Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for

Document Sample
scope of work template
							                    Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
                                                                                                                                              November 2008
                                                                                                                                         Tentative
Region                          Tender For:                Hwy.     Location                                                          Advertising Dates


  4       Bituminous Overlay                                6       15.1km North of PR 513--35.0km North of PR 513                    December 17, 2008

  2       Culvert Jacking                                   14      0.9km East of PTH 32--PR 306 (Various Locations)                  December 20, 2008

  4       Bridge Demolition                                352      At Whitemud River                                                  January 7, 2009

  3       Structure Rehabilitation                          1       At Assiniboine River (Vicinity of Brandon)                         January 10, 2009

  2       Grade, Base & Bituminous Pavement                 8       13.1 km South of PTH 68 -- PTH 68                                  January 14, 2009

  1       Substructure Installation                        710      English Brook (Rice River Road)                                    January 14, 2009

  5       Detour Construction                               10      At Big Island Lake (South of Flin Flon)                            January 17, 2009

  5       Bituminous Overlay                                10      PTH 60--PR 282                                                     January 21, 2009

  1       Structure Rehabilitation (Structural Steel)      100      At Assiniboine River                                               January 21, 2009

  2       Base & Bituminous Pavement                        2       0.4km W of PR 248--4.9km E of PR 332 (Fannystelle--Springstein)    January 24, 2009

  5       Structure Rehabilitation                         750      At Mystic Creek (South of Flin Flon)                               January 24, 2009

  1       Bituminous Overlay                                11      S Jct PTH 44--CPR Crossing (Whitemouth)                            January 31, 2009

  4       Depositing and Stockpiling Aggregate                      St. Laurent - Lundar - Gypsumville - Waterhen Area                 January 31, 2009

  1       Structure Rehabilitation (Pier Modifications)    100      At Assiniboine River                                               February 4, 2009

Various   Microsurfacing Treatment                        Various   Various Locations                                                  February 7, 2009

  4       Bituminous Pavement                               68      East of PTH 5--12.2km East of PTH 5 (East of Ste. Rose du Lac)    February 11, 2009

  4       Depositing and Stockpiling Aggregate                      Dauphin - Alonsa - Rorketon Area                                  February 14, 2009

  1       Intersection Improvements                         12      In Steinbach: At Clearspring Road                                 February 18, 2009

  5       Grade Restoration                                391      Thompson--Suwanee River (Various Locations)                       February 18, 2009

  3       Intersection Improvements                         10      At PR 355                                                         February 21, 2009

  4       Bituminous Pavement                               68      9.0 km South of PR 325 -- 19.2 km West of PTH 6                   February 25, 2009
                     Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
                                                                                                                                        November 2008
                                                                                                                                  Tentative
Region                        Tender For:              Hwy.   Location                                                         Advertising Dates


  3      Bituminous Overlay                              3    N Jct PTH 83--East Junction PR 254                               February 28, 2009

  1      Structure Rehabilitation (Contract 3)          59    At PTH 100 Overpass                                              February 28, 2009
         (Superstructure)

  4      Depositing and Stockpiling Aggregate                 Grandview - Roblin - Swan R - Birch R - Mafeking - Pine R Area   February 28, 2009

  2      Bituminous Pavement (Shoulders)                 1    Portage la Prairie--PTH 13 (W/B)                                    March 4, 2009
                                                              PTH 13--Elie (E/B)
                                                              Assiniboine River--Headingley (E/B)

  2      Bituminous Overlay                             14    0.9km East of PTH 32--PR 306                                        March 7, 2009

  1      Intersection Improvements                      100   Median Openings at PTH 2                                            March 14, 2009

  3      Bituminous Pavement                             1    PR 257--5.6 km West of PTH 21 (E/B)                                 March 18, 2009

  2      Base & Bituminous Pavement                      6    Vicinity of Grosse Isle                                             March 21, 2009

  3      Grading                                        110   PR 457--PTH 1                                                       March 25, 2009

  1      Bituminous Overlay                             59    PR 213--7.6km N of PR 213 (N/B & S/B)                                April 1, 2009

  5      Stockpiling Aggregate                                Lynn Lake Area                                                       April 4, 2009

  1      Bituminous Pavement                            75    0.9 km N of PR 201--0.8 km S of S Jct PTH 23 (S/B)                   April 8, 2009
         (Includes Concrete Retrofit)                         (Letellier--Morris)

  3      Culvert Replacement                             1    PTH 21 - PTH 10 (E/B) (Various Locations)                           April 18, 2009

  3      Twinning                                       10    In Brandon: At Assiniboine River (18th Street Bridge)               April 25, 2009

  3      Structure                                      83    At Jackson Creek (North of Melita)                                  April 29, 2009

  1      Grade Widening                                 100   At Assiniboine River                                                 May 2, 2009

  1      Shoo-Fly Detour                                59    At La Rochelle Drain (Coulee de Naults) (North of La Rochelle)      May 16, 2009

  1      Grading (Berm Construction)                    11    At Powerview Creek (Near Pine Falls)                                May 23, 2009

  4      Grading                                        588   North of PR 275 (West of Swan River)                                May 30, 2009
                     Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
                                                                                                                                           November 2008
                                                                                                                                      Tentative
Region                           Tender For:           Hwy.   Location                                                             Advertising Dates


  4      Culvert Installations                          483   PTH 10--Sapotaweyak Cree Nation (Various Locations)                     June 3, 2009

  2      Structure Rehabilitation                       248   At Assiniboine River: Baie St. Paul Bridge (North of St. Eustache)      June 6, 2009

  3      Bituminous Pavement                            1A    In Brandon: PR 457--PTH 1                                               June 6, 2009

  3      Bituminous Pavement                             1    PTH 21--E Jct PR 250 (E/B) & (W/B)                                     June 10, 2009
         (Including Paved Shoulders)

  4      Grading                                        513   PTH 6--Dauphin River First Nation (Various Locations)                  June 13, 2009

  5      Grade, Base & AST (Including New Location)     374   11.0km N of PR 373--3.0km S of Kichi Sipi Bridge                       June 20, 2009
                                                              (Southwest of Cross Lake)

  3      Bituminous Pavement                             1    E Jct PR 250--W Jct PTH 10 (E/B)                                       June 24, 2009
         (Including Paved Shoulders)

  5      Grade & Granular Base Course                   373   6.0km N of Rossville Jct--Pine Creek (North of Norway House)            July 4, 2009

  3      Bituminous Pavement                             1    PR 340--W Jct PR 351 (E/B)                                              July 8, 2009
         (Including Paved Shoulders)

  2      Structure                                      34    At Squirrel Creek (Vicinity of Austin)                                  July 11, 2009

  4      Structure                                      489   At Tributary to Garland River (South of Duck River)                     July 29, 2009

  4      Structure                                      513   At Partridge Drain (Northeast of St. Martin)                           August 1, 2009

  1      Structure (Including Roadworks)                 9    At Parks Creek (South of Selkirk)                                     August 19, 2009

  5      Stockpiling Aggregate                                Gillam Area                                                          September 19, 2009

  4      Stockpiling Aggregate                                Dauphin - Ashern - Swan River Area                                    October 3, 2009

  5      Structure Rehabilitation                       10    At Big Island Lake (South of Flin Flon)                               October 10, 2009

  1      Structure Rehabilitation                       59    At La Rochelle Drain (Coulee de Naults) (North of La Rochelle)        October 17, 2009

  1      Structure Rehabilitation                       100   At Assiniboine River                                                 November 7, 2009

  3      Structure Rehabilitation                       250   At Assiniboine River (North of Alexander)                            November 14, 2009
                     Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
                                                                                                                                    November 2008
                                                                                                                                Tentative
Region                      Tender For:                Hwy.   Location                                                       Advertising Dates


  3      Structure                                      110   At CP Rail Overpass                                            November 28, 2009

						