					Odour Improvement Project
    Mogden Sewage Treatment Works

    Residents’ Liaison Meeting

    26 September 2007




2
    Odour Improvement Project
     Scope of work:

      – Cover key parts of the treatment process, including:

          • Inlet works (East and West side of Mogden)

          • Primary settlement tanks (East side)

          • Two storm tanks (East Side)

      – Independent tests have been used to decide what
        areas of the site to cover

      – Install equipment to extract and treat the odorous air
        from the covered areas:

          • Two new odour control units (East and West side)

          • Designed to robustly comply with the requirements
            of the odour abatement notice.


3
    Agenda
    17:15
    Site walk-around
    18:15
    1.   Apologies
    2.   Odour Improvement Project
    3.   Odour
    4.   Mosquitoes
    5.   Working for a cleaner Thames
    6.   Further points raised by residents
    7.   Communications
    8.   Any other business and date of next meeting
    20:15
    Meeting Close



4
    Progress of Works




5
    East Works Progress

    AREA                            PROGRESS
    Inlet Penstocks                 100%
    Screenhouse & Screens           90%
    Screenings Handling Plant       95%
    Grit Channels                   70%
    Storm Weir                      95%
    Grit Handling Plant             80%
    Storm Tanks 4 and 5             95%
    Circular PSTs (Decommission)    0%
    Rectangular SSTs                65%
    Odour Control Unit (Chemical)   100%


6
    Screenings Handling Plant




7
    CV Grit Channels 1 and 2




8
    Storm Weir




9
     Grit Handling Plant




10
     Storm Tank 5




11
     Secondary Settlement Tanks 2 & 3




12
     Secondary Settlement Tank 4




13
     Secondary Settlement Tank 1




14
     East Odour Control Unit




15
     West Works Progress


      AREA                              PROGRESS
      Chambers Upstream of Screens      100%
      Fine Screens                      70%
      Cross Flow Grit Traps             95%
      Washpactors and Skip Loaders      100%
      Grit Handling Plant               70%
      Screw Pumps                       100%
      Pre-Aeration Lanes                100%
      Odour Control Unit (Biological)   90%




16
     Cross Flow Grit Traps




17
     Pre-Aeration Lanes




18
     Noise Update

      Noise attenuator installed
      on 17 May 2007 (pictured)

      Significant noise reduction
      on site

      Final noise survey to be
      undertaken tonight
      (26/09/07), commencing at
      9:00pm




19
     Operation of Mogden- Update


      Informative email notifications sent to residents:


           17 Proactive Notifications:
               Odour Improvement project works (x12)
               Site Maintenance works (x5)




          2 Reactive Notifications:
               Interruption to Power Supply
               Channel Cleaning




20
21
                                                      0
                                                          10
                                                               20
                                                                    30
                                                                         40
                                                                              50
                                                                                   60
                                                                                        70
                                                                                             80
                                                                                                          90
                                                                                                                                 100
                                            Apr-05

                                            May-05

                                            Jun-05

                                             Jul-05

                                            Aug-05

                                            Sep-05

                                            Oct-05

                                            Nov-05

                                            Dec-05

                                            Jan-06

                                            Feb-06

                                            Mar-06

                                            Apr-06

                                            May-06

                                            Jun-06

                                             Jul-06
                                                                                                                                       Complaints Received at Mogden




                                            Aug-06

                                            Sep-06

                                            Oct-06

                                            Nov-06

                                            Dec-06

                                            Jan-07

                                            Feb-07

                                            Mar-07
                                                                                                  Odour




                                            Apr-07

                                            May-07
                                                                                                          Mosquitoes




                                            Jun-07

                                             Jul-07
                                                                                                          Odour and mosquitoes




     N.B Figures reported to 31 August 07




                                            Aug-07
     Mosquitoes




22
     Surveying and controlling Mosquitoes at Mogden


       Strict year-round programme to survey and control mosquitoes
       Summer surveying and treatment programme began in mid-April 07:


            Weekly Surveys
            Target Summer breeding sites
            Mosquito treatment:


                Less than two days after the weekly survey
                Controls regular breeding sites & ad hoc sites as identified in the
               surveys
                Spraying near standing water




23
     Methods of Mosquito control at Mogden


       Physical

            Site housekeeping- Removing Mosquito breeding sites

       Biological

            Spraying Mosquito larvae with bacteria

       Mechanical

            Using ultraviolet insect traps

       Chemical

            Controlling adult Mosquitoes with pesticides




24
Number of sites inspected for Mosquitoes at Mogden

     250




     200




     150                                                                                                                             2003
                                                                                                                                     2004
                                                                                                                                     2005
                                                                                                                                     2006
     100                                                                                                                             2007




     50




      0
           1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

                                                                   Week


25
     Percentage of sites surveyed found to
     contain Mosquito activity
           80



           70



           60



           50
                                                                                                                                            2003
                                                                                                                                            2004
       %




           40                                                                                                                               2005
                                                                                                                                            2006
                                                                                                                                            2007
           30



           20



           10



           0
                1 2 3 4 5   6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
                                                                        Week




26
     Number of sites where larvae have been found
      35




      30




      25




      20                                                                                                                                         2003
                                                                                                                                                 2004
                                                                                                                                                 2005
                                                                                                                                                 2006
      15
                                                                                                                                                 2007



      10




      5




      0
           1   2   3 4   5   6 7   8   9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
                                                                           Week




27
     Number of sites where Adult Mosquitoes have
     been found
      14




      12




      10



                                                                                                                                                 2003
       8
                                                                                                                                                 2004
                                                                                                                                                 2005
                                                                                                                                                 2006
       6
                                                                                                                                                 2007



       4




       2




       0
           1   2   3   4 5   6   7 8   9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
                                                                           Week




28
     Mosquito Project 2007


       Project Scope:

            Target the main over-wintering sites:

           Digester galleries, aeration galleries, main pumping station drywell, power
          house basement & pumping stations 4 & 5

       Project aim:

            To physically alter sites to reduce the number of places where
          Mosquitoes can breed and to make control work easier

       Project commenced in March 2007




29
     Working for a Cleaner Thames




30
     Working for a cleaner Thames- Update


       Proposed site improvement works:
            Increase the amount of flow that can be fully treated
            Less use of storm tanks
            Includes new covered inlet works, covered primary tanks and
           new aeration lanes
            Odour control of the new works


       Reduce the likelihood of overflows from the works to the River
      Thames
       To help boost oxygen levels in the tidal Thames
       Improving the water quality and the habitants for aquatic life




31
     Preferred Solution for Mogden


                                     Area of development.

                                     Other land in
                                     applicants ownership.

                                     Buildings.

                                     Site roads / hardstanding.

                                     Above ground structures.

                                     New & re-profiled
                                     embankment.

                                     Soft landscaped areas.

                                     Earth retaining wall.




32
     Working for a cleaner Thames- Update



       Timescales:
            Planning Application: TBC- Delay due to finalisation of details
            Proposed construction date: Spring/Summer 2008
            Complete and operational: Spring/Summer 2012




       Public displays were held in Isleworth Public Library on the 21st,
      22nd and 24th of May 2007:
            Well received by local residents and businesses
            Questions answered by Thames Water representatives
            Comments Book completed



33
     Further points raised
         by residents




34
     Communication




35
     Communication


      E-mail notifications:
          Informing residents of possible increase in odour


      Mogden newsletter:
          Updating residents with progress on the odour improvement project
          To be distributed by end September/Beginning October 2007


      Mosquito Campaign:
          ‘Help control mosquitoes in your area’




36
     Communication


      Contact us about Mogden:
          Via the customer centre: 0845 9200 800
         Through our website:
        www.thameswater.co.uk/mogden
         By post: Thames Water, PO Box 436, Swindon,
        SN38 1TU


      Visit our website:
           Categorised ‘Answers to your questions’ webpage
          Mogden weekly site log webpage (includes regular
        updates of the Odour Improvement project)



37
     Thank You




38