~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1
PLEASE READ BEFORE READING IMPLEMENTATION SCHEDULE Schedule Overview: The New York/New Jersey/Philadelphia Metropolitan Area Airspace Redesign Implementation Plan (Plan) describes the tasks necessary to implement the Airspace Redesign project. Implementation is scheduled to take place in four (4) stages. The planned end dates for each stage are: • • • • Stage 1—March 6, 2009 Stage 2—October 1, 2009 Stage 3—November 9, 2011 Stage 4—September 7, 2012
Line Items Overview (Left Pane): The following Plan contains approximately 14,000 line items but it only shows the main tasks required to implement the Airspace Redesign. Many subtasks are hidden because they are composed of steps that recur each time the subtask is done. As an example, the development of an RNAV procedure is an 18 step process that is used each time an RNAV procedure is developed. This generic list of steps is described in detail only once in the implementation plan: TEB SID 24 - RNAV Procedure development is described on pages 3 - 4 of the Plan; all other RNAV procedure development line items contain only the subtask heading, but the 18 steps apply to that heading. Other subtasks that are comprised of a generic list of steps include: Procedure Development, Safety Risk Management, Spectrum Analysis, Business Case Analysis, Human-in-the-Loop Experiments, Airspace Implementation, and F&E Schedules. Schedule Bar Chart (Right Pane) and Legend: For those tasks that have been completed, a greater detail is shown and the respective schedule bar appears in green. Most of the bars appear as black because they are comprised of many subtasks that are incomplete. Each of the main tasks has a milestone subtask that indicates the completion point. The milestone tasks that are yet to be completed are shown as blue diamonds. Each main task also has a critical path that is comprised of subtasks that impact the total duration of the main task. These critical path tasks appear as red bars. Many milestones and critical tasks do not appear on the Plan because they are included in the subtasks under the main tasks. The planned end-date of each stage is shown as a red arrow. Caveat: The schedule is dependent on the resources available, design refinements, and the completion dates of earlier tasks; therefore, the schedule is subject to change. The Implementation schedule will be updated periodically and posted on the project website. Look for the next update in the Second Quarter of FY 2009 (March 2009)
1
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 0 1 2 179 180 206 207 208 209 210 211 212 219 220 271 278 279 280 281 282 283 284 285 286 287 288 289 290 291 343 350 351 352 353 354 355 356 357 358 359 360 363 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2009 Qtr 2 Qtr 3 Qtr 4 9/30 9/30 9/7 1/29 10/5 4/6 5/14 Qtr 1 2010 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2011 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2012 Qtr 2 Qtr 3
NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN
NYNJPHL Airspace Redesign Implementation Support Items FY09 Implementation Support Items (these support contracts and recurring meetings) NYNJPHL Airspace Redesign Implementation Items Stage 1 Meetings (Record of Decision, Coordination, Customer Forums and Kick Offs) Stage 1 - Procedural Changes Enroute Tasks ZNY Westgate Dual J80 Route from BRNAN Fix Westward Procedure for ZNY Westgate Dual J80 Route Customer Forum Publish Interim (operational) Post Implementation Operational Assessment of Conventional Route Develop RNAV Procedure for ZNY Dual J80 Route (Establish Q Route)* RNAV Process Post Implementation Operational Assessment of RNAV Route Terminal Tasks Stage 1 - EWR Implement EWR RWY 22s Dispersal Headings - Conventional Procedure Customer Forum Implementation of Conventional Procedure (2 Headings only - additional in later stage) Publish Conventional Procedure for Dispersal Heading Post Implementation Operational Assessment of Conventional Procedure
Operational Assessment after Six Months Data Collection and Analysis Document Evaluation Operational Assessment after 12 Months Data Collection and Analysis Document Evaluation 12/17 9/29 9/28 9/21 7/2 12/17 7/2 7/31 12/17 7/31 9/28 5/14 5/13 4/8 4/8 4/6 10/5
Qtr 4 9/7
Implement EWR RWY 22s Dispersal Headings - RNAV Overlay* Post Implementation Operational Assessment of RNAV Procedure Stage 1 - PHL PHL RNAV Kick off Meeting PHL RNAV Design Meeting Implement PHL RWY 09 Dispersal Headings - Conventional Procedure Implementation of Conventional Procedure (2 Headings only, additional in later stage) Publish Conventional Procedure for Disperal Heading Post Implementation Operational Assessment of Conventional Procedure
Operational Assessment after Six Months Data Collection and Analysis Document Evaluation Operational Assessment after 12 Months 7/2 12/17 7/2 7/31 12/17 7/31
Implement PHL RWY 09 Dispersal Headings - RNAV Overlay*
Completed Tasks Milestone Roll-up Summary Project Summary Planned Finish for Stages
9/23
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 2
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 364 415 422 423 424 425 426 427 428 429 432 433 484 491 492 543 550 551 602 609 610 611 612 613 664 671 674 681 682 733 740 743 750 751 802 809 810 811 816 867 874 875 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2009 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2010 Qtr 2 Qtr 3
RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement PHL RWY 27 Dispersal Headings - Conventional Procedure Implementation of Conventional Procedure (2 Headings only, additional in later stage) Publish Conventional Procedure for Disperal Heading Post Implementation Operational Assessment of Conventional Procedure
Operational Assessment after Six Months Data Collection and Analysis Document Evaluation Operational Assessment after 12 Months 7/2 12/17 7/2 7/31 12/17 7/31
Qtr 4 Qtr 1 9/23
2011 Qtr 2 Qtr 3
Qtr 4 9/21
Qtr 1
2012 Qtr 2 Qtr 3
Qtr 4
Implement PHL RWY 27 Dispersal Headings - RNAV Overlay Procedure* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement PHL DITCH SID Departure Procedures - RNAV Overlay Procedure* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement PHL 9L/R River Visual Approach Procedure - RNAV/RNP Overlay Procedure RNAV/RNP Process Post Implementation Operational Assessment of RNAV/PNP Procedure Stage 1 - LGA RNAV Kickoff Meeting LGA LGA LDA to 22 RNAV Procedure STAR Development to transition to LDA Approach to 22 (RNAV Process) RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement LGA RWY 31 Dispersal Headings - Conventional Procedure Post Implementation Operational Assessment of Conventional Procedure Implement LGA RWY 31 Dispersal Headings - RNAV Procedure* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement LGA RWY 4 Dispersal Headings - Conventional Procedure Post Implementation Operational Assessment of Conventional Procedure Implement LGA RWY 4 Dispersal Headings - RNAV Procedure* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Stage 1 - JFK Implement JFK CRI (13) Approach - (RNAV Fix for VOR 13L/R and 13R/L Visual at JFK) Work around… Waypoint off Sandy Hook ( named DVETO) RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement JFK RWY 31R Right Turn Departure - Conventional Procedure Implement Conventional Procedure
Completed Tasks Milestone Roll-up Summary Project Summary Planned Finish for Stages 4/29 8/27 4/8 4/8 3/20 3/30 10/22 10/22 6/18 6/29 10/22 10/22 10/22 10/22 10/22 8/27 8/27 4/8 4/8
9/23 9/23 9/21
4/20
9/8 11/3
11/3
11/3
11/3 10/5
9/8
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 3
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 876 877 884 885 936 943 944 995 1002 1003 1054 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1
Publish Conventional Procedure Post Implementation Operational Assessment of Conventional Procedure Implement JFK RWY 31R Right Turn Departure - RNAV Procedure* RNAV Process (operationally not viable at this stage of implementation) Post Implementation Operational Assessment of RNAV Procedure Implement JFK (SID RWY 22R) RNAV Overlay of Departure Procedures* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Implement JFK (SID RWY 04L) RNAV Overlay of Departure Procedures* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Stage 1 - TEB Implement TEB SID 24 - RNAV Procedure (named RUDDY) RNAV Process - RUDDY Request RNAV Procedure Notify FPO of New Procedure & Establish Publication Date Prepare Prototype Design Information from Facility to adapt TARGETS Adaptation of TARGETS Concurrence from RAPT Submit to RAPT Review by RAPT Consensus by RAPT Kick off Meeting Establish a Prototype Advise Industry of Project Development Reserve Waypoint Name Establish Core Work Group & Development Schedule Working Group/Design Finalize/Review Prototype Design Initial Prototype Acceptance Design the Procedure Determine if Waiver Needed Altitude and Speed Assignments Lead Operator Flight Trials or Simulations Work Group Review Procedures Process Decision Facility Concurrence with Procedure Prepare Procedure Documentation Automation Environmental Review/Consistency with the FEIS Process Verification
Completed Tasks Milestone Roll-up Summary Project Summary
2008 Qtr 2 Qtr 3 4/29
Qtr 4
Qtr 1
2009 Qtr 2 Qtr 3 5/19
Qtr 4
Qtr 1
2010 Qtr 2 Qtr 3
Qtr 4
Qtr 1
2011 Qtr 2 Qtr 3
Qtr 4
Qtr 1
2012 Qtr 2 Qtr 3
Qtr 4
10/22 10/22 11/3 9/23 9/23 10/5 9/23 9/23 10/5 4/20 1/15 1/15
3/12
2/6
2/6
5/2 4/30
3/19
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 4 Planned Finish for Stages
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1111 1112 1163 1170 1171 1222 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1246 1249 1250 1251 1252 1253 1254 1257 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2009 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2010 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2011 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2012 Qtr 2 Qtr 3 Qtr 4
Confirmation of Prototype Design Submit to Service Area Submit Procedure Documentation to FPO Coordinate with adjacent facilities LOA SOP FPO Development and Publication Notifications Upcoming Procedure Publication Customer Training & Database Updates Video Map Update Facility Training on Upcoming Procedure Published Post Implementation Operational Assessment of RNAV Procedure Implement TEB LPV for RWY 19/24 - RNAV Overlay Procedure RNAV Process Post Implementation Operational Assessment of RNAV Procedure Stage 1 - Implement MMU RWY 23 Departures (SID 23) - RNAV Overlay Procedure* RNAV Process Post Implementation Operational Assessment of RNAV Procedure Stage 2 - Integration of ZNY & N90 Identify ERAM Constraints Kickoff Meeting Westgate Expansion Westgate Expansion Design Enroute - Westgate Expansion Design ZNY Design Meeting ZNY West Corridor Design ZNY Experiment (HITL) ZNY Design Briefing Terminal - Westgate Expansion Design N90 Design Meeting N90 Design Verification N90 Design HITL Scrub Experiment N90 Design Briefing Combined Terminal and Enroute - Westgate Expansion Design Kickoff Meeting Design Prototype Experiment (HITL) Scrub Experiment
Completed Tasks Milestone Roll-up Summary Project Summary Planned Finish for Stages 12/23 1/20 2/17 2/10 2/17 3/5 11/7 10/31 11/7 12/11 7/10 6/29 3/30 5/25 9/23 10/5 1/15 1/15 1/15 1/15 1/27 4/8 4/8 4/20 10/5 1/15 4/16
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 5
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 1260 1261 1264 1383 1387 1402 1403 1404 1405 1463 1554 1555 1592 1682 1772 1862 1863 1953 2043 2133 2223 2224 2225 2315 2405 2495 2496 2586 2676 2677 2714 2751 2752 2930 2931 2932 3113 3203 3474 3564 3565 3566 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1
Design Briefing Design and Implementation Scoping Preliminary Evaluation for Business Case/Need for White Paper Spectrum Feasibility SMS/SRM Requirment Finalized Design Westgate Expansion Implementation Enroute Tasks - Westgate Expansion Realign RBV Crossing Traffic Through ZNY39 and ZNY55 Establish Additional Departure Fixes (5th Fix) Integrate Airspace Review and Design transfering airspace from ZNY39 and ZNY55 to N90 Redesign ZNY39 for JFK - NEWEL / ELIOT / PARKE Traffic Redesign Remaining Airspace for ZNY39 and 55 and Impacted Adjacent Sectors Institute Terminal Rules at ZNY for Sectors 39 and 55 Reroute Traffic to Existing Jet Airways Reroute ZID Destinations (currently on J80) to BRNAN Transition Route (AKA J80N) Reroute CVG Flights to J6 Create PHL Departure Airway to BRNAN Transition Route (AKA J80N) Create New PCT Arrival Routes from ZBW (all airports) Terminal Tasks - Westgate Expansion N90 Westgate Expansion Incorporate New Westgate Fix Reroute JFK RBV Departures to the Westgate Reconfigure all other impacted SIDs Integrate Airspace Accept New Airspace from ZNY Redesign LIBW Reconfigure Departure Positions at N90 Move Equipment/Position Display - Catskill Position Move Equipment/Positions - LIB Sector and ZNY39 and 55 PHL Arrival and Departure Routes Adjustments Routings Design Implementation of Design Enroute Tasks - PHL Reroute PHL Arrivals from ZOB Shift Western Arivals from BUNTS to BUKKS Realign PHL Arrival Flows to Existing Arrival Fixes Shift PTW NW Departures to the North Terminal Tasks - PHL Reconfigure PHL Westbound Departures Create New 3rd Westbound MXE Departure Fix at PHL
Completed Tasks Milestone Roll-up Summary Project Summary Planned Finish for Stages
2009 Qtr 2 Qtr 3 3/5 3/12 6/29 4/23 6/24 6/24
Qtr 4
Qtr 1
2010 Qtr 2 Qtr 3
Qtr 4
Qtr 1
2011 Qtr 2 Qtr 3
Qtr 4
Qtr 1
2012 Qtr 2 Qtr 3
Qtr 4
3/30 3/30 9/8 12/3 6/16 6/16 6/16 6/16 6/16 3/30 3/30 6/16 3/30 6/16 6/16 6/16 6/16 6/16 6/16 6/16 6/16 6/16 6/16 6/16 6/16 3/30 6/5 3/30 11/20 11/20 11/20 11/20 11/20 3/30 3/30 11/20
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 6
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 3656 3746 4017 4069 4159 4167 4219 4227 4279 4331 4332 4575 4818 4823 4824 4825 4826 4985 5422 5551 5556 5557 5558 5559 5755 5756 6171 6406 6858 7039 7130 7221 7679 7680 8117 9094 9095 9096 9547 9908 9998 10088 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2009 Qtr 2 Qtr 3 Qtr 4
New Departure Fix Potential Dependancies Reroute PHL Departures Develop RNAV Overlay Procedure for PHL Routing over MXE Reroute PHL East Departures via DITCH PHL RWY 09 3rd & 4th Dispersal Headings - Conventional Procedure PHL RWY 09 3rd & 4th Dispersal Headings - RNAV Procedure PHL RWY 27 3rd Dispersal Heading - Conventional Procedure PHL RWY 27 3rd Dispersal Heading - RNAV Procedure Develop New Approaches for PHL JFK - Terminal Tasks Redesign routes and establish altitude restrictions on LENDY arrivals Reroute JFK Europe Arrivals via ROBER Establish Traffic Flow Management Rules Stage 3 - Boundary Changes Identify ERAM Constraints Kickoff Meeting Northgate Expansion Design En-route Implementation Tasks - Northgate Expansion Terminal Tasks - Northgate Expansion Establish Traffic Flow Management Rules Stage 4 - Transfer of Sectors Identify ERAM Constraints Stage 4 - Kickoff Meeting Reallocation of Airspace between ZNY, ZBW, ZDC, N90 En-route Tasks Southgate Realignment Eastgate Realignment EWR Tasks TEB/MMU Tasks JFK Tasks ISP Tasks LGA Tasks Terminal Tasks Southgate Realignment Eastgate Realignment EWR Tasks Redesigning EWR Arrivals/Departures Terminal Changes for 22 Terminal Changes for 04 Cancel FQM STAR Relocate SHAFF 6 STAR West for EWR Implement 3rd Dispersal Heading at EWR - RNAV Procedure
Completed Tasks Milestone Roll-up Summary Project Summary Planned Finish for Stages
Qtr 1 11/20
2010 Qtr 2 Qtr 3
Qtr 4
Qtr 1
2011 Qtr 2 Qtr 3 3/30
Qtr 4
Qtr 1
2012 Qtr 2 Qtr 3
Qtr 4
4/8 11/20 2/8 4/8 2/8 4/8 4/8 11/20 11/20 11/20 5/25 1/2
1/18 1/10 1/2 1/10 3/7 9/7
7/22 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/2
* Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07 7
Mon 12/22/08
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 (Time-Line in Calendar Years)
ID 10146 10236 10329 10330 10420 10510 11051 11683 11864 12344 12345 12526 12527 12617 12707 12797 12798 12856 12914 12972 13030 13088 13089 13090 13148 13206 13207 13298 13659 13749 13839 14742 14832 Task Name 2007 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2008 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2009 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2010 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2011 Qtr 2 Qtr 3 Qtr 4 Qtr 1
EWR Night Time Ocean Routing Departures for Noise Mitigation (RWY 22) Adjust EWR Arrival Procedures Create Optimal Profile Decent Approach Procedures (Continuous Decent Approach -CDA) Create Optimal Profile Decent for EWR South Approaches to RWY 04 (RNAV) Create Optimal Profile Decent for EWR North Approaches to RWY 22 (RNAV) TEB/MMU Tasks JFK Tasks ISP Tasks LGA Tasks HPN Tasks Shift Arrival Streams Shift Departure Streams Reroute HPN Eastern Departures (shift South) Reroute HPN Southern Departure Streams to the West Reroute HPN Northern and Western Departure Flows to the northeast Establish Departure Procedures for HPN RNAV Overlay Procedures for HPN RWY 34 to J75 Departures RNAV Overlay Procedures for HPN RWY 34 to ZNY Southgate Departures RNAV Overlay Procedures for HPN RWY 34 to ZNY Northgate Departures RNAV Overlay Procedures for HPN RWY 34 to ZNY Westgate Departures RNAV Overlay Procedures for HPN RWY 34 to ZNY Eastgate Departures PHL Tasks Create Optimal Profile Decent Procedures (Continuous Decent Approach -CDA) Create Optimal Profile Decent for PHL for all fixes to 27 (RNAV) Create Optimal Profile Decent for PHL for all fixes to 09 (RNAV) General Integration Tasks TEC Adjustments Satellite Airports (23 EIS Study Airports) Reroute J42 to BOS (and Satellites) to the East Reroute BOS (and Satellites) Southwest Departure Routes West of BDR Westgate finalization Shift DCA/BWI Arrival Routes from ZBW Establish Traffic Flow Management Rules
2012 Qtr 2 Qtr 3 Qtr 4 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 7/13 4/18 4/18 4/18 4/18 4/18 4/18 4/18 4/18 4/18 4/18 7/13 7/13 7/13 7/13 7/13 7/13 7/13 9/7
Completed Tasks * Tasks that are not essential to complete a Stage. Critical Task Project: NYNJPHL AIRSPACE REDESIGN IMPLEMENTATION PLAN Project Start Date: Wed 9/5/07
Milestone Roll-up Summary
Project Summary Planned Finish for Stages
Mon 12/22/08
8
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 Acronyms Related to Airspace Redesign Project ARD Yardley VOR ARTCC Air Route Traffic Control Center BDR Bridgeport VOR BOS Boston Logan Airport BWI Baltimore Washington International Airport CDA Continuous Decent Approach CRI Canarsie VOR DCA Reagan National Airport DTW Detroit International Airport EIS Environmental Impact Statement ERAM Enroute Automation Modernization EWR Newark International Airport FEIS Final Environmental Impact Statement FPO Flight Procedures Office FQM Williamsport VOR GPS Global Positioning System HAR Harrisburg VOR HITL Human in the Loop HPN White Plains/Westchester County Airport IAD Dulles International Airport IFR Instrument Flight Rules ILS Instrument Landing System ISP Long Island MacArthur Airport J# Jet Route# JFK JFK Airport LDA Localizer Directional Aid LGA LaGuardia Airport LIB Liberty Sector LOA Letters of Agreement LPV A type of approach with vertical guidance based on WAAS, published on RNAV (GPS) approach charts MMU Morristown Airport MXE MODENA (Departure Fix for PHL & its Satellites) N90 New York TRACON NAP Needs Assessment Program OOD Woodstown VOR OPD Optimal Profile Decent
9
~ Working File ~ NYNJPHL Airspace Redesign Implementation Schedule - FY09 Q1 Acronyms Related to Airspace Redesign Project PCT Potomac TRACON PHL Philadelphia Airport PTW Pottstown VOR Q Route RNAV only Jet Route RAPT Regional Airspace Procedure Team RBV Robinsville VOR RNAV Area Navigation RNP Required Navigational Performance ROD Record of Decision ROMA Route Optimization and Mitigation Analysis RWY Runway SID Standard Instrument Departure SMS Safety Management System SOP Standard Operating Procedures SRM Safety Risk Management SRMD Safety Risk Management Document STAR Standard Terminal Arrival Route SWAP Severe Weather Avoidance Plan TARGETS Terminal Area Route Generation Evaluation and Traffic Simulation TEB Teterboro Airport TEC Tower Enroute Control TMA Traffic Management Advisor TRACON Terminal Radar Approach Control VCN Cedar Lake VOR VFR Visual Flight Rules VHF Very High Frequency VOR VHF Omni-directional Radio Range Station WAAS Wide Area Augmentation System ZBW Boston ARTCC ZDC Washington ARTCC ZID Indianapolis ARTCC ZNY New York ARTCC ZOB Cleveland ARTCC
10