Robbins machine embarks on hydropower tunnel

Document Sample
Robbins machine embarks on hydropower tunnel Powered By Docstoc
					Robbins machine embarks on hydropower tunnel
Anonymous
Mining Engineering; Mar 2009; 61, 3; Docstoc
pg. T7




Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.

				
DOCUMENT INFO
Description: The accelerated assembly schedule meant most of the heavy TBM structures were already shipped from the manufacturing facility in Dalian, ahead of the low water season on the Yangtze River when such shipments are not possible.
BUY THIS DOCUMENT NOW PRICE: $6.95 100% MONEY BACK GUARANTEED
PARTNER ProQuest LLC
ProQuest creates specialized information resources and technologies that propel successful research, discovery, and lifelong learning.