Updated March FLOODPROOFING GUIDELINES Floodproofing is only allowed for

Updated March 2005 FLOODPROOFING GUIDELINES Floodproofing is only allowed for a non-residential structure, a non-residential use portion of a mixeduse structure, an accessory structure, or an attached garage Items that should be obtained when planning a floodproofing project: • FEMA Floodproofing Certificate • Technical Bulletin 2-93 - Flood-Resistant Materials Requirements for Buildings Located in Special Flood Hazard Areas • Technical Bulletin 3-93 - Non-Residential Floodproofing-Requirements and Certification for Buildings Located in Special Flood Hazard Areas These bulletins should be used as guides for what must be considered when designing a floodproofing project. Section 10-38 of City Code details the specific floodproofing requirements as summarized below: Specific Requirements – These items must be submitted before the building permit will be released: 1. Pre-Construction Floodproofing Certificate signed by a registered professional engineer or architect. 2. Detailed plans for the floodproofing measures that have been certified by a registered professional engineer or architect. Plans should include: • Base Flood Elevation (BFE) and elevation of floodproofing. All elevations should be referenced to the City of Fort Collins Benchmark System. Floodproofing is not allowed if flood depth exceeds 3 feet. • Benchmark used. • Design details of the floodproofing and locations of the specific floodproofing measures. • Direction and distance that all doors swing. Floodproofing closure shields cannot block doors from opening when shields are in place. 3. Manufacturer’s specification sheets if using manufactured measures (i.e. sealants). 4. Manufacturer catalog cuts if ordering measures from a catalog (i.e. gates, shields, etc). 5. All gates or closure shields must have simple directions on the back of the gate or shield that describes how to secure and release the shield. (Ex. Turn RED handle to secure and release shield.). Please supply the wording that will be on these shields. 6. An emergency action plan that includes: • A description of where the floodproofing measures will be stored • A description of who will be responsible for making sure the measures are in place. If the building is occupied when the closure shields are in place, there must be someone responsible for monitoring the closure shields. Please specify who this person will be. • An annual schedule of when the floodproofing measures will be in use. (Recommended May to September) 7. Language that is to be on the required posted notices that inform the occupants of the structure that the building is floodproofed and the location of any equipment in the structure that requires human operation in order for the floodproofing to be effective. 8. Plan of the building that shows where the required floodproofing notices will be posted within the building. 9. Plan for maintenance and inspection of the floodproofing measures. Additional References: • “Answers to Questions About Substantially Damaged Buildings,” FEMA, May 1991, FEMA-213. • “Design Manual for Retrofitting Flood-Prone Residential Structures,” FEMA, September 1986, FEMA-114. • “Floodproofing Non-Residential Structures,” FEMA, May 1986, FEMA-102. • “Protecting Building Utilities from Damage,” FEMA, November 1999, FEMA-348 Publications are available for review at the Fort Collins Utilities Office (700 Wood Street) or the Fort Collins Public Library (201 Peterson). City Designated Floodplains-In addition to providing the FEMA information in Section 1, the following Masterplan information must also be included in Section 1: Master Plan Name, Master Plan Figure Number, Master Plan Date, Type of Floodplain, and Master Plan Base Flood Elevation. See the attached sheet for an example of how to fill out Section 1 for a floodproofing certificate in a City Designated Floodplain. Remember, a post-construction Floodproofing Certificate must be submitted and accepted by the City of Fort Collins Utilities before the CO is released.

Related docs
No Pets Allowed
Views: 31  |  Downloads: 0
it guidelines employees
Views: 4  |  Downloads: 1
guidelines newqxd
Views: 11  |  Downloads: 1
Last updated March 2004
Views: 0  |  Downloads: 0
Updated– March 4, 2003)
Views: 1  |  Downloads: 0
e only
Views: 5  |  Downloads: 0
PROMO GUIDELINES
Views: 13  |  Downloads: 1
updated admin 2009
Views: 2  |  Downloads: 0
No-Worms-or-Viruses-Allowed
Views: 0  |  Downloads: 0
last updated 250303
Views: 0  |  Downloads: 0
Updated-Author-Guidelines
Views: 0  |  Downloads: 0
Updated Response to Comments (PDF)
Views: 3  |  Downloads: 0
Other docs by Foxxy Brown
College Publicity Ideas
Views: 738  |  Downloads: 7
Articles of IncorporationCalifornia Simple
Views: 158  |  Downloads: 1
Board Resolution Calling Special Board Meeting
Views: 193  |  Downloads: 2
Personal Financial Statement
Views: 1041  |  Downloads: 40
Shareholder Resolution Appointing Directors
Views: 599  |  Downloads: 14
crowell-all
Views: 220  |  Downloads: 1
SALE OF MOTOR VEHICLE
Views: 710  |  Downloads: 14
Drug test consent form
Views: 382  |  Downloads: 12
Stock Certificate for Preferred Stock
Views: 492  |  Downloads: 20
craven-all
Views: 193  |  Downloads: 4