Appendix C-2 Power Purchase Evaluation Forms Intermediate Power

Reviews
Shared by: Pretty Clear
Stats
views:
1
rating:
not rated
reviews:
0
posted:
2/26/2009
language:
pages:
0
APPENDIX C - 2 POWER PURCHASE EVALUATION FORM Bid Option – Intermediate Power Purchase 2004 RFP for Capacity and Energy Resources Cleco Power LLC 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Bidder Contact: Name ______________________________________________________ Company ___________________________________________________ Street/P.O. Box _______________________________________________ City, State, Zip Code __________________________________________ Phone Number _______________________________________________ Fax Number _________________________________________________ E-Mail Address ______________________________________________ State of Incorporation __________________________________________ Signed: ____________________________________________________________ (Name of Bidder) ____________________________________________________________ (Signature of Authorized Representative of Bidder) Name ______________________________________________________ Title _______________________________________________________ Date Signed _________________________________________________ By: 99485643-1 1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Summary Information Name of Generating Resource: Location – County or Parish: State: __________________________________________ __________________________________________ __________________________________________ Proposed Delivery Term: __________________________________________ Binding Proposal: [ ] yes [ ] no Long Term Bid (15 + years) Short Term Bid (2 - 7 years) 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Option 1) Pricing Structure - Fixed or Stable Pricing Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Energy ($/MWh) Capacity ($/kW-yr) Delivery Term: __________________________________________ __________________________________________ __________________________________________ Type Unit or Non-Unit Contingent Replacement Power Provision (Specify) 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Option 2) Pricing Structure - Fixed Heat Rate Pricing Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Delivery Term: Type Unit or Non-Unit Contingent Replacement Power Provision (Specify) Heat Rate (Btu/kWh) Variable O&M ($/MWh) Non-Fuel Start Cost ($) Capacity ($/kW-yr) __________________________________________ __________________________________________ __________________________________________ 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Option 3) Pricing Structure - Unit Heat Rate Pricing Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 *Complete performance data Units Actual Heat Rate (Btu/kWh)* Variable O&M ($/MWh) Non-Fuel Start Cost ($) Capacity ($/kW-yr) Delivery Term: Type Unit or Non-Unit Contingent Replacement Power Provision (Specify) __________________________________________ __________________________________________ __________________________________________ 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Performance Specifications Baseload MW, net Btu/kWh HHV Seasonal Capacity (net of plant auxiliaries at bus) & Heat Rates Summer Conditions, 95degF, 70%RH -BreakPoint 1 ( min ) -BreakPoint 2 -BreakPoint 3 -BreakPoint 4 (max) Winter Conditions, 74%RH -BreakPoint 1 ( min ) -BreakPoint 2 -BreakPoint 3 -BreakPoint 4 (max) Comments: 43degF, Supplemental MW, net Btu/kWh HHV 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Performance Specifications continued Type Hours Fuel mmbtu Cold Start Warm Start Hot Start Minimum Up-Time , hours Minimum Down-Time , hours (time between starts) Ramp Rates , MW/min MVAR operating range, Historical Data Equivalent Forced Outage Rate, EFOR% Equivalent Availability Factor, EAF% Capacity Factor (%) Cumulative Run Hours (Life-to-Date) AGC Control Capability AGC Control Activated/Enabled Comments: [ ] yes [ ] yes [ ] no [ ] no N/A [ ] max, [ ] min Projected Start Parameters Non Fuel Cost - $/start Historical Average and Period 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Asset Summary, Configuration, & Equipment Generating asset name Location City Parish/County State Control Area Configuration ( i.e. , 2x1 CC, simple cycle, conventional steam, …) Manufacturer (major) Model Number Commercial Operation Date (actual or estimated) Age of Asset(s) Comments: 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Fuel Information Bidders are encouraged to provide as much information as possible regarding fuel supply associated with the specific generating resource so as to allow Cleco Power to adequately evaluate each proposal. In addition to providing detailed information on the items mentioned below, please detail any other fuel supply considerations that are relevant to Cleco Power’s consideration of the proposal. Type (coal, gas, oil ) -Primary -Secondary -Startup Fuel Type % capacity by fuel type* Supply Hub: (exclusive of tax) -Name of Hub -Basis to Supply Hub -Basis to Henry Hub Restrictions/Constraints: -Minimum Take -Maximum Take -Seasonal swings -Pressure -Size -Losses *What is the % of the total output (MWs) achievable with this fuel choice? 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Fuel Information continued Transport Cost: Suppliers: List -Supplier 1 -Supplier 2 -Supplier 3 Storage (onsite or offsite): -Minimum -Maximum -Capacity Fees -Penalties (parking/over pulls) Taxes: -Exempt -State -County -City % Comments: 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Transmission Information Requirements Bidders are encouraged to provide as much information as possible regarding transmission service associated with the specific generating resource so as to allow Cleco Power to adequately evaluate each proposal. In addition to the items mentioned below, please detail any other transmission considerations (known constraints, delivery flexibility, etc.) pertinent to the proposed product. -Interconnection Point or Dispatch Control Area -Interconnection Agreement -Delivery Point -Ancillary Services -Path to Cleco -Historical Transmission Studies -System Impact Study (Bidder responsible for submitting transmission request to Entergy) Comments: Provide as attachment Provide as attachment Provide as attachment 99485643-1 Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________ Bid Option – Intermediate Power Purchase Additional Benefits or Compensation (Please describe any additional benefits or compensation of this bid not expressly documented elsewhere in the bid. Example: transfer of transmission credits, cash, etc.) 99485643-1

Related docs
power products
Views: 32  |  Downloads: 4
purchase green power
Views: 122  |  Downloads: 13
Power_System.pdf
Views: 78  |  Downloads: 9
Canadian Green Power
Views: 36  |  Downloads: 1
POWER PURCHASE AGREEMENT
Views: 4  |  Downloads: 0
Nevada Power Credit
Views: 12  |  Downloads: 0
The “Efficiency Power Plant” --
Views: 29  |  Downloads: 6
premium docs
Other docs by Pretty Clear
Attachment to Commercial Lease
Views: 150  |  Downloads: 1
Dred Scott v Sanford info
Views: 264  |  Downloads: 2
National Labor Relations Act info
Views: 251  |  Downloads: 1
Trusteeship agreement for failing business
Views: 219  |  Downloads: 3
Surrender of Germany info
Views: 211  |  Downloads: 0
Distributions between partners
Views: 228  |  Downloads: 4
dfsd
Views: 138  |  Downloads: 0
Transcript of Voting Rights Act
Views: 194  |  Downloads: 1
Wyoming articles of incorporation
Views: 270  |  Downloads: 4
Sample Executive Summary SaleSeeker
Views: 295  |  Downloads: 3
Natural fathers application
Views: 215  |  Downloads: 0