									                       Naval Facilities Engineering Command
                     LEED for New Construction v2.2 Workbook
                                     Introduction



INTRODUCTION TO LEED / COST WORKBOOK

  In order to discuss with project users and provide a budget, team members must first
  understand the US Green Building Council’s Leadership in Energy and Environmental
  Design (LEED) Green Building Rating System.

  Pronunciation: LEED is pronounced LEED. “Not LEEDS”

  Points are earned for satisfying criterion designed to address specific environmental
  impacts. Different levels of green building certification are awarded based on the total
  points earned.

  From 1994 to 2006, LEED grew from one rating system for new construction to a
  comprehensive system of six interrelated rating systems covering all aspects of the
  development and construction process.

  For DOD projects, LEED for New Construction & Major Renovation (LEED-NC) is the
  primary green building rating system used. There are also LEED green building rating
  systems for Existing Buildings, Commercial Interiors, Core and Shell, Homes,
  Neighborhood Development and Schools.

  LEED was created to accomplish the following:
    A) Define “green building” by establishing a common standard of measurement.
    B) Promote integrated, whole-building design practices
    C) Recognize environmental leadership in the building industry
    D) Stimulate green competition
    E) Raise consumer awareness of green building benefits
    F) Transform the building market

  For LEED-NC, there are four rating levels of certification – Certified (26-32 points), Silver
  (33-38 points), Gold (39-51 points), and Platinum (52-69 points). Each rating level is
  reached by achieving the mandatory 7 prerequisites and the necessary points noted in
  parenthesis from the available 69 points.

  There are Six categories for points = Sustainable Sites, Water, Energy, Materials, Indoor
  Environmental Quality and Innovative Design.




                                                  1
                       Naval Facilities Engineering Command
                     LEED for New Construction v2.2 Workbook
                                     Introduction



LEED CERTIFICATION - ADMINISTRATION

  LEED certification is typically handled as part of the contract requirements and the project
  costs. Project teams pursuing LEED certification: (1) must first register online their intent
  with USGBC and then are required to use LEED-ONLINE which enables teams to submit
  100% of their documentation online in an easy-to-use format, (2) use the LEED-ONLINE
  submittal templates and complete the templates to document fulfillment of the credit
  requirements for the project and (3) submit the application for certification with the
  documentation for review by USGBC.
  USGBC LEED Certification Costs. NAVFAC is a USGBC Corporate member. The costs
  provided are the discounted member fees. Registration fee is $450 - fixed rate for all
  projects regardless of square footage. Documentation Costs. Currently the approximate
  cost to complete and submit the LEED-ONLINE templates for a LEED Silver-level rating,
  6-story BQ (100,00 SF) is $28,000. The documentation costs will vary on the building
  type and size, geographic location, credits pursuing and LEED experience of the
  contractor. Certification Fees. For Projects less than 50,000 SF - $1,750 fixed rate.
  Typical projects include Public Works Buildings, Administrative Buildings, Maintenance
  Facilities (3-6 bays with administrative space), 3-story Bachelor Quarters. For projects
  50,000 to 500,000 SF, the certification fee is $.035/SF. A typical project could be a 6-
  story Bachelor Quarters at 100,000 SF would cost $3,500. For projects exceeding
  500,000 SF - $17,500 fixed rate.
  LEED certification requires Fundamental Commissioning as one of the prerequisites. For
  Fundamental Commissioning on non-complex projects less than $20 M, the estimated
  cost is 1% of the primary facility cost. For complex buildings such as hospitals and
  laboratories and projects over $100 M, consider budgeting for Enhanced Commisioning at
  0.5% of the primary facility cost. For projects beween $20 M and $100 M, estimate the
  commissioning cost between 0.5 and 1% of the primary facility cost based on facility type,
  size, cost and geographic location.
  Sustainable design may require modeling that carefully considers the symbiotic
  relationships between the building and its subsystems. Examples of modeling and
  analyses: waterside economizer, air side economizer, high efficiency windows,
  daylighting, vegetative roof and strategies to optimize energy performance to comply with
  EPAct 2005. Two to four models/analyses may be required depending on credits
  pursuing. Approximate costs: $10,000 to $30,000 for this modeling. The modeling costs
  will vary on the number of analyses, building type/size and geographic location.
LEED PROJECT TEAM

  Ideally for all projects involving LEED budgeting, all key members such as Planners,
  Design Managers, Cost Engineers / Estimators, the Customer, Base representatives,
  Facility Managers as well as the multidiscipline design team should gather in workshops
  or teaming “charrettes” to evaluate points and 2life-cycle benefits. It is valuable to have
  experts in LEED design and construction to facilitate or participate in these sessions.
                        Naval Facilities Engineering Command
                     LEED for New Construction v2.2 Workbook
                                        Introduction
Ideally for all projects involving LEED budgeting, all key members such as Planners,
Design Managers, Cost Engineers / Estimators, the Customer, Base representatives,
Facility Managers as well as the multidiscipline design team should gather in workshops
or teaming “charrettes” to evaluate points and life-cycle benefits. It is valuable to have
experts in LEED design and construction to facilitate or participate in these sessions.




                                               3
                       Naval Facilities Engineering Command
                     LEED for New Construction v2.2 Workbook
                                     Introduction



  These workshops / charrettes should happen at the earliest opportunity in programming
  phase as this will allow suitable time for a smooth transition of the selected points into the
  project’s programming and/or design documents. This should happen in the Installation /
  PWD Final 1391 submittal stage but must take place by the Region/FEC Team Final
  1391. In-house teaming is encouraged, but for best results it is best that local design
  architects & discipline engineers who all have had LEED experience be involved. Experts
  will cost on the average $1000 per day and usually a three day minimum effort is required.
  Building complexity, size and regional differences will impact the cost.
  Key Team Members will be typically: Planner during programming, Design manager
  during RFP preparation / Design, Mechanical Engineer and Cost Engineer / Estimator.

  A good checklist for Project Team Members who should be involved and have input:
     1) Asset Management (Real Estate & Planning)
     2) Environmental
     3) Capital Improvement (Program Management, Design/Engineering & Construction)
     4) Acquisition
     5) FEAD/ROICC (Construction Management)
     6) Public Works
     7) Facilities Management/O&M
     8) Facility Occupation & Use (customers/occupants)
     9) A/E Design (Private architects & engineers)
     10) Facility Construction (contractors)

POINTS & COST STRATEGY

  The key for planners and the design / cost engineering team is to (a) determine whether a
  particular point is achievable for their particular project, and (b) evaluate what each valid
  point will cost.

  In order to determine whether a particular point is achievable, team members need to
  identify the potential for incorporation of each of the 69 points, the benefits to project
  mission, appropriateness of application, worker productivity / worker benefit and potential
  life-cycle benefits.




                                                  4
                     Naval Facilities Engineering Command
                   LEED for New Construction v2.2 Workbook
                                   Introduction



Following the identification of the achievable points, the lead team member or cost
engineer / estimator can begin to evaluate the cost implications of incorporating each

It is important to remember that the costs may either be pure additional costs, premium
costs or may even have no cost implications.

For example: incorporating bicycle racks and showers would be a pure additional cost,
using certified wood in lieu of non-certified wood may be a premium cost, and proximity to
mass transit will have no cost implications as this relates purely to the location of the
Project site (unless of course the Project has options with regards to site location).

Higher certification rating levels could require more points that have additional cost and
premium impacts. Initial cost vs. life-cycle costs/occupancy benefits will have to be
weighed and carefully evaluated.

The strategy is to first seek the points that have no financial impact, followed by those that
have either minimum premium costs and/or minimum additional costs.

Certified- and Silver-level ratings can be achieved at minimal cost. Gold- and Platinum-
level ratings will typically have a significant cost impact.

The costs involved with writing specifications, identifying costs within subcontractor bids,
filing and management of necessary documentation for final application to the USGBC
etc. will have a cost impact.

The cost of LEED certification depends upon: the level of certification sought the
particular Project occupancy and requirements and the economic benefits and pay-back.

LEED credits can be categorized into three areas for cost / value analysis strategy:
      Type 1 – Little or No Cost premium
      Type 2 – Cost premium but short term return on investment
      Type 3 – Cost premium with long term return on investment or no return

Type 1 (Site Dependent) - Little or No Cost premium
       SS Credit 1 - Site Selection
       SS Credit 2 - Urban Redevelopment
       SS Credit 4.1 - Public Transportation Access (Potential limitations at remote sites)
       MR Credit 5.2 - Local/Regional Materials (Potential limitations at remote sites)




                                                5
                      Naval Facilities Engineering Command
                    LEED for New Construction v2.2 Workbook
                                    Introduction



  Type 1 (Not Site Dependent) - Little or No Cost premium
         MR Credit 4 - Recycled Content
         MR Credit 2.1 – Waste Management (Potential limitations at remote sites)
         IEQ Credit 4.1-4.3 - Low Emitting Materials
         DE Credit 1.1-1.4 - Innovation in Design
         DE Credit 2 - LEED™ Accredited Professional

  Type 2 - Cost premium but short term return on investment
         WE Credit 1.1 - Water Efficient Landscaping
         EA Credit 1.1 - Optimize Energy Performance
         IEQ Credit 1 - Carbon Dioxide Monitoring
         IEQ Credit 2 - Increased Ventilation
         EA Credit 3 - Additional Commissioning
         IEQ Credit 6.1 - Controllability of Systems
         IEQ Credit 5 - Indoor Chemical and Pollutant Control

  Type 3- Cost premium with long term return on investment or no return
         EA Credit 6 - Green Power
         EA Credit 1.3 - Optimize Energy Performance 60%
         IEQ Credit 8.1 - Daylight and Views 75%
         IEQ Credit 8.2 - Daylight and Views 90%

NAVY AND LEED CERTIFICATION

  The Navy has mandated that sustainable design principles and energy conservation will
  be planned, programmed and integrated into the design, construction operation and
  maintenance of NAVY projects in accordance with Energy Policy Act 2005, Executive
  Order 13423 (implements Federal Leadership in High Performance and Sustainable
  Buildings MOU), Energy Independence and Security Act 2007, NAVFAC Engineering &
  Construction Bulletin 2008-01 and local directives. The project will be planned,
  programmed, designed and constructed to receive a minimum LEED Silver-level rating
  certified by USGBC.

  As part of the early programming & budgeting process for construction projects the key
  member is typically the planner however the design manager or cost engineer may be
  actively involved. This individual(s) may have to program and budget projects with
  sometimes minimal to no assistance and input from expert technical staff. This workbook
  is a tool which assists in preliminary program budgeting establishing a viable assessment
  of LEED credits to be incorporated into the project.
  This workbook will allow LEED credits to be assigned and determine a preliminary budget.
   It should only be used as a benchmark to assess basis of programming costs until further
  study, design & RFP development sessions and performance / prescriptive specifications
  are prepared by experienced professionals. 6
  Naval Facilities Engineering Command
LEED for New Construction v2.2 Workbook
                Introduction




                   7
                       Naval Facilities Engineering Command
                     LEED for New Construction v2.2 Workbook
                               Sources & References



Cost Data & Sources

  A) All Cost data from GSA LEED Cost Study, except as noted below:
     * Cost data provide by NAVFAC HQ FY10 Cost Guidance
     ** Cost data provided by Carnegie Institute of Technology Research Project
     *** Cost data estimated due to data considered soft costs

  B) Costs have been obtained from survey and developed costs. Costs are adjusted with
     inflation to October 2006 pricing.

References & Links

  Carnegie Institute of Technology Research Project
                    http://www.cmu.edu/greenpractices/green_initiatives/new_house_im
                    ages/newhouse_report.pdf

  DOD Facilities Pricing Guide (Draft)
    * Area Cost Factors - Table 4A
    ** Escalation Rates - Table 4B
                   http://www.uscost.net/costengineering/documents.htm

  GSA LEED Cost Study
                www.wbdg.org/ccb/GSAMAN/gsaleed.pdf

  NAVAFAC Presentation-2005 Dennis Talton R.A. LEED A.P & Brian Cooper P.E.
               http://www.fedcenter.gov/_kd/Items/actions.cfm?action=Show&item
               _id=10233&destination=ShowItem

  United States Green Building Council
                   www.usgbc.org/leed/

  USGBC LEED Reference Documents
              https://www.usgbc.org/DisplayPage.aspx?CMSPageID=1762

  Whole Building Design Guide
                  www.wbdg.org

Workbook Development Team Members

  Dennis Talton R.A. LEED A.P., NAVFAC LANT              NAVFAC Sustainable Development Program M
  Joe Tomko, NAVFAC NW                                   Workbook Development
  Steve Letson, NAVFAC NW                                Workbook Refinement / Beta Test
  Joe Bonaparte CCE, NAVFAC SW                           LEED Cost Data
                 Naval Facilities Engineering Command
               LEED for New Construction v2.2 Workbook
                         Sources & References



Stevenson Sparks R.A. LEED A.P. CCE, NAVFAC NW   LEED Introduction / Cost Data
Marcia Pauley R.L.A., NAVFAC NW                  Beta Testing
Shaleen Kessler, NAVFAC NW                       Beta Testing
                        Naval Facilities Engineering Command
                      LEED for New Construction v2.2 Workbook
                                      Instructions



Instructions

   A)      As part of the early programming & budgeting process for construction projects the
           key member is typically the planner however the design manager or cost engineer
           may be actively involved. This individual(s) may have to program and budget
           projects with sometimes minimal to no assistance and input from expert technical
           staff. This workbook is a tool which assists in preliminary program budgeting
           establishing a viable assessment of LEED credits to be incorporated into the
           project. This workbook will allow LEED points to be assigned and determine a
           preliminary budget. It should only be used as a benchmark to assess basis of
           programming costs until further study, design & RFP development sessions and
           performance / prescriptive specifications are prepared by experienced
           professionals.
   B)      Complete the following sections of the LEED Workbook

        Workbook Cover Sheet
          1) Under Project Information, enter the following information:
             a) Project Number
             b) Project Title
             c) Project Year
             d) Project Location
          2) Under Primary Facility Information, enter the following information:
             a) Cost of Primary Facility (in dollars)
             b) Size of Primary Facility (in square meters)
             c) Number of Occupants
          3) Under Additional Cost Information, enter the following information:
             a) Area Cost Factor
             b) Escalation Rate (as a percentage)
          4) Under LEED Checklist Prepared BY, enter the following information:
             d) Preparer of the Checklist

        LEED Checklist
          1) The workbook provides several pre-populated LEED checklists with
             recommended credit strategy based upon common facility types, Federal
             mandates and Navy policy. Facility types provided are:
             a) Academic Training Facility
             b) Administrative Building
             c) Airfield Pavement
             d) Air Traffic Control Facility and Tower
             e) Bachelor Quarters
             f) Child Development Center
             g) Communication Canters
                                                 10
               Naval Facilities Engineering Command
             LEED for New Construction v2.2 Workbook
                             Instructions



     h) Fire Station
     i) Fitness Center
     j) Magazine
     k) Operation Training Facility
     l) Ordnance Operations
     m) Pier
     n) Vehicle Maintenance Facility
     o) Warehouse (High Bay)
2)   The LEED credits in Orange are equivalent to the "Guiding Principles" of the
     Federal Leadership in High Performance and Sustainable Buildings MOU which
     are required by Executive Order 13423 and Navy policy, Engineering &
     Construction Bulletin 2008-01.
3)   Select the appropriate LEED Checklist based upon facility type
     a) If no pre-populated checklist fits the project facility type, at the end of the
        work sheets is a tab label MOU Req Credits. Use this LEED checklist for
        the specific project. DO NOT CHANGE THE NAME OF THE
        WORKSHEET, as it will adversely impact the fomulas on the associated
4)   The Prerequisites for each LEED Category have been pre-populated with "Y"
     a) Verify the prerequisite can be meet, otherwise change the "Y" to "N"
5)   For each LEED credit
     a) Enter a "1" in either the "Yes", "?", or "No" columns (column shaded in green)
        i) The "Yes" column has been pre-populated with green "1" with the
            recommended credit strategy. These credits can be changed based
            upon project specifics.
        ii) The "Yes" column has been pre-populated with orange "1" based upon
            the MOU. These credits are required and should be incorporated unless
            adequate justification can be provided to show that they are not life-cycle
            cost effective or not achievable due to geographic location, site or
            building type.
     b) LEED Credits EA1 and EA2 have a range of credits available and are
        assigned points based upon the option selected
        i) For these credits, enter a "1" in the box (shaded yellow) corresponding to
            the option selected
6)   The total points are tallied at the bottom of the worksheet
     a) The Navy policy is currently for all applicable projects to obtain a minimum
        LEED Silver-level rating.
7)   Once the LEED Checklist is completed, select the associated LEED Cost List
     a) The LEED Checklist and associated LEED Cost List are color coded for
        ease of identification




                                        11
                  Naval Facilities Engineering Command
                LEED for New Construction v2.2 Workbook
                                Instructions



LEED Cost List
  1) The LEED Cost List provides a detailed listing of items available and the cost
     associated with those items for obtaining LEED credits. Not all items are
     required for obtaining the LEED credit, nor do all items have a cost associated
     with obtaining the credit. Many LEED credits can be obtained with little or no
     additional cost.
  2) Under Include in 1391 column, select "Y" or "N"
     a) Select "Y" to include the specific cost item in the 1391
     b) Select "N" to not include the specific cost item in the 1391
  3) Cost calculations are automatically calculated based upon data in the
     Workbook Cover Sheet, the LEED Checklist and the LEED Cost List.
  4) The total cost of all the items to be included in the 1391 should be 2-4% of the
     primary facility cost. Higher costs are justifiable if life-cycle cost effective. If the
     total cost exceeds 4% of the primary facility cost, the selected credits with their
     costs should be included in the 1391. NAVFACHQ MILCON will review and
     decide on the total cost.
     a) For ease of review:
         i) If the Total LEED costs are less than 4% of the Primary Facility Cost, the
              following statement will appear in Green on Line 8 of the LEED Cost List:
              "LEED Total Cost Less Than 4% of Primary Facility Cost".
         ii) If the Total LEED costs are greater than 4% but less than 9% of the
              Primary Facility Cost, the following statement will appear in Orange on
              Line 8 of the LEED Cost List: "LEED Total Cost Exceeds 4% of Primary
         iii) If the Total LEED costs are greater than 9% of the Primary Facility Cost,
              the following statement will appear in Red on Line 8 of the LEED Cost
              List: "LEED Total Cost Exceeds 9% of Primary Facility Cost".
  5) Items that affect the calculations:
     a) If Quantity is "0"
         i) No points are assigned for the specific credit under the "Yes" column on
              the applicable LEED Checklist
     b) If Unit Cost is "0"
         i) No cost premium identified with the specific credit
         ii) "N" is enter under the Include in 1391 column for the specifc cost item
         iii) Cost associated with the specifc cost item is captured under is different
              credit
     c) If Cost is "0"
         i) For the specific cost item, if "Y" is entered under Include in 1391 column,
              and the amount under Quantity is greater than "0", and the amount
              under Unit Cost is greater than "0", then a Prerequisite on the LEED
              Checklist for that credit is not checked "Y"




                                             12
                     Naval Facilities Engineering Command
                   LEED for New Construction v2.2 Workbook
                                   Instructions



C)      Once the workbook is completed, the planner must update the project
        documentation in Electronic Procurement Generator (EPG)

     EPG Update
       1) From the LEED Cost List, transfer those items identified with a "Y" under the
          Include in 1391 column that have a cost associated with them into the 1391 in
          EPG under Block 9
          a) On the LEED Cost List, under the Applicable Section of 1391 column, if the
              item is "LEED and EPACT 2005 Compliance", enter the cost item and
              associated cost data in the Special Feature Costs section associated with
              the "LEED and EPACT 2005 Compliance" Special Feature Cost Type under
              the Special Features tab of Block 9.
          b) In EPG, create a new Supporting Cost Group titled "Site LEED and EPACT
              2005 Compliance", under the Supporting Facilites tab of Block 9.
              i) On the LEED Cost List, under the Applicable Section of 1391 column, if
                  the item is listed as "Site LEED and EPACT 2005 Compliance", enter the
                  cost item and associated cost data in the Supporting Costs section
                  associated with the "Site LEED and EPACT 2005 Compliance"
                  Supporting Cost Group, under the Supporting Facilities tab of Block 9.
          c) Since the LEED Cost List cost items include the area cost factor (ACF) and
              are escalated to midpoint of construction, ensure that in the 1391 in EPG
              that the ACF and Escalation are set to 1.00 for the cost item that was
              transferred from the LEED Cost List
       2) Text required to be incorporated into the 1391 in EPG under Block 10 is:
          a) Sustainable design principles and energy conservation will be planned,
              programmed and integrated into the design, construction operation and
              maintenance of NAVY projects in accordance with Energy Policy Act 2005,
              Executive Order 13423 (implements Federal Leadership in High
              Performance and Sustainable Buildings MOU), Energy Independence and
              Security Act 2007, NAVFAC Engineering & Construction Bulletin 2008-01
              and local directives. The project will be planned, programmed, designed
              and constructed to receive a minimum LEED Silver-level rating certified by
              USGBC.
       3) Upload the Workbook Cover Sheet and associated LEED Checklist and LEED
          Cost List into the Electronic Document Management System (EDMS) in EPG
          as part of the project documentation

D)      For assistance contact the local NAVFAC Asset Management Business Line (AM4)




                                             13
                  Naval Facilities Engineering Command
                LEED for New Construction v2.2 Workbook
                                Instructions



E)   Points of Contact

     1) NAVFAC SUSTAINABLE DEVELOPMENT PROGRAM MANAGER

        Dennis Talton R.A. LEED A.P., NAVFAC LANT
        Phone: (757)322-4211           Email: dennis.talton@navy.mil

     2) Questions/Comments Regarding LEED Cost Data

        Joe Bonaparte CCE, NAVFAC SW
        Phone: (619)532-3713        Email: joseph.bonaparte@navy.mil

     3) Questions/Comments Regarding LEED Workbook

        Joe Tomko, NAVFAC NW
        Phone: (360)396-5059          Email: joseph.tomko@navy.mil




                                       14
                         Naval Facilities Engineering Command
                       LEED for New Construction v2.2 Workbook
                                       Cover Sheet



Purpose

   The Navy LEED for New Construction v2.2 Workbook is a planning tool to assist the area
   planners in adjusting primary facility unit costs to account for acquiring LEED Certification
   credits by facility type. This workbook is a tool which assists in preliminary program
   budgeting establishing a viable assessment of LEED credits to be incorporated into the
   project. This workbook will allow LEED points to be assigned and determine a preliminary
   budget. It should only be used as a benchmark to assess basis of programming costs
   until further study, design & RFP development sessions and performance / prescriptive
   specifications are prepared by experienced professionals.
Project Information

   Project Number: P-001              Project Title:         Test Project

   Project Year:      2008            Project Location: NAS Anywhere, Some City, XX


Primary Facility Information

   Cost of Primary Facility ($):           19,000,000

   Size of Primary Facility (m2):               13,860

   Number of Occupants:                                396


Additional Cost Information

   Area Cost Factor:                        1.18

   Escalation Rate (%):                    3.23%


LEED Checklist Prepared By:           I.M. Someone
                                    LEED for New Construction v2.2
                                 NAVY Academic Training Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

6     8   0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
      1        Credit 1     Site Selection                                                                                1
      1        Credit 2     Development Density & Community Connectivity                                                  1
      1        Credit 3     Brownfield Redevelopment                                                                      1
      1        Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
1              Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
      1        Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
1              Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
      1        Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
      1        Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

4     1   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
      1        Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                    LEED for New Construction v2.2
                                 NAVY Academic Training Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

8     5   0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
      1        Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
      1        Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
      1        Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
1              Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
1              Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
      1        Credit 3.1   Materials Reuse, 5%                                                                       1
      1        Credit 3.2   Materials Reuse,10%                                                                       1
1              Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
1              Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
1              Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
1              Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
1              Credit 6     Rapidly Renewable Materials                                                               1
1              Credit 7     Certified Wood                                                                            1
Yes   ?   No

15 0      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
 1             Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
 1             Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

42 27 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                   LEED for New Construction v2.2
                                                             NAVY Administrative Building Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.039
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2            0          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  Y          Site LEED and EPACT 2005 Compliance       m2       13,860          0.43     5,937
                Light Pollution Reducing Fixtures*                                                         Y          Site LEED and EPACT 2005 Compliance       m2       13,860          0.43     5,937




                                                                                                   Page 18 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.039
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0         5.23           0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0         0.00           0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0         0.47           0
                Modulating Condensing Boilers                                                             Y          LEED and EPACT 2005 Compliance           m2            0         3.57           0
                High - Efficiency Chillers                                                                Y          LEED and EPACT 2005 Compliance           m2            0         6.41           0
                Variable Frequency Drive Cooling Tower Fans                                               Y          LEED and EPACT 2005 Compliance           m2            0         5.70           0
                Energy Recovery Units                                                                     Y          LEED and EPACT 2005 Compliance           m2            0        13.08           0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 19 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.039
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 20 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.039
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0




                                                                                                  Page 21 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.039
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 22 of 127
                                   LEED for New Construction v2.2
                             NAVY Administrative Building Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

6     8   0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
      1        Credit 1     Site Selection                                                                                1
      1        Credit 2     Development Density & Community Connectivity                                                  1
      1        Credit 3     Brownfield Redevelopment                                                                      1
      1        Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
1              Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
      1        Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
1              Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
      1        Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
      1        Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

4     1   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
      1        Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                   LEED for New Construction v2.2
                             NAVY Administrative Building Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

8     5   0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
      1        Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
      1        Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
      1        Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
1              Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
1              Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
      1        Credit 3.1   Materials Reuse, 5%                                                                       1
      1        Credit 3.2   Materials Reuse,10%                                                                       1
1              Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
1              Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
1              Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
1              Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
1              Credit 6     Rapidly Renewable Materials                                                               1
1              Credit 7     Certified Wood                                                                            1
Yes   ?   No

15 0      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
 1             Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
 1             Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

42 27 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                   LEED for New Construction v2.2
                                                             NAVY Administrative Building Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2            0          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 25 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 26 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 27 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0




                                                                                                  Page 28 of 127
                                                                  LEED for New Construction v2.2
                                                            NAVY Administrative Building Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 29 of 127
                                    LEED for New Construction v2.2
                                 NAVY Airfield Pavements Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

7     7   0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
1              Credit 1     Site Selection                                                                                1
      1        Credit 2     Development Density & Community Connectivity                                                  1
1              Credit 3     Brownfield Redevelopment                                                                      1
      1        Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
      1        Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
      1        Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
1              Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
      1        Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
      1        Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

3     2   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
      1        Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
      1        Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                    LEED for New Construction v2.2
                                 NAVY Airfield Pavements Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

8     5   0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
      1        Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
      1        Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
      1        Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
1              Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
1              Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
1              Credit 3.1   Materials Reuse, 5%                                                                       1
1              Credit 3.2   Materials Reuse,10%                                                                       1
1              Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
1              Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
      1        Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
      1        Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
1              Credit 6     Rapidly Renewable Materials                                                               1
1              Credit 7     Certified Wood                                                                            1
Yes   ?   No

6     9   0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
      1        Credit 1     Outdoor Air Delivery Monitoring                                                           1
      1        Credit 2     Increased Ventilation                                                                     1
      1        Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
      1        Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
1              Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
1              Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
1              Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
1              Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
      1        Credit 5     Indoor Chemical & Pollutant Source Control                                                1
      1        Credit 6.1   Controllability of Systems, Lighting                                                      1
      1        Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
1              Credit 7.1   Thermal Comfort, Design                                                                   1
      1        Credit 7.2   Thermal Comfort, Verification                                                             1
1              Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
      1        Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

33 36 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                    LEED for New Construction v2.2
                                                                 NAVY Airfield Pavement Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2            0          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 32 of 127
                                                                   LEED for New Construction v2.2
                                                                NAVY Airfield Pavement Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 33 of 127
                                                                   LEED for New Construction v2.2
                                                                NAVY Airfield Pavement Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 34 of 127
                                                                   LEED for New Construction v2.2
                                                                NAVY Airfield Pavement Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 35 of 127
                                                                   LEED for New Construction v2.2
                                                                NAVY Airfield Pavement Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 36 of 127
                                   LEED for New Construction v2.2
                            NAVY Air Traffic Control Facility and Tower Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                   LEED for New Construction v2.2
                            NAVY Air Traffic Control Facility and Tower Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

15 0      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
 1             Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
 1             Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

56 13 0          Project Totals (pre-certification estimates)                                             69 Points
            Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
Note: This sheet combined the credits list in both the "Air Force Sustainable Design and Development Policy" and
the "Seattle Terminal Radar Approach Control (TRACON) Facility". All TRACON Credits are printed in RED, while
additional credits found in the Air Force Policy are printed in BLACK.
                                                                  LEED for New Construction v2.2
                                                     NAVY Air Traffic Control Facility and Tower Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 39 of 127
                                                               LEED for New Construction v2.2
                                                  NAVY Air Traffic Control Facility and Tower Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0




                                                                                                  Page 40 of 127
                                                               LEED for New Construction v2.2
                                                  NAVY Air Traffic Control Facility and Tower Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 41 of 127
                                                               LEED for New Construction v2.2
                                                  NAVY Air Traffic Control Facility and Tower Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0




                                                                                                  Page 42 of 127
                                                               LEED for New Construction v2.2
                                                  NAVY Air Traffic Control Facility and Tower Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 43 of 127
                                          LEED for New Construction v2.2
                                            NAVY BQ Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

9     5   0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
1              Credit 1     Site Selection                                                                                1
      1        Credit 2     Development Density & Community Connectivity                                                  1
      1        Credit 3     Brownfield Redevelopment                                                                      1
      1        Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
1              Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
1              Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
      1        Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
1              Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
1              Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                          LEED for New Construction v2.2
                                            NAVY BQ Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

8     5   0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
      1        Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
      1        Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
      1        Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
1              Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
1              Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
      1        Credit 3.1   Materials Reuse, 5%                                                                       1
      1        Credit 3.2   Materials Reuse,10%                                                                       1
1              Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
1              Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
1              Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
1              Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
1              Credit 6     Rapidly Renewable Materials                                                               1
1              Credit 7     Certified Wood                                                                            1
Yes   ?   No

12 3      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
   1           Credit 2     Increased Ventilation                                                                     1
   1           Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
   1           Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
 1             Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
 1             Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

43 26 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                   LEED for New Construction v2.2
                                                                NAVY Bachelor Quarters Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 46 of 127
                                                                  LEED for New Construction v2.2
                                                               NAVY Bachelor Quarters Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 47 of 127
                                                                  LEED for New Construction v2.2
                                                               NAVY Bachelor Quarters Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 48 of 127
                                                                  LEED for New Construction v2.2
                                                               NAVY Bachelor Quarters Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0




                                                                                                  Page 49 of 127
                                                                  LEED for New Construction v2.2
                                                               NAVY Bachelor Quarters Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 50 of 127
                                    LEED for New Construction v2.2
                               NAVY Child Development Centers Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

10 4      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
 1             Credit 2     Development Density & Community Connectivity                                                  1
   1           Credit 3     Brownfield Redevelopment                                                                      1
 1             Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
   1           Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
   1           Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
   1           Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                    LEED for New Construction v2.2
                               NAVY Child Development Centers Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

10 3      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
   1           Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
   1           Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
   1           Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

12 3      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

46 23 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                  LEED for New Construction v2.2
                                                           NAVY Child Development Center Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 53 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 54 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 55 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 56 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 57 of 127
                                  LEED for New Construction v2.2
                            NAVY Communications Centers Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

11 3      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
 1             Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
 1             Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
   1           Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
   1           Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
   1           Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

4     1   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
      1        Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

7 10 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
1      Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                  LEED for New Construction v2.2
                            NAVY Communications Centers Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

10 3      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
   1           Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
   1           Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
   1           Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

14 1      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
 1             Credit 6.1   Controllability of Systems, Lighting                                                      1
 1             Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

49 20 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                  LEED for New Construction v2.2
                                                           NAVY Child Development Center Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 60 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 61 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 62 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 63 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Child Development Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 64 of 127
                                        LEED for New Construction v2.2
                                       NAVY Fire Station Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

10 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
 1             Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
               Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
               Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
1              Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
1              Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
      1        Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
1              Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                        LEED for New Construction v2.2
                                       NAVY Fire Station Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

10 3      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
   1           Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
   1           Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
   1           Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

11 3      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
               Credit 7.2   Thermal Comfort, Verification                                                             1
1              Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
      1        Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

45 21 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                      LEED for New Construction v2.2
                                                                     NAVY Fire Station Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 67 of 127
                                                                     LEED for New Construction v2.2
                                                                    NAVY Fire Station Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 68 of 127
                                                                     LEED for New Construction v2.2
                                                                    NAVY Fire Station Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 69 of 127
                                                                     LEED for New Construction v2.2
                                                                    NAVY Fire Station Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 70 of 127
                                                                     LEED for New Construction v2.2
                                                                    NAVY Fire Station Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 71 of 127
                                       LEED for New Construction v2.2
                                     NAVY Fitness Center Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
 1             Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
 1             Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
   1           Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
   1           Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                       LEED for New Construction v2.2
                                     NAVY Fitness Center Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

10 3      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
   1           Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
   1           Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
   1           Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

12 3      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
 1             Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

48 21 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                     LEED for New Construction v2.2
                                                                   NAVY Fitness Center Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 74 of 127
                                                                    LEED for New Construction v2.2
                                                                  NAVY Fitness Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0




                                                                                                  Page 75 of 127
                                                                    LEED for New Construction v2.2
                                                                  NAVY Fitness Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 76 of 127
                                                                    LEED for New Construction v2.2
                                                                  NAVY Fitness Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 77 of 127
                                                                    LEED for New Construction v2.2
                                                                  NAVY Fitness Center Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 78 of 127
                                         LEED for New Construction v2.2
                                         NAVY Magazine Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                         LEED for New Construction v2.2
                                         NAVY Magazine Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

10 3      2         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
          1 Credit 8.1      Daylight & Views, Daylight 75% of Spaces                                                  1
          1 Credit 8.2      Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

51 16 2        Project Totals (pre-certification estimates)                                               69 Points
           Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
Note: NAVSEA OP5, Para 8-3.1.11 states: "The use of windows in explosives operating buildings or any buildings
encumbered by inhabited building ESQD arcs should be avoided." It further states "Skylights shall not be used in
buildings where explosives or ammunition are processed or any buildings encumbered by inhabited building
distance ESQD arcs." IEQ Credits 8.1 and 8.2 should not be pursued.
                                                                      LEED for New Construction v2.2
                                                                      NAVY Magazine Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 81 of 127
                                                                     LEED for New Construction v2.2
                                                                     NAVY Magazine Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0




                                                                                                  Page 82 of 127
                                                                     LEED for New Construction v2.2
                                                                     NAVY Magazine Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 83 of 127
                                                                     LEED for New Construction v2.2
                                                                     NAVY Magazine Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 84 of 127
                                                                     LEED for New Construction v2.2
                                                                     NAVY Magazine Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 85 of 127
                                   LEED for New Construction v2.2
                            NAVY Operation Training Facility Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                   LEED for New Construction v2.2
                            NAVY Operation Training Facility Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

11 4      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

52 17 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                  LEED for New Construction v2.2
                                                           NAVY Operation Training Facility Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 88 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Operation Training Facility Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0




                                                                                                  Page 89 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Operation Training Facility Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 90 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Operation Training Facility Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 91 of 127
                                                                 LEED for New Construction v2.2
                                                          NAVY Operation Training Facility Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 92 of 127
                                    LEED for New Construction v2.2
                               NAVY Ordnance Operations Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                    LEED for New Construction v2.2
                               NAVY Ordnance Operations Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

10 3      2         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
          1 Credit 8.1      Daylight & Views, Daylight 75% of Spaces                                                  1
          1 Credit 8.2      Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

51 16 2        Project Totals (pre-certification estimates)                                               69 Points
           Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
Note: NAVSEA OP5, Para 8-3.1.11 states: "The use of windows in explosives operating buildings or any buildings
encumbered by inhabited building ESQD arcs should be avoided." It further states "Skylights shall not be used in
buildings where explosives or ammunition are processed or any buildings encumbered by inhabited building
distance ESQD arcs." IEQ Credits 8.1 and 8.2 should not be pursued.
                                                                   LEED for New Construction v2.2
                                                              NAVY Ordnance Operations Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                              N          None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                      N          Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                            N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             N          None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                          Y          Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                   N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                       N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                          N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                                N          LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                  N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                         N          Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                   Page 95 of 127
                                                                  LEED for New Construction v2.2
                                                             NAVY Ordnance Operations Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                     N          Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                                N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                  Y          LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                 N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                 Y          LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                             N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                                N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                               N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                     N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                             N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0




                                                                                                  Page 96 of 127
                                                                  LEED for New Construction v2.2
                                                             NAVY Ordnance Operations Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                     N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                  Page 97 of 127
                                                                  LEED for New Construction v2.2
                                                             NAVY Ordnance Operations Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                   N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                         N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                        N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                  N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                  Page 98 of 127
                                                                  LEED for New Construction v2.2
                                                             NAVY Ordnance Operations Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N          None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                  Page 99 of 127
                                          LEED for New Construction v2.2
                                            NAVY Pier Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

7     7   0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
1              Credit 1     Site Selection                                                                                1
      1        Credit 2     Development Density & Community Connectivity                                                  1
1              Credit 3     Brownfield Redevelopment                                                                      1
      1        Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
      1        Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
      1        Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
      1        Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
1              Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
1              Credit 5.2   Site Development, Maximize Open Space                                                         1
1              Credit 6.1   Stormwater Design, Quantity Control                                                           1
1              Credit 6.2   Stormwater Design, Quality Control                                                            1
      1        Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
      1        Credit 7.2   Heat Island Effect, Roof                                                                      1
1              Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

3     2   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
      1        Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
      1        Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                               17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                           Required
Y      Prereq 2 Minimum Energy Performance                                                                         Required
Y      Prereq 3 Fundamental Refrigerant Management                                                                 Required
4 6    Credit 1 Optimize Energy Performance                                                                         1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                             1
                    14% New Buildings or 7% Existing Building Renovations                                                 2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                            3
                 1 21% New Buildings or 14% Existing Building Renovations                                                 4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                            5
                    28% New Buildings or 21% Existing Building Renovations                                                6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                            7
                    35% New Buildings or 28% Existing Building Renovations                                                8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                            9
                    42% New Buildings or 35% Existing Building Renovations                                               10
   3   Credit 2 On-Site Renewable Energy                                                                              1 to 3
                    2.5% Renewable Energy                                                                                 1
                    7.5% Renewable Energy                                                                                 2
                    12.5% Renewable Energy                                                                                3
   1   Credit 3 Enhanced Commissioning                                                                                    1
1      Credit 4 Enhanced Refrigerant Management                                                                           1
1      Credit 5 Measurement & Verification                                                                                1
   1   Credit 6 Green Power                                                                                               1
                                                                                                              continued…
                                          LEED for New Construction v2.2
                                            NAVY Pier Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

10 3      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
   1           Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
   1           Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
   1           Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

6     9   0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
      1        Credit 1     Outdoor Air Delivery Monitoring                                                           1
      1        Credit 2     Increased Ventilation                                                                     1
      1        Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
      1        Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
1              Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
1              Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
1              Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
1              Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
      1        Credit 5     Indoor Chemical & Pollutant Source Control                                                1
      1        Credit 6.1   Controllability of Systems, Lighting                                                      1
      1        Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
1              Credit 7.1   Thermal Comfort, Design                                                                   1
      1        Credit 7.2   Thermal Comfort, Verification                                                             1
1              Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
      1        Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

35 34 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                       LEED for New Construction v2.2
                                                                         NAVY Pier Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                             N           None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                     N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                           N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                         Y           Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                  N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                      N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                         N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                               N           LEED and EPACT 2005 Compliance            m2            0          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                 N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                        N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                  Page 102 of 127
                                                                      LEED for New Construction v2.2
                                                                        NAVY Pier Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                    N           Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                 Y           LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                Y           LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                            N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                              N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                    N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                            N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                  N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                     Y           LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0




                                                                                                 Page 103 of 127
                                                                      LEED for New Construction v2.2
                                                                        NAVY Pier Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                    N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                          N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                 Page 104 of 127
                                                                      LEED for New Construction v2.2
                                                                        NAVY Pier Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                  N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                        N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                       N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                 N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                 Page 105 of 127
                                                                      LEED for New Construction v2.2
                                                                        NAVY Pier Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                 Page 106 of 127
                                    LEED for New Construction v2.2
                                NAVY Vehicle Maintenance Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                    LEED for New Construction v2.2
                                NAVY Vehicle Maintenance Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

11 4      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

52 17 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                   LEED for New Construction v2.2
                                                               NAVY Vehicle Maintenance Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                             N           None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                     N           Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                           N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                         Y           Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                      N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                         N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                               N           LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                 N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                        N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                  Page 109 of 127
                                                                  LEED for New Construction v2.2
                                                              NAVY Vehicle Maintenance Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                    N           Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                               N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                 Y           LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                Y           LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                            N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                              N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                    N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                            N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                  N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                     Y           LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0




                                                                                                 Page 110 of 127
                                                                  LEED for New Construction v2.2
                                                              NAVY Vehicle Maintenance Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                    N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                          N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                 Page 111 of 127
                                                                  LEED for New Construction v2.2
                                                              NAVY Vehicle Maintenance Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                  N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                       N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                 N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                 Page 112 of 127
                                                                  LEED for New Construction v2.2
                                                              NAVY Vehicle Maintenance Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                 Page 113 of 127
                                   LEED for New Construction v2.2
                            NAVY General Warehouse (High Bay) Project Checklist

                            Project Title:      Test Project                        Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX         Prepared by:    I.M. Someone

Yes   ?   No

12 2      0         Sustainable Sites                                                                         14 Points
Y              Prereq 1     Construction Activity Pollution Prevention                                             Required
 1             Credit 1     Site Selection                                                                                1
   1           Credit 2     Development Density & Community Connectivity                                                  1
 1             Credit 3     Brownfield Redevelopment                                                                      1
   1           Credit 4.1   Alternative Transportation, Public Transportation Access                                      1
 1             Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms                                  1
 1             Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                            1
 1             Credit 4.4   Alternative Transportation, Parking Capacity                                                  1
 1             Credit 5.1   Site Development, Protect or Restore Habitat                                                  1
 1             Credit 5.2   Site Development, Maximize Open Space                                                         1
 1             Credit 6.1   Stormwater Design, Quantity Control                                                           1
 1             Credit 6.2   Stormwater Design, Quality Control                                                            1
 1             Credit 7.1   Heat Island Effect, Non-Roof                                                                  1
 1             Credit 7.2   Heat Island Effect, Roof                                                                      1
 1             Credit 8     Light Pollution Reduction                                                                     1
Yes   ?   No

5     0   0         Water Efficiency                                                                           5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                      1
1              Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                    1
1              Credit 2   Innovative Wastewater Technologies                                                              1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                              1
1              Credit 3.2 Water Use Reduction, 30% Reduction                                                              1
Yes   ?   No

8     9   0         Energy & Atmosphere                                                                       17 Points
Y              Prereq 1 Fundamental Commissioning of the Building Energy Systems                                   Required
Y              Prereq 2 Minimum Energy Performance                                                                 Required
Y              Prereq 3 Fundamental Refrigerant Management                                                         Required
4     6        Credit 1 Optimize Energy Performance                                                                 1 to 10
                            10.5% New Buildings or 3.5% Existing Building Renovations                                     1
                            14% New Buildings or 7% Existing Building Renovations                                         2
                            17.5% New Buildings or 10.5% Existing Building Renovations                                    3
                         1 21% New Buildings or 14% Existing Building Renovations                                         4
                            24.5% New Buildings or 17.5% Existing Building Renovations                                    5
                            28% New Buildings or 21% Existing Building Renovations                                        6
                            31.5% New Buildings or 24.5% Existing Building Renovations                                    7
                            35% New Buildings or 28% Existing Building Renovations                                        8
                            38.5% New Buildings or 31.5% Existing Building Renovations                                    9
                            42% New Buildings or 35% Existing Building Renovations                                       10
      3        Credit 2 On-Site Renewable Energy                                                                      1 to 3
                            2.5% Renewable Energy                                                                         1
                            7.5% Renewable Energy                                                                         2
                            12.5% Renewable Energy                                                                        3
1              Credit 3 Enhanced Commissioning                                                                            1
1              Credit 4 Enhanced Refrigerant Management                                                                   1
1              Credit 5 Measurement & Verification                                                                        1
1              Credit 6 Green Power                                                                                       1
                                                                                                              continued…
                                   LEED for New Construction v2.2
                            NAVY General Warehouse (High Bay) Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

13 0      0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
 1             Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
 1             Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
 1             Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
 1             Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
 1             Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
 1             Credit 3.1   Materials Reuse, 5%                                                                       1
 1             Credit 3.2   Materials Reuse,10%                                                                       1
 1             Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
 1             Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
 1             Credit 6     Rapidly Renewable Materials                                                               1
 1             Credit 7     Certified Wood                                                                            1
Yes   ?   No

11 4      0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
 1             Credit 1     Outdoor Air Delivery Monitoring                                                           1
 1             Credit 2     Increased Ventilation                                                                     1
 1             Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
 1             Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
 1             Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
 1             Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
 1             Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
 1             Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
 1             Credit 5     Indoor Chemical & Pollutant Source Control                                                1
   1           Credit 6.1   Controllability of Systems, Lighting                                                      1
   1           Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
 1             Credit 7.1   Thermal Comfort, Design                                                                   1
   1           Credit 7.2   Thermal Comfort, Verification                                                             1
 1             Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
   1           Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

52 17 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                LEED for New Construction v2.2
                                                        NAVY General Warehouse (High Bay) Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                             N           None                                      m2       13,860          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                     N           Site LEED and EPACT 2005 Compliance       m2         653           0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                           N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2       13,860          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                         Y           Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                High Albedo Material                                                                      N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Pervious Surfaces                                                                         N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                               N           LEED and EPACT 2005 Compliance            m2       13,860          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                 N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0
                Light Pollution Reducing Fixtures*                                                        N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00          0




                                                                                                  Page 116 of 127
                                                               LEED for New Construction v2.2
                                                       NAVY General Warehouse (High Bay) Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                    N           Site LEED and EPACT 2005 Compliance      m2       13,860          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                               N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                 Y           LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                Y           LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                            N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                              N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                    N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                            N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                  N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                     Y           LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0




                                                                                                 Page 117 of 127
                                                               LEED for New Construction v2.2
                                                       NAVY General Warehouse (High Bay) Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                    N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2       13,860          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                          N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                 Page 118 of 127
                                                               LEED for New Construction v2.2
                                                       NAVY General Warehouse (High Bay) Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                  N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                        N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                       N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                 N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                 Page 119 of 127
                                                               LEED for New Construction v2.2
                                                       NAVY General Warehouse (High Bay) Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                 Page 120 of 127
                                          LEED for New Construction v2.2
                                             NAVY Project Checklist

                            Project Title:      Test Project                    Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX     Prepared by:    I.M. Someone

Yes   ?   No

2 12 0      Sustainable Sites                                                                             14 Points
Y      Prereq 1 Construction Activity Pollution Prevention                                                     Required
   1   Credit 1   Site Selection                                                                                      1
   1   Credit 2   Development Density & Community Connectivity                                                        1
   1   Credit 3   Brownfield Redevelopment                                                                            1
   1   Credit 4.1 Alternative Transportation, Public Transportation Access                                            1
   1   Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms                                        1
   1   Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles                                  1
   1   Credit 4.4 Alternative Transportation, Parking Capacity                                                        1
   1   Credit 5.1 Site Development, Protect or Restore Habitat                                                        1
   1   Credit 5.2 Site Development, Maximize Open Space                                                               1
1      Credit 6.1 Stormwater Design, Quantity Control                                                                 1
1      Credit 6.2 Stormwater Design, Quality Control                                                                  1
   1   Credit 7.1 Heat Island Effect, Non-Roof                                                                        1
   1   Credit 7.2 Heat Island Effect, Roof                                                                            1
   1   Credit 8   Light Pollution Reduction                                                                           1
Yes   ?   No

2     3   0         Water Efficiency                                                                       5 Points
1              Credit 1.1 Water Efficient Landscaping, Reduce by 50%                                                  1
      1        Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation                                1
      1        Credit 2   Innovative Wastewater Technologies                                                          1
1              Credit 3.1 Water Use Reduction, 20% Reduction                                                          1
      1        Credit 3.2 Water Use Reduction, 30% Reduction                                                          1
Yes   ?   No

6 11 0      Energy & Atmosphere                                                                           17 Points
Y      Prereq 1 Fundamental Commissioning of the Building Energy Systems                                       Required
Y      Prereq 2 Minimum Energy Performance                                                                     Required
Y      Prereq 3 Fundamental Refrigerant Management                                                             Required
4 6    Credit 1 Optimize Energy Performance                                                                     1 to 10
                    10.5% New Buildings or 3.5% Existing Building Renovations                                         1
                    14% New Buildings or 7% Existing Building Renovations                                             2
                    17.5% New Buildings or 10.5% Existing Building Renovations                                        3
                 1 21% New Buildings or 14% Existing Building Renovations                                             4
                    24.5% New Buildings or 17.5% Existing Building Renovations                                        5
                    28% New Buildings or 21% Existing Building Renovations                                            6
                    31.5% New Buildings or 24.5% Existing Building Renovations                                        7
                    35% New Buildings or 28% Existing Building Renovations                                            8
                    38.5% New Buildings or 31.5% Existing Building Renovations                                        9
                    42% New Buildings or 35% Existing Building Renovations                                           10
   3   Credit 2 On-Site Renewable Energy                                                                          1 to 3
                    2.5% Renewable Energy                                                                             1
                    7.5% Renewable Energy                                                                             2
                    12.5% Renewable Energy                                                                            3
   1   Credit 3 Enhanced Commissioning                                                                                1
1      Credit 4 Enhanced Refrigerant Management                                                                       1
1      Credit 5 Measurement & Verification                                                                            1
   1   Credit 6 Green Power                                                                                           1
                                                                                                          continued…
                                          LEED for New Construction v2.2
                                             NAVY Project Checklist

                            Project Title:      Test Project                     Project Number: P-001
                            Project Location:   NAS Anywhere, Some City, XX      Prepared by:    I.M. Someone

Yes   ?   No

4     9   0         Materials & Resources                                                                  13 Points
Y              Prereq 1     Storage & Collection of Recyclables                                                 Required
      1        Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof                             1
      1        Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof                            1
      1        Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements                          1
1              Credit 2.1   Construction Waste Management, Divert 50% from Disposal                                   1
      1        Credit 2.2   Construction Waste Management, Divert 75% from Disposal                                   1
      1        Credit 3.1   Materials Reuse, 5%                                                                       1
      1        Credit 3.2   Materials Reuse,10%                                                                       1
1              Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)                                    1
      1        Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)                                    1
      1        Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally                    1
      1        Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally                    1
1              Credit 6     Rapidly Renewable Materials                                                               1
1              Credit 7     Certified Wood                                                                            1
Yes   ?   No

6     9   0         Indoor Environmental Quality                                                           15 Points
Y              Prereq 1     Minimum IAQ Performance                                                             Required
Y              Prereq 2     Environmental Tobacco Smoke (ETS) Control                                           Required
      1        Credit 1     Outdoor Air Delivery Monitoring                                                           1
      1        Credit 2     Increased Ventilation                                                                     1
      1        Credit 3.1   Construction IAQ Management Plan, During Construction                                     1
      1        Credit 3.2   Construction IAQ Management Plan, Before Occupancy                                        1
1              Credit 4.1   Low-Emitting Materials, Adhesives & Sealants                                              1
1              Credit 4.2   Low-Emitting Materials, Paints & Coatings                                                 1
1              Credit 4.3   Low-Emitting Materials, Carpet Systems                                                    1
1              Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products                               1
      1        Credit 5     Indoor Chemical & Pollutant Source Control                                                1
      1        Credit 6.1   Controllability of Systems, Lighting                                                      1
      1        Credit 6.2   Controllability of Systems, Thermal Comfort                                               1
1              Credit 7.1   Thermal Comfort, Design                                                                   1
      1        Credit 7.2   Thermal Comfort, Verification                                                             1
1              Credit 8.1   Daylight & Views, Daylight 75% of Spaces                                                  1
      1        Credit 8.2   Daylight & Views, Views for 90% of Spaces                                                 1
Yes   ?   No

3     2   0         Innovation & Design Process                                                             5 Points
1              Credit 1.1 Innovation in Design: Moisture Control Plan                                                 1
1              Credit 1.2 Innovation in Design: Bio-Based Products                                                    1
      1        Credit 1.3 Innovation in Design: Provide Specific Title                                                1
      1        Credit 1.4 Innovation in Design: Provide Specific Title                                                1
1              Credit 2   LEED® Accredited Professional                                                               1
Yes   ?   No

23 46 0            Project Totals (pre-certification estimates)                                          69 Points
               Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points
                                                                       LEED for New Construction v2.2
                                                                           NAVY Project Cost List
                            Project Title:      Test Project                                                       Year of Project:                                          2008
                            Project Number:     P-001                                                              Cost of Primary Facility:                           19,000,000                 0.038
                            Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                          13,860
                            Prepared By:        I.M. Someone                                                       Number of Occupants:                                       396
                                                                  LEED Total Cost Less Than 4% of Primary Facility Cost

Sustainable Sites                                                                                                                      Modifications to Project 1391
                                                                                                    Include in 1391          Applicable Section of 1391         UM     Quantity     Unit Cost   Cost
Prereq 1     Construction Activity Pollution Prevention
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed             Y          None                                      m2       13,860          0.00          0
Credit 1     Site Selection
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 2     Development Density & Community Connectivity
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 3     Brownfield Redevelopment
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.1   Alternative Transportation, Public Transportation Access
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                Cost Premiums Captured By GUC                                                             N           None                                      m2            0          0.00          0
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 4.4   Alternative Transportation, Parking Capacity
                Carpool and Vanpool Preferred Parking                                                     N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.1   Site Development, Protect of Restore Habitat
                Native Drought Resistant Plants                                                           N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 5.2   Site Development, Maximize Open Space
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            N           None                                      m2            0          0.00          0
Credit 6.1   Stormwater Design, Quantity Control
                Increased Landscape Area                                                                  N           Site LEED and EPACT 2005 Compliance       m2       13,860          0.00         0
                Pervious Surfaces                                                                         Y           Site LEED and EPACT 2005 Compliance       m2       13,860          8.80   121,981
Credit 6.2   Stormwater Design, Quality Control
                Subsurface Sand Filter System                                                              Y          Site LEED and EPACT 2005 Compliance       m2       13,860          5.31    73,584
Credit 7.1   Heat Island Effect, Non-Roof
                Improved Design Reducing Heat Islands***                                                  N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                High Albedo Material                                                                      N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Pervious Surfaces                                                                         N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
Credit 7.2   Heat Island Effect, Roof
                Highly Reflective Energy Star Roof Material                                               N           LEED and EPACT 2005 Compliance            m2            0          0.00          0
Credit 8     Light Pollution Reduction
                Improved Design Reducing Light Pollution*                                                 N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0
                Light Pollution Reducing Fixtures*                                                        N           Site LEED and EPACT 2005 Compliance       m2            0          0.00          0




                                                                                                  Page 123 of 127
                                                                      LEED for New Construction v2.2
                                                                          NAVY Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                 0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Water Efficiency                                                                                                                     Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Water Efficient Landscaping, Reduce by 50%
                Native Drought Resistant Plants                                                           Y          Site LEED and EPACT 2005 Compliance      m2       13,860          5.87    81,321
Credit 1.2   Water Efficient Landscaping, No Potable Use or No Irrigation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 2     Innovative Wastewater Technologies
                Innovative Wastewater Technologies***                                                    N           Site LEED and EPACT 2005 Compliance      m2            0          0.00          0
Credit 3.1   Water Use Reduction, 20% Reduction
                Low Flow Plumbing Fixtures                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.35    46,418
Credit 3.2   Water Use Reduction, 30% Reduction
                Low Flow Plumbing Fixtures                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0

Energy and Atmosphere                                                                                                                Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Fundamental Commissioning of the Building Energy Systems
                Fundamental Building Systems Commissioning                                                Y          LEED and EPACT 2005 Compliance           m2       13,860        10.48    145,190
Prereq 2     Minimum Energy Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Prereq 3     Fundamental Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1     Optimize Energy Performance
                Daylight Dimming Systems                                                                 Y           LEED and EPACT 2005 Compliance           m2            0          5.23          0
                Occupancy Sensor Controls                                                                N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Premium Efficiency Motors                                                                Y           LEED and EPACT 2005 Compliance           m2            0          0.47          0
                Modulating Condensing Boilers                                                            N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                High - Efficiency Chillers                                                               N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Variable Frequency Drive Cooling Tower Fans                                              N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
                Energy Recovery Units                                                                    N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     On-Site Renewable Energy
                Photovoltaics                                                                            N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 3     Enhanced Commissioning
                Enhanced Building Systems Commissioning                                                  N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4     Enhanced Refrigerant Management
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 5     Measurement & Verification
                Continuous Metering Equipment*                                                           N           LEED and EPACT 2005 Compliance           m2       13,860          0.00         0
                Measurement and Verification Plan***                                                     Y           LEED and EPACT 2005 Compliance           m2       13,860          2.34    32,384
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0




                                                                                                 Page 124 of 127
                                                                      LEED for New Construction v2.2
                                                                          NAVY Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Materials and Resources                                                                                                              Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Storage & Collection of Recyclables
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.2   Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 1.3   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2            0          0.00          0
Credit 2.1   Construction Waste Management, Divert 50% from Disposal
                Waste Management Plan                                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          2.79   38,681
Credit 2.2   Construction Waste Management, Divert 75% from Disposal
                Waste Management Plan                                                                    N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.1   Resource Reuse, 5%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 3.2   Resource Reuse, 10%
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 4.1   Recycled Content, 10% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                           Y          LEED and EPACT 2005 Compliance           m2       13,860          4.19   58,112
Credit 4.2   Recycled Content, 20% (post-consumer + ½ pre-consumer)
                Materials with Recycled Content                                                          N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 5.1   Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 5.2   Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                Materials Manufactured Regionally                                                        N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6     Rapidly Renewable Materials
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 7     Certified Wood
                Certified Wood Materials**                                                                Y          LEED and EPACT 2005 Compliance           m2       13,860          3.92   54,334




                                                                                                 Page 125 of 127
                                                                      LEED for New Construction v2.2
                                                                          NAVY Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Indoor Environmental Quality                                                                                                         Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Prereq 1     Minimum IAQ Performance
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          None                                     m2       13,860          0.00          0
Credit 1     Outdoor Air Delivery Monitoring
                Carbon Dioxide Sensors*                                                                  N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 2     Increased Ventilation
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.1   Construction IAQ Management Plan, During Construction
                Construction IAQ Management Plan*                                                        N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan*                                                       N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.3   Low-Emitting Materials, Carpet Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**                                                     Y          LEED and EPACT 2005 Compliance           m2       13,860          0.95   13,134
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*                                                 N           LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0
Credit 8.1   Daylight & Views, Daylight 75% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 8.2   Daylight & Views, Views for 90% of Spaces
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           LEED and EPACT 2005 Compliance           m2            0          0.00          0




                                                                                                 Page 126 of 127
                                                                      LEED for New Construction v2.2
                                                                          NAVY Project Cost List
                           Project Title:      Test Project                                                       Year of Project:                                         2008
                           Project Number:     P-001                                                              Cost of Primary Facility:                          19,000,000                0.038
                           Project Location:   NAS Anywhere, Some City, XX                                        Size of Primary Facility (m2):                         13,860
                           Prepared By:        I.M. Someone                                                       Number of Occupants:                                      396
                                                                 LEED Total Cost Less Than 4% of Primary Facility Cost

Innovation & Design Process                                                                                                          Modifications to Project 1391
                                                                                                   Include in 1391            Applicable Section              UM     Quantity     Unit Cost   Cost
Credit 1.1   Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.2   Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed            Y          LEED and EPACT 2005 Compliance           m2       13,860          0.00          0
Credit 1.3   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 1.4   Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed           N           None                                     m2            0          0.00          0
Credit 2     LEED® Accredited Professional
                LEED Accreditation**                                                                      Y          LEED and EPACT 2005 Compliance           m2       13,860          4.48   62,070




                                                                                                 Page 127 of 127

								