Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for
Document Sample


Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
November 2008
Tentative
Region Tender For: Hwy. Location Advertising Dates
4 Bituminous Overlay 6 15.1km North of PR 513--35.0km North of PR 513 December 17, 2008
2 Culvert Jacking 14 0.9km East of PTH 32--PR 306 (Various Locations) December 20, 2008
4 Bridge Demolition 352 At Whitemud River January 7, 2009
3 Structure Rehabilitation 1 At Assiniboine River (Vicinity of Brandon) January 10, 2009
2 Grade, Base & Bituminous Pavement 8 13.1 km South of PTH 68 -- PTH 68 January 14, 2009
1 Substructure Installation 710 English Brook (Rice River Road) January 14, 2009
5 Detour Construction 10 At Big Island Lake (South of Flin Flon) January 17, 2009
5 Bituminous Overlay 10 PTH 60--PR 282 January 21, 2009
1 Structure Rehabilitation (Structural Steel) 100 At Assiniboine River January 21, 2009
2 Base & Bituminous Pavement 2 0.4km W of PR 248--4.9km E of PR 332 (Fannystelle--Springstein) January 24, 2009
5 Structure Rehabilitation 750 At Mystic Creek (South of Flin Flon) January 24, 2009
1 Bituminous Overlay 11 S Jct PTH 44--CPR Crossing (Whitemouth) January 31, 2009
4 Depositing and Stockpiling Aggregate St. Laurent - Lundar - Gypsumville - Waterhen Area January 31, 2009
1 Structure Rehabilitation (Pier Modifications) 100 At Assiniboine River February 4, 2009
Various Microsurfacing Treatment Various Various Locations February 7, 2009
4 Bituminous Pavement 68 East of PTH 5--12.2km East of PTH 5 (East of Ste. Rose du Lac) February 11, 2009
4 Depositing and Stockpiling Aggregate Dauphin - Alonsa - Rorketon Area February 14, 2009
1 Intersection Improvements 12 In Steinbach: At Clearspring Road February 18, 2009
5 Grade Restoration 391 Thompson--Suwanee River (Various Locations) February 18, 2009
3 Intersection Improvements 10 At PR 355 February 21, 2009
4 Bituminous Pavement 68 9.0 km South of PR 325 -- 19.2 km West of PTH 6 February 25, 2009
Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
November 2008
Tentative
Region Tender For: Hwy. Location Advertising Dates
3 Bituminous Overlay 3 N Jct PTH 83--East Junction PR 254 February 28, 2009
1 Structure Rehabilitation (Contract 3) 59 At PTH 100 Overpass February 28, 2009
(Superstructure)
4 Depositing and Stockpiling Aggregate Grandview - Roblin - Swan R - Birch R - Mafeking - Pine R Area February 28, 2009
2 Bituminous Pavement (Shoulders) 1 Portage la Prairie--PTH 13 (W/B) March 4, 2009
PTH 13--Elie (E/B)
Assiniboine River--Headingley (E/B)
2 Bituminous Overlay 14 0.9km East of PTH 32--PR 306 March 7, 2009
1 Intersection Improvements 100 Median Openings at PTH 2 March 14, 2009
3 Bituminous Pavement 1 PR 257--5.6 km West of PTH 21 (E/B) March 18, 2009
2 Base & Bituminous Pavement 6 Vicinity of Grosse Isle March 21, 2009
3 Grading 110 PR 457--PTH 1 March 25, 2009
1 Bituminous Overlay 59 PR 213--7.6km N of PR 213 (N/B & S/B) April 1, 2009
5 Stockpiling Aggregate Lynn Lake Area April 4, 2009
1 Bituminous Pavement 75 0.9 km N of PR 201--0.8 km S of S Jct PTH 23 (S/B) April 8, 2009
(Includes Concrete Retrofit) (Letellier--Morris)
3 Culvert Replacement 1 PTH 21 - PTH 10 (E/B) (Various Locations) April 18, 2009
3 Twinning 10 In Brandon: At Assiniboine River (18th Street Bridge) April 25, 2009
3 Structure 83 At Jackson Creek (North of Melita) April 29, 2009
1 Grade Widening 100 At Assiniboine River May 2, 2009
1 Shoo-Fly Detour 59 At La Rochelle Drain (Coulee de Naults) (North of La Rochelle) May 16, 2009
1 Grading (Berm Construction) 11 At Powerview Creek (Near Pine Falls) May 23, 2009
4 Grading 588 North of PR 275 (West of Swan River) May 30, 2009
Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
November 2008
Tentative
Region Tender For: Hwy. Location Advertising Dates
4 Culvert Installations 483 PTH 10--Sapotaweyak Cree Nation (Various Locations) June 3, 2009
2 Structure Rehabilitation 248 At Assiniboine River: Baie St. Paul Bridge (North of St. Eustache) June 6, 2009
3 Bituminous Pavement 1A In Brandon: PR 457--PTH 1 June 6, 2009
3 Bituminous Pavement 1 PTH 21--E Jct PR 250 (E/B) & (W/B) June 10, 2009
(Including Paved Shoulders)
4 Grading 513 PTH 6--Dauphin River First Nation (Various Locations) June 13, 2009
5 Grade, Base & AST (Including New Location) 374 11.0km N of PR 373--3.0km S of Kichi Sipi Bridge June 20, 2009
(Southwest of Cross Lake)
3 Bituminous Pavement 1 E Jct PR 250--W Jct PTH 10 (E/B) June 24, 2009
(Including Paved Shoulders)
5 Grade & Granular Base Course 373 6.0km N of Rossville Jct--Pine Creek (North of Norway House) July 4, 2009
3 Bituminous Pavement 1 PR 340--W Jct PR 351 (E/B) July 8, 2009
(Including Paved Shoulders)
2 Structure 34 At Squirrel Creek (Vicinity of Austin) July 11, 2009
4 Structure 489 At Tributary to Garland River (South of Duck River) July 29, 2009
4 Structure 513 At Partridge Drain (Northeast of St. Martin) August 1, 2009
1 Structure (Including Roadworks) 9 At Parks Creek (South of Selkirk) August 19, 2009
5 Stockpiling Aggregate Gillam Area September 19, 2009
4 Stockpiling Aggregate Dauphin - Ashern - Swan River Area October 3, 2009
5 Structure Rehabilitation 10 At Big Island Lake (South of Flin Flon) October 10, 2009
1 Structure Rehabilitation 59 At La Rochelle Drain (Coulee de Naults) (North of La Rochelle) October 17, 2009
1 Structure Rehabilitation 100 At Assiniboine River November 7, 2009
3 Structure Rehabilitation 250 At Assiniboine River (North of Alexander) November 14, 2009
Manitoba Infrastructure and Transportation Proposed Fall Advertising Schedule for 2009 Construction Season
November 2008
Tentative
Region Tender For: Hwy. Location Advertising Dates
3 Structure 110 At CP Rail Overpass November 28, 2009
Related docs
Get documents about "