GSC Report
Document Sample


GSC Report
Simon Morris
(Durham University, GSC Chair)
Outline
• The ‘New’ GSC
• Agenda for Oct 18 2007 GSC Meeting
The ‘New’ GSC
• The Gemini Science Committee provides the
Observatory and the Gemini Board with strategic
and near-term advice on scientific issues. This
includes the content of the on-going
instrumentation program and scientific
performance requirements for the telescopes
and instrumentation. The GSC is expected to be
represented at the annual strategic planning
activities of the Observatory and to actively
participate.
• The GSC in whole or in part may assist the
Director by functioning as a User Committee by
assessing the Observatory's responsiveness to
the national scientific communities.
The ‘New’ GSC
• Prof. Simon Morris • Dr. Christopher C.
(Chair) Packham
• Dr. Timothy C. Beers • Dr. Suzie Ramsey-
• Dr. Simon Casassus Howatt
• Dr. Scott Croom • Dr. Henry G. Roe
• Dr. Rene Doyon • Dr. Basilio Santiago
• Dr. Nancy A. • Prof. Alan Stockton
Levenson • Dr. Chris Willott
• Dr. Ross J. Mclure
Agenda for Oct 18 2007 GSC
Meeting
• Copy of agenda on UK 8m UG web site
• Docs for meeting distributed Monday
8/10/07
• Deployment of Gemini instruments on
GN/GS = Long Range Plan
• Scientific priorities at Gemini for 2008 =
Short Term Priorities
• Discussion of User Issues
Short Term Priorities
• Red CCDs for GMOS N. The GSC still holds • NICI
to a specification of ‘competitive with – Commissioning
FORS2’ – System Verification
• ALTAIR LGS – Start of science campaign
– With NIFS (and NIRI with PSF variable) – • FLAMINGOS 2 (see above for some
option for no field lens larger TT sky coverage discussion of the GSC opinion on the
– Larger FOV for TT with field lens (goal to get relative priority of Flamingos 2 and MCAO)
comparable sky coverage to Keck LGS) – Commissioning
– Improve the operational elevation from ≥ 59 – System Verification
deg to ≥ 30 deg
– Goal of comparable IQ to Keck LGS – Demo science
• Blind offset ability for GN (and GS) – GMOS • MCAO
high priority – System Verification
– GSAOI
• MICHELLE
– Flamingos-2
– Eliminate image elongation which is impacting
science output – MCAO science operation readiness
– Dual beam chopping/guiding • Red CCDs for GMOS S . The GSC still
– Increase chop throw to 30” holds to a specification of ‘competitive with
– Spectropolarimetry FORS2’. NB First priority for red CCDs is
GMOS N.
• Blind offset ability for GS – GMOS, GNIRS
high priority
OPC Report
Simon Morris
(Durham University, OPC Chair)
Outline
• P80
• Laboca Delta Call
• P81
P80
• 878 Normal proposals and 14 Large proposals
• The numbers of subpanels was increased (from 10 to
12) and the amount of time for subpanel discussion and
ranking of the proposals was also increased (from ~ 2 to
~2.5 days)
• The OPC approved the continuation of all the ongoing
Large Programmes. The specific case of the zCOSMOS
survey by Lilly et al. was discussed, and its continuation
supported despite a possible need to take 4 years to
complete.
• The overall demand per telescope remains high for
almost all telescopes.
Pressure factor shown as time requested for all
classes of proposal (including Large) divided by
the time available
8.0
UT1 UT2 UT3 UT4 3.6m NTT 2.2m
7.0
6.0
5.0
Pressure
4.0
3.0
2.0
1.0
0.0
P61 P62 P63 P64 P65 P66 P67 P68 P69 P70 P71 P72 P73 P74 P75 P76 P77 P78 P79 P80
Period
Laboca Delta Call
• Laboca available for limited number of
nights (2 runs, ~26 nights) for ESO during
P80
• Separate meeting of a panel
• Some ‘large’ programmes recommended
(e.g. Smail et al. survey of ECDFS)
• Merged with Apex-2A and Flash
P81
• 3 ‘Procedures’ documents on UK 8m UG
web site
– Feedback (presented in March 2007)
– Panel Chair Guidelines
– Large Programme Procedures
• Chair got list of proposals and panel
members today (wed 10/10/07). Hotel
broadband too slow to download…
Related docs
Get documents about "