									                                    IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                      District 1

     DRAFT                                                         State Highways

                                                                   COOK COUNTY
                                                                                                                         DRAFT
Route/Street    Location                                            Improvements              Est. Cost               City
I   57         AT 167TH ST                                         BRIDGE DECK OVERLAY         $1,000,000   OAK FOREST           1-75807-0200


I   57         AT 125TH ST                                         BRIDGE NEW DECK             $1,435,000   CALUMET PARK         1-74647-0100


I   57         AT 115TH ST                                         BRIDGE NEW DECK             $2,900,000   CHICAGO              1-74651-0100


I   57         AT 112TH PLACE                                      BRIDGE NEW DECK             $2,700,000   CHICAGO              1-77067-0001


I   57         AT VAROUS STRUCTURES (103RD, 111TH, 112TH, 115TH,   CONSTRUCTION ENGINEERING    $1,300,000   CHICAGO              1-77067-0100
               125TH, 167TH, GENOA AVE, & PEOTONE-JOLIET RD)                                                CALUMET PARK


I   57         AT 111TH ST                                         BRIDGE NEW DECK             $2,800,000   CHICAGO              1-77067-0002


I   57         AT 103RD ST                                         BRIDGE NEW DECK             $2,375,000   CHICAGO              1-74652-0100


I 90           AT SAYRE AVE                                        BRIDGE SUPERSTRUCTURE       $3,000,000   CHICAGO              1-73721-0100
KENNEDY EXPY

I 90           AT SAYRE AVE                                        CONSTRUCTION ENGINEERING      $300,000   CHICAGO              1-73721-0103
KENNEDY EXPY

I 90           AT CENTRAL AVE                                      BRIDGE NEW DECK             $3,800,000   CHICAGO              1-74492-0100
KENNEDY EXPY                                                       BRIDGE PAINTING

I 90           AT CENTRAL AVE                                      CONSTRUCTION ENGINEERING      $380,000   CHICAGO              1-74492-0101
KENNEDY EXPY

I 94           HUBBARDS CAVE TO I-290 (EISENHOWER EXPY) (RAMP      RAMP MODIFICATIONS          $7,100,000   CHICAGO              1-77014-0000
I 90           EXTENSION & REMOVAL)                                RETAINING WALL
KENNEDY EXPY                                                       PAVEMENT MARKING
                                                                   SIGN MAINTENANCE
                                                                   MISCELLANEOUS
                                                                   SURVEILLANCE




                                                                        1-1
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 1

    DRAFT                                                             State Highways

                                                                      COOK COUNTY
                                                                                                                               DRAFT
Route/Street       Location                                             Improvements              Est. Cost                City
I 94              HUBBARDS CAVE TO I-290 (EISENHOWER EXPY) (RAMP      CONSTRUCTION ENGINEERING       $600,000    CHICAGO               1-77014-0200
I 90              EXTENSION & REMOVAL)
KENNEDY EXPY

I 94              W OF M L KING DR TO 130TH ST                        SIGNING (NEW)                  $175,000    CHICAGO               1-76592-0000
BISHOP FORD EXP

I 94              W OF M L KING DR TO 130TH ST                        RESURFACING                  $10,900,000   CHICAGO               1-77323-0000
BISHOP FORD EXP   Miles = 5.26

I 94              W OF M L KING DR TO US 6 (159TH ST)                 CONSTRUCTION ENGINEERING      $2,000,000   CHICAGO               1-77323-0300
BISHOP FORD EXP                                                                                                  DOLTON
                                                                                                                 CALUMET CITY
                                                                                                                 SOUTH HOLLAND

I 94              130TH ST TO US 6 (159TH ST)                         SIGNING (NEW)                  $175,000    DOLTON                1-77323-0001
BISHOP FORD EXP                                                                                                  CHICAGO
                                                                                                                 CALUMET CITY
                                                                                                                 SOUTH HOLLAND

I 94              130TH ST TO US 6 (159TH ST)                         RESURFACING                   $8,900,000   DOLTON                1-77323-0200
BISHOP FORD EXP   Miles = 4.29                                                                                   CHICAGO
                                                                                                                 CALUMET CITY
                                                                                                                 SOUTH HOLLAND

I 290             THORNDALE AVE (ELGIN-O'HARE EXPY) TO GRAND AVE &    P.E. (PHASE II)               $5,100,000   FOREST PARK           1-77631-0500
I 355             I-88 (E-W TOLLWAY) TO I-90/94 (KENNEDY EXPY)                                                   CHICAGO
EISENHOWER EXPY                                                                                                  OAK PARK
                                                                                                                 HILLSIDE
                                                                                                                 MAYWOOD
                                                                                                                 BELLWOOD
                                                                                                                 BROADVIEW
                                                                                                                 WESTCHESTER
                                                                                                                 ADDISON
                                                                                                                 ITASCA
                                                                                                                 ELMHURST
                                                                                                                 WOOD DALE

US 6              WILL-COOK RD TO W OF US 45                          RESURFACING                   $5,180,000   ORLAND PARK           1-74502-0101
ILL 7             Miles = 2.98
159TH ST




                                                                             1-2
                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                        District 1

    DRAFT                                                            State Highways

                                                                     COOK COUNTY
                                                                                                                            DRAFT
Route/Street    Location                                              Improvements              Est. Cost                City
US 6           WILL-COOK RD TO W OF US 45                            CONSTRUCTION ENGINEERING      $600,000   ORLAND PARK           1-74502-1101
ILL 7
159TH ST

US 6           I-294 (TRI-STATE TOLLWAY) TO ILL 1 (HALSTED ST)       RECONSTRUCTION             $21,110,000   MARKHAM               1-73912-1100
159TH ST       Miles = 2.33                                          INTERSECTION IMPROVEMENT                 HARVEY
                                                                     LIGHTING
                                                                     UTILITY ADJUSTMENT

US 12          ILL 58 (GOLF RD) TO US 12/45 (DES PLAINES RIVER RD)   RESURFACING                   $800,000   DES PLAINES           1-76748-0000
RAND RD        Miles = 0.79

US 12          US 12 (RAND RD) TO WALNUT AVE (LEE MANNHEIM COUPLE)   RESURFACING                 $1,200,000   DES PLAINES           1-76594-0000
US 12 A        Miles = 1.97
US 45
US 45 B
LEE/MANNHEIM
GRACELAND

US 12          WALNUT AVE TO PROSPECT AVE                            RESURFACING                   $950,000   DES PLAINES           1-75482-0000
US 45          Miles = 1.14
LEE ST

US 12          LAKE ST TO N OF I-290 (EISENHOWER EXPY)               RESURFACING                 $1,300,000   BELLWOOD              1-77109-0000
US 20          Miles = 1.43                                                                                   HILLSIDE
US 45                                                                                                         MELROSE PARK
MANNHEIM RD

US 41          CENTRAL AVE TO OLD ORCHARD RD                         RESURFACING                   $745,000   WILMETTE              1-77468-0000
SKOKIE RD      Miles = 0.82                                                                                   SKOKIE

US 41          FOSTER ST TO TOUHY AVE                                RESURFACING                 $3,010,000   SKOKIE                1-77469-0000
ILL 50         Miles = 2.91                                                                                   LINCOLNWOOD
SKOKIE RD
CICERO AVE

ILL 43         DES PLAINES RIVER RD TO BUSSE HWY, GREENWOOD AVE      RESURFACING                 $3,350,000   PARK RIDGE            1-76769-0000
OAKTON ST      TO US 14 (CALDWELL AVE)                                                                        NILES
               Miles = 3.47                                                                                   MORTON GROVE
                                                                                                              DES PLAINES




                                                                          1-3
                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                      District 1

    DRAFT                                                          State Highways

                                                                   COOK COUNTY
                                                                                                                          DRAFT
Route/Street    Location                                            Improvements               Est. Cost               City
ILL 43         STONEY CREEK                                        BRIDGE DECK OVERLAY            $652,000   WORTH                1-77803-0000
HARLEM AVE

ILL 50         DEVON AVE TO ILL 19 (IRVING PARK RD)                RESURFACING                  $2,080,000   CHICAGO              1-76582-0000
CICERO AVE     Miles = 3.06

ILL 50         34TH ST TO 46TH ST & AT I-55 (STEVENSON EXPY)       RESURFACING                  $1,700,000   CICERO               1-76802-0000
CICERO AVE     Miles = 1.46                                                                                  CHICAGO

ILL 50         34TH ST TO 46TH ST & AT I-55 (STEVENSON EXPY)       DRAINAGE                        $50,000   CICERO               1-76802-0001
CICERO AVE                                                                                                   CHICAGO

ILL 72         ALMOND LN (W OF PLUM GROVE RD) TO W OF MEACHAM RD   RESURFACING                  $1,700,000   SCHAUMBURG           1-73003-0100
HIGGINS RD     Miles = 1.06                                                                                  HOFFMAN ESTATES

25TH AVE       ADDISON ST TO BELMONT AVE                           RESURFACING                    $200,000   FRANKLIN PARK        1-74047-0000
ROSE AVE       Miles = 0.50
FAU 2714

26TH ST        ILL 43 (HARLEM AVE) TO ILL 50 (CICERO AVE)          RESURFACING                  $1,620,000   CICERO               1-76798-0100
25TH PL        Miles = 3.11                                                                                  BERWYN
FAU 1459

31ST ST        ILL 171 TO DES PLAINES AVE; ILL 171 TO 31ST ST      RESURFACING                    $375,000   NORTH RIVERSIDE      1-77249-0000
GOLFVIEW AVE   Miles = 0.62                                                                                  BROOKFIELD
FAU 1467
FAU 3784

39TH ST        SOUTH RACINE AVE & N&S RR 1.3 MI W OF I-90/94       BRIDGE DECK REPAIRS            $226,000   CHICAGO              1-89992-0200
PERSHING RD
FAP 391

95TH ST        ILL 171 (ARCHER AVE) TO US 45 (96TH AVE)            RESURFACING                  $1,240,000                        1-74175-0000
FAU 1566       Miles = 2.54

175TH ST       GOVERNORS HWY TO DIXIE HWY                          RESURFACING                    $420,000   HOMEWOOD             1-75288-0000
FAU 1618       Miles = 0.75                                                                                  EAST HAZEL CREST

BRAINARD AVE   BURNHAM AVE TO INDIANA STATE LINE                   RESURFACING                    $865,000   BURNHAM              1-75293-0000
FAU 3592       Miles = 1.08




                                                                         1-4
                                       IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                           District 1

    DRAFT                                                               State Highways

                                                                        COOK COUNTY
                                                                                                                                DRAFT
Route/Street       Location                                              Improvements              Est. Cost                City
BURNHAM AVE       OVER STATE ST, RRS & GRAND CALUMET RIVER              BRIDGE DECK OVERLAY         $4,960,000   CALUMET CITY           1-70210-0000
FAU 2943                                                                BRIDGE JOINT REPAIR

BURNHAM AVE       OVER STATE ST, RRS & LITTLE CALUMET RIVER             CONSTRUCTION ENGINEERING      $400,000   CALUMET CITY           1-70210-0100
FAU 2943

CHICAGO AVE       LAKE ST TO THATCHER RD                                RESURFACING                   $750,000   MELROSE PARK           1-76778-0000
FAU 1398          Miles = 1.47                                                                                   RIVER FOREST
                                                                                                                 MAYWOOD

DEMPSTER ST       US 41 (SKOKIE BLVD) TO MCCORMICK BLVD; CHICAGO AVE    RESURFACING                 $1,666,000   SKOKIE                 1-76676-0000
FAP 377           TO JUDSON AVE                                                                                  EVANSTON
FAU 3727          Miles = 2.07

DES PLAINES AVE   RANDOLPH ST TO ROOSEVELT RD                           RESURFACING                 $1,460,000   FOREST PARK            1-77146-0000
OR 300            Miles = 1.34
FAU 2759

DES PLAINES AVE   26TH ST TO 31ST ST                                    RESURFACING                   $450,000   RIVERSIDE              1-10730-0000
OR 37A            Miles = 0.51                                                                                   NORTH RIVERSIDE

DESPLAINES R RD   0.3 MI N OF TOUHY AVE TO DEVON AVE                    RESURFACING                 $1,100,000   DES PLAINES            1-78077-0000
FAU 2710          Miles = 1.32

DIXIE HWY         GOVERNOR'S HWY TO 183RD ST                            RESURFACING                   $900,000   HOMEWOOD               1-77129-0600
FAU 2843          Miles = 1.08

EAST AVE          47TH ST TO 55TH ST                                    RESURFACING                   $533,000   MC COOK                1-60720-0000
FAU 2719          Miles = 1.00                                                                                   COUNTRYSIDE

FRANKLIN ST       FRANKLIN CONNECTOR AT 26TH ST & AT I-55 FRONTAGE RD   BRIDGE SUPERSTRUCTURE       $6,245,000   CHICAGO                1-73531-0200
CONNECTOR         B
FAP 392

FRANKLIN ST       FRANKLIN CONNECTOR AT 26TH ST & AT I-55 FRONTAGE RD   CONSTRUCTION ENGINEERING      $390,000   CHICAGO                1-73531-0300
CONNECTOR         B
FAP 392

LEMONT RD         DES PLAINES RIVER, RR CANAL (N ABUTMENT)              BRIDGE DECK OVERLAY         $9,600,000   LEMONT                 1-70213-0000
FAU 2612                                                                BRIDGE JOINT REPAIR




                                                                             1-5
                                      IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 1

    DRAFT                                                             State Highways

                                                                      COOK COUNTY
                                                                                                                             DRAFT
Route/Street      Location                                             Improvements              Est. Cost              City
LEMONT RD        DES PLAINES RIVER, RR CANAL (N ABUTMENT)             CONSTRUCTION ENGINEERING    $1,000,000   LEMONT                1-70213-0100
FAU 2612

RAND RD          US 12/45 (DES PLAINES RIVER RD) TO LUNDERGAN AVE E   RESURFACING                 $1,800,000   DES PLAINES           1-74128-0000
NORTHWEST HWY    OF I-294 (TRI-STATE TOLLWAY)                                                                  PARK RIDGE
FAU 3523         Miles = 1.84
SBI 60
FAU 3524

TOUHY AVE        NORTHWEST HWY TO N CENTRAL AVE                       RESURFACING                 $2,575,000   PARK RIDGE            1-78080-0000
FAP 341          Miles = 3.18                                                                                  CHICAGO
FAP 375                                                                                                        NILES

TOUHY AVE        LEE ST TO DES PLAINES RIVER                          RESURFACING                 $1,780,000   DES PLAINES           1-75486-0000
FAP 341          Miles = 1.70                                                                                  ROSEMONT

VARIOUS          VARIOUS LOCATIONS IN NORTH COOK COUNTY               PATCHING                    $4,000,000                         1-77953-1600


VARIOUS          VARIOUS LOCATIONS IN CENTRAL COOK COUNTY             PATCHING                    $4,000,000                         1-77953-1700


VARIOUS          VARIOUS LOCATIONS IN SOUTH COOK COUNTY               PATCHING                    $4,000,000                         1-77953-1800


WESTERN AVE      87TH ST TO 99TH ST                                   RESURFACING                 $1,770,000   EVERGREEN PARK        1-77491-0000
FAP 370          Miles = 1.51                                                                                  CHICAGO

WESTERN AVE      87TH ST TO 99TH ST                                   DRAINAGE                      $500,000   EVERGREEN PARK        1-77491-0100
FAP 370                                                                                                        CHICAGO

WILLOW SPRINGS   DES PLAINES RIVER & CANAL                            BRIDGE DECK OVERLAY         $4,300,000   WILLOW SPRINGS        1-70214-0000
RD
FAU 2697




                                                                           1-6
                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                           District 1

    DRAFT                                                               State Highways

                                                                        DUPAGE COUNTY
                                                                                                                          DRAFT
Route/Street    Location                                                 Improvements          Est. Cost               City
US 34          E OF I-355 (VETERAN'S TOLLWAY) TO WARWICK AVE            RESURFACING             $3,260,000   DOWNERS GROVE        1-77039-0000
OGDEN AVE      Miles = 3.37                                                                                  WESTMONT

ILL 38         KRESS CREEK                                              BRIDGE DECK OVERLAY       $470,000   WEST CHICAGO         1-77805-0000
ROOSEVELT RD

ILL 53         ST CHARLES RD TO MADISON ST                              RESURFACING               $775,000   LOMBARD              1-77218-0200
ROHLWING RD    Miles = 0.99

ILL 59         AT BNSF & UP RR 1.3 MI N OF ILL 38 & AT ILL 38 & KRESS   BRIDGE DECK OVERLAY     $1,310,000   WEST CHICAGO         1-77636-0000
NELTNOR BLVD   CREEK 0.7 MI S OF ILL 38 & AT ABANDONED RR 0.6 MI S OF
               ILL 64


VARIOUS        VARIOUS LOCATIONS IN DUPAGE COUNTY                       PATCHING                $2,000,000                        1-77953-1300




                                                                             1-7
                                      IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                       District 1

    DRAFT                                                           State Highways

                                                                    KANE COUNTY
                                                                                                                            DRAFT
Route/Street    Location                                             Improvements               Est. Cost                City
US 30          US 30/ILL 56 TO S OF PRAIRIE ST                      RESURFACING                    $560,000   SUGAR GROVE           1-77215-0800
ILL 47         Miles = 0.72

US 30          (WB) RAMP TO ILL 47                                  RESURFACING                    $100,000   SUGAR GROVE           1-77215-0900
ILL 47         Miles = 0.30
ILL 56

US 30          PRAIRIE ST TO JERICHO RD                             RESURFACING                    $750,000   SUGAR GROVE           1-77790-0000
ILL 47         Miles = 1.86

US 30          JERICHO RD TO KENDALL CO LINE                        RESURFACING                    $175,000                         1-77215-0100
ILL 47         Miles = 0.37

US 30          ILL 47 TO ORCHARD RD                                 RESURFACING                  $1,425,000   MONTGOMERY            1-77540-0000
               Miles = 3.54                                                                                   YORKVILLE

US 30          AT RIVER ST                                          BRIDGE DECK OVERLAY            $560,000   MONTGOMERY            1-77808-0000


ILL 25         ILL 72 (HIGGINS RD) TO I-90 (NORTHWEST TOLLWAY)      RESURFACING                  $1,950,000   EAST DUNDEE           1-75238-0000
DUNDEE AVE     Miles = 1.95                                                                                   ELGIN

ILL 72         OVER I-90 (NORTHWEST TOLLWAY)                        BRIDGE DECK OVERLAY            $640,000   GILBERTS              1-77807-0000


VARIOUS        VARIOUS LOCATIONS IN KANE COUNTY                     PATCHING                     $2,000,000                         1-77953-1500




                                                                         1-8
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 1

    DRAFT                                                             State Highways

                                                                      LAKE COUNTY
                                                                                                                                 DRAFT
Route/Street     Location                                              Improvements               Est. Cost                   City
ILL 22          AT US 45/ILL 21 (MILWAUKEE AVE)                       INTERSECTION RECONSTN         $4,800,000   LINCOLNSHIRE            1-77112-0001
ILL 21

ILL 22          AT US 45/ILL 21 (MILWAUKEE AVE)                       CONSTRUCTION ENGINEERING       $600,000    LINCOLNSHIRE            1-77112-0101
ILL 21

ILL 60          ILL 120 (BELVIDERE RD) TO S OF ILL 176                RESURFACING                   $2,960,500   ROUND LAKE PARK         1-77029-0006
ILL 83          Miles = 6.88

ILL 60          E OF ILL 21 (MILWAUKEE AVE) TO W OF I-94 (TRI-STATE   RESURFACING                   $1,850,000   METTAWA                 1-77667-0000
                TOLLWAY)
                Miles = 1.96

ILL 83          WISCONSIN STATE LINE TO PETITE LAKE RD                WIDENING & RESURFACING       $20,000,000   ANTIOCH                 1-72788-0100
MILWAUKEE AVE   Miles = 4.62                                          BI-DIRECT LEFT TURN LANE                   LAKE VILLA
MAIN ST                                                               TRAF SIGNAL MODERNIZATION
                                                                      SIGNAL TIMING/PROGRESSION

ILL 83          WISCONSIN STATE LINE TO PETITE LAKE RD                CONSTRUCTION ENGINEERING      $2,600,000   ANTIOCH                 1-72788-0109
MILWAUKEE AVE                                                                                                    LAKE VILLA
MAIN ST

ILL 131         ILL 120 TO 0.2 MI S OF ILL 137                        RESURFACING                   $3,235,000   NORTH CHICAGO           1-77330-0000
                Miles = 3.09                                                                                     WAUKEGAN

ILL 137         M L KING DR/22ND ST TO 0.3 MI W OF US 41              RESURFACING                   $4,400,000   NORTH CHICAGO           1-77029-0010
BUCKLEY RD      Miles = 2.51

ILL 137         DES PLAINES RIVER                                     BRIDGE DECK OVERLAY            $575,000                            1-77809-0000
BUCKLEY RD

VARIOUS         VARIOUS LOCATIONS IN EAST LAKE COUNTY                 PATCHING                      $1,500,000                           1-77953-1100


VARIOUS         VARIOUS LOCATIONS IN WEST LAKE COUNTY                 PATCHING                      $1,500,000                           1-77953-1150




                                                                            1-9
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 1

    DRAFT                                                             State Highways

                                                                    MCHENRY COUNTY
                                                                                                                              DRAFT
Route/Street       Location                                            Improvements               Est. Cost                City
US 12             WISCONSIN STATE LINE TO ILL 173 (KENOSHA ST)        RESURFACING                    $475,000   RICHMOND              1-75379-0201
MAIN ST           Miles = 1.12

US 14             BUNKER HILL RD TO PARK LANE DR                      RESURFACING                    $915,000                         1-77207-0300
                  Miles = 2.35

ILL 173           US 12 (MAIN ST) TO LAKE CO LINE                     RESURFACING                  $2,320,000   RICHMOND              1-75376-0000
KENOSHA ST        Miles = 5.46

ILL 176           ILL 31 TO FOX RIVER                                 RESURFACING                  $1,585,000   PRAIRIE GROVE         1-75377-0000
CRYSTAL LAKE RD   Miles = 3.89

VARIOUS           VARIOUS LOCATIONS IN MCHENRY COUNTY                 PATCHING                     $2,000,000                         1-77953-1200




                                                                           1 - 10
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 1

     DRAFT                                                            State Highways

                                                                       WILL COUNTY
                                                                                                                             DRAFT
Route/Street      Location                                             Improvements               Est. Cost               City
I   55           I-80 TO US 30 (PLAINFIELD RD)                        NOISE BARRIERS               $10,000,000   CHANNAHON           1-74984-0700
                                                                                                                 SHOREWOOD
                                                                                                                 JOLIET

I   55           US 30 (PLAINFIELD RD) TO WEBER RD                    NOISE BARRIERS               $18,000,000   JOLIET              1-74984-0750


I   57           AT NORTH PEOTONE - JOLIET RD                         BRIDGE DECK OVERLAY            $500,000                        1-77814-0000


US 30            HICKORY CREEK                                        BRIDGE DECK OVERLAY            $335,000                        1-77637-0000
LINCOLN HWY

US 45            FORKED CREEK 2.1 MI S OF MANHATTAN-MONEE RD          BRIDGE DECK OVERLAY            $275,000                        1-77816-0000


US 45            ROCK CREEK (S BRANCH OF FORKED CREEK)                BRIDGE DECK OVERLAY            $390,000                        1-77812-0000
US 52
96TH AVE

US 52            RAYNOR AVE TO MAYOR ART SCHULTZ DR                   RESURFACING                   $1,000,000   JOLIET              1-77744-0000
US 6             Miles = 1.16
US 30
JEFFERSON ST

US 52            N BRANCH JACKSON CREEK 4 MI SE OF ILL 53             BRIDGE DECK OVERLAY            $275,000                        1-77813-0000
OLD MANHATTAN

ILL 1            TRIM CREEK                                           BRIDGE DECK OVERLAY            $535,000                        1-77811-0000
                                                                      BRIDGE JOINT REPAIR
                                                                      BRIDGE APPROACH SPANS

ILL 7            I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-COOK RD    RESURFACING                   $8,820,000                       1-90021-0103
159TH ST         Miles = 5.18

ILL 7            I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-COOK RD    CONSTRUCTION ENGINEERING       $500,000                        1-90021-1103
159TH ST

ILL 50           PAULING RD TO 0.1 MI S OF NORTH PEOTONE RD           RESURFACING                   $2,025,000                       1-77031-0004
GOVERNOR'S HWY   Miles = 4.11




                                                                           1 - 11
                                    IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                     District 1

    DRAFT                                                         State Highways

                                                                   WILL COUNTY
                                                                                                                 DRAFT
Route/Street    Location                                           Improvements               Est. Cost       City
ILL 102        RAYNS CREEK 6 MI S OF ILL 53                       BRIDGE DECK OVERLAY            $190,000                1-77815-0000


VARIOUS        VARIOUS LOCATIONS IN WILL COUNTY                   PATCHING                     $2,000,000                1-77953-1400




                                                                       1 - 12
                                             IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                      District 1

    DRAFT                                                                          State Highways

                                                                                   DISTRICT-WIDE
                                                                                                                                                            DRAFT
Route/Street                 Location                                                  Improvements                        Est. Cost                     City
VARIOUS                    LOCAL ROADS CONSULTANT                                  P.E. PROJECT MANAGERS                    $4,000,000                                         1-77500-2390


VARIOUS                    MISCELLANEOUS CONSTRUCTION ENGINEERING                  CONSTRUCTION ENGINEERING                     $750,000                                       1-74805-2212


VARIOUS                    MISCELLANEOUS CONSTRUCTION ENGINEERING                  CONSTRUCTION ENGINEERING                     $750,000                                       1-77376-1101




     District 1 State Project Totals             Projects = 110     Miles =   114.02         Bridges =   29   Intersections =       6      Spots =   0          $278,127,500




                                                                                          1 - 13
                                      IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                            District 2

      DRAFT                                                              State Highways
                                                                                                                               DRAFT
Route/Street    Location                                                  Improvements             Est. Cost             County
I 39           LASALLE CO LINE TO OGLE CO LINE                           PATCHING                   $1,000,000   LEE                   2-17400-0300
US 51                                                                    SHOULDER RECONSTRUCTION

I 74           OVER ILL 92 (EB & WB) (1ST & 7TH ST) IN MOLINE            BRIDGE DECK REPAIRS        $1,000,000   ROCK ISLAND           2-29060-0100
US 6

I 74           S OF 7TH AVE TO S OF ILL 5 IN MOLINE                      RESURFACING               $12,170,000   ROCK ISLAND           2-10380-0300
US 6           Miles = 2.85                                              PATCHING
                                                                         BRIDGE DECK REPAIRS
                                                                         SLOPEWALL REPAIR
                                                                         COLD MILLING

I 74           OVER 12TH AVE IN MOLINE                                   BRIDGE DECK REPAIRS        $1,830,000   ROCK ISLAND           2-26000-0100
US 6

I    88        0.2 MI E OF MOLINE RD TO LEE CO LINE                      RESURFACING                $7,500,000   WHITESIDE             2-27120-0100
               Miles = 8.45                                              COLD MILLING

US    6        ILL 84 TO I-80 SE OF COLONA                               RESURFACING                  $495,000   HENRY                 2-14290-0100
               Miles = 1.06

US    6        0.1 MI E OF ILL 82 (S) IN GENESEO TO STATE ST (ATKINSON   RESURFACING                $2,970,000   HENRY                 2-98600-0000
               RD) IN ATKINSON                                           PATCHING
               Miles = 7.44

US    6        STATE ST (ATKINSON RD) IN ATKINSON TO MUD CREEK           RESURFACING                $2,100,000   HENRY                 2-97700-0000
               Miles = 5.11                                              PATCHING

US 20          0.2 MI W OF RUSH ST TO 0.2 MI E OF SIMMONS ST IN          RESURFACING                  $600,000   JODAVIESS             2-16395-0000
ILL 78         STOCKTON
NORTH AVE      Miles = 0.97

US 20          JODAVIESS CO LINE TO REES RD                              RESURFACING                $2,475,000   STEPHENSON            2-97140-0500
               Miles = 5.86

US 20          0.7 MI W OF ILL 26 TO 0.7 MI E OF ILL 26 N OF FREEPORT    RESURFACING                $1,510,000   STEPHENSON            2-16910-0100
FREEPORT BYP   Miles = 1.27

US 20          US 20 BUSN E OF FREEPORT TO WINNEBAGO CO LINE             RESURFACING                $6,900,000   STEPHENSON            2-12320-0000
               Miles = 7.34

US 20          STEPHENSON CO LINE TO 0.2 MI W OF PECATONICA RD           RESURFACING                $1,850,000   WINNEBAGO             2-37690-0000
W STATE ST     Miles = 1.83



                                                                               2-1
                                       IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                        District 2

    DRAFT                                                            State Highways
                                                                                                                             DRAFT
Route/Street     Location                                             Improvements               Est. Cost             County
US 20           E OF FARMINGTON WAY IN BELVIDERE TO MCHENRY CO       RESURFACING                  $3,150,000   BOONE                 2-36250-0000
                LINE
                Miles = 5.45

US 20 BUS       E STATE ST TO MULBERRY ST IN ROCKFORD                RESURFACING                  $1,225,000   WINNEBAGO             2-11240-0000
ILL 70          Miles = 1.35                                         COLD MILLING
US 20 BUSA
JEFFERSON ST
KILBURN AVE

US 20 BUS       E STATE ST TO MULBERRY ST IN ROCKFORD                RR INSURANCE                     $7,000   WINNEBAGO             2-11240-0002
ILL 70                                                               RR FLAGGER
US 20 BUSA
JEFFERSON ST
KILBURN AVE

US 30           GALT RD TO 0.1 MI E OF PROPHET RD W OF ROCK FALLS    RESURFACING                  $1,250,000   WHITESIDE             2-13300-0000
                Miles = 2.33

US 52           0.2 MI S OF ILL 38 IN DIXON TO ELDENA RD             RESURFACING                    $530,000   LEE                   2-14000-0000
                Miles = 1.43

US 67           N OF 10TH AVE IN MILAN TO 0.1 MI N OF ILL 94         RESURFACING                  $3,695,000   ROCK ISLAND           2-07260-0401
                Miles = 3.48                                         PATCHING

ILL 2           E 4TH ST TO 45TH AVE IN STERLING                     RESURFACING                  $2,410,000   WHITESIDE             2-28400-0000
                Miles = 2.08

ILL 2           SALEM ST TO CEDAR ST IN ROCKFORD                     RESURFACING                    $900,000   WINNEBAGO             2-98941-0100
(NORTHBOUND)    Miles = 1.37                                         COLD MILLING

ILL 2           CEDAR ST / S MAIN ST TO JOHN ST / N MAIN ST IN       RESURFACING                    $600,000   WINNEBAGO             2-16920-0000
ILL 2 B         ROCKFORD
(SOUTHBOUND)    Miles = 1.05

ILL 5           COLONA RD TO 0.5 MI W OF I-80                        RESURFACING                  $6,750,000   ROCK ISLAND           2-12970-0000
ILL 92          Miles = 5.68                                         PATCHING
JOHN DEERE RD

ILL 5           COLONA RD TO 0.5 MI W OF I-80                        RR INSURANCE                    $10,000   ROCK ISLAND           2-12970-0001
ILL 92                                                               RR FLAGGER
JOHN DEERE RD




                                                                           2-2
                                           IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                              District 2

    DRAFT                                                                  State Highways
                                                                                                                                 DRAFT
Route/Street       Location                                                 Improvements             Est. Cost               County
ILL 26            0.3 MI S OF FAIRVIEW RD TO N OF US 20 BUSN IN FREEPORT   RESURFACING                $2,400,000   STEPHENSON            2-37670-0000
WEST AVE          Miles = 1.69

ILL 26            S OF ILL 72 (W) TO S OF WILLOW ST IN FORRESTON           RESURFACING                $2,150,000   OGLE                  2-17800-0000
ILL 72            Miles = 4.66

ILL 26            S OF ILL 72 (W) TO S OF WILLOW ST IN FORRESTON           RR INSURANCE                  $35,000   OGLE                  2-17800-0001
ILL 72                                                                     RR FLAGGER

ILL 26            N OF ELKHORN ST TO SCL OF POLO                           RESURFACING                  $950,000   OGLE                  2-28840-0100
US 52             Miles = 1.33

ILL 40            1ST ST IN ROCK FALLS TO US 30                            RESURFACING                $1,200,000   WHITESIDE             2-23380-0100
                  Miles = 1.25

ILL 72            SHANNON RD IN SHANNON TO ILL 26                          RESURFACING                $2,190,000   CARROLL               2-11670-0100
                  Miles = 6.03                                                                                     OGLE

ILL 81            0.4 MI W OF I-74 TO 0.3 MI E OF I-74                     RESURFACING                  $270,000   HENRY                 2-22010-0100
                  Miles = 0.72

ILL 81            WCL OF CAMBRIDGE TO 0.2 MI E OF ILL 82 (N)               RESURFACING                  $860,000   HENRY                 2-37580-0000
ILL 82            Miles = 2.34
CENTER ST
WEST ST

ILL 82            N OF SMITH ST TO S OF US 6 (E) IN GENESEO                RESURFACING                  $850,000   HENRY                 2-24000-0100
US 6              Miles = 2.29
COLLEGE ST

ILL 92            16TH ST TO S OF I-280 IN ROCK ISLAND                     RESURFACING                $5,500,000   ROCK ISLAND           2-14750-0000
CENTENNIAL EXPY   Miles = 4.41

ILL 136           MISSISSIPPI RIVER TO US 30                               RESURFACING                $2,000,000   WHITESIDE             2-12010-0000
                  Miles = 3.21                                             PATCHING
                                                                           COLD MILLING

ILL 251           WINDSOR RD TO N OF ROOSEVELT RD IN LOVES PARK            RESURFACING                $1,070,000   WINNEBAGO             2-06250-0200
N 2ND ST          Miles = 1.61

ILL 251           WHITMAN ST TO WALNUT ST IN ROCKFORD                      RESURFACING                  $470,000   WINNEBAGO             2-22521-0100
ILL 251 A         Miles = 0.71
(SOUTHBOUND)



                                                                                 2-3
                                                IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                           District 2

    DRAFT                                                                               State Highways
                                                                                                                                                              DRAFT
Route/Street                  Location                                                      Improvements                       Est. Cost                  County
ILL 251                     WALNUT ST TO WHITMAN ST IN ROCKFORD                         RESURFACING                                 $420,000    WINNEBAGO                        2-23521-0100
(NORTHBOUND)                Miles = 0.75

ILL 251                     1ST AVE / WALNUT ST TO POPE ST IN ROCKFORD                  RESURFACING                                 $720,000    WINNEBAGO                        2-21521-0100
KISHWAUKEE ST               Miles = 0.63

ILL 251                     CHICAGO RD TO US 52 IN MENDOTA                              RESURFACING                             $4,000,000      LEE                              2-16320-0000
                            Miles = 11.74                                                                                                       LASALLE

VARIOUS                     CONSTRUCTION ENGINEERING                                    CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                        2-27800-0000


VARIOUS                     CONSTRUCTION ENGINEERING                                    CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                        2-27900-0000


VARIOUS                     CONSTRUCTION ENGINEERING                                    CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                        2-29800-0000




      District 2 State Project Totals               Projects =   43      Miles =   109.77         Bridges =   0   Intersections =       0      Spots =    0        $89,512,000




                                                                                                2-4
                                         IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                          District 3

     DRAFT                                                             State Highways
                                                                                                                               DRAFT
Route/Street    Location                                                Improvements               Est. Cost               County
I   80         VARIOUS LOCATIONS IN LASALLE CO                         RESURFACING INTERMITTENT     $1,200,000   LASALLE               3-08050-0050
               Miles = 1.20

I   80         E OF I-180 TO W OF ILL 89                               COLD MILLING                 $4,500,000   BUREAU                3-08006-0100
               Miles = 7.15                                            PATCHING
                                                                       RESURFACING INTERMITTENT

I 80           E OF SENECA INTCHG TO W OF ILL 47                       MICROSURFACING               $1,500,000   GRUNDY                3-08032-0070
(WESTBOUND)

US 52          ILL 251 (S JCT) TO I-39                                 RESURFACING                  $1,000,000   LASALLE               3-44100-0000
               Miles = 3.63                                            COLD MILLING

ILL 1          ILL 17 TO NCL OF ST ANNE                                RESURFACING                  $1,730,000   KANKAKEE              3-42980-0000
               Miles = 6.52                                            COLD MILLING

ILL 17         E OF REDDICK RUN TO E OF HERSCHER RD                    RESURFACING                  $2,150,000   KANKAKEE              3-44160-0000
               Miles = 8.10                                            COLD MILLING                              GRUNDY

ILL 17         E OF LOWE RD E OF KANKAKEE TO W OF ILL 1 (S)            COLD MILLING                 $3,500,000   KANKAKEE              3-01746-0030
               Miles = 4.30                                            PATCHING
                                                                       RESURFACING

ILL 18         E OF ILL 89 TO E OF ILL 251                             RESURFACING                  $1,870,000   LASALLE               3-01850-0020
               Miles = 7.04                                            COLD MILLING                              PUTNAM

ILL 38         W OF LOVES RD TO KANE CO LINE                           RESURFACING                  $1,790,000   DEKALB                3-37560-0000
               Miles = 5.30                                            SHOULDER RECONSTRUCTION
                                                                       PATCHING
                                                                       TURNING LANES

ILL 47         0.2 MI S OF ILL 113 TO 0.4 MI N OF I-55                 RESURFACING                  $3,090,000   GRUNDY                3-43040-0000
               Miles = 11.02

ILL 47         S OF I-55 TO 0.2 MI S OF ILL 116                        RESURFACING                  $4,450,000   LIVINGSTON            3-04753-0010
               Miles = 15.69                                           COLD MILLING                              GRUNDY

ILL 49         US 24 TO MILFORD RD                                     RESURFACING                  $2,860,000   IROQUOIS              3-42000-0000
               Miles = 10.80                                           COLD MILLING

ILL 53         I-55 TO WILL CO LINE                                    RESURFACING                  $1,750,000   GRUNDY                3-44140-0000
               Miles = 6.30                                            COLD MILLING



                                                                             3-1
                                      IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                       District 3

    DRAFT                                                           State Highways
                                                                                                                            DRAFT
Route/Street    Location                                             Improvements               Est. Cost               County
ILL 54         N OF THAWVILLE TO I-57 AT ONARGA                     RESURFACING                  $1,220,000   IROQUOIS              3-42850-0000
               Miles = 4.57                                         COLD MILLING

ILL 92         ECL OF WALNUT TO ILL 26                              RESURFACING                  $1,580,000   BUREAU                3-09206-0020
               Miles = 5.91                                         COLD MILLING

ILL 115        IRWIN TO W OF KANKAKEE                               RESURFACING                  $1,850,000   KANKAKEE              3-44150-0000
               Miles = 6.94                                         COLD MILLING

ILL 116        TR 276 TO CHERRY ST IN CULLOM                        RESURFACING                  $3,300,000   LIVINGSTON            3-36120-0100
JACKSON ST     Miles = 0.89                                         CURB AND GUTTER
                                                                    STORM SEWER (NEW)
                                                                    CULVERT REHABILITATION

ILL 178        0.1 MI N OF US 6 TO 0.9 MI N OF US 6                 RESURFACING                    $300,000   LASALLE               3-17850-0010
               Miles = 0.78

ARMOUR RD      US 45/52 IN BOURBONNAIS TO ILL 50 IN BRADLEY         BI-DIRECT LEFT TURN LANE     $3,900,000   KANKAKEE              3-37930-0100
FAU 6176       Miles = 1.25                                         RESURFACING
                                                                    PATCHING
                                                                    CURB AND GUTTER
                                                                    STORM SEWER (NEW)

OLD US 66      ILL 47 TO ILL 53                                     RESURFACING                  $1,910,000   GRUNDY                3-39440-0000
FAS 298        Miles = 7.20                                         COLD MILLING                              LIVINGSTON




                                                                          3-2
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                              District 3

    DRAFT                                                                  State Highways
                                                                                                                                            DRAFT
Route/Street                 Location                                          Improvements                       Est. Cost             County




     District 3 State Project Totals      Projects =   20   Miles =   114.59         Bridges =   0   Intersections =     2    Spots =   0        $45,450,000




                                                                                   3-3
                                           IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                            District 4

     DRAFT                                                               State Highways
                                                                                                                                DRAFT
Route/Street       Location                                               Improvements               Est. Cost              County
I   74            W OF KICKAPOO-EDWARDS RD TO E OF I-474                 RESURFACING                  $9,180,000   PEORIA               4-08120-0100
                  Miles = 5.71                                           COLD MILLING

I   74            KICKAPOO CREEK TRIB 0.7 MI W OF ILL 6                  CULVERT REHABILITATION          $60,000   PEORIA               4-00085-0100


I   74            E OF MORTON AVE TO WOODFORD CO LINE                    RESURFACING                  $9,000,000   TAZEWELL             4-00090-0600
                  Miles = 6.73                                           COLD MILLING

ILL 8             BRANCH OF FARM CREEK TO E OF SUNRISE AVE               CONSTRUCTION ENGINEERING     $1,600,000   TAZEWELL             4-02320-0301
E WASHINGTON ST

ILL 26            PARK ST IN LACON TO WOODFORD CO LINE                   RESURFACING                  $1,460,000   MARSHALL             4-00124-0200
                  Miles = 7.01

ILL 78            1 MI S OF I-74 TO ILL 8 (E)                            RESURFACING                    $925,000   PEORIA               4-00137-0400
ILL 8             Miles = 3.06

ILL 78            ILL 116 (W) TO NCL OF CANTON                           RESURFACING                  $2,020,000   FULTON               4-00137-0200
                  Miles = 7.54

ILL 78            SCL OF CANTON TO ILL 100                               RESURFACING                    $750,000   FULTON               4-00137-0500
ILL 100           Miles = 2.80

ILL 78            ILL 100 TO US 24 IN LITTLE AMERICA                     RESURFACING                  $1,150,000   FULTON               4-00137-1000
                  Miles = 6.39

ILL 100           BRYANT TO ILL 97 IN LEWISTOWN                          RESURFACING                  $1,155,000   FULTON               4-00101-0000
                  Miles = 4.97

ILL 116           WCL OF ROANOKE TO ILL 117 (N)                          RESURFACING                  $3,350,000   WOODFORD             4-43650-0000
ILL 117           Miles = 6.12

VARIOUS           ON-CALL CONSTRUCTION INSPECTION                        CONSTRUCTION ENGINEERING     $1,700,000   DIST-WIDE            4-00003-1200




                                                                               4-1
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                             District 4

    DRAFT                                                                 State Highways
                                                                                                                                           DRAFT
Route/Street                 Location                                         Improvements                       Est. Cost             County




     District 4 State Project Totals      Projects =   12   Miles =   50.33         Bridges =   1   Intersections =     0    Spots =   0        $32,350,000




                                                                                  4-2
                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                      District 5

     DRAFT                                                         State Highways
                                                                                                                           DRAFT
Route/Street    Location                                            Improvements               Est. Cost               County
I 74           N OF I-55 BUSN LOOP TO E OF US 51 AT BLOOMINGTON    RESURFACING                  $7,755,000   MCLEAN                5-42240-0000
I 55           Miles = 3.56                                        PATCHING
US 51                                                              BRIDGE REPAIR

I   74         MANSFIELD TO MAHOMET                                RESURFACING                  $4,240,000   PIATT                 5-52510-0000
               Miles = 4.51                                        SAFETY IMPROVEMENTS                       CHAMPAIGN
                                                                   PATCHING

US 24          W OF MCLEAN ST IN GRIDLEY TO W OF I-55              RESURFACING                  $1,820,000   MCLEAN                5-44190-0000
               Miles = 7.28

US 36          MOULTRIE CO LINE TO WASHINGTON ST IN TUSCOLA        RESURFACING                  $2,420,000   DOUGLAS               5-50590-0000
               Miles = 9.78                                                                                  PIATT

US 36          ILL 130 TO ILL 49                                   RESURFACING                  $3,350,000   DOUGLAS               5-53710-0000
ILL 130        Miles = 12.58                                                                                 EDGAR

US 136         DEWEY-FISHER RD TO S BRANCH BIG DITCH W OF          RESURFACING                    $855,000   CHAMPAIGN             5-53360-0000
               RANTOUL
               Miles = 3.80

ILL 9          HOOPESTON TO INDIANA STATE LINE                     RESURFACING                  $2,395,000   VERMILION             5-92610-0200
               Miles = 6.62                                        GUARDRAIL

ILL 9          HOOPESTON TO INDIANA STATE LINE                     CULVERT REPLACEMENT            $405,000   VERMILION             5-92610-0000
                                                                   BRIDGE DECK OVERLAY

ILL 16         COLES CO LINE TO ILL 133 AT PARIS                   RESURFACING                  $3,850,000   EDGAR                 5-53907-0000
ILL 49         Miles = 14.53

ILL 48         ILL 54 TO ILL 10                                    RESURFACING                  $1,565,000   DEWITT                5-53750-0000
               Miles = 5.68

ILL 48         ILL 10 TO ILL 32                                    RESURFACING                  $2,200,000   DEWITT                5-53760-0000
               Miles = 7.32                                                                                  PIATT
                                                                                                             MACON

ILL 49         US 150 AT OGDEN TO SCL OF HOMER                     RESURFACING                  $1,435,000   CHAMPAIGN             5-51300-0000
               Miles = 5.98

ILL 105        ILL 32 (S) TO SCL OF BEMENT                         RESURFACING                  $2,575,000   PIATT                 5-94890-0000
ILL 32         Miles = 12.66




                                                                         5-1
                                                  IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                            District 5

    DRAFT                                                                                State Highways
                                                                                                                                                              DRAFT
Route/Street                  Location                                                       Improvements                       Est. Cost                 County
ILL 119                     ILL 1 TO INDIANA STATE LINE                                  RESURFACING                             $1,892,000      VERMILION                       5-93300-0000
                            Miles = 7.78

CHICAGO ST                  FAIRMOUNT TO SIDELL                                          PATCHING                                    $600,000    VERMILION                       5-53933-0000
FAS 513

OLD US 51                   2.5 MI S OF I-74 TO 1 MI S OF HEYWORTH                       RESURFACING                             $1,525,000      MCLEAN                          5-39820-0000
FAS 1476                    Miles = 7.23                                                 COLD MILLING
SBI 2

OLD US 66                   SW OF TOWANDA TO N OF LEXINGTON                              RESURFACING                             $3,365,000      MCLEAN                          5-04940-0000
FAS 294                     Miles = 13.08
FAU 6348

VARIOUS                     ON-CALL ENGINEERING                                          CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                       5-50790-0604




      District 5 State Project Totals                 Projects =     18   Miles =   122.39         Bridges =   0   Intersections =       0      Spots =   0        $42,747,000




                                                                                                 5-2
                                       IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                 District 6

    DRAFT                                                                     State Highways
                                                                                                                                     DRAFT
Route/Street    Location                                                       Improvements               Est. Cost              County
I 55           VARIOUS STRUCTURES IN SPRINGFIELD MPO AREA                     BRIDGE DECK WATERPROOFING      $116,000   SANGAMON             6-00624-0100
I 72
US 36

I 55 BUS       LAUREL ST TO SOUTH GRAND AVE IN SPRINGFIELD                    RESURFACING                    $250,000   SANGAMON             6-00505-0000
9TH ST         Miles = 0.29                                                   PARKING IMPROVEMENT

I 172          PIKE CO LINE TO 0.3 MI N OF ILL 96                             PATCHING                       $250,000   ADAMS                6-00623-0000


I 172          0.3 MI N OF ILL 96 TO US 24 NE OF QUINCY                       RESURFACING                 $12,050,000   ADAMS                6-69750-0000
ILL 336        Miles = 9.41                                                   BRIDGE REPAIR
                                                                              BRIDGE JOINT REPAIR
                                                                              BRIDGE DECK OVERLAY

US 67          0.1 MI N OF ILL 101 TO 0.2 MI N OF US 24 & 0.2 MI S OF US 24   RESURFACING                  $3,775,000   SCHUYLER             6-00139-0000
               TO 2 MI SE OF US 24 S OF RUSHVILLE
               Miles = 9.95

US 67          0.1 MI S OF ILL 125 IN BEARDSTOWN TO MORGAN CO LINE            RESURFACING                  $2,600,000   CASS                 6-76190-0000
ILL 100        Miles = 9.96

ILL 9          ILL 94 (N) IN LA HARPE TO COTTONWOOD ST IN DALLAS              RESURFACING                  $4,750,000   HANCOCK              6-00357-0000
ILL 94         CITY                                                           PARKING IMPROVEMENT
ILL 96         Miles = 13.28

ILL 16         GIBSON ST TO SINGER AVE IN NOKOMIS INCLUDING                   RESURFACING                    $995,000   MONTGOMERY           6-00129-0000
SPRUCE         SPRUCE; MADISON ST TO ILL 16                                   PARKING IMPROVEMENT
               Miles = 1.81                                                   RR FLAGGER

ILL 54         DEWITT CO LINE TO 1.5 MI NE OF ILL 121                         RESURFACING                  $1,700,000   LOGAN                6-76420-0200
               Miles = 6.89

ILL 78         N OF I&M RR IN HAVANA TO SAIDORA RD                            RESURFACING                  $7,425,000   MASON                6-00127-0000
               Miles = 13.61                                                  SHOULDER RECONSTRUCTION
                                                                              MILLED RUMBLE STRIP

ILL 78         ILL 125 IN VIRGINIA TO N OF MORGAN CO LINE                     RESURFACING                  $2,000,000   CASS                 6-00581-0000
               Miles = 5.55                                                   PARKING IMPROVEMENT

ILL 78         SNAKE CREEK 3.4 MI N OF JACKSONVILLE TO 0.3 MI S OF            RESURFACING                    $600,000   MORGAN               6-00580-0000
               BNRR STRUCTURE N OF JACKSONVILLE
               Miles = 3.61



                                                                                   6-1
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 6

    DRAFT                                                             State Highways
                                                                                                                             DRAFT
Route/Street      Location                                             Improvements               Est. Cost              County
ILL 96           2 MI NW OF PAYSON TO 0.1 MI E OF PAYSON              RESURFACING                  $1,100,000   ADAMS                6-00569-0000
                 Miles = 3.67

ILL 97           SANGAMON RIVER AT MASON CO LINE & SANGAMON RIVER     BRIDGE DECK REPAIRS          $1,300,000   MENARD               6-00584-0000
                 OVERFLOW 0.4 MI S OF MASON CO LINE                   BRIDGE DECK WATERPROOFING
                                                                      BRIDGE JOINT REPAIR
                                                                      BRIDGE DECK OVERLAY

ILL 97           MEADOWLARK DR TO 1ST ST IN SPRINGFIELD               RESURFACING                  $1,950,000   SANGAMON             6-00447-0100
ILL 29           Miles = 2.06                                         PARKING IMPROVEMENT
JEFFERSON ST                                                          TRAF SIGNAL MODERNIZATION

ILL 104          0.3 MI E OF I-172 TO 0.4 MI E OF PLAINVILLE RD       RESURFACING                  $5,275,000   ADAMS                6-00152-0000
BROADWAY         Miles = 5.87

ILL 104          ROGER RD (TR 388) 0.6 MI W OF WAVERLY TO SANGAMON    RESURFACING                  $2,725,000   MORGAN               6-76330-0000
                 CO LINE                                              STORM SEWER (NEW)
                 Miles = 2.10                                         DRAINAGE

ILL 106          LITTLE SANDY CREEK TO GREENE CO LINE                 RESURFACING                  $1,550,000   SCOTT                6-00142-0000
                 Miles = 4.66

ILL 125          LOST CREEK TRIB 0.9 MI E OF BLUFF SPRING RD          CULVERT REPAIR                 $125,000   CASS                 6-60505-0000


ILL 125          LOST CREEK TRIB 2 MI E OF BLUFF SPRING RD            CULVERT REPLACEMENT          $1,075,000   CASS                 6-60510-0000


ILL 125          LOST CREEK TRIBUTARY 2 MI E OF BLUFF SPRING RD       UTILITY ADJUSTMENT              $50,000   CASS                 6-60510-0102


ILL 125          LOST CREEK TRIB 3.6 MI E OF BLUFF SPRING RD          CULVERT REPLACEMENT            $975,000   CASS                 6-60500-0000


MACARTHUR BLVD   AT OUTER PARK DR IN SPRINGFIELD                      PAVEMENT MARKING                $40,000   SANGAMON             6-00494-0000
FAP 664

OLD US 36        AT FARMINGDALE RD W OF SPRINGFIELD                   INTERSECTION IMPROVEMENT       $325,000   SANGAMON             6-00220-0000
FAS 1613                                                              RR FLAGGER
FAU 8012




                                                                            6-2
                                              IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                      District 6

    DRAFT                                                                          State Highways
                                                                                                                                                         DRAFT
Route/Street                 Location                                                  Improvements                       Est. Cost                 County
VARIOUS                    KEOKUK, QUINCY MEMORIAL, BEARDSTOWN, MEREDOSIA, &       BRIDGE CLEANING                             $150,000    ADAMS                           6-00625-0000
                           FLORENCE BRIDGES                                                                                                CASS
                                                                                                                                           HANCOCK
                                                                                                                                           MORGAN
                                                                                                                                           SCOTT

VARIOUS                    LAGRANGE WETLAND BANK IN BROWN CO                       WETLAND MITIGATION                          $600,000    BROWN                           6-00335-0000


VARIOUS                    LAGRANGE WETLAND BANK IN BROWN CO                       WETLAND MITIGATION                          $600,000    BROWN                           6-00336-0000


VARIOUS                    VARIOUS STRUCTURES IN ADAMS, CHRISTIAN, & MORGAN        BRIDGE DECK WATERPROOFING                   $109,000    ADAMS                           6-00624-0000
                           COUNTIES                                                                                                        CHRISTIAN
                                                                                                                                           MORGAN




     District 6 State Project Totals              Projects =   28    Miles =   92.72         Bridges =   2   Intersections =       7      Spots =    0       $54,460,000




                                                                                           6-3
                                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                              District 7

     DRAFT                                                                                 State Highways
                                                                                                                                                                DRAFT
Route/Street                     Location                                                      Improvements                       Est. Cost                 County
I   57                         ILL 16 TO DOUGLAS CO LINE                                   RESURFACING                            $20,000,000      COLES                           7-93080-0000
                               Miles = 10.87                                               UNDERDRAINS
                                                                                           SAFETY IMPROVEMENTS

ILL 32                         ILL 16 TO EFFINGHAM CO LINE                                 RESURFACING                             $4,100,000      SHELBY                          7-50326-0000
                               Miles = 13.00

ILL 33                         1 MI W OF OBLONG TO DOGWOOD CREEK                           RESURFACING                             $8,000,000      CRAWFORD                        7-02820-5000
MAIN ST                        Miles = 2.52

ILL 105                        E OF 26TH ST TO E OF BENDER RD IN DECATUR                   RESURFACING                             $3,030,000      MACON                           7-79900-0000
                               Miles = 3.05

ILL 121                        WEST SIDE OF COURTHOUSE SQUARE IN TOLEDO TO                 RESURFACING                             $2,140,000      CUMBERLAND                      7-50140-0000
ILL 121    A                   CUMBERLAND ST IN GREENUP
                               Miles = 5.18

FISH HATCHRY RD                STREAM 3.3 MI S OF ILL 16 N OF PARADISE                     CULVERT REPLACEMENT                         $180,000    COLES                           7-93440-0100
FAS 674




         District 7 State Project Totals                   Projects =    6   Miles =   34.62         Bridges =   0   Intersections =       0      Spots =   0        $37,450,000




                                                                                                   7-1
                                      IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                               District 8

     DRAFT                                                                  State Highways
                                                                                                                                     DRAFT
Route/Street    Location                                                     Improvements              Est. Cost                 County
I   55         UNDER ILL 162                                                BRIDGE REPLACEMENT         $35,550,000   MADISON                 8-11114-0000
I   70                                                                      INTERCHANGE RECONSTRUCTN
                                                                            RAMP MODIFICATIONS
                                                                            RETAINING WALL

I   55         UNDER ILL 162                                                CONSTRUCTION ENGINEERING    $2,500,000   MADISON                 8-11114-0003
I   70

US 50          0.1 MI E OF BRUBAKER CREEK TRIB TO METCALF RD                RESURFACING                   $900,000   MARION                  8-81271-0000
               Miles = 2.72

ILL 3          RR SUBWAY TO GRANVILLE ST IN VENICE                          NEW CONSTRUCTION            $4,500,000   MADISON                 8-81050-0100
RELOCATION     Miles = 0.63                                                 GRADING
FAP 788                                                                     DRAINAGE
                                                                            PAVING
                                                                            LIGHTING
                                                                            SIGNING (NEW)
                                                                            TRAF SIGNAL INSTALLATION

ILL 13         23RD ST TO 0.1 MI W OF 11TH ST IN BELLEVILLE                 RESURFACING                   $750,000   ST. CLAIR               8-00017-1000
               Miles = 0.70

ILL 100        VINE ST IN GRAFTON TO LOCKHAVEN RD                           RESURFACING                 $4,500,000   JERSEY                  8-70072-0000
               Miles = 8.36

ILL 100        LOCKHAVEN RD TO STATE ST                                     RESURFACING                 $3,500,000   JERSEY                  8-70093-0000
               Miles = 6.56                                                                                          MADISON

ILL 157        ILL 13 TO 0.1 MI S OF (EB) ILL 15 RAMPS & 0.1 MI S OF LAKE   RESURFACING                 $2,300,000   ST. CLAIR               8-00156-0000
               BLVD TO STATE ST
               Miles = 1.78

ILL 255        OVER HUMBERT RD                                              BRIDGE (NEW)                $4,000,000   MADISON                 8-84020-0000
ALTON BYP

ILL 255        ALONG HUMBERT RD                                             WIDENING & RESURFACING      $3,500,000   MADISON                 8-84030-0000
ALTON BYP      Miles = 0.66                                                 CHANNELIZATION

VARIOUS        CONSTRUCTION ENGINEERING                                     CONSTRUCTION ENGINEERING      $500,000   DIST-WIDE               8-81081-9000


VARIOUS        CONSTRUCTION ENGINEERING                                     CONSTRUCTION ENGINEERING      $500,000   DIST-WIDE               8-81081-9010




                                                                                  8-1
                                             IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                                   District 8

    DRAFT                                                                       State Highways
                                                                                                                                                     DRAFT
Route/Street                 Location                                               Improvements                       Est. Cost                 County
VARIOUS                    CONSTRUCTION ENGINEERING                             CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                       8-81081-9015


VARIOUS                    CONSTRUCTION ENGINEERING                             CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                       8-81081-9025


VARIOUS                    CONSTRUCTION ENGINEERING                             CONSTRUCTION ENGINEERING                    $500,000    DIST-WIDE                       8-81081-9035




     District 8 State Project Totals            Projects =   15   Miles =   21.41         Bridges =   3   Intersections =       2      Spots =   1        $64,500,000




                                                                                        8-2
                                     IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                         District 9

    DRAFT                                                             State Highways
                                                                                                                              DRAFT
Route/Street    Location                                               Improvements              Est. Cost                County
I 57           N OF ILL 14 TO JEFFERSON CO LINE                       RUBBLIZATION/OVERLAY       $12,235,000   FRANKLIN               9-00093-0100
(SOUTHBOUND)   Miles = 8.68

ILL 13         LOVERS LN NEAR WCL OF HARRISBURG TO ECL                RELOCATION                 $11,800,000   SALINE                 9-97380-0100
ILL 34         Miles = 2.67                                           GRADING
                                                                      PAVING
                                                                      CURB AND GUTTER
                                                                      CULVERT EXTENSION

ILL 13         LOVERS LN NEAR WCL OF HARRISBURG TO ECL                BRIDGE (NEW)                $1,800,000   SALINE                 9-97380-0300
ILL 34

ILL 145        ILL 146 TO 3.5 MI N                                    RESURFACING                   $875,000   POPE                   9-00137-0000
               Miles = 3.75

ILL 146        0.4 MI E OF ILL 147 TO POPE CO LINE                    RESURFACING                 $2,100,000   JOHNSON                9-00041-0000
               Miles = 8.78

ILL 148        ILL 14 TO COELLO RD IN CHRISTOPHER                     RESURFACING                   $280,000   FRANKLIN               9-96950-0000
               Miles = 1.53

ILL 148        MAPLE ST IN ZEIGLER TO 0.2 MI N OF YELLOW BANKS RD S   RESURFACING                 $1,300,000   FRANKLIN               9-00091-0000
               OF CHRISTOPHER
               Miles = 4.26

ILL 151        ILL 4 TO ILL 3                                         RESURFACING                 $1,800,000   JACKSON                9-00090-0000
               Miles = 7.84

VARIOUS        CONSTRUCTION ENGINEERING                               CONSTRUCTION ENGINEERING      $300,000   DIST-WIDE              9-00254-0400


VARIOUS        CONSTRUCTION ENGINEERING                               CONSTRUCTION ENGINEERING      $300,000   DIST-WIDE              9-00254-0500




                                                                            9-1
                                        IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                             District 9

    DRAFT                                                                 State Highways
                                                                                                                                           DRAFT
Route/Street                 Location                                         Improvements                       Est. Cost             County




     District 9 State Project Totals      Projects =   10   Miles =   37.51         Bridges =   1   Intersections =     0    Spots =   0        $32,790,000




                                                                                  9-2
                                   IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                     Statewide

    DRAFT                                                         State Highways
                                                                                                                       DRAFT
Route/Street    Location                                           Improvements              Est. Cost             County
I 55           PAVEMENT MARKING IN SPRINGFIELD MPO AREA           PAVEMENT MARKING              $500,000   SANGAMON            0-01208-6002
I 72
US 36

VARIOUS        PAVEMENT MARKING IN DISTRICT 2                     PAVEMENT MARKING              $600,000   DIST-WIDE           0-01208-2001


VARIOUS        PAVEMENT MARKING IN DISTRICT 3                     PAVEMENT MARKING              $540,000   DIST-WIDE           0-01208-3001


VARIOUS        PAVEMENT MARKING IN DISTRICT 3                     PAVEMENT MARKING               $60,000   DIST-WIDE           0-01208-3002


VARIOUS        PAVEMENT MARKING IN DISTRICT 4                     PAVEMENT MARKING              $600,000   DIST-WIDE           0-01208-4001


VARIOUS        PAVEMENT MARKING IN DISTRICT 5                     PAVEMENT MARKING              $600,000   DIST-WIDE           0-01208-5001


VARIOUS        PAVEMENT MARKING IN DISTRICT 6                     PAVEMENT MARKING              $100,000   DIST-WIDE           0-01208-6001


VARIOUS        PAVEMENT MARKING IN DISTRICT 7                     PAVEMENT MARKING              $360,000   DIST-WIDE           0-01208-7001


VARIOUS        PAVEMENT MARKING IN DISTRICT 7                     PAVEMENT MARKING              $240,000   DIST-WIDE           0-01208-7002


VARIOUS        PAVEMENT MARKING IN DISTRICT 8                     PAVEMENT MARKING              $600,000   DIST-WIDE           0-01208-8001


VARIOUS        PAVEMENT MARKING IN DISTRICT 9                     PAVEMENT MARKING              $600,000   DIST-WIDE           0-01208-9001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 2   GUARDRAIL END-SECT REPL     $1,000,000   DIST-WIDE           0-01839-2001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 3   GUARDRAIL END-SECT REPL       $800,000   DIST-WIDE           0-01839-3001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 3   GUARDRAIL END-SECT REPL       $200,000   DIST-WIDE           0-01839-3002




                                                                       3-1
                                   IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                       Statewide

    DRAFT                                                           State Highways
                                                                                                                         DRAFT
Route/Street    Location                                             Improvements             Est. Cost             County
VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 4     GUARDRAIL END-SECT REPL      $800,000   DIST-WIDE            0-01839-4001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN PEORIA MPO     GUARDRAIL END-SECT REPL      $200,000   DIST-WIDE            0-01839-4002


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 5     GUARDRAIL END-SECT REPL    $1,000,000   DIST-WIDE            0-01839-5001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 6     GUARDRAIL END-SECT REPL      $950,000   DIST-WIDE            0-01839-6001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN SPRINGFIELD    GUARDRAIL END-SECT REPL       $50,000   SANGAMON             0-01839-6002
               MPO AREA


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 7     GUARDRAIL END-SECT REPL      $900,000   DIST-WIDE            0-01839-7001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 7     GUARDRAIL END-SECT REPL      $100,000   DIST-WIDE            0-01839-7002


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 8     GUARDRAIL END-SECT REPL      $800,000   DIST-WIDE            0-01839-8001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 8     GUARDRAIL END-SECT REPL      $200,000   DIST-WIDE            0-01839-8002


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 9     GUARDRAIL END-SECT REPL    $1,000,000   DIST-WIDE            0-01839-9001


VARIOUS        PAVEMENT PROFILE TESTING FOR ECONOMIC RECOVERY       CE QA/MATERIALS TESTING      $300,000   STATE-WIDE           0-99995-0000
               PROJECTS


VARIOUS        PAVEMENT MARKING IN DISTRICT 1 (INTERSTATE ROUTES)   PAVEMENT MARKING           $1,200,000                        0-01208-1001


VARIOUS        GUARDRAIL END SECTION REPLACEMENTS IN DISTRICT 1     GUARDRAIL END-SECT REPL    $1,000,000                        0-01839-1001




                                                                          1-2
                                       IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009
                                                                           Statewide

    DRAFT                                                               State Highways
                                                                                                                                           DRAFT
Route/Street                Location                                        Improvements                       Est. Cost               City




     Statewide State Project Totals      Projects =   27   Miles =   0.00         Bridges =   0   Intersections =     0    Spots =   450      $15,300,000




                                                                                1-3
                       IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009

                                                       Report Totals - State Projects:
                                                                                                               DRAFT
DRAFT   Projects =   289          Miles =   697.36   Bridges =     36   Intersections =   17   Spots =   451   $692,686,500




                                                                 1-1

								