Docstoc

evaluate_worksheet23b

Document Sample
evaluate_worksheet23b Powered By Docstoc
					Name ________________________ Period ______

                              Evaluation Worksheet 23
                         PROJECT EVALUATION (Summative Evaluation)

Objective of this Worksheet: to gather data and summarize responses
Evaluation data that I gathered gave results for Level 1 and Level 2 Evaluation:

Level 1: How do students react to specific education events in the instruction?
         Did they meet the goals and objectives in an acceptable way? Did they like it?

From student responses to the questionnaire, the summary of their answers:

1.   Learner experiences and attitudes toward delivery system, navigation, screen design:

             Positive                                          Negative




              Revision recommendations:




2.   Learner experiences with, and attitudes toward, the instructional materials and topics in your project:

             Positive                                          Negative




             Revision recommendations:




3.   Learner experiences and attitudes toward objectives, lesson flow and options, and how you assess them.

              Positive                                         Negative




             Revision recommendations:



                                                                                                               1
Level 2: Can students actually do what the instruction tried to teach them to do or learn?
 How well did the students accomplish the objectives of your instruction? (Worksheet 6)

Test results when at least 5 people from the class or school tried it out in the Beta Test:
3.   Number of learners in test: _______
4.   Number of learners successfully completing Beta test and completing the objectives: _______
5.   Average length of time of instruction: _________________
6.   Pre- and post-test scores:

      Learner Number         1      2       3       4       5       6       7        8       9
      Pre-test score

      Post-test score



Summary comments on how well students were able to complete the objectives (Worksheet 6)

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________




General project revision recommendations:
These are listed in order of priority, to do before I produce the Final Version of the project:

1. ______________________________________________________________________________

2. ______________________________________________________________________________

3. ______________________________________________________________________________

4. ______________________________________________________________________________

5. ______________________________________________________________________________




Approved by ____________________________ Date ______________

                                                                                                   2