PRE-PROPOSAL CONFERENCE
Request for Proposal for the
Purchase and Redevelopment
of the
Thomas C. Green Water Treatment Plant
and
Austin Energy Control Center
Solicitation RML0012
March 17, 2008 2:00 PM
AGENDA
• Redevelopment Overview
– Questions and Answers
• RFP Requirements and Procedures
– Questions and Answers
• Affordable Housing Presentation
– Questions and Answers
• District Walking Tour
Redevelopment Overview
• Fred Evins
– Redevelopment Project Manager, Economic Growth and Redevelopment Services Office
Redevelopment Vision & Policy Principles
• Reinforce viability of Downtown Austin as mixed-use retail, entertainment, residential, and employment center. • Maintain unique and authentic characteristics of Austin, Texas, and Downtown Austin.
Redevelopment Vision & Policy Principles
• Maximize density in Downtown Austin compliant with established urban design policies. • Connect and strengthen City’s existing investment in 2nd Street Retail District and Seaholm Power Plant redevelopment. • Increase and strengthen City’s tax base through sale and/or redevelopment of underutilized government-owned land.
Redevelopment Vision & Policy Principles
• Demonstrate and achieve unparalleled excellence and high values in:
– Urban design and architecture; – Sustainable building practices; – Mobility and connectivity enhancement; – Maximizing taxpayer value; – Community values, public facilities and/or public benefits
Downtown Residential Development
• Goal to have 25,000 people living downtown by 2015 • “If eight-tenths of one percent of the people who live in Austin today chose to live downtown, you would fill up every single unit that’s here, that is under construction, and that is planned at the moment. It’s a market that is not being overbuilt.” – Ray Perryman, Texas economist
Local Economy
• Austin No. 1 Fastest Growing Large Metro Economy – Forbes magazine and Moody’s Economy.com • “The Lone Star State is being ‘discovered’ by the rest of the country because of its affordable housing, lower cost of living and cost of business, greater employment opportunities and appealing livestyles. Events and circumstances point toward a Texas-sized boom between 2005 and 2030.” – James P. Gaines, Texas A&M
Other Indicators
• Austin one of least stressful US cities – Bizjournals • City of Austin given top bond rating (AAA) by Standard & Poor’s
Subject Properties Overview
GREEN WATER TREATMENT PLANT
Green Water Treatment Plant (GWTP)
Cesar Chavez Boulevard
nto nio Str e et
k
Sa
nA
Green Water Treatment Plant
Existing Condition
ee oal C r Sh
ENERGY CONTROL CENTER
GREEN WATER TREATMENT PLANT
Energy Control Center (ECC)
Third Stree t ROW
West Avenue
Hike
rail ike T &B
k Cree al Sho
Austin Energy Control Center
Existing Condition
APPROXIMATE AREA OF TRAIL EASEMENT
THIR
WES T AV ENU E
Developable Area +/- 72,400 sf
DS TRE
ET R OW
APPROXIMATE AREA OF WATERLINE EASEMENT
N Austin Energy Control Center
Easements
ENERGY CONTROL CENTER
GREEN WATER TREATMENT PLANT
INTAKE STRUCTURES
Intake Structures
Intake Structures
Redevelopment Context
Location, Location, Location
Seaholm District Master Plan
(Updated 2008)
ENERGY CONTROL CENTER
SEAHOLM
GREEN WATER TREATMENT PLANT
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Seaholm Power Plant Redevelopment
Seaholm Power Plant Redevelopment
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SEAHOLM
PFLUGER BRIDGE EXTENSION
GREEN WATER TREATMENT PLANT
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Sand Beach
Sand Beach
Pfluger Bridge Extension & Gables Park Plaza
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SUBSTATION SEAHOLM
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Central Library
Austin Energy Substation
Existing Condition
Central Library Site
Substation Reduction
Central Library Site
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SUBSTATION SEAHOLM
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
2ND STREET RETAIL DISTRICT SILICON SILICON LABS LABS BLOCK 4 BLOCK 2
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Second Street District
2nd Street District
Block 2 & 4 Retail
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SUBSTATION SEAHOLM
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
2ND STREET RETAIL DISTRICT SILICON SILICON AUSTIN LABS LABS CITY HALL BLOCK 4 BLOCK 2 BLOCK 3
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Second Street District
Austin City Hall
Block 3
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SUBSTATION SEAHOLM
AMLI BLOCK 22
GREEN WATER TREATMENT PLANT
AMLI BLOCK 20
2ND STREET RETAIL DISTRICT
SILICON LABS BLOCK 2 AUSTIN CITY HALL BLOCK 3 SILICON LABS BLOCK 4
CENTRAL LIBRARY
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Second Street District
AMLI
Block 20 & 22
ENERGY CONTROL CENTER
GABLES PARK PLAZA
SUBSTATION SEAHOLM
AMLI BLOCK 22
W BLOCK 21
AMLI BLOCK 20
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
2ND STREET RETAIL DISTRICT
SILICON LABS BLOCK 2 AUSTIN CITY HALL BLOCK 3 SILICON LABS BLOCK 4
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Second Street District
W Hotel and Residences / Austin City Limits
Block 21
REPUBLIC SQUARE
ENERGY CONTROL CENTER
GABLES PARK PLAZA SEAHOLM
SHOAL CREEK TRAIL
SUBSTATION
AMLI BLOCK 22
W BLOCK 21
AMLI BLOCK 20
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
SILICON LABS BLOCK 2
AUSTIN CITY HALL BLOCK 3
SILICON LABS BLOCK 4
LANCE ARMSTRONG BIKEWAY
SUBJECT PROPERTY
LADY BIRD LAKE TRAIL
INTAKE STRUCTURES
EXISTING UNDER CONSTRUCTION PROPOSED
LADY BIRD LAKE TRAIL
Parks and Open Space
ECC Trail
Lance Armstrong Bikeway
GWTP from Lady Bird Lake
Parks & Open Space
REPUBLIC FEDERAL SQUARE COURTHOUSE
ENERGY CONTROL CENTER
STATE PARKING GARAGE
AMOA
GABLES PARK PLAZA SEAHOLM
AUSTIN BALLET MUSIC HALL AUSTIN
SUBSTATION
AMLI BLOCK 22
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
AUSTIN CITY LIMITS AUSTIN CITY HALL
AMLI BLOCK 20
SILICON LABS BLOCK 2
SILICON LABS BLOCK 4
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Civic / Cultural
Federal Courthouse
Republic Square
Austin Museum of Art
Austin Music Hall
Ballet Austin
Civic / Cultural Investments
6TH & LAMAR MARKET DISTRICT WHOLE FOODS WORLD HEADQUARTERS W 6TH STREET ENTERTAINMENT DISTRICT NOVARE NOVARE AUSTIN BLOCK BLOCK CITY 51 52 LOFTS ZOM MONARCH PHOENIX SPRING CONDOS GABLES WEST AVENUE LOFTS SEAHOLM PLAZA CONDOS 404 RIO GRANDE 4
ENERGY CONTROL CENTER
TH
FEDERAL COURTHOUSE REPUBLIC SQUARE
PLAZA LOFTS
GABLES STREET WAREHOUSE ENTERTAINMENT DISTRICT
STATE PARKING GARAGE AMOA
360 CONDOS
AUSTIN MUSIC HALL
GABLES PARK PLAZA
BALLET AUSTIN
SUBSTATION
CENTRAL LIBRARY
GREEN WATER TREATMENT PLANT
W AMLI AMLI BLOCK BLOCK BLOCK 21 22 20 2ND STREET RETAIL DISTRICT
SILICON LABS BLOCK 2 AUSTIN CITY HALL BLOCK 3 SILICON LABS BLOCK 4
ALTA VIDA
SUBJECT PROPERTY EXISTING
INTAKE STRUCTURES
UNDER CONSTRUCTION PROPOSED
Emerging Urban Neighborhood
404 Rio Grande
West Ave Lofts & Monarch
360
Whole Foods
Spring
Emerging Urban Neighborhood
Subject Properties Infrastructure Considerations
WHOLE FOODS WORLD HEADQUARTERS
ZOM MONARCH
FEDERAL COURTHOUSE
REPUBLIC SQUARE
SPRING CONDOS
GABLES WEST AVENUE LOFTS
ENERGY CONTROL CENTER
360 CONDOS AUSTIN MUSIC HALL
STATE PARKING GARAGE
AMOA
GABLES PARK PLAZA SEAHOLM
BALLET AUSTIN
SUBSTATION
AMLI BLOCK 22
W BLOCK 21
AMLI BLOCK 20
GWTP
GWTP
CENTRAL LIBRARY
GWTP
GWTP
SILICON LABS BLOCK 2
AUSTIN CITY HALL BLOCK 3
SILICON LABS BLOCK 4
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Infrastructure
2nd & Nueces
Great Streets Extensions
WHOLE FOODS WORLD HEADQUARTERS
ZOM MONARCH
FEDERAL COURTHOUSE
REPUBLIC SQUARE
SPRING CONDOS
GABLES WEST AVENUE LOFTS
ENERGY CONTROL CENTER
360 CONDOS AUSTIN MUSIC HALL
STATE PARKING GARAGE
AMOA
GABLES PARK PLAZA SEAHOLM
BALLET AUSTIN
SUBSTATION
AMLI BLOCK 22
W BLOCK 21
AMLI BLOCK 20
GWTP
GWTP
CENTRAL LIBRARY
GWTP
GWTP
SILICON LABS BLOCK 2
AUSTIN CITY HALL BLOCK 3
SILICON LABS BLOCK 4
SUBJECT PROPERTY EXISTING UNDER CONSTRUCTION
INTAKE STRUCTURES
PROPOSED
Infrastructure
2nd Street Bridge
& Extension to West Avenue
Green Water Treatment Plant
Site Restoration
Green Water Treatment Plant
Site Restoration
Green Water Treatment Plant
Bank Stabilization
Subject Properties Land Use Considerations
Green Water Treatment Plant
Projected 100 Year Flood Plain
Setback Angle Basewall Cesar Chavez or Shoal Creek
Waterfront Overlay District Setbacks
North Shore Central Subdistrict
Cesar Chavez or Shoal Creek
Waterfront Overlay District Setbacks
City Hall Subdistrict
100’ max
Development Entitlements
• Rezoning by City to CBD-CURE • Subdivision by City • Development in Public Right-of-Way
– Public infrastructure – Private development
• Compliance with:
– – – – Waterfront Overlay District Capitol View Corridors Downtown Creeks Overlay Downtown (Urban) Design Guidelines
Questions and Answers
RFP Requirements and Procedures
• Rosemary Ledesma
– Senior Buyer, Purchasing Office
• Byron Johnson
– Purchasing Officer
• Raymond Young
– Small and Minority Business Resources
Affordable Housing
• Margaret Shaw
– Deputy Director, Neighborhood Housing and Community Development