GUNNISON COUNTY BUILDING PERMIT
Document Sample


GUNNISON COUNTY
MOBILE HOME PERMITS
Each mobile home in Gunnison County must obtain a mobile home permit from
the Gunnison County Building Office prior to placement.
The following conditions must be met before the building office can issue a
mobile home permit:
1) The mobile home must have been constructed after May, 1972, and must
bear the Colorado Division of Housing seal. Units not bearing the CDH
seal must be inspected for compliance with Colorado State plumbing and
electrical codes.
Plumbing and electrical permits and inspections, if required, are additional
and must be secured from the appropriate agency.
Plumbing inspections – Colorado State Plumbing Inspector
Electrical inspections – Colorado State Electrical Inspector
2) The unit must meet applicable county snowload requirements.
3) The foundation for the unit must be designed and constructed according to
manufacturer’s recommendations or must be designed according to the
recommendations of a licensed Colorado engineer, and approved by the
Gunnison County Building Official.
4) In areas of the county where potential conflicts with the Gunnison County
Land Use Resolutions exist, the Building Official may require that the
owner secure a land use change permit.
5) In many subdivisions, architectural control boards must review and
approve the placement of mobile homes.
Revised 6/8/2010
GUNNISON COUNTY BUILDING PERMIT
APPLICATION FOR PLACEMENT OF A MOBILE HOME
NOT IN A MOBILE HOME PARK
1) APPLICANT: ____________________________________________________
ADDRESS: ____________________________________________________
____________________________________________________
PHONE: HOME:_____________WORK:_____________ CELL:________
2) PERMIT APPLIED FOR: Temporary
Renewal
Long term occupancy
3) LEGAL DESCRIPTION OF LAND ON WHICH MOBILE HOME WILL BE
PLACED: ________________________________________________________
ABOVE LAND: Owned by applicant Rented by applicant
Being purchased by applicant
Other - explain ________________________________
____________________________________________________
HAS THIS OR ANY OTHER MOBILE HOME BEEN PARKED ON THE SITE
BEFORE: Yes No
IF YES, GIVE DETAILS: ____________________________________________
4) MOBILE HOME WILL BE OCCUPIED BY:
Landowner
Employee
Renters
Other - explain ________________________________
5) SPECIFICATIONS ON MOBILE HOME:
Name of manufacturer: ________________________________________
Date of manufacture: ________________________________________
State of manufacture: ________________________________________
Dimensions of unit: ________________________________________
Approved by Colorado Division of Housing: Yes No
Revised 6/8/2010
FOR COUNTY USE ONLY NO.
6) PERMIT FEE PAID ( ) AMOUNT $_______________________
Snow load requirement for location: ______________ lbs/sq.ft.
Land Use Resolution requirements:
Hazard Areas ( ) Specify: ___________________________
___________________________
___________________________
Resource Areas ( ) Specify: ___________________________
___________________________
___________________________
Impact Classification ___________________________
Land description recorded* Yes No
* (for long term occupancy only) Book _________ Page _______
Permit: Issued ( ) Date: __________ By: ____________________
Denied ( ) Date: __________ By: ____________________
Reason: _________________________________________
_________________________________________
Conditionally approved ( ) Date: __________________
Conditions _________________________________________
_________________________________________
_________________________________________
_________________________________________
Revised 6/8/2010
GUNNISON COUNTY
APPLICATION FOR PERMIT
FOR PLACEMENT OF AN INDIVIDUAL MOBILE HOME
UPON PRIVATE PROPERTY
Instructions
Please provide all of the requested information. This is necessary in order to determine
whether or not a permit can be issued in response to your request.
Note, failure to provide the required information may result in a denial of your
application. Your permit may be issued for a limited time only. If so, the mobile home
must be moved at the expiration of the permit.
A PERMIT MAY BE REVOKED IF THE COUNTY DETERMINES THAT
THERE HAS BEEN A SUBSTANTIAL CHANGE IN THOSE FACTS
UPON WHICH THIS APPLICATION IS BASED.
Type of Permit Applied for: (check only one)
( ) Ranch employee
( ) 180-day temporary permit
( ) Long term permit
1. Where will the mobile home be located? (e.g., address, lot and block
number, brief legal description)
2. Who owns the property? (Name and address)
3. Who owns the mobile home? (Name and address)
4. Describe the mobile home. (Make, year, size, and identification number)
5. Who will the mobile home be occupied by:
Yes No
( ) ( ) The owner of the mobile home?
( ) ( ) The owner of the property upon which the mobile home is
located?
( ) ( ) Members of the property owners immediate family?
( ) ( ) An employee of the property owner?
If occupied by an employee, briefly describe duties:
Revised 6/8/2010
6. Are there any other mobile homes located upon the property owned by the
person(s) named in question number 2 above?
Yes No
( ) ( )
If yes, how many?
7. Has this mobile home been located on this piece of property before?
Yes No
( ) ( )
If yes, give dates. From _____________________ to __________________
8. Will the occupant pay rent?
Yes No
( ) ( )
If yes, to whom?
_______________________________ ___________________________________
Date Applicant’s Signature
Revised 6/8/2010
APPLICANT: DO NOT COMPLETE BELOW THIS LINE
For Building/Planning Department Use Only
YES NO
1. Colorado Division of Housing Approval
2. Electric system approved
3. Plumbing system meets standards
4. Location is within a platted subdivision
5. Location is in close proximity to a platted subdivision
6. Location complies with Land Use Resolution
Snow load requirements at the location exceed 50# per
7.
square foot
Is the location in an area in which no other mobile home is
8.
located
Do covenants or deed restrictions exist for this property
9.
which revert or limit placement of a mobile home
10. Is the location on a legally subdivided parcel
11. Is there a legal source of water to supply this residence
12. Can a septic permit be issued for this home
Location complies with Gunnison County Mobile Home
13.
Regulations (If not, will comply within ________ days)
Revised 6/8/2010
Related docs
Get documents about "