Northern New Jersey FSS Optimization Lean Six Sigma

Document Sample
scope of work template
							®




Northern New Jersey
 FSS Optimization

    Lean Six Sigma


      May 15, 2009
 ®




NNJ FSS Optimization
   Lean Six Sigma
Flat Distribution Plan

     Define Phase
            NNJ LSS FSS Optimization
            Define Phase – Action Items

Goal Statement (SMART – Specific Measurable Achievable Relevant Timely):
 Align DVD, NNJ Metro, Kilmer, West Jersey, and Newark Flat distribution to
  maximize the flow of machineable flats to FSS and thus achieving the highest FSS %
  (85% initially). Goal also includes eliminating APPS rejects at both NJI-BMC and at
  DVD.
 Baseline 0% FSS. Goal is 80 % FSS or higher.
 Eliminate DVD APPS Rejects.
 Eliminate NJ-BMC APPS Rejects.
Project Goal Measured by:
1. FSS %
2. 146 volume %
3. Carrier Cased volume
Project Scope:
 All NNJ plants (DVD, NNJ Metro, Kilmer, West Jersey, and Newark)
           NNJ LSS FSS Optimization
            USPS Flats Guiding Principles

1.   Always run the committed mail first, then balance the planned run time
     volume with uncommitted mail
          USPS Flats Guiding Principles
     a.   Deliver on-time, every time
     b.   Keep classes segregated until carrier route or DPS
2.   FSS schedule drives preceding schedules (align & synchronize using
     pull system methodology)
3.   Maximize automation of Flat Operations End-to-End (Arrival at
     acceptance unit to delivery at DU)
4.   Mail is always sorted to the finest depth of sort
     a.   Only ship 100% finalized product to downstream operations
5.   100% adherence to dispatch of value (DOV) and clearance times (CTs)
6.   Adhere to labeling, placarding, & color coding procedures
7.   Transportation
     a.   Adhere to flats operating plan schedules
     NNJ LSS FSS Optimization
      Aligning APPS/SPBS/AFSM & FSS Processes



What Needs to be Done to Align the Processes ?
    USPS Flats Guiding Principles


  1. Eliminate rejects– all bundles flowing from APPS
     must be finalized to the finest depth of sort.

  2. Minimize the flow of loose pieces from APPS due
     to broken bundles

  3. Align Flats Distribution

      Alignment across all NNJ facilities
      Improve flow, transport, and processing time
      Eliminate missing FSS processing times
 ®




NNJ FSS Optimization
   Lean Six Sigma
Flat Distribution Plan

     Measure Phase
             NNJ LSS FSS Optimization
            DVD STD Flats Current Process Flow Chart
SUPPLIER                                                                                  PROCESS                                                         OUTPUT


                                                                                               5 Digit Sacks

                                                                                                Dispatch
                                                                                                                      5 digit CR
                                                                                                                       bundles
                                                                                                                        Dispatch




             3 & 5 digit
               Pallets




            3 digit sacks
                                                                3 digit bundles
  Mailers                                                                                                                                     UFSM1000
                                                                                               AFSM 145
                                                   APPS STD                                                                        HSTS        & Manual
                                                                                                 Prime
            5 digit sacks
            machineable



            5 digit sacks   HSUS




                                                                5 digit non- CR
                non-




                                                                    bundles
            machineable


                                                                                                                                                           Delivery
                                   3 digit sacks
                                     shakeout




            3 digit sacks


 NJ BMC

            5 digit sacks                                                                                                                  Newark
                                                                                                                    AFSM 146              AFSM100
                                                                                                                      STD                 146 STD
                                                   SPBS STD

                                                                             5 digit bundles



                                   5 digit sacks
                                   DVD zones

                                   5 digit sacks
                                   NWK zones

                                                                  5 digit non-
                                                              machineable bundles                                       Dispatch

                                                                                                       5 digit CR
                                                                                                                        Dispatch
                                                                                                        bundles
                NNJ LSS FSS Optimization
                DVD 2C Flats Current Process Flow Chart
SUPPLIER                                                                                                                      PROCESS                                             OUTPUT



                                                                                                            5 Digit Sacks     Dispatch

                                                                                                            5 digit non CR
                                                                                                               bundles                          Dispatch

                                                                                                              5 digit CR                        Dispatch
                                                                                                               bundles

               3 & 5 digit
                 Pallets




              3 digit sacks
  Mailers                                                                                                                                                  UFSM1000
                                                                                       APPS 2C              3 digit bundles          AFSM MMP                MMP

              5 digit sacks
                                                             5 Digit sacks CR



              machineable
                                                                & non CR




              5 digit sacks
                  non-
              machineable


                                                                                                     Broken bunles                                                                 Delivery
                                          HSUS
                                                                                                      Machineable
                                                                                Broken bundles Non
                                                    3 Digit bundles




                                                                                   Machineable




                                                                                                                                                AFSM 146
                                                                                                                                                  FCM



                                                                                                             Manual
                                                                                                            Cases 2C
                                                                                                           (desitnating)


                              07099 working tubs
 L009 Sites
                              (machineable flats)


                                                                                                                                                                       Dispatch


                                                                                                                                                            Dispatch
            NNJ LSS FSS Optimization
            Other NNJ Plants Current Process Flow Chart
SUPPLIER                                               PROCESS               OUTPUT




                                                                 UFSM1000
                                                                  & Manual



                            NNJ Metro    NNJ Metro
                             SPBS        AFSM 146




                                                                 UFSM1000
                                                                  & Manual



  Mailers
                                          Kilmer
                           Kilmer SPBS
                                         AFSM 146

                                                                              Delivery

   DVD




                                                                 UFSM1000
                                                                  & Manual



                           West Jersey   West Jersey
                             SPBS        AFSM 146
NNJ LSS FSS Optimization
NNJ Current Distribution Profile (APPS, SPBS, AFSM, UFSM)
NNJ LSS FSS Optimization
NNJ Current Flat Distribution Profile (STD Runs)




                                       Standard Bundle Runs
NNJ LSS FSS Optimization
NJI BMC Current Flat Distribution Profile
      NNJ LSS FSS Optimization
      Data Collection Goals:


Data Collection Goals:
•Identify a drop shipment arrival profile at all NNJ
Plants and at the NJ-BMC(STD and PER)
•Pieces at risk at the APPS at DVD and NJ-BMC

						