APPENDIX C - 2
POWER PURCHASE EVALUATION FORM Bid Option – Intermediate Power Purchase
2004 RFP for Capacity and Energy Resources
Cleco Power LLC
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Bidder Contact: Name ______________________________________________________ Company ___________________________________________________ Street/P.O. Box _______________________________________________ City, State, Zip Code __________________________________________ Phone Number _______________________________________________ Fax Number _________________________________________________ E-Mail Address ______________________________________________ State of Incorporation __________________________________________
Signed:
____________________________________________________________ (Name of Bidder) ____________________________________________________________ (Signature of Authorized Representative of Bidder) Name ______________________________________________________ Title _______________________________________________________ Date Signed _________________________________________________
By:
99485643-1
1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Summary Information
Name of Generating Resource: Location – County or Parish: State:
__________________________________________
__________________________________________ __________________________________________
Proposed Delivery Term:
__________________________________________
Binding Proposal:
[ ] yes
[ ] no
Long Term Bid (15 + years) Short Term Bid (2 - 7 years)
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase Option 1) Pricing Structure - Fixed or Stable Pricing
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Energy ($/MWh) Capacity ($/kW-yr)
Delivery Term:
__________________________________________ __________________________________________ __________________________________________
Type Unit or Non-Unit Contingent Replacement Power Provision
(Specify)
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase Option 2) Pricing Structure - Fixed Heat Rate Pricing
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Delivery Term: Type Unit or Non-Unit Contingent Replacement Power Provision
(Specify)
Heat Rate (Btu/kWh)
Variable O&M ($/MWh)
Non-Fuel Start Cost ($)
Capacity ($/kW-yr)
__________________________________________ __________________________________________ __________________________________________
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase Option 3) Pricing Structure - Unit Heat Rate Pricing
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
*Complete performance data
Units Actual Heat Rate (Btu/kWh)*
Variable O&M ($/MWh)
Non-Fuel Start Cost ($)
Capacity ($/kW-yr)
Delivery Term: Type Unit or Non-Unit Contingent Replacement Power Provision
(Specify)
__________________________________________ __________________________________________ __________________________________________
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Performance Specifications Baseload MW, net Btu/kWh HHV
Seasonal Capacity (net of plant auxiliaries at bus) & Heat Rates Summer Conditions, 95degF, 70%RH -BreakPoint 1 ( min ) -BreakPoint 2 -BreakPoint 3 -BreakPoint 4 (max) Winter Conditions, 74%RH -BreakPoint 1 ( min ) -BreakPoint 2 -BreakPoint 3 -BreakPoint 4 (max) Comments: 43degF,
Supplemental MW, net Btu/kWh HHV
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Performance Specifications continued Type Hours Fuel mmbtu Cold Start Warm Start Hot Start Minimum Up-Time , hours Minimum Down-Time , hours (time between starts) Ramp Rates , MW/min MVAR operating range, Historical Data Equivalent Forced Outage Rate, EFOR% Equivalent Availability Factor, EAF% Capacity Factor (%) Cumulative Run Hours (Life-to-Date) AGC Control Capability AGC Control Activated/Enabled Comments: [ ] yes [ ] yes [ ] no [ ] no N/A [ ] max, [ ] min Projected
Start Parameters
Non Fuel Cost - $/start
Historical Average and Period
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Asset Summary, Configuration, & Equipment Generating asset name Location City Parish/County State
Control Area Configuration ( i.e. , 2x1 CC, simple cycle, conventional steam, …) Manufacturer (major) Model Number Commercial Operation Date (actual or estimated) Age of Asset(s) Comments:
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Fuel Information
Bidders are encouraged to provide as much information as possible regarding fuel supply associated with the specific generating resource so as to allow Cleco Power to adequately evaluate each proposal. In addition to providing detailed information on the items mentioned below, please detail any other fuel supply considerations that are relevant to Cleco Power’s consideration of the proposal.
Type (coal, gas, oil ) -Primary -Secondary -Startup
Fuel Type
% capacity by fuel type*
Supply Hub: (exclusive of tax) -Name of Hub -Basis to Supply Hub -Basis to Henry Hub
Restrictions/Constraints: -Minimum Take -Maximum Take -Seasonal swings -Pressure -Size -Losses
*What is the % of the total output (MWs) achievable with this fuel choice?
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Fuel Information continued Transport Cost:
Suppliers: List -Supplier 1 -Supplier 2 -Supplier 3
Storage (onsite or offsite): -Minimum -Maximum -Capacity Fees -Penalties (parking/over pulls)
Taxes: -Exempt -State -County -City
%
Comments:
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Transmission Information Requirements
Bidders are encouraged to provide as much information as possible regarding transmission service associated with the specific generating resource so as to allow Cleco Power to adequately evaluate each proposal. In addition to the items mentioned below, please detail any other transmission considerations (known constraints, delivery flexibility, etc.) pertinent to the proposed product.
-Interconnection Point or Dispatch Control Area -Interconnection Agreement -Delivery Point -Ancillary Services -Path to Cleco -Historical Transmission Studies -System Impact Study (Bidder responsible for submitting transmission request to Entergy) Comments: Provide as attachment Provide as attachment Provide as attachment
99485643-1
Appendix C-2 CLECO POWER LLC 2004 RFP FOR CAPACITY AND ENERGY RESOURCES POWER PURCHASE EVALUATION FORM Bidder No. ___________
Bid Option – Intermediate Power Purchase
Additional Benefits or Compensation
(Please describe any additional benefits or compensation of this bid not expressly documented elsewhere in the bid. Example: transfer of transmission credits, cash, etc.)
99485643-1