           Program History

 2006 MoDOT Completed the I-70 EIS/ROD

 2007 USDOT selected six “Corridors of the
  Future” interstate routes in response to
  Nationwide Congestion Concerns



          St Louis I-70 Truck Corridor Study
           Program History
 2008 MoDOT Completed the I-70 SEIS,
  including the St. Louis Truck-Only Lane
  Feasibility Study
 January 2009 Ohio, Indiana, Illinois and
  Missouri signed COF Partnership
  Agreement
 INDOT currently has an RFQ on the street
  for the COF I-70 Feasibility Study

          St Louis I-70 Truck Corridor Study
Corridors of the Future




  St Louis I-70 Truck Corridor Study
Corridors of the Future




         Louis I-70 Truck Corridor Study
      StSt Louis I-70 Truck Corridor Study
Corridors of the Future
 I-70 one of 6 corridors selected & funded
   $5 million discretionary grant from FHWA
   Limits: Kansas City, Missouri to Ohio/West
    Virginia Border (800 miles)
   $2 million of the $5 million was used to fund
    MoDOT’s SEIS
   $3 million remaining to study the complete I-70
    multi-state corridor



            Louis I-70 Truck Corridor Study
         StSt Louis I-70 Truck Corridor Study
MoDOT I-70 SEIS
 Project Limits: East of Kansas City,
  Missouri to West of St. Louis
 Origin/Destination Study in Kansas City
 Route Feasibility Study in St. Louis to be
  followed by an Origin/Destination Study
 Conclusions of the SEIS: FHWA/MoDOT
  have approved Truck Only Lanes as the
  Preferred Alternative for I-70.

           St Louis I-70 Truck Corridor Study
 Goals of the St. Louis I-70 Truck
          Corridor Study
 St. Louis Feasibility Study to provide:

• Connectivity Evaluation
• Support for MoDOT’s I-70 SEIS
• Begin to address issues associated with
  Truck-Only Lanes crossing the St. Louis
  Metropolitan area.


           St Louis I-70 Truck Corridor Study
St. Louis Truck Lane Corridor
Study Tasks
    Study Overview
    Existing System Conditions
    Screening Criteria
    Development of Route Alternatives
    Screening of Route Alternatives
  Conclusions and Recommendations




              Louis I-70 Truck Corridor Study
          StLouis I-70 Truck Corridor Study
          St St Louis I-70 Truck Corridor Study
Data Collection
   Accident & Traffic Data
   Roadway Geometrics
   Bridge Ratings & Clearance
   Truck & Inter-modal Facilities
   Environmental Assets
   Cultural Resources
   Land Use
   Planned Transportation Facilities
   Design Criteria (I-70 SEIS)

                 Louis I-70 Truck Corridor Study
             StLouis I-70 Truck Corridor Study
             St St Louis I-70 Truck Corridor Study
Initial Truck Only Lanes Routes
Considered
Initial Range of Corridors:
   I-70
   I-270N, I-270N/370
   East-West Split Option (I-70 EB/I-270N WB)
   I-64
   364/Page Avenue
   I-270S: I-270S/I-255, I-270S/I-44, I-270S/I-55
   Route on new alignment/new river crossing


                 Louis I-70 Truck Corridor Study
             StLouis I-70 Truck Corridor Study
             St St Louis I-70 Truck Corridor Study
Refining Options
 3 Reasonable Corridors
   I-70 across the New Mississippi River Bridge
   I-70 to I-270 to I-70
   I-70 to Route 370 to I-270 to I-70




              Louis I-70 Truck Corridor Study
          StLouis I-70 Truck Corridor Study
          St St Louis I-70 Truck Corridor Study
Refining Options
 3 Reasonable Corridors (I-70, I-270, & 370)
   Limited adverse travel through metro area
   Limited through truck traffic in downtown St.
    Louis and avoids Poplar Street Bridge
   Highest truck percentages
   Least right of way constraints
   Best connectivity to freight generating facilities
    and intermodal facilities in metro area
   Ability to accommodate Long Combination
    Vehicles (LCV)

               Louis I-70 Truck Corridor Study
           StLouis I-70 Truck Corridor Study
           St St Louis I-70 Truck Corridor Study
Evaluation Criteria
 Environmental
     “Red Flags”
     Secondary & Cumulative Impacts
     Right of Way
     Cultural 4(f)/6(f)
 Engineering
 Economic


               Louis I-70 Truck Corridor Study
           StLouis I-70 Truck Corridor Study
           St St Louis I-70 Truck Corridor Study
Evaluation Criteria
 Environmental
 Engineering
     Traffic Congestion
     Major River Bridge Capacity & Widening
     High Crash Location
     Route Continuity
     Relative Cost
 Economic

               Louis I-70 Truck Corridor Study
           StLouis I-70 Truck Corridor Study
           St St Louis I-70 Truck Corridor Study
Evaluation of Impacts:




           Louis I-70 Truck Corridor Study
       StLouis I-70 Truck Corridor Study
       St St Louis I-70 Truck Corridor Study
  Evaluation of Impacts:

                         Table 8: Relative Impact Summary
                                                               I-70 to I-270        I-70 to Rte
    Alternative Route                         I-70                to I-70          370 to I-270
                                                                                          Low
                                           High                  Medium
                                                                                       (Estimated
Estimated Construction                  (Estimated             (Estimated
and Right of Way Costs
                                                                                          $750
                                         $1.5 to$2              $1 to $1.5
                                                                                        Million to
                                          Billion                Billion)
                                                                                        $1 Billion)
   Residential Impacts                       High                Medium                   Low
     Commercial Sites                        High                Medium                   Low
Cost for adding Truck Only Lanes does not include rebuilding existing infrastructure




                             Louis I-70 Truck Corridor Study
                         StLouis I-70 Truck Corridor Study
                         St St Louis I-70 Truck Corridor Study
Next Step:
 Finalize MoDOT’s I-70 SEIS
 MoDOT to complete the St. Louis
  Origin/Destination Study
 FHWA to conduct a Feasibility Study for
  the I-70 Corridors of the Future Program




              Louis I-70 Truck Corridor Study
          StLouis I-70 Truck Corridor Study
          St St Louis I-70 Truck Corridor Study
Comments/Questions




 St Louis I-70 Truck Corridor Study

								
To top