REQUEST FOR PROPOSALS Lexington School District Four The District

Reviews
Shared by: the machine
Stats
views:
1
rating:
not rated
reviews:
0
posted:
2/18/2009
language:
English
pages:
0
REQUEST FOR PROPOSALS Lexington School District Four ( The District) is requesting proposals for painting the exterior of the building at Swansea High School, 500 East First Street, Swansea, SC 29160. Specific details for the project are contained in the Scope of Work which follows. GENERAL NOTICES The District reserves the right to reject any or all proposals or to cancel this request in its entirety. All proposals will be treated as public information unless it is specifically requested that portions of the proposals be treated as Trade Secrets under the Freedom of Information Act. Such portions must be conspicuously labeled CONFIDENTIAL. The District may cancel the contract at any time in the event services prove to be unsatisfactory. • • • DISTRICT REPRESENTATIVE Dave Toole Director of Operations Lexington School District Four 607 E. Fifth Street Swansea, SC 29160 (803) 568-1000 Ext. 10031 dtoole@lexington4.net PROPOSED SCHEDULE OF EVENTS Questions and Answers Period Questions concerning this solicitation must be received in writing through email no later than 4:00 p.m., Wednesday, October 8, 2008. A listing of written questions and answers will be supplied to interested parties upon request. Direct all questions through e-mail to: Dave Toole dtoole@lexington4.net Work Site Visit It is required for contractors to visit the worksite located at Swansea High School, 500 East First Street, Swansea, SC 29160 prior to submitting a proposal. Visits to the worksite must be scheduled by contacting: Dave Toole (803) 518-2873 Proposals Received One (1) hardcopy of the proposal must be received no later than 2:00 p.m., Wednesday, October 15, 2008 at: Monroe Pinckney Administrative Office Lexington School District Four 607 East Fifth Street Swansea, SC 29160 Please indicate, “Proposal for Painting SHS” on the outside of the envelope of the sealed proposal. Proposals will be opened at 2:01 p.m. on Wednesday, October 15, 2008 at the Administrative Office. Any proposal received later than the specified time will not be considered. Notice of Award Notice of Intent to Award will be made via posting on the District Web site (www.lexington4.net) by 5:00 p.m., Wednesday, October 15, 2008. Right to Protest Protest of the contract award must be made in writing to the district superintendent no later than 2:00 p.m., Friday, October 31, 2008. Linda G. Hawkins, Ph.D. Superintendent Lexington School District Four 607 East Fifth Street Swansea, Sc 29160 Work Location and Schedule All work will be conducted on-site at Swansea High School. Work to be scheduled to avoid interruption to the school day and must be completed by July 1, 2009. ADDITONAL REQUIREMENTS Bidders must include the following in their responses: 1. At least two (2) references from previous work site owners 2. Experience and certification of staff who will work on the project 3. Listing of similar work completed in the last 12 months VENDOR SELECTION The District will select the vendor whose proposal represents the best value for the District. Selection will not be made solely on price. District will consider: 1. Comprehensiveness of work plan 2. Technical experience of the firm 3. Qualifications of staff 4. References 5. Cost SCOPE OF WORK The following information must be used for submitting proposals: 1. 2. Pressure wash facility to remove dirt, debris and loose paint. Fill cracks/holes with appropriate exterior calking material. 3. Paint exterior of facility with appropriate Rose Talbert Exterior Latex Paint. 4. Colors to be used: Swansea Purple- Special Mix Swansea Yellow-AC105Y-C4565N Crisp Khaki-8233M White – 200 All paint will be: Low Luster- Exterior Bondaplex Acrylic 5. 6. Color scheme and pattern to be determined prior to bid by site visit. PROPOSAL SUBMISSION SHEET SWANSEA HIGH SCHOOL PAINTING PROJECT 2008-09 Company Name:__________________________________________________________ Address:________________________________________________________________ __________________________________________________________________ Total Cost of Project to paint exterior of Swansea High School as specified in the Scope of Work. $_________________ References From Previous Work Sites: Company representative placed in charge of the project and his/her experience: Listing of similar work completed in the last 12 months Submitted By:________________________________________ Date:_____________

Related docs
District statements
Views: 0  |  Downloads: 0
Toledo School District Request for Proposals
Views: 0  |  Downloads: 0
district budget
Views: 15  |  Downloads: 1
Request for Proposals
Views: 0  |  Downloads: 0
DISTRICT OF COLUMBIA
Views: 41  |  Downloads: 0
premium docs

Other docs by the machine
Call Option Agreement - eBay Inc and iBazar SA
Views: 365  |  Downloads: 11
Educational reference check letter
Views: 536  |  Downloads: 1
Employee Rejection Letter
Views: 2228  |  Downloads: 7
Learning 1
Views: 491  |  Downloads: 6
CorpDocs-Board Appoints a Committee
Views: 247  |  Downloads: 2
Sample rejection Letters
Views: 1651  |  Downloads: 17
Workplace violence prevention policy
Views: 374  |  Downloads: 16
Users marcsigal Desktop term papers wpfull
Views: 505  |  Downloads: 0
0206 Inst SS-4 (PR) (PDF) Instrucciones
Views: 404  |  Downloads: 5