : NORTH LUZON TOLLWAYS PROJECT
                      (C-5 Northern Part)


IMPLEMENTING AGENCY : DPWH-BOT          Valenzuela City
SUPPORTING AGENCY   :
                                                                      Quezon City
                                 Navotas
                                       Malabon

                                            Caloocan                                 Marikina




                                            Manila              San Juan



                                                                                 Pasi
                                                             Makati              g
                                                                           Pateros

                                                        Pasay         Taguig



                                                     Paranque




                                                 Las Pinas




                                                              Muntinlupa
PROJECT NAME           : NORTH LUZON TOLLWAYS PROJECT
                         (C-5 Northern Part)


STATUS 2002
Updating of detailed engineering designs is on-going. ROW acquisition can
commence upon approval of Detailed Engineering Design and availability of
funds.


STATUS 2005

NO UPDATE
PROJECT NAME         : MANILA-CAVITE TOLL EXPRESSWAY
                      (C-5 SOUTH SECTION & R-1 EXTENSION)


IMPLEMENTING AGENCY : DPWH - BOT
 SUPPORTING AGENCY  :
                                              Valenzuela City

                                                                            Quezon City
                                       Navotas
                                             Malabon

                                                  Caloocan                                 Marikina




                                                  Manila              San Juan



                                                                                       Pasi
                                                                   Makati              g
                                                                                 Pateros

                                                              Pasay         Taguig



                                                           Paranque



                                                                            C-5
                                                       Las Pinas
                                                                            SOUTH
                                                                            SECTION
          R-1 EXTENSION
                                                                    Muntinlupa
PROJECT NAME   : MANILA-CAVITE TOLL EXPRESSWAY
                (C-5 SOUTH SECTION & R-1 EXTENSION)



                      STATUS 2002
                      The proponent has proposed to defer the
                      construction of the C-5, Southern Section
                      due to ROW problems


                      STATUS 2005
                      Detailed design completed. To be
                      implemented after the start of R-1
                      Expressway Extension (Zapote-Noveleta).
PROJECT NAME                   : NAIA EXPRESSWAY
                                 (REVISED SCHEME)


IMPLEMENTING AGENCY : DPWH BOT                       Valenzuela City
SUPPORTING AGENCY   :
                                                                                   Quezon City
                                              Navotas
                                                    Malabon

Phase I                                                  Caloocan                                 Marikina

- Skyway to NAIA Terminal 3,
 6 Lanes, 2.18 km.
Phase II                                                 Manila              San Juan

- Ft. Bonifacio to Skyway,
  4 Lanes, 0.70 km.                                                                           Pasi
- NAIA Terminal 3 to Roxas                                                Makati              g
                                                                                        Pateros
  Blvd. 4 Lanes, 3.66 km
                                                                     Pasay         Taguig



                                                                  Paranque




                                                              Las Pinas




                                                                           Muntinlupa
PROJECT NAME               : NAIA EXPRESSWAY
                             (REVISED SCHEME)


STATUS 2002
1. The Project was approved by NEDA-TB on 13 August 2001. The project
approved by NEDA-ICC for implementation through public-private
partnership, as follows:
        Phase I - through Special Yen Loan Package of Japan

        Phase II - through BOT

2. Project Appraise for Phase I has been started.

3. Angel Lazaro & Associates will package the Phase II (BOT Section) for BOT
implementation under the Project Development Facility.

STATUS 2005
Phase I: Ongoing (2005)
Phase II: Ongoing (2005)
PROJECT NAME             : METRO MANILA SKYWAY PROJECT
                           (STAGE 2)


IMPLEMENTING AGENCY : DPWH BOT               Valenzuela City
SUPPORTING AGENCY   :
                                                                           Quezon City
                                      Navotas
                                            Malabon

Stage 2-A                                        Caloocan                                 Marikina

The continuation of Stage 1 from
Bicutan to Alabang along the SLE,                Manila              San Juan
L=6.80 kms
                                                                                      Pasi
                                                                  Makati              g
Stage 2-B                                                                       Pateros

The Skyway to C-5 connection via                             Pasay         Taguig

the Food Terminal Inc.
(FTI), L=3.10 kms                                         Paranque




                                                      Las Pinas




                                                                   Muntinlupa
PROJECT NAME               : METRO MANILA SKYWAY PROJECT
                             (STAGE 2)

 STATUS 2002
 Project proposal for Stage 2 is under Preparation.

 STATUS 2005
 -         On July 26, 1999, CMMTC submitted to TRB a concept study redefining the
 scope of the MMS- Stage 2
 -         On May 29, 2000, CMMTC submitted to TRB a revised investment proposal
 containing the features of the technical aspect of the revised MMS-Stage 2. The
 negotiation of the said Investment Proposal to date.
 -         DPWH proposed to undertake partial implementation of Stage 2 by
 constructing some of the foundation and columns of the Project under the PPP
 scheme to reduce the toll rates. CMMC will prepare new investment proposal taking
 into account the works and cost to be to be implemented by the DPWH.
 -         The construction of the remaining portion of the Project to be funded by the
 Private Investor will require the approval of the new investment Proposal by the TRB.
 -         Status of DPWH Construction Work - bidding for DPWH works set for March
 14, 2005 was deferred indefinitely.
 -         Collateral Activities - Memorandum of Agreement with DPWH, subject to
 resolution by DPWH of CMMTC legal concerns, Procurement of Construction
 Supervision Services.
PROJECT NAME       : R-10/C-3 EXPRESSWAY PROJECT



IMPLEMENTING AGENCY : DPWH BOT           Valenzuela City
 SUPPORTING AGENCY  :
                                                                       Quezon City
                                  Navotas
                                        Malabon

                                             Caloocan                                 Marikina




                                             Manila              San Juan



                                                                                  Pasi
                                                              Makati              g
                                                                            Pateros

                                                         Pasay         Taguig



                                                      Paranque




                                                  Las Pinas




                                                               Muntinlupa
PROJECT NAME           : R-10/C-3 EXPRESSWAY PROJECT



STATUS 2002

Feasibility study is scheduled to be undertaken in 2002.



STATUS 2005

NO UPDATE
PROJECT NAME        : PASIG EXPRESSWAY (PASEX)
                      (MARCOS HIGHWAY TO C-5)


IMPLEMENTING AGENCY : DPWH BOT
 SUPPORTING AGENCY  :                     Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan


                                                                                   Pasig

                                                               Makati
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME           : PASIG EXPRESSWAY (PASEX)
                         (MARCOS HIGHWAY TO C-5)


STATUS 2002
First Pass approval was granted by NEDA-ICC in January 1998. The technical
aspects of the Investment Proposal will have to be revised to consider NEDA-
ICC conditionality. Draft Toll Operations Agreement and Terms of Reference
for the Challenge Bid are under preparation.




STATUS 2005

NO UPDATE
PROJECT NAME             : MANILA BAY EXPRESSWAY PROJECT
                           (REVISED SCHEME)


IMPLEMENTING AGENCY : DPWH BOT                Valenzuela City
SUPPORTING AGENCY   :
                                                                            Quezon City
                                       Navotas
                                             Malabon

Phase 1: P. Burgos St.                            Caloocan                                 Marikina

to North Harbor
                                                  Manila              San Juan
Phase 2: From Manila Road to
P. Burgos St. along Roxas Boulevard                                                    Pasi
                                                                   Makati              g
                                                                                 Pateros

                                                              Pasay         Taguig



                                                           Paranque




                                                       Las Pinas




                                                                    Muntinlupa
PROJECT NAME             : MANILA BAY EXPRESSWAY PROJECT
                           (REVISED SCHEME)


STATUS 2002

Feasibility Study of the Project by the Pacific Consultants International (PCI),
a Japanese consulting firm, is on-going.




STATUS 2005

NO UPDATE
PROJECT NAME        : CAVITE – LAGUNA (CALA) URBAN
                      DEVELOPMENT AND TRANSPORT
                      IMPROVEMENT PROJECT

IMPLEMENTING AGENCY : DPWH BOT
 SUPPORTING AGENCY  :                     Valenzuela City

                                                                        Quezon City
                                   Navotas
                                         Malabon

                                              Caloocan                                 Marikina




                                              Manila              San Juan



                                                                                   Pasi
                                                               Makati              g
                                                                             Pateros

                                                          Pasay         Taguig



                                                       Paranque




                                                   Las Pinas




                                                                Muntinlupa
PROJECT NAME        : CAVITE – LAGUNA (CALA) URBAN
                      DEVELOPMENT AND TRANSPORT
                      IMPROVEMENT PROJECT

STATUS 2002

CALA EXPRESSWAY =   For NEDA approval
BUSWAY          =   For NEDA approval


STATUS 2005

CALA EXPRESSWAY =   FS and Implementation Support on the CALA East-
                    West National Road Project ongoing (target
                    completion 2006)

BUSWAY         =    FS completed (2002)
PROJECT NAME            : METRO MANILA INTERCHANGE
                          CONSTRUCTION PROJECT


IMPLEMENTING AGENCY : DPWH URPO
SUPPORTING AGENCY   :                                   Valenzuela City

                                                                                      Quezon City
                                                 Navotas
1. C-5 / Ortigas Avenue, Extension Interchange         Malabon

   Pasig City                                               Caloocan                                 Marikina


2. C-5 Boni Serrano Avenue, Katipunan
   Avenue Interchange Quezon City                           Manila              San Juan

3. EDSA / North Avenue – West Avenue
   Interchange, Quezon City                                                                      Pasi
                                                                                                 g
                                                                             Makati
4. EDSA / Roosevelt Avenue Interchange                                                     Pateros


   Quezon City                                                          Pasay         Taguig


5. C-5 / Lanuza Street – Julia Vargas Avenue
                                                                     Paranque
   Interchange, Pasig City
6. C-5 / Kalayaan Avenue (R-4) Interchange
   Makati City                                                   Las Pinas


7. EDSA / Quezon Avenue, Interchange
   Quezon City
                                                                              Muntinlupa
PROJECT NAME        : METRO MANILA INTERCHANGE
                      CONSTRUCTION PROJECT


IMPLEMENTING AGENCY : DPWH URPO
SUPPORTING AGENCY   :                    Valenzuela City

                                                                       Quezon City
                                  Navotas
                                        Malabon

                                             Caloocan                                 Marikina




                                             Manila              San Juan



                                                                                  Pasi
                                                              Makati              g
                                                                            Pateros

                                                         Pasay         Taguig



                                                      Paranque




                                                  Las Pinas




                                                               Muntinlupa
PROJECT NAME                      : METRO MANILA INTERCHANGE CONSTRUCTION PROJECT
               PROJECT                             STATUS 2002                  STATUS 2005

1. C-5 / Ortigas Avenue, Extension      Contract documents at Legal Office
   Interchange Pasig City               for Review                           COMPLETED (2004)

2. C-5 Boni Serrano Avenue, Katipunan   Draft Resolution of Award for
   Avenue Interchange Quezon City       deliberation.                        COMPLETED (2004)

3. EDSA / North Avenue – West Avenue    Plans are being finalized by the
   Interchange, Quezon City             Consultant PQ documents are with             -
                                        JBIC for review

4. EDSA / Roosevelt Avenue              Plans are being finalized by the
   Interchange Quezon City              Consultant.                                  -

5. C-5 / Lanuza Street – Julia Vargas   Re-design of plans
   Avenue Interchange, Pasig City                                                    -

6. C-5 / Kalayaan Avenue (R-4)          Plans for final review by BOD JBIC
   Interchange Makati City              correction on PQ documents to be
                                        incorporated.                                -

7. EDSA / Quezon Avenue, Interchange    Accomplishment as of Nov. 30, 2001
   Quezon City                            Planned = 57.8875%
                                                                             COMPLETED (2002)
                                          Actual = 62.24707%
                                          Slippage = +4.35957
PROJECT NAME                       : METRO MANILA URBAN TRANSPORT INTEGRATION
                                     PROJECT (MMURTRIP) AND THE METRO MANILA AIR
                                     QUALITY IMPROVEMENT SECTOR DEVELOPMENT
                                     PROGRAM

IMPLEMENTING AGENCY : DPWH URPO & MMDA

      PROJECT NAME              IMPLEMENTING   FUNDING           STATUS 2002               STATUS 2005
                                   AGENCY      AGENCY
1.   Metro Manila Urban         DPWH           World      Detailed Engineering is on    Support agency is
     Transport Integration      (URPO)         Bank       going.                        MMDA
     Project (MMURTRIP)                        Assisted
     Phase 1
2.   Metro Manila Urban         DPWH           World                                    DENR Clearance
     Transport Integration      (URPO)         Bank       DENR Clearance already        already issued
     Project (MMURTRIP                         Assisted   issued.
     Phase 2                                                                            Ongoing
3.   Metro Manila Air Quality   DPWH           ADB Loan   Detailed Engineering Design
     Improvement Sector         (URPO)         No. 1665   started on October 2, 2000
     Development Program                       PHI        and will be completed on
     (Investment Loan)                                    October 1, 2001 for a
     Phase I – Civil Works                                duration of twelve (12)
                                                          months. Accomplishment as
4.   Metro Manila Air Quality   DPWH                      of December 31, 2000 is       - In case funds raised
     Improvement Sector         (URPO)                    14.70%                        from proposed re-
     Development Program                                                                allocation will not be
                                                                                        sufficient,
     (Investment Loan)                                    Detailed Engineering to
                                                                                        Commonwealth Ave. will
     Phase I – Consulting                                 commence on October 2000.     be given first priority.
     Services
PROJECT NAME                 : METRO MANILA URBAN TRANSPORT INTEGRATION
                               PROJECT (MMURTRIP) AND THE METRO MANILA AIR
                               QUALITY IMPROVEMENT SECTOR DEVELOPMENT
                               PROGRAM


IMPLEMENTING AGENCY : MMDA
    PROJECT NAME           IMPLEMENTING   FUNDING            STATUS 2002                 STATUS
                              AGENCY      AGENCY                                          2005


1. Metro Manila Urban      MMDA           IBRD –     Detailed Engineering is on       -Currently on
                                                                                      the Defects
   Transport Integration                  Assisted   going Evaluation of              Liability Period,
   Project                                World      Consultants for Construction     which started on
   (MMURTRIP)                             Bank       Supervision and Advisory         July 2, 2004
   Phase 1                                           Services.

2. Metro Manila Air    MMDA               ADB        Procurement of equipment &       -In case funds
                                                                                      raised from
   Quality Improvement                    Loan       coordination with the LGUs       proposed re-
   Sector Development                     No. 1665   with regards to the Training /   allocation will
   Program (Investment                    PHI        Seminar for the ASB              not be sufficient,
                                                                                      Commonwealth
   Loan)                                             component is on-going.           Ave. will be
                                                     Capacity building for the        given first
                                                     TEM component is on going.       priority.
PROJECT NAME                   : METRO MANILA URBAN TRANSPORT INTEGRATION
                                 PROJECT (MMURTRIP) AND THE METRO MANILA AIR
                                 QUALITY IMPROVEMENT SECTOR DEVELOPMENT
                                 PROGRAM

IMPLEMENTING AGENCY : MMDA & DPWH

     PROJECT NAME            IMPLEMENTING   FUNDING    STATUS 2002               STATUS 2005
                                AGENCY      AGENCY
1.   Metro Manila Urban      MMDA –         Loan No.   On-going         1. -Currently on the Defects
     Transport Integration   TEC            3450                        Liability Period, which started on
     Project (MMURTRIP                      PH under                    July 2, 2004 (Pasong Tamo)
     Phase 1 (Detailed                      NRIMP                       -Implementation to proceed as
     Engineering)                           Project                     originally intended after
                                                                        completion of parcellary survey.
2.   Metro Manila Urban      MMDA –         World      Detailed         (LRT Line 2 Corridor)
     Transport Integration   TEC            Bank       Engineering is   -Proposed for restructuring.
     Project (MMURTRIP                      Assisted   on going.        Preparation of necessary
     Phase I & II Traffic                                               documents to be submitted to the
     Signalization Project                                              Bank to support the proposed
     (54 Intersections)                                                 restructuring on-going. ( MRT 3
                                                                        Corridor)
3.   Metro Manila Traffic    MMDA –         Loan No.   On-going.
     Engineering &           TEC            DAN 94-                     2. NO UPDATE
     Management Project                     2324
     Phase IV “SMART                        (35%                        3. Completed 2002
     Traffic Signal                         Grant)
     System” (419
     Intersections)
                 SUMMARY
            MMUTIS MTDP 1999-2004

TOTAL 34 PROJECTS
# COMPLETED    # ON-GOING   # OF PROJECTS   # FOR REVIEW /
  PROJECTS      PROJECTS      NO UPDATE      PREPARATION

     8             4             4               18
   23%            12%           12%              53%



         MAJOR ISSUES / PROBLEMS
         1. ROW Acquisition
         2. Funding Constraints
MMDA on the ROAD, Towards a STRONG REPUBLIC




   Maraming Salamat

				